LAXMI CONSTRUCTION COMPANY Engineering … · To become leading Engineering and Construction...

18
LAXMI CONSTRUCTION COMPANY Engineering Solutions Redefined

Transcript of LAXMI CONSTRUCTION COMPANY Engineering … · To become leading Engineering and Construction...

LAXMI CONSTRUCTION COMPANYE n g i n e e r i n g S o l u t i o n s R e d e f i n e d

To become leading Engineering and Construction company of India in our Segments of Interest by providing and constantly identifying and delivering better services that combines Technical & cost effective solutions at lower cost to our valued customers by creating innovative and value engineered solutions.

Vision

Mission

Meets the specific customer requirement through Superior customer focus and thereby improving our customer's productivity with the best Industrial Engineering and Constructions solutions & their integration, reliability and services. Thus, we strive to

With our strong emphasis on intellectual property by hiring and nurturing the best people in the industry, we provide solutions for growth and continuous improvement in productivity to our entire customers, thereby becoming their “Vendor of choice”. To achieve this, we at Laxmi Construction Company follow stringent quality regimen and also develop industry best, ethical & moral standards to make ourselves unique from our competitors.

Focusing on current industrial trends, by providing our technical expertise, we always aim to be market leaders.

Customer Perspective

Differentiator

Market Leadership

The values followed at Laxmi Construction Company have its genesis in the firm belief of the founder of the company Mr. Ajay Kumar Singh and same being carried forward by the Proprietor Mr. Dibakar Kumar. The aim has always been to contribute in the development of our society and surrounding, with environment friendly, world class, high quality Engineering and Constructions solutions. For this, we are dedicated to excellence & follow high ethical standards.

Competence

Dynamic Development

Respect for Individual

Ideas, Knowledge, energy, resources & risk taking are our drivers. We are high performing team. We always develop people with “CAN DO” Attitude and build strong intellectual property by hiring and nurturing the best people in the industry.

We believe in “INNOVATION” that is coming up with new thoughts to maintain our long term & win-win relationship with our customers, while focusing on Execution Excellence.

Our Employees own part of the company to have a complete share in our success. We always value diversity & treat people as we would like to be treated ourselves.

Values

deliver top quality services to our clients and to exceed client expectations.

2. FINANCIAL1. BASIC INFORMATION

PROPRIETOR

PROJECT CORDINATORFINANCIAL /

COMMERCIAL COORDINATOR

SITE-IN-CHARGE ACCOUNTS OFFICER

SITE ENGINEERMATERIAL / STORE SUPERVISOR

SUPERVISOR SUPERVISORSUPERVISOR

TECHNICAL / SKILLED / UNSKILLED WORKERS

Organization Chart

1.1

1.2

1.31.41.51.6

1.7

1.8

1.92.02.1

Company Name

Contact Person

Type of CompanyCapacityPANVAT Registration No. (Bihar)Central Sales TaxRegistration No.Service Tax Registration No.PF Registration No.

ESIC Registration No.Tan Registration No.

: M/S Laxmi Construction Co.: Shri Dibakar Kumar: Shri Ajay Kumar Singh: Proprietorship: Medium Scale: AELPK7326Q: 10361990081

: 10361990178

: AELPK7326QST001

: BR/MUZ/20090: PTNL00376F: 42000106920001019

2.1

2.2

2.3

Authorized & Paid up Capital

Name of The Banker

Annual Turnover

: Rs. 50.65 Lakh

: STATE BANK OF INDIA Barauni Refinery Campus Branch Dist.: Begusarai – 851 114. (Bihar)

: Assessment Year. 2011-12 - Rs.187.02 Lakh 2012-13 – Rs.133.10 Lakh 2013-14 – Rs.133.12 Lakh

Laxmi Construction Company with its professionally managed group of technology innovator and engineers, is an emerging leader in Engineering and Construction segment in India. We have executed various project works since 1997 and have established a strong reputation within our markets for executing large complex projects and for providing turnkey solutions to our clients. Laxmi Construction Company's approach and methodology towards project management and its Streamlined, cost-effective, state-of-the-art systems & processes have helped the company to deliver projects on time and within budget, while adhering to strict quality control and safety measures meeting the strict expectation of customers.

