40 . TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 51 157B Lookout Place COT @1 W U.S. Nuclear Regulatory Commission ATTI: Document Control Desk Washington, D.C. 20555 Gentlemen: In the Matter of ) Docket los. 50-259 50-328 Tennessee Valley Authority ) 50-260 50-390 ) 50-296 50-391 ) 50-321 PROPOSED PROGRAM IN RESPONSE TO GENERIC LETTER 88-20 - INDIVIDUAL PLANT EXAMINATION (IPE) FOR SEVERE ACCIDENT VULNERAB1LITIES Reference... 1. Generic Letter 88-20, "Individual Plant Examination for Severe Accident Valnerabilities - 10 CFR 50.54(f)," dated November 23, 1988 2. NUREG-1335, "Individual Plant Examination: Submittal Guidance, Final Report," August 1989 Generic Letter 88-20 (Reference 1) requested each licensee perform an IPE and submit the results to the NRC. In addition, Reference 1 requires that the licensee submit the IPE results within three years of tho issuance of the NRC guidance document (Reference 2). The availability of Reference 2 was published in the Federal Register on September 1, 1989, thus starting the three-year period. Additionally, the generic letter requested each licensee submit its proposed program for completing the IPEf within 60 days from the date of the Federal Reister notice announcing the availability of Reference 2. The response was requested to identify the method and approach to be used for performing the IPE, to describe the method to be used, and to identify milestones and schedules for submitting the results of the 1Pts to the URC. TVA's program is to complete a Level 1 probabilistic risk assessment and containment analysis for Browns Ferry, Watts Bar, and Sequoyah Nuclear Plants satisfying the criteria of Generic Letter 88-20 and NUREG 1335 by September 1, 1992. Previous risk assessment work by TVA will be utilized to complete this work. Enclosure 2 provides a mili(tone schedule for the proposed program. The commitments contained in this submittal are stated in Enclosure 1. 0010 FP| DRAU, W "l An Iq(UJI (OpfJi) !OJUIty t l IfI, "E

Transcript of Lookout COT W - Nuclear Regulatory Commission · 2012-11-30 · 40 . TENNESSEE VALLEY AUTHORITY...

Page 1: Lookout COT W - Nuclear Regulatory Commission · 2012-11-30 · 40 . TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 51 157B Lookout Place COT @1 W U.S. Nuclear Regulatory

40 .

TENNESSEE VALLEY AUTHORITY

CHATTANOOGA. TENNESSEE 37401

51 157B Lookout Place

COT @1 W

U.S. Nuclear Regulatory Commission ATTI: Document Control Desk Washington, D.C. 20555

Gentlemen:

In the Matter of ) Docket los. 50-259 50-328 Tennessee Valley Authority ) 50-260 50-390

) 50-296 50-391 ) 50-321

PROPOSED PROGRAM IN RESPONSE TO GENERIC LETTER 88-20 - INDIVIDUAL PLANT EXAMINATION (IPE) FOR SEVERE ACCIDENT VULNERAB1LITIES

Reference... 1. Generic Letter 88-20, "Individual Plant Examination for Severe Accident Valnerabilities - 10 CFR 50.54(f)," dated November 23, 1988

2. NUREG-1335, "Individual Plant Examination: Submittal Guidance, Final Report," August 1989

Generic Letter 88-20 (Reference 1) requested each licensee perform an IPE and submit the results to the NRC. In addition, Reference 1 requires that the licensee submit the IPE results within three years of tho issuance of the NRC guidance document (Reference 2). The availability of Reference 2 was published in the Federal Register on September 1, 1989, thus starting the three-year period. Additionally, the generic letter requested each licensee submit its proposed program for completing the IPEf within 60 days from the date of the Federal Reister notice announcing the availability of Reference 2. The response was requested to identify the method and approach to be used for performing the IPE, to describe the method to be used, and to identify milestones and schedules for submitting the results of the 1Pts to the URC.

TVA's program is to complete a Level 1 probabilistic risk assessment and containment analysis for Browns Ferry, Watts Bar, and Sequoyah Nuclear Plants satisfying the criteria of Generic Letter 88-20 and NUREG 1335 by September 1, 1992. Previous risk assessment work by TVA will be utilized to complete this work. Enclosure 2 provides a mili(tone schedule for the proposed program. The commitments contained in this submittal are stated in Enclosure 1.

0010

FP| DRAU, W "l Fý

An Iq(UJI (OpfJi) !OJUIty t l IfI, "E

Page 2: Lookout COT W - Nuclear Regulatory Commission · 2012-11-30 · 40 . TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 51 157B Lookout Place COT @1 W U.S. Nuclear Regulatory

OCT 30 189U.S. Nuclear Regulatory Coismssion

If you have questions regarding this at (615) 751-811.

submittal, please telephone S. K. Crowe

Very truly yours,

TENNESSEn VALLEY AUTHORITY

Mandi Reg'latry Aensing and Regstlatory Affairs

Enclosures cc (Rnclosures):

Ns. S. C. Black, Assistant Director for Projects

TVA Projects Division U.S. Nuclear Regulatory Comission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

Kr. B. A. Wilson, Assistant Director for Inspection Programs

TWA Projects Division U.S. Nuclear Regulatory Commission Region I1 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

NRC Resident Inspntor Browns Ferry Nuclear Plant Route 12, P.O. Box 637 Athens, Alabama 35609-2000

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

NRC Resident Inspector Watts Bar Nuclear Plant P.O. box 700 Spring City, Tennessee 37381

Page 3: Lookout COT W - Nuclear Regulatory Commission · 2012-11-30 · 40 . TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 51 157B Lookout Place COT @1 W U.S. Nuclear Regulatory

Enclosure 1

1. TVA's prosram Is to complete a Level 1 probabilistic risk assessment and containment analysis for Browns Ferry, Watts Bar, and Sequoyah Nuclear Plants satisfying the criteria of Generic Letter 88-20 and UUREG-1335 by September 1, 1992.

Page 4: Lookout COT W - Nuclear Regulatory Commission · 2012-11-30 · 40 . TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 51 157B Lookout Place COT @1 W U.S. Nuclear Regulatory

ENCLOSURE 2

TVA'S INDIVIDUAL PLAN7 EXAMINATION MILESTONE SCHEDULE

WBN

BFN

SQN

I I I I I I

OCT JAN 'a9 O90

JAN 191

LEVEL I PROBABILISTIC RISK ASSESSMENT

CONTAINMENT ANALYSIS

OL 85-20 RESPONSE

vj v vy y

JAN '92

JAN 193