SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS...

14
Scale Project number Date Drawn by Checked by ABBREVIATIONS MATERIAL LEGEND SYMBOL LEGEND 10 A100 4 2 3 1 A100 1 A100 A100 1 1 1 101 2 2 1 U1 CABINET UNIT HEATER CERAMIC TILE DEMOLISH, DEMOLITION DUPLEX RECEPTACLE DOUBLE HUNG DOUBLE-ACTING ELECTRICAL PANELBOARD ENCLOSE (URE) ELECTRIC (AL) EACH WAY EACH FACE EXPANSION, EXPOSED EXPANSION JOINT EXPANSION BOLT ELECTRIC WATER COOLER FIRE EXTINGUISHER FIRE HOSE CABINET FIRE HOSE STATION FIRE HYDRANT FINISHED FLOOR FLUID APPLIED WATERPROOFING FIRE EXTINGUISHER CABINET FACE OF CONCRETE FLUORESCENT FACE OF FINISH FIRE-RESISTANT COATING CEMENTITIOUS BOARD FIBER REINFORCED FACE OF STUD FEET PER MINUTE FRAME (D) (ING) FACE OF MASONRY FEMININE NAPKIN RECEPTACLE FLEXIBLE SHEET ROOFING FIRE STAND PIPELINE FINNED TUBE RADIATION FURRED (ING) FIRE-RETARDANT GENERAL CONTRACT (OR) FOC CL CENTER LINE CSK COUNTER SINK(SUNK) CASEMENT CAST STONE CS CSMT GC GB GRAB BAR CEMENT PLASTER (PORTLAND) CONCRETE MASONRY UNIT CONTINUOUS or CONTINUE COMPRESS (ED,ION,IBLE) COPPER CARPET CORRIDOR COORDINATE CONCRETE CONNECTION CONTRACT (OR) CONSTRUCTION CARPET TILE CORR CPR CONT CONTR CONC CONN CONST COORD CPTT CPT CEILING COLUMN CLEAN CLEANOUT COMBINATION CLEAR (ANCE) CONTRACT LIMIT LINE CLG CO COL CLN CLR CLL COMB COMP CMPL CMU FSP FRT FTG FUT FUR FTR FT FSR GA FOOTING FUTURE FOOT, FEET GAGE, GAUGE FOF FPM FPL FOS FP FRCB FRC FR FOM FLOOR PLATE FIREPROOF FASTEN (ER) FAS BRICK BRK CATCH BASIN, CORNER BEAD CUBIC FEET PER MINUTE CAST IN PLACE CONCRETE CUBIC FOOT (FEET) COUNTERFLASHING CIRCLE CAST IRON CONTROL JOINT CIRCUMFERENCE CEILING HEIGHT CORNER GUARD CF CFM CFLG CI CIR CH CJT CIRC CIPC CG CEMENT CABINET COURSE BOTH WAYS BASEMENT BOTH SIDES BUILT-UP ROOFING BRITISH THERMAL UNIT BW BS BTU BSMT BUR C CAB CB CEM FHS FIN FHC FLUR FNR FLX FLG FL FJT FIXT FINISH (ED) FLASHING FLEXIBLE FLUSH JOINT FLOOR (ING) FIXTURE FBD FAWP FD FB FDN FEC FE FF FGL FH FACE BRICK FIBERBOARD FLOOR DRAIN FOUNDATION FIBERGLASS BIT,BITUM BITUMINOUS BUILDING BLOCK BLOCKING BOTTOM OF CURB BENCH MARK BACKER ROD BEARING BEARING PLATE BOTTOM BM BLK BOC BLDG BLKG BKR BPL BRG BOT BOARD AVENUE BETWEEN BELOW AUTOMATIC AMERICAN SOCIETY BRICK COURSE ABOVE TOP OF SLAB for TESTING MATERIALS BD AVE BC ATS AUTO ASTM BET BEL EXISTING EXIST EXPN BLT EXH EXP EXIST EXT EXP JT FA F EXHAUST EXISTING EXTERIOR FIRE ALARM FAHRENHEIT ELEC ELEV EMER ENC EQPT EQ EP EST EWEF EWC EQUAL ESTIMATE ELEVATOR EMERGENCY EQUIPMENT ABOVE FINISHED FLOOR AGG AGGREGATE ANODIZED ASPHALT ALUMINUM ASSEMBLY ANNEALED ACCESS PANEL ARCHITECT (URAL) APPROXIMATE ANCHOR, ANCHORAGE ALTERNATE AL AP ANC ASPH ASSEM ANOD ARCH ANLD APPROX ALT ACCESS ACCESS FLOOR ACOUSTICAL PLASTER AREA DRAIN ADJACENT ADDENDUM ADJUSTABLE ARCHITECT/ENGINEER ACOUSTIC CEILING TILE ACC ACPL ACFL AD ADD ADJ AFF A/E ADJT ACT DIMENSION DIM DR DWG DTL EA EF E ELAS EL DN DRAWING DETAIL EACH EAST ELEVATION ELASTOMERIC EACH FACE DOWN CY D DIFF DIAG DEP DH DIA DEM DA DRAIN CUBIC YARD DIFFUSER DIAMETER DIAGONAL DEPRESSED ABOVE ACOUSTICAL ANCHOR BOLT AIR CONDITIONING ABV AC AB A/C CT CTR CUH CW COUNTER COLD WATER WC WATER CLOSET RAILING RLG METER (S) M WATERPROOF (ING), WATER RESISTANT WEATHERSTRIPPING WELDED WIRE FABRIC EXISTING TO REMAIN WATER REPELLANT SCHED SHTHG METAL MULLION METAL STUD MTL MULL MTL ST SM SNT SP MARBLE MEMBRANE MODULAR MEDIUM MEMBER MAXIMUM MASONRY MANHOLE MIRROR MINIMUM MECHANIC (AL) MACHINE BOLT METAL FLOOR DECK MISCELLANEOUS METAL FURRING MOUNT (ED) (ING) MANUFACTURE (R) MOLDING, MOULDING METAL ROOF DECK MASONRY OPENING MH MO MLDG MFR MISC MIR MRD MIN MTFR MT MAR MB MEMB MECH MDL MBR MAX MFD MED MAS SF SIM SKYLT SFGL SHT SECT SD SLV SLR RM S SC SCRN RTN RWC R/W RO SHEET METAL SOUND PROOF SEALANT SHEATHING SQUARE FOOT (FEET) SAFETY GLASS STORM DRAIN SIMILAR SKYLIGHT SHEET SECTION SLEEVE SEALER SCHEDULE SOILD CORE RAIN WATER CONDUCTOR RIGHT OF WAY ROUGH OPENING ROOM SOUTH SCREEN RETURN WR W/R WSCT WWF WST XTR WAINSCOTT WD WH WIN WP WM W/O WPT WGL WOOD WIRE MESH WALL HUNG WINDOW (S) WITHOUT WEATHERPROOF WORKING POINT WIRED GLASS STAINLESS STEEL TOP AND BOTTOM TONGUE AND GROOVE TERNE COATED STAINLESS TEMPORARY, TEMPERED TRAFFIC DECK COATING TOP OF EXISTING SLAB TOP OF ROOFING TOP OF CONCRETE, CURB TOILET TISSUE DISPENSER TOILET PAPER HOLDER TOP OF STEEL/ TOP OF SLAB VINYL COVE BASE VINYL COMPOSITION TILE VAPOR BARRIER, VINYL VAPOR RETARDER UNLESS OTHERWISE NOTED VINYL WALL FABRIC PLYWD R KD KNOCK-DOWN KILOVOLT KILOWATT KITCHEN LIMESTONE LOCATION LIVE LOAD LAVATORY LENGTH LABEL LINTEL LIGHT LOUVER LABORATORY LEFT HAND KILOVOLT-AMPERE LIGHT SWITCH LIGHTWEIGHT CONCRETE LIGHTPROOF, LOW POINT LL LOC LMS LTL LT LWC LVR LSW LP KW KV KIT KVA L LH LAB LBL LAV REG REINF REM RES REV RFG RFL RGD RH REQD RCB RAD RB RBT RC REF RECP REC RCP RD HEIGHT HEATING INVERT INTERIOR JOIST JOINT HARDWOOD INSIDE DIAMETER JOINT FILLER IRON PIPE SIZE JUNCTION BOX INCLUDE (D) (ING) INSULATE (D) (ION) HOT WATER, HEADWALL HEATING/VENTILATING/ AIR CONDITIONING KIPS (1000 LBS) INT INV J IPS JB JF K JT HT HW ID HVAC HTG HWD INSUL INCL PTD PVT PTN PVMT PVC PTH "R" QT PRF PLAS PLF PNL PNT PL PLAM PSI PSF VARNISH VAR RADIUS, RISER REINFORCED CONCRETE PIPE REINFORCE (D) (ING) REVISION (S), REVISED REFLECT (ED) (IVE) RIGHT HAND REGISTER REMOVED RESILIENT ROOFING RIGID REQUIRED RUBBER BASE-STRAIGHT REINFORCED CONCRETE RUBBER COVE BASE RABBET, REBATE REFERENCE RECESSED RECEPTACLE ROOF DRAIN RADIATOR VR VJT VNR VT W VWF W/ WB VRM VENEER V-JOINT (ED) VINYL TILE WOOD BASE WITH WEST VERMICULITE VC VB VCT VCB VERT VEST VIF VG VIN VESTIBULE VINYL VERTICAL BASE-STRAIGHT VINYL COATED VERTICAL GRAIN VERIFY IN FIELD POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PAPER TOWEL DISPENSER PAVER TILE PAVEMENT POLY VINYL CHLORIDE PAPER TOWEL HOLDER THERMAL RESISTANCE QUARRY TILE PARTITION PAINT (ED) IN FIELD PREFORMED PLASTIC LAMINATE POUNDS PER LINEAL FOOT PLASTER PLYWOOD PANEL PLATE TPH TYP TTD UNF UC UNEX VAC UON UNFINISHED UNDERCUT TYPICAL UNEXCAVATED VACUUM TOES TOR TO TOP TOF TOC TOL THRU TOW TOS TOLERANCE THROUGH TOP OF TOP OF PLANK TOP OF FOOTING TOP OF WALL HARDENED GROUT GRANITE HARDWARE HOUR GRILLE GLASS FIBER GALVANIZED GLAZING COMPOUND HOSE BIBB HORIZONTAL HEAD JOINT HEAVY DUTY HIGH POINT HOLLOW METAL HOLLOW CORE HARDBOARD GLAZED STRUCTURAL TILE GALVANIZED STEEL SHEET GYPSUM WALL BOARD HARDN HB HD HC HM HR HP HOR HJT HDW HBD GLF GLV GLCOM GT GWB GST GSS GRN GRL OPNG OPP PER PRKG PCC PCF PCP PED PAR PBD NOM NRC OA OC OD OFF OH NTS GASKET (ED) GRADE, GRADING GLASS BLOCK GLASS, GLAZING GD GL GKT GLB N NIC N0,# NAT OPENING PERIMETER PRECAST CONCRETE PARTICLE BOARD POUNDS PER CUBIC FOOT PRECAST CONCRETE PLANK OPPOSITE PARKING PEDESTAL PARALLEL COEFFICIENT NOISE REDUCTION OVERHEAD OUTSIDE DIAMETER ON CENTER (S) NOT TO SCALE NOMINAL OVERALL OFFICE T & B TB TEMP TCS T&G TDC TEL THK THRESH TC THRESHOLD TELEPHONE STEEL TEST BORING THICK (NESS) TERRA COTTA STR STL SURF T TAP SYS SYN SYM SUSP STEEL SURFACE STRUCTURAL SYNTHETIC SYSTEM TREAD TAPERED SYMMETRY (ICAL) SUSPENDED NOT IN CONTRACT NUMBER NATURAL NORTH SPEC SQ SST STD STANDARD SQUARE SPECIFICATION COLUMN LINE ALUMINUM ENLARGED DETAIL PLAN OR SECTION NEW (PROPOSED) ELEVATION EXISTING ELEVATION INTERIOR ELEVATION MARK NORTH REVISION PARTITION TYPE ROOM NUMBER WINDOW TYPE DOOR TYPE WALL OR DETAIL SECTION BUILDING SECTION ELEVATION GYPSUM WALLBOARD CERAMIC OR QUARRY TILE STEEL MARBLE, GRANITE PLYWOOD RIGID INSULATION BLUSTONE FLAGGING SOAP STONE (GRAVEL, STONE) POROUS FILL SLATE RUBBLE STONE EARTH BATT INSULATION SHIM WOOD, ROUGH CONCRETE CMU BRICK WOOD, FINISHED LOCATION MAP DRAWING LIST Villa Savoye 82 Rue de Villiers 78300 Poissy, France 12" = 1'-0" 4/23/2013 3:04:35 PM A000 Cover Sheet Project Number Villa Savoye Joseph Bloom 4/25/2013 Author Checker No. Description Date A000 Cover Sheet A001 Site Plan A100 Ground Floor A101 First Floor A102 Solarium A201 Elevations A202 Elevations A301 Building Sections A302 Building Sections A501 Stair Detail A502 Exploded Views A600 Schedules A901 Perspective Views A902 Section Perspective