Starting with core business in Fabrication and Erection of structural, it has diversified into areas like Industrial Piping, Installation of Equipments, Conveyor System, Boiler, Installation of Fire Protection System, Instrumentation and Electrical, Column Internals, Civil work (Pipe support, Switchyard etc.).

Laxmi Construction Company offers a thoroughly professional approach at every step and has participated actively in the diversification and expansion program of its customers to create a viable industrial base in that part of India where economic development were only a dream before the entry of our customers.

Company Profile

We are skillfully assisted by a team of experienced professionals and young technocrats who put their dedicated and professional approach at every step.In addition to this, we have experienced team members at different levels of:

Our Teammates also encompass quality control inspectors, logistics and transportation personnel and other skilled workmen. They have in-dept understanding for the products, manufacturing and related services.

1. Engineering and Programming2. Designing3. Manufacturing4. Erection & Installation5. Supervisors and Technicians

Our unit is based in a spacious area wherein we have all the facilities which are required for qualitative production. At our unit, we have following major machine & tools.

1. Hydraulic Bending, Cutting & Punching Machines

2. Hydraulic C Frame Machines

3. Sheet cutting & Bending Machines

4. Welding, Drilling & Grinding Machines

5. Fabrication, Shearing Machine, Angle Cutter, Drill Machine, Grinder Sander, Die & Tools, Assembly Cutting Machine.

TeamInfrastructure

We have expert & dedicated team for Fabrication and Erection of structural, Industrial Piping, Installation of Equipments, Conveyor System, Boiler, Installation of Fire Protection System, Instrumentation and Electrical, Column Internals, Civil work (Pipe support, Switchyard etc.).. Due to these strengths we are providing the best & cost effective solution in various segments of industries. We also work as a consultant for our customer to help them to take right decisions for optimal uses of resourses and to deliver quality products.

As a part of our quality assurance program, Laxmi Construction Company follows

Quality Assurance

Strengths

Our Expertise / Services:Fabrication and Erection of structuralIndustrial PipingInstallation of EquipmentsConveyor SystemBoilerInstallation of Fire Protection SystemInstrumentation and ElectricalColumn InternalsCivil work (Pipe support, Switchyard etc.)Industrial PaintingFoundation worksGeneral order supply and Manpower

1.2.3.4.5.6.7.8.9.10.11.12.

GalleryGallery

Our Clients

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL GUJARAT REFINERY

IOCL GUJARAT REFINERY

IOCL BARAUNI REFINERY

IOCL GUJARAT REFINERY

11417450

14703827

1170000.00

10002210

3888260.4

4679824.1

9337017.9

23854318 dtd 16.04.2013

23801931 dtd 12.02.2013

23892033 dtd 08.06.2013

23947134 dtd 23.08.2013

23842604 dtd 30.03.2013

23689158 dtd 28.08.2012

23665913 dtd 20.07.2012

Mechanical Piping, Installation of High Volumn Long Range Monitors (HVLRMs) and other misc. jobs at Barauni Refinery.

Replacement of Coker equipment (Column K2 Top), Vessel, E-1 & E-11, relocation of Exchanger EE-11), Piping, stractural and allied miscellaneous jobs at Coker - A of Barauni Refinery.

Mobilization of 300MT crane for replacement of column overhead piping at AVU-I shutdown

Hot and Cold jobs at GRE/GRSPF Units of Gujarat Refinery.

Mechanical, Stractural and Civil works for Re-routing of 10" Natural Gas Line from Underground to aboveground at Gujarat Refinery.

Hot & Cold job related to furnace of Coker-B during shutdown of Coker-B at Barauni Refinery

Hot and Cold jobs at MSQ/LAB/GRE/GRSPF/WS&E/Headworks/Township Units at Gujarat Refinery

2013

2013

2013

2013

2013

2012

2012

1.

2.

3.

4.

5.

6.

7.

