    M/490 Smartgrid Mandate Status

    UCA CIMug Meeting

    London, 16.05.2012

    Eric Lambert

  • Page 2 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Agenda

    • Smartgrid context

    • M/490 Mandate

    • Sustainable Process Working Group

    • Reference Architecture Working Group

    • Information Security Working Group

    • Smart Grid Coordination Group work

    • Towards a First set of Standards for SG

    • Conclusion

  • Page 3 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    TC8

  • Page 4 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    European Smartgrid context

    OpenNode,

    Grid4EU,

    Finseny…

  • Page 5 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Mandate M/490 Smart Grid

    Mandate Scope

    Smart Grid

    Coordination

    Group(former JWG)

    EC

    Reference

    Group

    Process

    Team

    Security

    Team

    First Set of

    Standards

    Team

    Architecture

    Team

    Steering

    Committee

    Further

    Tasks

    • Report 2.0

    • Liaisons

    • Promotion

    New joint WGs

    Existing WGs

    • NIST

    • JISC

    • China

    • Etc.

    TC LevelTC Level

    SGSG--CG LevelCG Level

    EC LevelEC Level

    New joint WGs

    Existing WGs

    New joint WGs

    Existing WGs

    New joint WGs

    Existing WGs

    M/441

    M/468

    coordination

    Organisation

    SG-CG participants are from

    industry/user organizations,

    commission and standardizations

    organizations

    Scope: coordination of activities,

    no standards are developed.

    Expected results till 2012

    First Set of Standards

    Sustainable Processes

    Reference Architecture

    Security

    Mandate focus is on processes, models

    and functions, not on single standards.

  • Page 6 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Scope of work

    Sustainable Processes

    today's main focus: set up a use cases management

    Organization

    39 members (active 12-13) + Observers: 8 Industry, 14 Telecom/ETSI, 10 Utility, 5 R&D, 1 SDO

    (attendance: 10-13)

    6 x F2F, 8 Conference calls, 1 open workshop with stakeholders

    Deliverables and Milestones

    1 March 2012

    Draft report

    Use Case Management Repository

    End of 2012

    Final Report

    Use Case Management Process

    Sustainable Process working group

  • Page 7 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Milestone Plan

    “Processes

    Use Case

    Management”

    Inform about

    Methodology

    Comments Draft

    Report

    Stakeholder

    meeting Start

    UC collection

    First Analysis

    Collection of Use

    Cases (> 450)

    Draft Report to

    EU Commission

    05 07 09 11 02 06 12 10 06 08 10 12 01 03 04 05 07 08 09 11

    2011 2012

    Draft Report

    Workshop(s)

    to Generic

    Use Cases

    Time Table of the WG SP

    May 21st : DR/DSM workshop

    May 31st: EV workshop

    Use Case Template

    Based on IEC PAS 62559,

    Basis for the Use Case collection

    Actor List Based on IEC System Actors + ENTSO-ebIX-EFET Role Model

  • Page 8 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Use Cases – Interrelation Between Domain and

    IT Experts

    UML-Graphics

    Domain Expert IT Expert

    System Engineer

    Template as

    form or check list

    UML (Unified Modeling Language) for the technology neutral description of interactions and actors

  • Page 9 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    TC 13

    TC 8 TC 22

    TC 57

    TC 82

    TC 88 TC YZ

    TC XY „TC 8“, „TC 57“, „TC 22“ -> IEC

    Why is standardization interested in the use case approach?

  • Page 10 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Smart Grid – Collaboration of Technical Committees

    TC 13

    TC 8 TC 22

    TC 57

    TC 82

    TC 88 TC YZ

    TC XY

    New processes for

    complex, cross cutting

    systems? e.g. collaborative

    description of use cases

    Web 2.0?

  • Page 11 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    IEC TC8 AHWG4 Domain Core Teams Use cases definition

    Leading Team

  • Page 12 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    The Reference Architecture is responsible for

    Setup, organization and work plan on Ref. Architecture

    Selection of existing input to the work

    Definition of scope for Reference Architecture

    Incl. nature and usage of documents

    Organization

    89 members to date (58% Power Industry, 42% ICT)

    9 Face-to-face meetings; average 26 participants ()

    Deliverables and Milestones

    Delivery of interim report on 02/03/12 (after 9 months)

    Publication of TR at end of 2012

    Reference Architecture working group

  • Page 13 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Status of the Work

    Achievements

    Development of Architecture Model

    Agreed scope of Conceptual Model

    Limited differences with NIST CM (SGIP and NIST informed)