Transcript of SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS...

Page 1: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Scale

Project number

Date

Drawn by

Checked by

ABBREVIATIONSMATERIAL LEGENDSYMBOL LEGEND

10

A100

4 2

3

1

A100

1

A100

A100

1

1

1

101

2

2

1

U1

CABINET UNIT HEATER

CERAMIC TILE

DEMOLISH, DEMOLITION

DUPLEX RECEPTACLE

DOUBLE HUNG

DOUBLE-ACTING

ELECTRICAL PANELBOARDENCLOSE (URE)

ELECTRIC (AL)

EACH WAY EACH FACE

EXPANSION, EXPOSEDEXPANSION JOINTEXPANSION BOLT

ELECTRIC WATER COOLER

FIRE EXTINGUISHER

FIRE HOSE CABINETFIRE HOSE STATION

FIRE HYDRANT

FINISHED FLOOR

FLUID APPLIED WATERPROOFING

FIRE EXTINGUISHER CABINET

FACE OF CONCRETE

FLUORESCENT

FACE OF FINISH

FIRE-RESISTANT COATING

CEMENTITIOUS BOARDFIBER REINFORCED

FACE OF STUD

FEET PER MINUTEFRAME (D) (ING)

FACE OF MASONRY

FEMININE NAPKIN RECEPTACLE

FLEXIBLE SHEET ROOFINGFIRE STAND PIPELINE

FINNED TUBE RADIATIONFURRED (ING)

FIRE-RETARDANT

GENERAL CONTRACT (OR)

FOCCL CENTER LINE

CSK COUNTER SINK(SUNK)

CASEMENTCAST STONECS

CSMTGCGB GRAB BAR

CEMENT PLASTER (PORTLAND)CONCRETE MASONRY UNIT

CONTINUOUS or CONTINUE

COMPRESS (ED,ION,IBLE)

COPPERCARPET

CORRIDORCOORDINATE

CONCRETECONNECTION

CONTRACT (OR)

