Dave Whitbeck, P.E. Presented at PNWS AWWA Conference Bellevue, WA April 29, 2015

Transcript of Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ......

Page 1: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Dave Whitbeck, P.E.

Presented at

PNWS AWWA Conference

Bellevue, WA

April 29, 2015

Page 2: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Overview

• History and Background

• Solids Production at GRFF

• Dewatering Options and Screw Press Selection

• Design Features

• Performance and Solids Disposal

Page 3: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

History and Background

• Tacoma Water has been diverting

from the Green River since 1913

• At the GRFF, Tacoma Water has

capability to divert year-round

from the Green River under all

river conditions.

• Historically, when river turbidity is

high or carrying excessive debris,

North Fork Wellfield used to

supplement Green River water to

improve quality

Page 4: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

History and Background

• To limit solids handling at the plant, a goal was

established to blend Green River with NFW supply

so that influent turbidity <5 NTU at all times.

• North Fork Wellfield has 72 MGD capacity and is

typically available from December to April

Average Daily

Demand (ADD)

mgd

Peak Daily

Demand (PDD)

mgd

Minimum Daily

Demand (MDD)

mgd

Annual Basis 106 150 n/a

Winter Period 71 90 20

Summer Period 118 150 36

Page 5: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

History and Background Raw Water Turbidity

5

Green River Composite Turbidity

(1998-2010)

Average

1.5

50

5.8

90

0.1

1

10

100

1000

0 20 40 60 80 100

Tu

rbid

ity (

NT

U)

Percentile

Peak Week Event, January 2009

Page 6: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Solids Production at GRFF

• Solids at plant generated from: Suspended solids carried from the river

Alum/PACL and Cationic Polymer added the flash mix channel

6

WTP Operating Scenario Est. Weekly Solids Production

(dry lbs/week)

Plant Flow

NFW

Blending Event

Win

ter

90 MGD Yes Avg Week 45,000

90 MGD Yes Peak Week 416,000

90 MGD No Peak Week 1,860,000

Su

mm

er 150 MGD Yes Avg Week 26,000

150 MGD Yes Peak Week 256,000

150 MGD No Peak Week 454,000

Peak Week: Jan 8-14, 2009; Summer Peak: May 17-23, 2009

Page 7: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Technology Advantages Disadvantages

Drying

beds/lagoons

Simple

technology

Lowest capital

cost

Large land

area required;

constant

“working” may

be required

Mechanical

(e.g.

centrifuge,

screw press,

belt press)

Easily used

year-round;

small footprint

Higher capital

cost, higher

O&M

Solids Handling/Dewatering Options

Considered

Tolt WTP, SPU

Note: Sewer Disposal not available at GRFF

Page 8: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Lagoons and Drying Beds at GRFF

• Based on climate, estimated drying rate

of 6 lbs dry solids/sf

Worst-case year requires more space

than available on site

• Effectiveness also dependent on

weather conditions (Annual Rainfall =

93”) and staff effort at turning solids and

managing flows

Tolt WTP

SPU

Period ADD (MGD)

Max Annual Production (dry lbs) Est. Min Acreage Required

Worst-Case Year Average Year Worst-Case Year Average Year

Year 1 82 1,386,000 1,345,000 5.3 5.2

Year 10 95 1,804,000 1,576,000 6.9 6.0

Year 25 106 2,320,000 1,795,000 8.9 6.9

Not enough space on site to accommodate

future worst-case years

Page 9: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Comparison of Mechanical Dewatering

Technologies

Pros Cons

Centrifuge • Smaller Footprint

• Proven Technology

• Higher Speed

• Higher Power Usage (50 Hp)

• Specialized maintenance requirements

• Less likely to operate unattended for

extended periods

Belt Press • Proven Technology

• Moderate power usage (25 hp)

• Most operator attention required

• Lower cake solids

Screw

Press

• Lower Speed

• Lower Power Use (5 Hp)

• Reduced Maintenance

• More likely to operate unattended

for extended periods

• Limited experience with WTP solids

• Larger footprint

• Heavier Equipment

• More expensive

Deciding Factors:

• An analysis of life-cycle costs supported the use of screw presses over the other

technologies.

• Tacoma Water staff had positive experiences with screw presses in WW applications

Page 10: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Screw Presses Lab Tests During Predesign

• Samples from the pilot

plant were sent to FKC

and Huber during the

predesign phase:

• Based on the results,

screw presses

considered viable for this

facility.