S.No Year Description W.O No & DateContract Amount

Name of Organization

Our Clients

Mechanical Piping Installation of Make Up Water Heater (MUWH) in Heat Recovery Steam Generator (HRSG) & other miscellaneous jobs at Barauni Refinery

Hot & Cold job related to furnace of AVU - I during shutdown of AVU-I at Barauni Refinery

Inter Connecting piping job between existing tie in point at TPS and BHEL terminal points at Battery Limit at Barauni Refinery.

Piping job for RCO Unloading Facility at Barauni Refinery (Part-A & Part-B)

PO For Manpower Supply

PO For A/G Piping Work

Installation, Modification and Commissioning of Staged Flare System at IOCL, Barauni Refinery

P.O for Manpower and Supply of Car for recovery of Oil from Oily Sludge Processing at IOCL Barauni

Installation of column internal in 608 - c - 04 of ATU at Barauni Refinery

2012

2012

2012

2011

2011

2011

2011

2011

2010

8.

9

10.

11.

12.

13.

14.

15.

16.

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

Punj Lloyd Ltd

Punj Lloyd Ltd

Airoil Flaregas (I) Pvt Ltd

Evergreen Environmental

Technology Pte Ltd

IOCL BARAUNI REFINERY

1334143.5

3196610.2

2354270.6

4026311.00

1877105.4

2,12,329.99

10,47,961.00

4709346.00

21,00,000.00

23650965 dtd 29.06.2012

23574189 dtd 11.03.2012

23553679 dtd 15.02.2012

23304410 dtd 01.02.11

23312107 dtd 09.02.11

PEIN09/307465

PEIN09/310714

AFIL/BR/FLARE/002 dtd 23.09.11

……

23171028 dtd 22.06.10

S.No Year Description W.O No & DateContract Amount

Name of Organization

Our Clients

Balmer Lawrie & Co. Ltd

Balmer Lawrie & Co. Ltd

Balmer Lawrie & Co. Ltd

NASIM AHSAN CONSTRUCTION PVT.

LTD.

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

IOCL BARAUNI REFINERY

13,10,942.08

1,28,925.00

6,00,000.00

57,47,000.00

8,33,913.98

10,00,000.00

48,26,019.33

62,49,428.78

ROFS/Lagoon-III/PO-09 dtd 25.10.10

ROFS/Lagoon-III/PO-09A dtd 11.01.11

ROFS/2K10/07/PO-10 dtd 29.10.10

NAC/RO/2010-11/716 dtd 30.04.10

23016721 dtd 01.10.2009

17926308 dtd 27.04.09

17925391 dtd 24.04.09

177776402 dtd 25.06.08

Design, Fabrication, Testing & Supply of Sludge Holding Tank, Mixing Tank and Recovered Oil Tank with all accessories.

Design, Fabrication, Testing & Supply of Sludge Holding Tank, Mixing Tank and Recovered Oil Tank with all accessories. (Amend)

Mechanical & Electrical Erection Work for Lagoon Sludge Processing Unit at IOCL, Barauni Refinery.

Mechanical & Piping works for CRU/NSU Revamp & DHDT at Barauni Refinery.

Piping and Allied Civil Jobs for Routing of Heavy Naptha to Ex AVUs at Barauni Refinery.

External Cleaning of Air Fin Cooler at Barauni Refinery

Out site battery limit (OSBL) piping jobs related to Amine Treating Unit at Barauni Refinery

Piping job for New MS Tank at Barauni Refinery

2010

2010

2010

2010

2009

2009

2009

2008

17.

18.

19.

20.

21.

22.

23.

24.

S.No Year Description W.O No & DateContract Amount

Name of Organization

Our Clients

JNS/AMK/WO dtd 26.04.06

17521571 dtd 30.01.07

LPO-009 dtd 14.12.06

LPO-016 dtd 08.01.07

17376058 dtd 20.03.06

17362651 dtd 20.02.06

17339560 DTD 27.12.05

17322056 DTD 24.11.05

M/s J.N Singh & Co.