CONSTRUCTION

CARPET TILE

CORRCPR

CONTCONTR

CONCCONNCONST

COORD

CPTTCPT

CEILING

COLUMN

CLEAN

CLEANOUT

COMBINATION

CLEAR (ANCE)

CONTRACT LIMIT LINECLG

COCOL

CLNCLR

CLL

COMBCOMP

CMPLCMU

FSPFRT

FTG

FUTFURFTR

FTFSR

GA

FOOTING

FUTURE

FOOT, FEET

GAGE, GAUGE

FOF

FPMFPL

FOSFP

FRCBFRCFR

FOM

FLOOR PLATEFIREPROOF

FASTEN (ER)FASBRICKBRK

CATCH BASIN, CORNER BEAD

CUBIC FEET PER MINUTE

CAST IN PLACE CONCRETE

CUBIC FOOT (FEET)COUNTERFLASHING

CIRCLE

CAST IRON

CONTROL JOINTCIRCUMFERENCE

CEILING HEIGHTCORNER GUARD

CF

CFMCFLG

CI

CIR

CH

CJTCIRC

CIPC

CG

CEMENT

CABINETCOURSE

BOTH WAYS

BASEMENTBOTH SIDES

BUILT-UP ROOFINGBRITISH THERMAL UNIT

BW

BS

BTUBSMT

BUR

CCABCBCEM

FHSFIN

FHC

FLUR

FNRFLX

FLGFLFJTFIXT

FINISH (ED)

FLASHING

FLEXIBLE

FLUSH JOINTFLOOR (ING)

FIXTURE

FBD

FAWP

FD

FB

FDN

FECFE

FFFGLFH

FACE BRICKFIBERBOARDFLOOR DRAINFOUNDATION

FIBERGLASS

BIT,BITUM BITUMINOUS

BUILDINGBLOCKBLOCKING

BOTTOM OF CURBBENCH MARK

BACKER ROD

BEARINGBEARING PLATEBOTTOM

BM

BLK

BOC

BLDG

BLKG

BKR

BPLBRG

BOT

BOARD

AVENUE

BETWEENBELOW

AUTOMATIC

AMERICAN SOCIETY

BRICK COURSE

ABOVE TOP OF SLABfor TESTING MATERIALS

BD

AVE

BC

ATSAUTO

ASTM

BETBEL

EXISTINGEXIST

EXPN BLT

EXH

EXPEXIST

EXT

EXP JT

FAF

EXHAUSTEXISTING

EXTERIOR

FIRE ALARMFAHRENHEIT

ELECELEVEMERENC

EQPTEQEP

EST

EWEFEWC

EQUAL

ESTIMATE

ELEVATOREMERGENCY

EQUIPMENT

ABOVE FINISHED FLOORAGG AGGREGATE

ANODIZED

ASPHALT

ALUMINUM

ASSEMBLY

ANNEALED

ACCESS PANEL

ARCHITECT (URAL)APPROXIMATE

ANCHOR, ANCHORAGEALTERNATE

AL

AP

ANC

ASPHASSEM

ANOD

ARCH

ANLD

APPROX

ALT

ACCESSACCESS FLOORACOUSTICAL PLASTER

AREA DRAIN

ADJACENTADDENDUM

ADJUSTABLEARCHITECT/ENGINEER

ACOUSTIC CEILING TILE

ACC

ACPLACFL

ADADDADJ

AFFA/EADJT

ACT

DIMENSIONDIMDR

DWGDTL

EAEF

E

ELASEL

DN

DRAWINGDETAIL

EACHEAST

ELEVATIONELASTOMERIC

EACH FACE

DOWN

CY

D

DIFFDIAG

DEPDHDIA

DEMDA

DRAIN

CUBIC YARD

DIFFUSER

DIAMETERDIAGONAL

DEPRESSED

ABOVEACOUSTICAL

ANCHOR BOLTAIR CONDITIONING

ABVAC

ABA/C CT

CTRCUHCW

COUNTER

COLD WATER

WC WATER CLOSETRAILINGRLGMETER (S)M

WATERPROOF (ING),

WATER RESISTANT

WEATHERSTRIPPINGWELDED WIRE FABRIC

EXISTING TO REMAIN

WATER REPELLANTSCHED

SHTHG

METAL

MULLIONMETAL STUD

MTL

MULLMTL ST

SMSNTSP

MARBLE

MEMBRANE

MODULAR

MEDIUM

MEMBER

MAXIMUMMASONRY

MANHOLE

MIRRORMINIMUM

MECHANIC (AL)

MACHINE BOLT

METAL FLOOR DECK

MISCELLANEOUS

METAL FURRINGMOUNT (ED) (ING)

MANUFACTURE (R)

