MAXIMIZING UTILITY ASSETS - PNWS-AWWA

32
MAXIMIZING UTILITY ASSETS & SUCCESSFULLY PARTNERING WITH CELL CARRIERS Diane Pottinger, P.E. Shannon Emerick, P.E. North City Water District RH2 Engineering, Inc.

Transcript of MAXIMIZING UTILITY ASSETS - PNWS-AWWA

Page 1: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

MAXIMIZING UTILITY ASSETS &SUCCESSFULLY PARTNERING WITH CELL CARRIERS

Diane Pottinger, P.E. Shannon Emerick, P.E.North City Water District RH2 Engineering, Inc.

Page 2: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CHANGING DISTRICT NEEDS

• Need to Recoat Tank

• Future Pump Station

Page 3: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CHANGING CELL CARRIER NEEDS

• Crowding making it very difficult to maintain/update equipment

Page 4: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

DEFINING GOALS

• Cost Sharing

• Space Allocation

• Security & Accountability

• Maintaining Cell ServiceDuring Construction

• Permit Streamlining

• Timing

Page 5: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

FINANCIAL CONSIDERATIONS

• Cover actual costs (including coordination)

• Rent increase 200% w/project

• Ongoing annual rent increase

• By investing more time/capital, gained influence

• Extra construction effort on future recoating

Page 6: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

23 ENTITIES TO COORDINATE

T. MobileRH2 Engineering

Quality Coatings

Insp.

Lesees

SprintAT&T

Sno-King DispatchEmergency Communications

BJ Thomas

T.Bailey

Shoreline

Bldg. permit

Mayes

Testing

Safway CoatingsBonner Electric

Commercial Fence

Ind. Contr. Ind. Contr.

BJ Thomas BJ Thomas

Shoreline

WTF permit

Ind. Contr.

Shoreline

WTF

Shoreline

WTF

Triad

Survey

Guardian Security Ind. Contr.

Clearwire

North City Water District (Owner)

Page 7: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

OWNERNorth City Water District (Owner)

Page 8: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CELL CARRIERS/LESEESNorth City Water District (Owner)

T. Mobile

Lesees

Sprint ClearwireAT&T

Sno-King DispatchEmergency Communications

Page 9: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

DESIGNERS

Lesees

SprintAT&T

Sno-King DispatchEmergency Communications

BJ Thomas BJ Thomas BJ ThomasTriad

Survey

T. Mobile Clearwire

North City Water District (Owner)

RH2 Engineering

Page 10: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

PERMITTING

RH2 Engineering

Lesees

SprintAT&T

Sno-King DispatchEmergency Communications

BJ ThomasShoreline

Bldg. permit

BJ Thomas BJ Thomas

Shoreline

WTF permit

Shoreline

WTF

Shoreline

WTF

Triad

Survey

North City Water District (Owner)

T. Mobile Clearwire

Page 11: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

INSPECTION AND TESTING

Quality Coatings

Insp.

Lesees

SprintAT&T

Sno-King DispatchEmergency Communications

BJ ThomasShoreline

Bldg. permit

Mayes

Testing

BJ Thomas BJ Thomas

Shoreline

WTF permit

Shoreline

WTF

Shoreline

WTF

Triad

Survey

T. Mobile Clearwire

North City Water District (Owner)

RH2 Engineering

Page 12: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

GENERAL CONTRACTORS

RH2 Engineering

Triad

Survey

Quality Coatings

Insp.

Lesees

SprintAT&T

Sno-King DispatchEmergency Communications

BJ Thomas

T.Bailey

Shoreline

Bldg. permit

Mayes

Testing

Ind. Contr. Ind. Contr.

BJ Thomas BJ Thomas

Shoreline

WTF permit

Ind. Contr.

Shoreline

WTF

Shoreline

WTF

T. Mobile

Guardian Security Ind. Contr.