    Use Cases provided by Sustainable Processes WG

    Generic uses cases used for Comm. Arch. Analysis

    Draft report v1.0 distributed for comments

    Draft Communication Architecture viewpoint

  • Page 14 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Requirements for a Smart Grids architecture framework

    Able to represent

    system aspects of smart grids in comprehensive, consistent and understandable manner

    interoperability aspects

    Able to locate gaps in standardization

    Able to cope with

    moving targets (in regulation) and

    evolutionary implementation of smart grids

    Reuse existing foundational concepts and work

    Independent from technology and solutions

  • Page 15 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Smart Grids Architecture Model: based on existing frameworks & contributions

    Generation

    Transmission

    Distribution

    DER

    Customer

    Premise

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    Component Layer

    Communication Layer

    Information Layer

    Function Layer

    Protocol

    Protocol

    Data Model

    Data Model

    Outline of Usecase

    Subfunctions

    Business Layer

    Business Objectives

    Polit. / Regulat.. Framework

    NIST/EU Conceptual Model Business Architecture Models

    GWAC

    Interoperability Stack

    Reference Architecture for

    Power System

    Information Exchange SGAM

    CEN/CENELEC/ETSI

    Standards

    EU Smart Grid Projects

    EU EG and JWG contributions

  • Page 16 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    SGAM: the Smart Grid Plane

    Generation

    Transmission

    Distribution

    DER

    Customer

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    (Home, Building,

    Industry, EV, Mobility)

    Power System

    Primary Equipment

    Information Management

  • Page 17 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    SGAM: inspired by GWAC Stack

    System A

    Business Context

    Semantic Understanding

    Network Interoperability

    Syntactic Interoperability

    Basic Connectivity

    Business Procedures

    Business Objectives

    Economic / Regulatory Policy

    Function

    System B

    Business Layer

    Function Layer

    Information Layer

    Communication Layer

    Component Layer

  • Page 18 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    SGAM

    Generation

    Transmission

    Distribution

    DER

    Customer

    Premise

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    Component Layer

    Communication Layer

    Information Layer

    Function Layer

    Protocol

    Protocol

    Data Model

    Data Model

    Outline of Usecase

    Subfunctions

    Business Layer

    Business Objectives

    Polit. / Regulat.. Framework

    Interoperability

    Dimension

  • Example Use Case

    UC: DMS System controls reactive power of DER unit

    Business Service: Voltage control in distribution system

    Service: RTU Data-acquisition

    Service: Voltage/Var control

    Service: Control/Supervision of DER

    Service: Audit of control actions

    Precondition:

    Data-acquisition is running

    Feeder electric models are current

    Sequence of events:

    RTU sends measurement to DMS

    Voltage/Var-Control is triggered by event

    Voltage/Var-Control calculates control value

    Voltage/Var-Control sends control value to DMS

    DMS sends controlable setpoint to DER

    DER receives setpoint and acknowledges

    DER adjusts reactive power injection

    DMS posts DER control action to audit of control actions

    CRM system obtains audit actions

  • Use Case Mapping on SGAM

  • Page 21 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Component Layer

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

  • Page 22 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Business Layer / Function Layer

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

    Busines

    s objecti

    ves

    Busines

    s proces

    ses

    Econom

    ic and re

    gulatory

    constrain

    ts

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

    Busines

    s Service

    „Voltage

    Control

    in

    Distribu

    tion Sys

    tem

    RTU

    Supervision

    DER

    Control &

    Supervision

    Voltage/Var

    Control

    Audit

  • Page 23 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Information Layer

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

    RTUSupervision

    DER

    Control &

    Supervision

    Voltage/Var

    Control

    Audit

    Measurement Control

    Value

    Ackn

    CTRL ACTAckn

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

    IEC

    61850-7

    -420

    IEC

    61

    85

    0-7

    -4

    CIM

    IEC 61968-4

    Message View Canonical Data Model View

    Message Payloads will use standardized semantic models (CIM, 61850, COSEM, …)

  • Page 24 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Communication Layer

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

    IEC 61968-100

    ESB IEC 61968-100

    IEC 61850-8-1

    GPRS

    IEC 61850-8-1

    IEEE 1901.1

    IEC 61850-8-1

    ADSL

  • Page 25 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    SGIS working group

  • Page 26 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Scope of Information Security WG

  • Page 27 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Existing Security standards

  • Page 28 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    SGIS – security levels

  • Page 29 CEN/CENELEC/ETSI Smart Grid Co-ordination Group © CEN-CENELEC-ETSI 2012

    1. What standards can be used in Europe today

    for the implementation of Smart Grids?