MOLDING, MOULDING

METAL ROOF DECKMASONRY OPENING

MH

MOMLDG

MFR

MISCMIR

MRD

MIN

MTFRMT

MAR

MB

MEMB

MECHMDLMBR

MAX

MFD

MED

MAS

SF

SIMSKYLT

SFGLSHT

SECTSD

SLVSLR

RM

SSC

SCRN

RTNRWCR/W

RO

SHEET METAL

SOUND PROOFSEALANT

SHEATHING

SQUARE FOOT (FEET)SAFETY GLASS

STORM DRAIN

SIMILARSKYLIGHT

SHEET

SECTION

SLEEVESEALER

SCHEDULESOILD CORE

RAIN WATER CONDUCTORRIGHT OF WAY

ROUGH OPENINGROOM

SOUTH

SCREEN

RETURN

WRW/RWSCT

WWFWST

XTR

WAINSCOTT

WD

WHWIN

WP

WMW/O

WPT

WGLWOOD

WIRE MESH

WALL HUNGWINDOW (S)

WITHOUT

WEATHERPROOFWORKING POINT

WIRED GLASS

STAINLESS STEEL

TOP AND BOTTOM

TONGUE AND GROOVE

TERNE COATED STAINLESS

TEMPORARY, TEMPERED

TRAFFIC DECK COATING

TOP OF EXISTING SLAB

TOP OF ROOFING

TOP OF CONCRETE, CURB

TOILET TISSUE DISPENSERTOILET PAPER HOLDER

TOP OF STEEL/ TOP OF SLAB

VINYL COVE BASEVINYL COMPOSITION TILE

VAPOR BARRIER, VINYL

VAPOR RETARDER

UNLESS OTHERWISE NOTED

VINYL WALL FABRIC

PLYWD

RKD KNOCK-DOWN

KILOVOLT

KILOWATT

KITCHEN

LIMESTONELOCATION

LIVE LOAD

LAVATORY

LENGTH

LABEL

LINTELLIGHT

LOUVER

LABORATORY

LEFT HAND

KILOVOLT-AMPERE

LIGHT SWITCH

LIGHTWEIGHT CONCRETE

LIGHTPROOF, LOW POINT

LL

LOCLMS

LTLLT

LWCLVR

LSWLP

KW

KVKIT

KVA

L

LH

LAB

LBLLAV

REGREINFREM

RESREVRFGRFLRGDRH

REQD

RCB

RADRBRBTRC

REFRECPREC

RCPRD

HEIGHTHEATING

INVERTINTERIOR

JOIST

JOINT

HARDWOOD

INSIDE DIAMETER

JOINT FILLER

IRON PIPE SIZE

JUNCTION BOX

INCLUDE (D) (ING)INSULATE (D) (ION)

HOT WATER, HEADWALL

HEATING/VENTILATING/AIR CONDITIONING

KIPS (1000 LBS)

INTINV

J

IPS

JBJF

K

JT

HT

HW

ID

HVACHTG

HWD

INSULINCL

PTD

PVT

PTN

PVMTPVC

PTH

"R"

QT

PRF

PLASPLF

PNLPNT

PLPLAM

PSIPSF

VARNISHVARRADIUS, RISER

REINFORCED CONCRETE PIPE

REINFORCE (D) (ING)

REVISION (S), REVISED

REFLECT (ED) (IVE)

RIGHT HAND

REGISTER

REMOVED

RESILIENT

ROOFING

RIGID

REQUIRED

RUBBER BASE-STRAIGHT

REINFORCED CONCRETERUBBER COVE BASE

RABBET, REBATE

REFERENCE

RECESSEDRECEPTACLE

ROOF DRAIN

RADIATOR

VR

VJTVNR

VT

W

VWF

W/WB

VRM

VENEERV-JOINT (ED)

VINYL TILE

WOOD BASEWITHWEST

VERMICULITE

VC

VB

VCTVCB

VERTVEST

VIFVG

VIN

VESTIBULE

VINYL

VERTICAL

BASE-STRAIGHTVINYL COATED

VERTICAL GRAINVERIFY IN FIELD

POUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCHPAPER TOWEL DISPENSER

PAVER TILEPAVEMENTPOLY VINYL CHLORIDE

PAPER TOWEL HOLDER

THERMAL RESISTANCE

QUARRY TILE

PARTITION

PAINT (ED) IN FIELDPREFORMED

PLASTIC LAMINATE

POUNDS PER LINEAL FOOTPLASTER

PLYWOODPANEL

PLATE

TPH

TYPTTD

UNF

UCUNEX

VAC

UONUNFINISHED

UNDERCUT

TYPICAL

UNEXCAVATED

VACUUM

TOES

TOR

TO

TOP

TOF

TOC

TOL

THRU

TOWTOS

TOLERANCE

THROUGHTOP OF

TOP OF PLANK

TOP OF FOOTING

TOP OF WALL

HARDENED

GROUT

GRANITE

HARDWARE

HOUR

GRILLE

GLASS FIBERGALVANIZED

GLAZING COMPOUND

HOSE BIBB

HORIZONTAL

HEAD JOINT

HEAVY DUTY

HIGH POINT

HOLLOW METAL

HOLLOW COREHARDBOARD

GLAZED STRUCTURAL TILEGALVANIZED STEEL SHEET

GYPSUM WALL BOARD

HARDNHB

HDHC

HM

HRHPHOR

HJTHDW

HBD

GLFGLV

GLCOM

GTGWB

GSTGSSGRNGRL

OPNGOPP

PERPRKG

PCCPCFPCPPED

PARPBD

NOMNRC

OAOCODOFFOH

NTS

GASKET (ED)GRADE, GRADING

GLASS BLOCKGLASS, GLAZING

GD

GLGKT

GLB

N

NICN0,#

NAT

OPENING

PERIMETER

PRECAST CONCRETEPARTICLE BOARD

POUNDS PER CUBIC FOOTPRECAST CONCRETE PLANK

OPPOSITE

PARKING

PEDESTAL

PARALLEL

COEFFICIENTNOISE REDUCTION

OVERHEAD

OUTSIDE DIAMETERON CENTER (S)

