IPP Project for gas supply 2x41 MW Senipah PLTG - Kaltim Indonesia

Transcript of IPP Project Presentation

  • IPP ProjectTotal E&P Indonesie Area. Location Area.

    PPA area for install Metering skid and Pig launchercomplete with all piping and structure

    PPA Technical Building or install Metering Panel,Shutdown system and Process control.

  • IPP ProjectTotal E&P Indonesie Area. Overall Progress.

    Progress installation on PPA area are 70%.

    Job has done:

    Installation Pig launcher

    Pipe line from TEPI to IPP Pamedas.

    Some Piping and structure .

    Tie in Point for gas supply.

    Electrical and Instrument cable has been pulled.

  • IPP ProjectTotal E&P Indonesie Area. Continue.

    Pigging FCG and IP.

    Remaining Job.

    Hydrotest.

    Up load program PCS (process control system and SSS (safety shutdown system).

    Electrical Power supply tie in.

    Install Metering skid.

    Welding remaining Piping work.

  • IPP ProjectTotal E&P Indonesie Area. Continue.

    PAGA installation.

    Installation ESDV valve and manual Valve.

    Pre-commissioning and Commissioning.

  • IPP ProjectTotal E&P Indonesie Area. Docummentation.

    Pre-commissioning dossier has been created.

    Tie in Procedure has been ready.

    Operguide Procedure for piping tie-in has been created.

  • IPP ProjectTotal E&P Indonesie Area

    IPP Project Area - PPA

    METERING PIG LAUNCHER

  • IPP ProjectTotal E&P Indonesie Area.

    Tie in gas supply for Metering to IPP Pemedas

  • IPP ProjectTotal E&P Indonesie Area.

    Pig Launcher at PPA Area and venting system

  • IPP ProjectTotal E&P Indonesie Area.

    Pipeline at PPA Area to IPP Pemedas 5 km

  • IPP ProjectTotal E&P Indonesie Area.

    E&I work at IT Room

  • IPP ProjectTotal E&P Indonesie Area.

    THANK YOU