IOCL BARAUNI REFINERY

Plant -Tech Midcontinent (I) Pvt

Ltd, Manglore

Plant -Tech Midcontinent (I) Pvt

Ltd, Manglore

IOCL BARAUNI REFINERY

------DO------

------DO------

------DO------

1,48,75,739.00

72,67,162.50

8,35,250.00

15,00,000.00

16,78,402.80

4,47,767.01

5,17,415.03

9,70,776.00

Execution and handing over of civil works for 220 kv sub station extension in Madhya Pradesh

Mechanical & Civil jobs for LPG treating unit at Barauni Refinery

Fabrication of 20 feet solvent tank at Braruni Refinery Site

Installation of Oily Slugs plant of our IOCL barauni Site

Maintenance of Columns & Vessels during M&I shut down of BXP units at Barauni Refinery.

Maintenance of Columns, Vessels and other related job during shut down of AVU -III & CRU units at Barauni Refinery.

Mechanical Job For Restoration of Coker-A At Barauni Refinery.

REPLACEMENT OF VACCUM COLUMN PACKING AND RELATED JOB OF AVU-I & II AT BARAUNI REFINERY.

2007

2007

2006

2006

2006

2006

2005

2005

25.

26.

27.

28.

29.

30.

31.

32.

S.No Year Description W.O No & DateContract Amount

Name of Organization

Our Clients

17296575 DTD 22.09.05

17238123 DTD 05.05.05

17189387 DTD17.01.05

17169598 DTD 03.12.04

17156082 DTD 26.10.04

17122815 DTD 19.07.04

17068151/408 DTD27.01.04

------DO------

------DO------

------DO------

------DO------

------DO------

------DO------

------DO------

1,31,627.02

12,49,000.00

25,65,618.00

4,00,720.00

14,29,236.73

21,43,837.00

2,73,252.00

DISMENTLING OF OLD H-7 & H-8 AND INSTSLLATION OF NEW PROCURED GAS OIL PUMP IN AVU-I & II AT BARAUNI REFINERY.

INSULATION FOR SCHEME RELATED TO BS-II/EURO-III EQ GR. HSD AT BARAUNI REFINERY.

PIPING AND STRUCTURAL JOBS FOR AVUs& CRU AT BARAUNI REFINERY.

WASH WATER HEATING WITH BRINE IN AVU-I & II AT BARAUNI REFINERY.

PIPING & CIVIL WORKS TO FACILITATE BITUMEN PRODUCTION DIRECTLY FROM K - 301 OF AVU - III AT Barauni Refinery.

PIPING JOB FOR BY PASSING CRU COOLING TOWER AT BARAUNI REFINERY.

MAINTENANCE (MECHANICAL JOBS) OF COKE CONVEYOR OF COKER-A AT BARAUNI REFINERY.

2005

2005

2005

2004

2004

2004

2004

33.

34.

35.

36.

37.

38.

39.

S.No Year Description W.O No & DateContract Amount

Name of Organization

17067808 DTD 29.01.04

BHEL/PSER/Barauni/WO/2835 DTD 10.11.2003.

17041484/2655 DTD 21.08.2003

17036883/2276 DTD 29.07.2003

BES/ML/2003/1313/569DTD 21.02.2003

17027971/1517 DTD 29.05.2003.

17025095/1085 DTD 16.04.2003.

Our Clients

------DO------

BHEL BARAUNI REFINERY SITE

IOCL BARAUNI REFINERY

------DO------

------DO------

------DO------

------DO------

48662.60

9500.00

5,26,212.48

1,39,706.00

66426.10

3,05,199.84

70553.65

GAS CUTTING & WELDING OF INSERT PLATES IN CONVEYOR GALLERY OF MECHANISED PETRO COKE HANDLING PROJECT IN BARAUNI REFINERY.

THERMOWELL PAD FIXING ON SH TUBES FOR METEL TEMPERATUREIN HRSG-PH II

PIPING & STRUCTURALS JOBS FOR CARRYING OUT REPAIR & REPLACEMENT AT AVU-3

MODIFICATION OF DROP OUT FACILITY (CONVEYOR K-4C) AT BARAUNI REFINERY (PART - B)

MM JOB FOR COLUMN OF AVU-II AT BARAUNI REFINERY

CIVIL & MECHANICAL MODIFICATION JOB FOR EXTENSION OF K2 CONVEYOR OF COKER - A AT BARAUNI REFINERY.