NOT TO SCALE

NOMINAL

OVERALL

OFFICE

T & BTB

TEMP

TCS

T&G

TDCTEL

THKTHRESH

TC

THRESHOLD

TELEPHONE

STEEL

TEST BORING

THICK (NESS)

TERRA COTTA

STRSTL

SURF

TTAP

SYSSYNSYMSUSP

STEEL

SURFACESTRUCTURAL

SYNTHETICSYSTEM

TREADTAPERED

SYMMETRY (ICAL)SUSPENDED

NOT IN CONTRACTNUMBER

NATURALNORTH SPEC

SQSSTSTD STANDARD

SQUARESPECIFICATION

COLUMN LINE

ALUMINUM

ENLARGED DETAILPLAN OR SECTION

NEW (PROPOSED) ELEVATION

EXISTING ELEVATION

INTERIOR ELEVATION MARK

NORTH

REVISION

PARTITION TYPE

ROOM NUMBER

WINDOW TYPE

DOOR TYPE

WALL OR DETAIL SECTION

BUILDING SECTION

ELEVATION

GYPSUM WALLBOARD

CERAMIC OR

QUARRY TILE

STEEL

MARBLE, GRANITE

PLYWOOD

RIGID INSULATION

BLUSTONE

FLAGGINGSOAP STONE

(GRAVEL, STONE)POROUS FILL

SLATE

RUBBLE STONE

EARTH

BATT INSULATION

SHIM

WOOD, ROUGH

CONCRETE

CMU

BRICK

WOOD, FINISHED

LOCATION MAP

DRAWING LIST

Villa Savoye82 Rue de Villiers78300 Poissy, France

12" = 1'-0"

4/23

/201

3 3:

04:3

5 PM

A000

Cover Sheet

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

A000 Cover SheetA001 Site PlanA100 Ground FloorA101 First FloorA102 SolariumA201 ElevationsA202 ElevationsA301 Building SectionsA302 Building SectionsA501 Stair DetailA502 Exploded ViewsA600 SchedulesA901 Perspective ViewsA902 Section Perspective

Page 2: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

20' -

2"

Scale

Project number

Date

Drawn by

Checked by

1/16" = 1'-0"

4/23

/201

3 3:

11:3

5 PM

A001

Site Plan

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Joseph Bloom

Checker

1/16" = 1'-0"1 Site

No. Description Date

Page 3: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

UP

A2022

A201

A201

A202

1

2

1

1 2 3 4 5

A

B

C

D

E

C.4

C.5

C.6

B.5

2.7 3.3

D.3

D.4

1A301

2A301

006-2

005-2 006-1

001-1

Linen Room005

Salle006

Chambre004

Chambre003 Garage

007

Foyer001

005-1

003-1

004-1

002-1

W.C.002

0' -

4"2'

- 8"

0' -

4"9'

- 3"

0' -

4"7'

- 1"

0' -

4"7'

- 3"

0' -

4"

0' - 1"

A5011

D.5

1A302

2A302

5' -

10"

0' -

10"

1' -

1"1'

- 6"

2' -

7"7'

- 2"

9' - 11" 5' - 4" 5' - 4" 9' - 11"

3' - 8"

0' - 4"

4' - 0"

0' - 8"

4' - 0"

R 31' - 0"

R 20

' - 8

"

0' - 1"

6' - 0"

001-2

WC008

RAMP UP

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

11:3

8 PM

A100

Ground Floor

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

1/4" = 1'-0"1 Ground Level

No. Description Date

Page 4: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

UP

DN

A2022

A201

A201

A202

1

2

1

1 2 3 4 5

A

B

C

D

E

C.4

C.5

C.6

B.5

2.7 3.3

D.3

D.4

1A301

2A301

105-1104-2

104-1

102-1

114-2 113-1

112-2

112-1

101-1

107-1

106-1 110-1

109-1

Chambre105

Boudoir110

Chambre106

Salle112

Cuisine114

Office113

Chambre102

Bains104

1616 16 16 16 16 2216

22

29

24

22

2929292929292929

29

29

29

29

24

22

24

D.5

1A302

2A302

108-1 WC109

WC108

WC103

A5014

Terrasse101

RAMP DN RAMP UP

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

11:3

9 PM

A101

First Floor

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

1/4" = 1'-0"1 Level 1

No. Description Date

Page 5: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

DN

1 2 3 4 5

A

B

C

D

E

C.4

C.5

C.6

B.5

2.7 3.3

D.3

D.4

1A301

2A301

D.5

1A302

2A302

Open toBelow

A5015

Roof Access201 RAMP DN

20' - 0"

