January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN...

33
June 19, 2022 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna Magda

Transcript of January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN...

Page 1: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

April 11, 2023

1

Identifying dominant measurements errors in

fully automated water networksPWN Waterleidingbedrijf Noord-HollandWater technology

Lucyna Magda

Page 2: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

2

Content

• Problem definition• Errors in mass balances• Flowmeter In-Situ calibration and its constraints• Vendors who sell this kind of equipment• PWN-state of the art• List of companies who use this kind of

equipment• Recommendations- advice on application.

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 3: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

Scope of the presentation

3

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 4: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

Water balance

4

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

∑(OUT-IN)-dS/dt=0

Page 5: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

PWN-Validatie ruwwaterstrom 2002

• Up to 70% of water balances are doubtful

• All balances show systematic error-bias

• The errors are in the reach 3000 m3/day

• Possible causes:• Leakage• Additional inflow• Flowmeters

malfunctioning• RESULT OF THE ANALY

SIS

5

• April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 6: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

6

Problem definition

Malfunctioning field devices, including flowmeters cause process disturbances and errors in mass

balances

When such devices monitor themselves, faults can be detected and reported at an early stage,

greatly reducing their impact on the process.

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 7: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

7

Problem definition

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 8: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

8

Problem definition

“On

site

flow

cal

ibra

tion

is p

ainf

ul b

ut n

eces

sary

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 9: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

9

Errors in mass balances

Faults are frequently not the result of an instrument defect but application-related malfunctioning:

• device selection and sizing, • unsuitable installation,• application problems.

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 10: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

10

Type of the errors

1. Systematic Errors2. Accidental and Random Errors

Vendors: gross errors = systematic if proper installed.

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 11: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

11

Errors from the flowmeters

Gross error

• e - the manufactory error, • b - a systematic error • x - systematic component of the random error

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 12: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

12

Flowmeters types-choice dilemma

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 13: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

13

Flowmeters best application

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 14: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

14

Flowmeters surrounding errors

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 15: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

15

Electromagnetic Flowmeter

(1)  U = K × B × v × D

K instrument constant B magnetic field strength v mean flow velocity D electrode spacing

The volumetric flow rate qv can be calculated according to

(2)  qv = v × D² ×  π/4

It follows from equation (1) that

(3)  v = U / K×B×D

Therefore:

(4)  qv = (U / K×B) × D ×  π/4

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 16: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

Flowmeter: Primary and Secondary

16

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Secondary

Primary

Page 17: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

Examples of Primary and Secondary

17

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 18: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

Wet Calibration

18

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

1.

2.

3.

Page 19: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

19

Dry Calibration- Flowmeter Secundary

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 20: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

20

Verification techniques- Flowmeter Primary

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 21: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

21

Verification techniques- Flowmeter Secundary

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 22: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

22

Flowmeter calibration-a typical calibration curve

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 23: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

NameNumber of flowmeters

at PWNExpanded diagnostic

Verification techniques

161 CallMaster MagMaster

Emflux 2 - COMBINED EMFLUX

74 - Field Check

Heinrichs 2 - UMF

16 Optiflux MAGCHECK

Tokimec 8 - TOKYO KEIKI

- - SIMENS VERIFICATOR

Juergen - - COMBINED EMFLUX

23

Vendors

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 24: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

24

PWN-state of the art

• April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 25: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

25

Recommendations

• How to choose which flowmeters should be replaced:

• Water Balances that do not pass validationand the following set in the importance order:• Plenty control strategic points• Plenty Performance• Plenty Cardio• PT-Monthly Reports• Setpoint related flowmeters

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 26: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

26

PWN- Schematic representation of WRK

• April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 27: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

27

PWN- Schematic representation of WRK

• April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Plenty control biggest importance

Bed water mass balances

Page 28: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

28

PWN- Schematic representation of WRK

• April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Plenty control biggest importance

Bed water mass balances

Page 29: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

29

PWN- Schematic representation of WRK

• April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Plenty control biggest importance

Bed water mass balances

Page 30: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

30

Recommendations

• Electromagnetic flowmeters at Bergen should be replaced with the footprinted flowmeter

• Electromagnetic flowmeter at Secundairs 9-10 should be replaced with the ultrasonic 3-beams flowmeter

• I recommend periodic pipe inspecions near the extraction point

• I recommend structural changes where it is possible to increas the flushing of the sediments

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 31: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

31

Similar projects in The Netherlands

• Grolsh brewery in Enschede- Optiflux 4000 and mass flowmeters

• Detroit water and Sewage Department- Mag master and Call Master

• Both cases have been published with positive reviews

April 11, 2023 MSc: Water Resources Management , Lucyna Magda

Page 32: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

April 11, 2023

32

QUESTIONS?

5 min

Page 33: January 15, 2015 1 Identifying dominant measurements errors in fully automated water networks PWN Waterleidingbedrijf Noord-Holland Water technology Lucyna.

April 11, 2023

33

Thank you for you attention.

Special thanks to:Ignaz Worm, Eric de Vos, Henk van Duist, Harry Rolf, and everyone else from the Water Technology team