ARC FOR MAINT OF FIXED FIRE PROTECTION SYSTEM VIZ HYDRANTS, MONITORS,WATER, WATER SPRAY SYSTEM, SEMI FIXED FOAM POURER SYSTEM etc AT B.R

2004

2003

2003

2003

2003

2003

2003

40.

41.

42.

43.

44.

45.

46.

S.No Year Description W.O No & DateContract Amount

Name of Organization

270/L0098M/331756 DTD 08.08.2002

WO/2002-03/03 DTD 31.05.2002

OGSP/45000-09005/S N PALEKAR DTD

06.10.2002

ES/ML/2002/1285/5299

DTD 11.10.2002.

PJ/W-121/84 DTD 26.03.2002

ES/ML/2001/1184/2515 DTD 01.01.2002.

DPCC/BR-EVE/09/2002/02 DTD

18.09.2002

Our Clients

GODRAJ & BOYCE MFG.CO.LTD.MUMBAI

M/S. BUILD WORK PVT. LTD.GUWAHATI

LARSEN & TOUBRO LTD

IOCL BARAUNI REFINERY

------DO------

------DO------

M/S DIVYA PRABHA CONSTRUCTION CO.

BARAUNI

1,00,000.00

49,44,430.31

30,22,182.00

2,78,505.00

1,15,000.00

2,40,240.00

51,88,223.00

REPAIRING/RECTIFICATION/MODIFICATION OF BAFFLE OF COLUMN NO. 701-C-208

REPAIR AND PAINTING OF BUILDING AT BARAUNI REFINERY TOWNSHIP (PART-A)

MANPOWER & FABRICATION SERVICES DURING PRECOMMISSIONING & COMMISSIONING IOCL BARAUNI PROJECT

MAINTENACE & REPAIR OF NEW COKE CONVEYOR SYSTEM OF COKER - A AT B.R

FACILITY DEVELOPMENT TO DROP OUT COKE IN FREE SPACE THROUGH CONVEYOR 4C

FABRICATION OF BELT CONVEYOR ITEMS OF MECHANISED PETRO COKE HANDLING PROJECT AT BARAUNI REFINERY.

ERECTION OF EQUIPMENTS IN AVU I & II FOR VACCUM EJECTOR SYSTEM AT BARAUNI REFINERY

2002

2002

2002

2002

2002

2002

2002

47.

48.

49.

50.

51.

52.

53.

S.No Year Description W.O No & DateContract Amount

Name of Organization

ES/ML/2002/1195/2962 DTD 11.02.2002.

270/L0098M/310611 DTD 16.04.2001

ES/ML/2001/1167 DTD 24.10.2001

PECL/SKB/C-626/5841/2001 DTD.

06.08.2001

EST/P-240/2207/2001 DTD 02.03.2001.

778953 DTD 05.07.2000

778952 DTD 05.07.2000

772576 DTD 01.06.2000

Our Clients

IOCL BARAUNI REFINERY

GODRAJ & BOYCE MFG.CO.LTD.,MUMBAI

IOCL BARAUNI REFINERY

PETRON ENGINEERING

CONSTRUCTION LTD., PUNE

ENSYS TECHNOLOGIES (I) PVT LTD. CHENNAI.

L&T LTD ECC DIVISION

------DO------

------DO------

22,78,000.00

2,00,000.00

1,80,287.00

21,87,606.8

44,47,170.00

1,81,550.00

1,87,500.00

1,13,454.00

ERECTION , ALIGNMENT, TESTING & COMMISSIONING OF BELT CONVEYOR, TRIPPER & OTHER ASSOCIATED ITEMS AT BARAUNI REFINERY.