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

11:5

0 PM

A102

Solarium

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1/4" = 1'-0"1 Solarium

Page 6: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

1 2 3 4 52.7 3.32A301

2' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 8' - 4" 1' - 8"0' - 8"

4' -

7"3'

- 5"

3' -

6"

1A302

2A302

Open to Beyond

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

ABCDE C.4C.5C.6 B.5D.3D.4

1A301

3' -

6"3'

- 5"

4' -

7"

4' - 5" 7' - 6" 7' - 6" 0' - 8" 7' - 6" 7' - 6" 0' - 8" 3' - 4" 1' - 8"0' - 8" 9' - 3" 0' - 8" 7' - 6" 7' - 6" 4' - 5"

D.5

Open to Beyond

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

12:2

5 PM

A201

Elevations

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1/4" = 1'-0"1 South

1/4" = 1'-0"2 West

Page 7: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

12345 2.73.3 2A301

0' - 8" 7' - 6" 7' - 6" 0' - 8" 7' - 6" 7' - 6" 0' - 7" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 1' - 5"

1A302

2A302

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

A B C D EC.4 C.5 C.6B.5 D.3 D.4

1A301

5' - 1" 1' - 8" 7' - 6" 5' - 0"1' - 6"

45' - 5" 4' - 5"4' -

7"3'

- 5"

3' -

6"

D.5

Open to Beyond

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

12:4

9 PM

A202

Elevations

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1/4" = 1'-0"1 North

1/4" = 1'-0"2 East

Page 8: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

12345 2.73.3 2A301

1A302

2A302

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

ABCDE C.4C.5C.6 B.5D.3D.41

A301

D.5

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

13:0

6 PM

A301

Building Sections

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1/4" = 1'-0"1 Section B

1/4" = 1'-0"2 Section A

Page 9: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

ABCDE C.4C.5C.6 B.5D.3D.41

A301

D.5

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

A B C D EC.4 C.5 C.6B.5 D.3 D.41

A301

D.5

Scale

Project number

Date

Drawn by

Checked by

1/4" = 1'-0"

4/23

/201

3 3:

13:1

8 PM

A302

Building Sections

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1/4" = 1'-0"1 Section C

1/4" = 1'-0"2 Section D

Page 10: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

UP

UP

DN

DN

2

B.5

2A501

Ground Level0' - 0"

Level 110' - 0"

Solarium20' - 0"

Roof28' - 6"

2 2.7

2

B.5

2A501

2

B.5

2A501

Scale

Project number

Date

Drawn by

Checked by

1/2" = 1'-0"

4/23

/201

3 3:

14:2

2 PM

A501

Stair Detail

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1/2" = 1'-0"1 Callout of Ground Level 1/2" = 1'-0"2 Stair Section3 Stair Axon

1/2" = 1'-0"4 Callout of Level 1

1/2" = 1'-0"5 Callout of Solarium

Page 11: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Scale

Project number

Date

Drawn by

Checked by

4/23

/201

3 3:

18:2

3 PM

A502

Exploded Views

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1 Ground Floor NW

2 First Floor NW

3 Solarium NW

4 Gound Floor SE

5 First Floor SE

6 Solarium SE

Page 12: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Scale

Project number

Date

Drawn by

Checked by

4/23

/201

3 3:

18:2

4 PM

A600

Schedules

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

Room ScheduleFloor Number Name Floor Finish Area

Not Placed 3 Room Not PlacedNot Placed 10 Room Not Placed

Ground Level 001 Foyer 821 SFGround Level 002 W.C. 14 SFGround Level 003 Chambre 131 SFGround Level 004 Chambre 87 SFGround Level 005 Linen Room 152 SFGround Level 006 Salle 220 SFGround Level 007 Garage 505 SFGround Level 008 WC 10 SF

Level 1 101 Terrasse 100 SFLevel 1 102 Chambre 162 SFLevel 1 103 WC 11 SFLevel 1 104 Bains 53 SFLevel 1 105 Chambre 256 SFLevel 1 106 Chambre 437 SFLevel 1 108 WC 11 SFLevel 1 109 WC 11 SFLevel 1 110 Boudoir 195 SFLevel 1 112 Salle 921 SFLevel 1 113 Office 112 SFLevel 1 114 Cuisine 176 SF

Solarium 201 RoofAccess

114 SF

Window ScheduleWindow

ID # Count Family TypeRoughHeight

RoughWidth Height Width Sill Height

Level 116 7 Slider with Trim Corbu Slider 8' 4" 3' - 5" 8' - 4" 3' - 0"22 4 Fixed Corbu 20" fixed 3' - 5" 1' - 8" 3' - 0"24 3 Fixed Corbu 40" Fixed 3' - 5" 3' - 4" 3' - 0"29 15 Slider with Trim Corbu Slider 7' 5 1/2" 3' - 5" 7' - 5 1/2" 3' - 0"30 1 Corbu Opening Fixed20" 3' - 5" 9' - 2 1/2" 3' - 0"Solarium29 1 Slider with Trim Corbu Slider 7' 5 1/2" 3' - 5" 7' - 5 1/2" 3' - 0"

