REPORT
ON
RAINWATER PREVENTION MEASURES
( Mayur Park Society , Kamothe , Navi Mumbai )
ar. kapil sachdevaB.Arch. | MCA | PC ( Urban Planning ) | PC (Sustainibilty)
Mobile - +91-7874607661 | Mail - [email protected] | Address - D-275 , Anand Vihar , Jagatpura , Jaipur
-
8/2/2019 Mayur Park
2/9
ar. kapil sachdeva
EXISTING STRUCTURE__________________________________
1. G+4 North BlockTOTAL AREA : 306 Sq.M
G+7
G+4 G+4
G+7
-
8/2/2019 Mayur Park
3/9
ar. kapil sachdeva
2. G+4 South BlockTOTAL AREA : 305 Sq. M
3. G+7 BlockTOTAL AREA : 1085 Sq. M
-
8/2/2019 Mayur Park
4/9
ar. kapil sachdeva
OVERALL SITE AREA : 1696 Sq. M
: 16960 Sq.Ft
SOLUTIONS___________________________________________
OPTION 1
TEMPORARY STEEL STRUCTURE
This includes the fabrication and erection of MS Structure which contains an
assemblage of Square Box Sections in the form of Columns , Rafters , and Purlins .
The Structure is then covered by Powder Coated Galvanised Iron Corrugated
Sheet.
The structure design of the system is as follows :
TYPICAL PLAN
-
8/2/2019 Mayur Park
5/9
ar. kapil sachdeva
TYPICAL SECTION
Calculation of Steel
The design Uses following ISMB Tata Steel Iron Sections :
1. ISMB- 80 x 80 x 3.2 Square Box Section2. ISMB - 80 x 40 x 3.2 Rectangular Box Section3. ISMB - 50 x 50 x 3.6 Square Sections
As per the structural calculations , the amount of Steel used per 100 Sq. M of Area is
as Follows :
1. ISMB - 80 x 80 x 3.2 : 354.81 Kg2. ISMB - 80 x 40 x 3.2 : 501.63 Kg3. ISMB - 50 x 50 x 3.6 : 937.24 Kg
Hence Total Steel used per 100 Sq.M : 1793 .68 Kg
Cost of Structure : 100 Rs / kg
The above cost includes :
Basic Material Cost Labour Cost Fabrication Cost , Transportation Cost Erection Cost Coat of Base Primer to the Structure Coat of Black paint to the Structure
Hence Cost of Steel Structure is : Rs 179368 per Sq. M
: Rs 179 per Sq. Ft
Calculation of Roofing
The design uses Powder Coated TATA STEELs corrugated iron sheet .
Cost of Roofing : Rs 55 per Sq. ft
The above cost includes Material Labour
-
8/2/2019 Mayur Park
6/9
ar. kapil sachdeva
Transportation Erection and Fixing
Total Cost of Structure per Sq. ft : 234 per Sq.Ft
OVERALL COST for the society : 234 x 16960 Sq Ft
: Rs 3968640
OPTION 2
MEMBRANE WATER PROOFING
This includes the putting up of TORCHSHEILD membrane on already existing roofing
surface. This is a 3mm thick heavy duty membrane which is even used in swimming
pools . So it can be very safe in our case.
Specifications are as follows :
-
8/2/2019 Mayur Park
7/9
ar. kapil sachdeva
It comes in Roll of 1m by 10 m , it is put up on a cleaned leveled surface . It is then
blown by a fire torch which makes it stick to the flooring surface.
At the junctions it is overlapped for 100mm width . The company PROVIDEDS A
WARRANTY OF 5 YEARS with it . The life of this coat is around 10 years .
Costing of the Product : Rs 54/ Sq.ft
The above cost includes :
Material Cost Application Cost Hardware Equipments cost Labour Cost
5 YEARS GUARANTEE CERTIFICATE would be provided to the client
OVERALL COST for the Society : 54 x 16960 Sq
: Rs 915840
-
8/2/2019 Mayur Park
8/9
ar. kapil sachdeva
OPTION 3
TRIPLE LAYERED MICROFIBRE COATING
This includes the application of heavy duty microfiber reinforced acrylic paste to
provide a very flexible waterproofing . It has the ability to resist subsequent
expansion and contraction due to heat and even cracks arising in the flooring.It is a successful product of Singapore , now came in India .
It can be done in any of the three available colours.
Technical Specifications of the product is :
The company PROVIDES A GUARANTEE OF 5 YEARS to it . The life of this coat is 10
years around.
-
8/2/2019 Mayur Park
9/9
ar. kapil sachdeva
Costing of the Product : Rs 58/ Sq.ft
The above cost includes
Material Cost Application Cost Hardware Equipments cost Labour Cost
5 YEARS GUARANTEECERTIFICATE would be provided to the client.
OVERALL COST for the Society : 58 x 16960 Sq Ft
: Rs 983680
IN SUMMATION_______________________________________
OVERALL COST of Steel Structure : Rs 3968640OVERALL COST of Membrane Water Proofing : Rs 915840
OVERALL COST of Triple Layer Microfibre Coating : Rs 983680
We Would highly recommend option 2 , for getting Quick , easy , reliable and
authentic solution to the existing problem of water leakage of the society.