SITE WORK - BALANCE WORK ON EQUIPMENT NO. 701-C208,204 ADND 205 FOR SAMSUNG AT IOCL BARAUNI

RAISING HEIGHT OF RETAINING WALL FOR PROTECTION OF COKE SIZER IN COKER-A AT BARAUNI REFINERY

FABRICATION & ERECTION OF STEAM TRACING LINES,DHDT REACTOR INTERNALS INSTALLATION & INSTALLATION OF TRAYS IN COLUMN.

ERECTION & COMMISSIONING OF HRSG BOILER AT OUR SITE IOCL BARAUNI REFINERY

SUPPLY OF STONE CHIPS (KODARMA)

SUPPLY OF STONE CHIPS (KODARMA)

SUPPLY OF STONE CHIPS (KODARMA)

2002

2001

2001

2001

2001

2000

2000

2000

54.

55.

56.

57.

58.

59.

60.

61.

S.No Year Description W.O No & Date Name of OrganizationContract Amount

778951 DTD 28.06.2000754998 DTD 26.07.2000754996 DTD 15.07.2000

ES/ML/2000/869/1374 DTD 22.03.2000.

ES/ML/2000/868/1375 DTD 22.03.2000.

SD/318/BR/009 DTD 01.08.2000.

482047 DTD 03.06.2000.EST/P-

203/2207/2000 DTD 24.07.2000.

EST/P-222/2206/2001 DTD 24.07.2000.

PRJ/W-101/347 DTD 01.04.1999

Our Clients

------DO------

------DO------

------DO------

IOCL BARAUNI REFINERY

------DO------

M/S. BUILD WORK PVT. LTD.,GUWAHATI

L&T LTD ECC DIVISIONENSYS

TECHNOLOGIES (I) PVT LTD. CHENNAI.

------DO------

IOCL BARAUNI REFINERY

93301.00

2,75,778.00

2,60,327.00

1,96,711.92

1,12,390.00

2,32,369.64

6,00,250.00

35,40,915.00

9,65,000.00

25803.75

SUPPLY OF SAND

SUPPLY OF SAND

SUPPLY OF SAND

STRUCTURAL PATHWAY & OTHER CHECK LIST JOBS FOR COMPLETION OF TANK JOBS AT BARAUNI REFINERY.

PIPING AROUND CRUDE TANKS AS PER REVISED OISD REQUIREMENT AT BARAUNI REFINERY.

MECHANICAL WORK FOR PRESSURISED WATER RECIRCULATION SYSTEM AT BARAUNI REFINERY.

HOOK UP & TRACING

ERECTION & COMMISSIONING OF HRSG BOILER AT OUR SITE IOCL BARAUNI REFINERY

DISMENTLING OF EXISTING COLUMN AT COKER-A REVAMP PROJECT AT IOCL BARAUNI SITE.

MODIFICATIO OF FOAM POURER COOLING WATER LINE OF TANK NO 226,231,233.

2000

2000

2000

2000

2000

2000

2000

2000

2000

1999

62.

63.

64.

65.

66.

67.

68.

69.

70.

71.

S.No Year Description W.O No & Date Name of OrganizationContract Amount

SIS/TA/0442 DTD 16.03.1998

CPFF1957/W/FF/34 DTD 03.09.1998

PRJ/P-71/98/216 DTD 23.03.1998

PRJ/W-96/96/674 DTD 09.09.1998

PRJ/W-72/809 DTD 09.09.1998

DTD 08.10.1998

BA/IOCL/HTR/LCC/02 DTD 06.11.1998

Our Clients

SANMAR INDUSTRIES LTD., CHENNAI

LARSEN & TOUBRO LTD

IOCL BARAUNI REFINERY

------DO------

------DO------

SAB TECHNICAL SERVICES (I)PVT LTD, MUMBAI

LARSEN & TOUBRO LTD

27000.00

26000.00

56167.50

25239.60

39913.81

4,00,000.00

3,21,946.00

SUPPLY, FABRICATION, ERECTION & PAINTING OF STEEL STRUCTURALS.

PROVIDE MANPOWER & MATERIALS TO MAKE AN APPROACH ROAD.

PIPING JOB FOR COOLING WATER LINE TO WHFU.