Door Schedule

Door ID # Count Family Type HeightRoughHeight

RoughWidth Width Fire Rating

Ground Level4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"14 1 Curtain Wall Dbl Glass Curtain Wall Dbl Glass 6' - 10 1/2" 5' - 11"16 1 Curtain Wall Sgl Glass Curtain Wall aluminum 7' - 7 1/2" 2' - 11"Level 14 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"1 1 Single-Flush 36" x 84" 7' - 0" 3' - 0"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"4 1 Single-Flush 30" x 84" 7' - 0" 2' - 6"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"3 1 Single-Flush 32" x 84" 7' - 0" 2' - 8"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"8 1 Single-Flush 24" x 84" 7' - 0" 2' - 0"Solarium16 1 Curtain Wall Sgl Glass Curtain Wall aluminum 6' - 6 1/2" 2' - 8 1/16"

Floor Material Takeoff

Level Type Material: NameMaterial:

AreaMaterial:

Cost

Ground Level Generic - 12" Default Floor 4442 SFGround Level Generic - 8" GFRC 2134 SF 0.00Ground Level Tile foyer Tile 8x8 785 SF 0.00Ground Level Tile bath Tile 4x4 bath 89 SF 0.00Ground Level Generic - 6 Ramp interior Default Floor 114 SFGround Level Generic - 6 Ramp interior Concrete, Cast-in-Place gray 114 SF 0.00Ground Level Generic - 6 Ramp interior Default Floor 35 SFGround Level Generic - 6 Ramp interior Concrete, Cast-in-Place gray 35 SF 0.00Ground Level Generic - 6 Ramp interior Default Floor 114 SFGround Level Generic - 6 Ramp interior Concrete, Cast-in-Place gray 114 SF 0.00Ground Level wood floor Wood Planks 132 SF 0.00Ground Level wood floor Wood Planks 88 SF 0.00Ground Level wood floor Wood Planks 221 SF 0.00

Level 1 Generic - 6" GFRC 4006 SF 0.00Level 1 Generic - 6 Ramp Default Floor 114 SFLevel 1 Generic - 6 Ramp Granite, Cut, Rough(1) 114 SF 0.00Level 1 Generic - 6 Ramp Default Floor 35 SFLevel 1 Generic - 6 Ramp Granite, Cut, Rough(1) 35 SF 0.00Level 1 Generic - 6 Ramp Default Floor 114 SFLevel 1 Generic - 6 Ramp Granite, Cut, Rough(1) 114 SF 0.00Level 1 Tile level 1 outside Granite, Cut, Rough 1089 SF 0.00Level 1 Dirt Earth 56 SF 0.00Level 1 Skylight Glass 10 SF 0.00Level 1 Skylight Glass 7 SF 0.00Level 1 Tile bath Tile 4x4 bath 11 SF 0.00Level 1 Tile bath Tile 4x4 bath 190 SF 0.00Level 1 Tile bath Tile 4x4 bath 11 SF 0.00Level 1 Tile bath Tile 4x4 bath 53 SF 0.00Level 1 Tile bathtub Tile, Mosaic, Gray 17 SF 0.00Level 1 Tile bathtub 2 Tile, Mosaic, Gray 11 SF 0.00Level 1 Tile bathtub 3 Tile 4x4 bath 2 SF 0.00Level 1 wood floor Wood Planks 482 SF 0.00Level 1 Floor Salle Tile, Porcelain, 6in 921 SF 0.00Level 1 wood floor Wood Planks 257 SF 0.00Level 1 wood floor Wood Planks 163 SF 0.00Level 1 Tile Slate Slate 293 SF 0.00Level 1 wood floor Wood Planks 176 SF 0.00Level 1 wood floor Wood Planks 113 SF 0.00Level 1 Tile level 1 outside Granite, Cut, Rough 101 SF 0.00

Solarium Solarium Cobble Stone Default Floor 3076 SFSolarium Solarium Cobble Stone Gravel 3076 SF 0.00Solarium Generic - 6" solarium Plaster 202 SF 0.00Solarium Dirt Earth 111 SF 0.00Solarium Skylight Glass 4 SF 0.00Solarium Generic - 6" solarium Plaster 17 SF 0.00Solarium Skylight Glass 7 SF 0.00Solarium Skylight Glass 15 SF 0.00Solarium Skylight Glass 7 SF 0.00Solarium Tile level 1 outside Granite, Cut, Rough 310 SF 0.00Solarium Tile Slate Slate 70 SF 0.00

Page 13: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Scale

Project number

Date

Drawn by

Checked by

4/23

/201

3 3:

24:1

8 PM

A901

Perspective Views

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1 Perspective 1

2 Perspective 2 3 Perspective 3

Page 14: SYMBOL LEGEND MATERIAL LEGEND ABBREVIATIONS …cadsmith.weebly.com/uploads/1/9/1/9/19196125/villa_savoye_joseph... · symbol legend material legend abbreviations 10 a100 4 2 3 1 a100

Scale

Project number

Date

Drawn by

Checked by

4/23

/201

3 3:

31:1

8 PM

A902

Section Perspective

Project Number

Villa SavoyeJoseph Bloom

4/25/2013Author

Checker

No. Description Date

1 Section Perspective 1

2 Section Perspective 2 3 Section Perspective 3