10

Inlet Solids

Conc (%)

lb Active

Polymer per

dry lb solids

Dewatered

Solids Conc

(%)

FKC

Test 1

4.5 4.6 37.3

2.3 9.3 39.3

1.2 18.1 39.7

FKC

Test 2 1.5 10.4 26.9

FKC

Test 3 5.7 3.6 40.3

Huber 3.4 5-20 40-56

Page 11: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

SOLIDS HANDLING FACILITIES

AT GRFF

Page 12: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

FWW From

Filters

Washwater

Equalization

Basins

Washwater

Equalization

Basins Pump

Station

PE

G

M

Sludge From

Flocculation/

Sedimentation

Basins

M

M

Washwater

Clarifiers

Solids Metering

Vault

PE

G

Thickener Sludge Blending

Tank

Sludge

Thickener Decant

Screw Press No. 1

Screw Press No. 2

PE

G

PE

G

Hauled Offsite

Hauled Offsite

Hauled Offsite Pressate

Pressate

Thickened Sludge

Pump Station

Return Water To

Ozone Reactors

Return Water To

Rapid Mix Channel

Return Water

Pump Station

Decant Structure

Return

Equalization

Basin

Sludge Storage Basin

Geobags

From FTW

Floc/Sed Drain and

Sludge Bypass

Decant

Overflow

Ove

rflo

w

12

Solids Handling – Process Flow

Sludge Storage

Basin

Pump Station

SH

C

Page 13: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Solids Handling Facilities

13

Thickener

Return EQ

Basin

Washwater Clarifiers

Sludge Storage

Basin Pump Station

Emergency Sludge

Storage Basin

Decant Structure

Thickened Sludge

Pump Station Solids

Metering Vault

Sludge

Blending

Tank

Mechanical

Dewatering

Building

(Screw Presses)

Washwater EQ Basins

& Pump Station

Return Water

Pump Station

Page 14: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Screw Presses Equipment Arrangement

14

Floc Tanks

Polymer

Area

Screw

Presses

Electrical

Room

Page 15: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Screw Presses Key Facts

15

• FKC Model BHX-1000x5500L

• Solids Capacity, each: 1000

dry lbs/hr

• Hydraulic Capacity, each: 50-

100 gpm

• Operating Speed: 0.3 rpm

• Unit Weight: 17,637 lbs (dry),

25,353 lbs (operating)

• Length: 5500 mm (216.5”)

• Drum Diameter: 1000 mm

(39.4”)

Page 16: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Flocculation Tanks Key Facts

16

• 2 units for each press to

accommodate multiple polymer use

• Continuous shaft and paddle agitation

in each tank

• Total volume: 600 gallons

• Tank Retention Time, Ea: 3 min

• Open top to allow for visual

observation of the floc formation

Page 17: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Screw Presses

17

6’’ Pipe from

Thickened Sludge PS

Pressate Return to

Thickener

Truck Scale

Screw

Conveyor

Knife

Gates

Sludge Disposal

Container

Page 18: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Screw Press Operation

Floc Formation

Pressate Cake

Page 19: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Solids Disposal

• Containers positioned

beneath screw conveyors,

each with 22 cy capacity

• Truck scales measures

weight added to containers

• Private trucking company

hauls off containers

• Tacoma Water is seeking

certification as “inert” to

reduce disposal costs

Page 20: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

• Dewatered Cake Solids %:

– Median: 22%

– Max: 32%

– Min 17%

• Polymer Dose (lbs active/dry ton)

– Median: 3.1

– Max: 4.8

– Min: 1.1

• As of Feb 24th, the GRFF has

processed and sent out 282.1 tons

of sludge

Note: Results from analysis of the

screw press log, which is based on

sampling

Screw Press Results

Page 21: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

Contingency Plans

What if one or both presses fail?

• Temporary storage in thickener,

blending tank, sedimentation basins

• Emergency sludge storage basin

• Sludge Conveyor Overflow

• Geobags

Geobags at Everett WTP

Sludge Storage Basin

Sludge Conveyor Overflow

Page 22: Dave Whitbeck, P.E. - PNWS-AWWA Sessi… · PNWS AWWA Conference Bellevue, WA April 29, ... •Performance and Solids Disposal . ... Solids Handling – Process Flow Sludge Storage

QUESTIONS? Solids Handling using Screw Presses, a Case Study

Dave Whitbeck, P.E.