Clearwire

North City Water District (Owner)

Page 13: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

SUBCONTRACTORSNorth City Water District (Owner)

RH2 Engineering

Triad

Survey

Quality Coatings

Insp.

Lesees

SprintAT&T

Sno-King DispatchEmergency Communications

BJ Thomas

T.Bailey

Shoreline

Bldg. permit

Mayes

Testing

Safway CoatingsBonner Electric

Commercial Fence

Guardian Security

BJ Thomas BJ Thomas

Shoreline

WTF permit

Shoreline

WTF

Shoreline

WTF

ClearwireT. Mobile

Ind. Contr.Ind. Contr.Ind. Contr.Ind. Contr.

Page 14: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

WIRELESS TRANSMISSION FACILITIES

• City of Shoreline Wireless Transmission Facility permit (for each carrier):

• Structural Calcs and Appearance

Before Photo simulation As constructed

Page 15: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CONSTRICTED SITE

Tank

Existing Emergency Generator

and Booster Pump Station

Proposed Booster

Pump Station

Multi-user Accessory Equip.

Building (MUAEB)

Page 16: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

ANTENNA NEEDS

• Orientation

• Elevation

Page 17: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

ANTENNA SPACE

Exist. Platform:

50 lf rail

New Catwalk:

120 lf rail

Page 18: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

ANTENNA SPACE

Exist. Platform:

50 lf rail

New Catwalk:

120 lf rail

Cell Cables in

Underground Conduit

Multi-user Accessory Equip.

Building (MUAEB)

Page 19: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CABLE SPACE ALLOCATION (WALL)

Raceway up Tank Wall

Plan View

Page 20: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CABLE SPACE ALLOCATION (ROOF)

• Watch Transitions

• Check During:

• plan development

• shop drawing review

• construction

• cable installation

• Physically Mark Space

• Allow for Adjustment

Raceway Under Catwalk

Vertical Section

Page 21: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

ROOF AFTER IMPROVEMENTS

• Clearance for Recoating

• Design for Growth

Page 22: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

DOMED ROOF CONCERNS

• Fall Protection

• Visual Screening

Page 23: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CABLE RACEWAY

• Consider Shroud Costs vs. Benefits

• Provide Ability to Add/Change

Before After

Page 24: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CHANGING TECHNOLOGY

• Coaxial vs. Hybrid Fiber

• Different clearance & support needs

Page 25: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

TANK TO GROUND TRANSITION (EXT.)

• Access/Security

• Visual Screening

Before After

Page 26: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

TANK TO GROUND TRANSITION (INT.)

• Clearance for Recoating

• Prevent Water in Conduit

• Watch Electrical Transitions

Page 27: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

SECURITY/ACCESS

• Cut-free/Climb Free Fence

• Co-location and Security

Before After

Page 28: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

GROUND TO BUILDING TRANSITION

• Equipment Protection

• Ability to Add/Change

Outside Inside

Page 29: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

INSIDE THE MULTI-USER BUILDING

• Co-Location and Security

• Equipment Support

• Ability to Add/Change

Page 30: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

MAKING IT A SUCCESS

• Coordination!

• Budget Future Recoating Effort

• Capacity to Add/Change

• If Modifying Existing, Plan for Some Rehab

• Check New Tech Needs

Page 31: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

LESSONS LEARNED

• “I wish we had posted the plans for every project on this site in one common location” – Mike Jansma,

Project Manager, T. Bailey & Associates

• “through partnership ….(and) team atmosphere(we) achieved the design goals of everyone” – Unnamed cell carrier representative

• “It was the District’s willingness to work together with the cell carriers that made this a success.” – Sprint and T Mobile representative

Page 32: MAXIMIZING UTILITY ASSETS - PNWS-AWWA

CONTACT INFORMATION

Diane Pottinger, P.E.North City Water District206.362.8100

Shannon Emerick, P.E.RH2 Engineering, Inc.425.951.5345