Johann M. Heuser – The CBM Experiment at FAIR 1 STS and magnet engineering.

download Johann M. Heuser – The CBM Experiment at FAIR 1 STS and magnet engineering.

If you can't read please download the document

description

Johann M. Heuser – The CBM Experiment at FAIR 3 Superconducting dipole magnet CAD design study Field profile along the beam axis B[T] E.A. Matyushevskiy, P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov, V.V. Ivanov, E.I. Litvinenko, and A.I. Malakhov JINR, Dubna, Russia

Transcript of Johann M. Heuser – The CBM Experiment at FAIR 1 STS and magnet engineering.

Johann M. Heuser The CBM Experiment at FAIR 1 STS and magnet engineering Johann M. Heuser The CBM Experiment at FAIR 2 Silicon Tracking System STS: 8 detectors stations in thermal enclosure Stations: carbon enforced ladder structures with peripheral read-out. 2 Ladders: sensors, bonded to ultra-thin long micro-cables, read-out electronics at periphery S. Belogurov et al., S. Igolkin et al, E.A. Matyushevskiy et al. Johann M. Heuser The CBM Experiment at FAIR 3 Superconducting dipole magnet CAD design study Field profile along the beam axis B[T] E.A. Matyushevskiy, P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov, V.V. Ivanov, E.I. Litvinenko, and A.I. Malakhov JINR, Dubna, Russia Johann M. Heuser The CBM Experiment at FAIR 4 Long-term engineering project We must have long-term available engineering capabilities at GSI to ensure system integration of STS-MVD-Beam pipe-Magnet Contact person:Wolfgang Niebur, GSI who will collect the different inputs from CBM institutes and will be in contact with the GSI construction group under discussion/planning now: how to transfer the work and effort done so far by S. Belogurov et al. to GSI in 2009.