    Mandate – SG-CG work

    Use

    Cases

    Generation

    Transmission

    Distribution

    DER

    Customer

    Premise

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    Component Layer

    Communication Layer

    Information Layer

    Function Layer

    ProtocolProtocol

    Data Model

    Data Model

    Outline of Usecase

    Subfunctions

    Business Layer

    Inte

    rop

    era

    bilit

    y

    WG-SP

    Generic Use Cases

    EG1 Report

    6 High level services

    2. Step Map UCs to SGAM

    1. Step Map Use Cases

    to EG 1 Report

    Identify generic

    Use Cases

    WG-RA

    Architecture Model

    3. Step Locate standards

    usage

    4. Step Identify common

    standards WG-FSS First set of standards

    Source

    Expected outcome

    Result • Set of existing standards

    ready for implementation

    • >80% of all “necessary”

    standards expected in

    this category (inline with main finding of JWG report)

    Existing

    Standards

    CEN, CLC,

    ETSI WG-RA

    Architecture Model

    t.b.d t.b.d

    t.b.d

    t.b.d

    Target date

    End 2012

    Time Horizon First set of standards

    Ready by end 2012

  • Page 30 CEN/CENELEC/ETSI Smart Grid Co-ordination Group © CEN-CENELEC-ETSI 2012

    2. How can we solve the already identified gaps?

    Mandate – SG-CG work

    WG-FSS

    Prioritization

    JWG Report

    2. Step Perform Gap Analysis

    1. Step Prioritize

    Gaps from JWG

    report

    WG-FSS

    Gap Analysis

    3. Step Develop

    Methodology

    4. Step Identify common

    standards WG-FSS Workprogram

    Source

    Accomplished outcome (31.11.11 – to be iterated)

    Result • Work program for SDOs

    to fill gaps

  • Page 31 CEN/CENELEC/ETSI Smart Grid Co-ordination Group © CEN-CENELEC-ETSI 2012

    3. How can we in future systematically identify

    additional gaps??

    Mandate – SG-CG work

    Use

    Cases

    Generation

    Transmission

    Distribution

    DER

    Customer

    Premise

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    Component Layer

    Communication Layer

    Information Layer

    Function Layer

    ProtocolProtocol

    Data Model

    Data Model

    Outline of Usecase

    Subfunctions

    Business Layer

    Inte

    rop

    era

    bilit

    y

    Generic Use Cases

    Repository

    Further findings:

    R&D, Pilots, Implementation

    2. Step Map UCs to SGAM

    1. Step Identify New Generic

    Use Cases from findings

    3. Step Locate

    requirements for

    standards

    4. Step Identify new

    gaps NEW Gap List

    (follow process 2. from here)

    Source

    Expected outcome

    Result • Identification of “new

    gaps”

    • Systematically investigate

    need for new

    standardization according

    to the new process

    established by SG-CG

    t.b.d

    Target date

    from 2013

    SGAM

    SGAM

    Generation Transmission Distribution Customer PremiseDER

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    HV MV LV

    G H

    RTUDER

    Controller

    HMI HES

    DMS

    Computer

    Gateway

    CRM

    Computer

    HAN

    Controller

    Data

    Concentrator

    IEC

    61850-7

    -420

    IEC

    61

    85

    0-7

    -4

    CIM

    IEC 61968-4

    GAP

    Time Horizon Process set end 2012

    Iteration ongoing from

    2013

  • Generation

    Transmission

    Distribution

    DER

    Customer

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    Coverage by semantic standards

    Page 32

    (Home, Building,

    Industry, EV, Mobility)

    (Hierarchy)

    KNX, BacNet,

    Echonet,

    Profibus,

    OpenADR, SEP, …

  • Generation

    Transmission

    Distribution

    DER

    Customer

    Process

    Field

    Station

    Operation

    Enterprise

    Market

    Domains

    Zones

    TC57 covers the supply side of Smart Grid

    Page 33

    (Home, Building,

    Industry, EV, Mobility)

    (Hierarchy)

  • Page 34 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Conclusion • M/490 reinforces IEC Good Working Practices

    • IEC 62559 UC Template

    • Use cases Role models

    • Use Cases web 2.0 Tool to coordinate TCs

    • SG Architecture Models

    • SG Information Security Standards

    • FSS for European SG and Standard Gaps

    • Challenges to come :

    • IEC Generic Use Cases

    • International coordination between IEC TC

    • Standard Harmonization

    • UML models for any semantic model

    • European SG demonstrator projects coordination with IEC

  • Page 35 | 15/05/12 | Status @ SGCG 2012 CIM User Group Europe © CEN-CENELEC-ETSI 2012

    Thanks to M490 convenors & contributors

    Thanks for your attention

    Questions ?