MODIFICATION OF FIRE WATER LINE & FOAM SUPPLY LINE TO STORAGE TANK NO 92,95,96 & 97

MECHANICAL PIPING FOR DRAIN CUM RE CIRCULATION LINE OF MPU.

FABRICATION OF TRAY SUPPORTS RINGS BOLTING BARS, RING CHANNELS & OTHER ATTAVHMENTS REQUIRED FOR COLUMN K1,K4 & k9 of IOCL REFINERY, BARAUNI IN AVU I & II DURING S/D.

CONSTRUCTION OF REFRACTORYSHED OF OUR AVU-III AT I.O.C.L BARAUNI.

1998

1998

1998

1998

1998

1998

1998

72.

73.

74.

75.

76.

77.

78.

S.No Year Description W.O No & Date Name of OrganizationContract Amount

List Of Our Tools And Plants

Hydra 12MTTractor TrallyWelding Generator (Advani make)Welding Rectifier machineWelding TransformerArgon set (Tig Welding set)Gas Cutting setsChain Pully Block - 1 TonChain Pully Block - 3 TonChain Pully Block - 5 TonChain Pully Block - 10 TonElectric winch - 3 TonHydraulic Jak - 25 TonHydraulic Jak - 50 TonScrew Jack - 10/25 TonCheave Pully - 2 tonCheave Pully - 5 TonCheave Pully - 10 TonFull lift - 3 TonFull lift - 5 TonMax pullerSlings 1.5”Slings 2.5”Slings 2"Wire Rope 1”Wire Rope 7/8”Wire Clamp 1.5”Wire Clamp 7/8”D. Shackles 1/2T to 10T capacityD. Shackles 20T capacityD. Shackles 50T capacityTurn Buckle 1/2T to 20T capacityPully Block 1/2T to 3T capacity

1.2.3.

4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.

34.35.36.

51.

52.53.

54.55.56.57.58.59.60.

37.38.39.

40.41.42.

43.44.45.

46.47.48.49.

50.

A.G7 GrindersG.Q.-4 GrindersF-F.2 Grinders (Fixible shaft electrical grinder)AG-4 GrindersAG-5 Grinders

Vernier callipers upto 800 mm. (Lease count - 0.01 mm.)Vernier callipers upto 300 mm. Pressure guage (0.10 Kg./Sq. cm& 0.100 Kg/sq.cm.)Filler guage (upto 600 mm)Steel scales (upto 600 mm.)D-Spanners SetRing Spanners setSocket/Box-Spanner setTorck WrenchChain Wrench

Pipe Bending Machine (Hydraulic)Pipe Vice (Heavy Duty)Bench VicePortable Drill Machine 1" (Pistol Type)Megnatic Drill 30 mmPug cutting machineElectrode drying oven Bench typeElectrode drying oven (portable)Threading tap sets (upto 56 mm)Eye Bolt (upto 56mm)Dial Indicator (Least count 0.01 mm.)Magnetic base for dial indicator

Description of EquipmentsS.No.

Description of EquipmentsS.No.

List Of Our Tools And Plants

Adjustable pipe wrenchOther hand ToolsConcrete Mixing MachneVibratorAuto LevelTheodoliteCube Test MachineScaffolding MaterialConcrete Breaker Heavy DutyCompressor MachineHydraulic Testing Machine (upto200Kg pressure)

Portable fire ExtinguishesSafety BeltSafety ShoeHand GlovesHelmetAcid cleaning ApronSafety GogglesWelding screen and HelmetWelding screen and HelmetRope Ladder

61.62.63.64.65.66.67.68.69.70.71.

72.73.74.75.76.77.78.79.80.81.

S.No.

Description of Equipments

SAFETY EQUIPMENTS

ADDRESSLAXMI CONSTRUCTION COMPANY

HEAD OFFICE:SABOURA,

P.O.-BARAUNI OIL REFINERY,DISTRICT-BEGUSARAI,

STATE BIHAR-851114

TEL. NO.: 06243-244587Cell Phone : 9431029997 / 9431417644,

9199508424E-mail : [email protected]

2nd Email : [email protected] : www.laxmiconstruction.com