WELCOME Od is London’s leading fit-out and refurbishment company in commercial, residential and leisure.

We provide the very best specialist construction skills from project initiation to completion, and we can cope with any scale project including new builds.

We’re experts in organising people and materials within tight timescales.

Jon Kearney has put together a dedicated team with over 50 years’ collective experience as London and the South East’s leading high-quality contractor

Within this document you will find a selection of our recently completed commercial office projects

Page 3: Intro to od 021013
Page 4: Intro to od 021013

• OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.

• Recruitment of Commercial Director (Managing Surveyor of top fit out company)

• Recruitment of Construction Director (BCO & FX Quality Award Winner)

• AIB framework contractor.

• OD Projects currently employ 25 staff.

• Achieve British Council for offices corporate member status.

• Sign 5 year lease and fit out Moorgate HQ.

• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.

• Rolls Royce Framework contractor• Green Apple Award for Digitas

Saatchi & Saatchi

• Instutute of Chartered Accountants Framework contractor

• Awarded Vogue /Condenast HQ fitout

• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College

• Savills approved contractor

• High end residential team acknowledged as leading contractor within sector

• Awarded refurbishment for Royal Albert Hall

2004 2005 2006 2007 2008 2009 2010 2011 2012

In January Jon Kearney founds OD Projects.

• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.

• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.

• Royal & Sun Alliance approved contractor status.

• OD Projects complete £4 million,107 Leadenhall, fit out.

• OD Projects achieve ISO9001 status.

• Forecast record turnover of circa £20m in with Business Plan.

• Official launch of aftercare team ‘ZEROdEFECTS’.

• Successful completion of first Irish project for Marcus Evans HQ in Dublin.

• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.

• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.

• Rebrand of Od which defines our focus and disciplined approach to achieving quality.

• Od appointed on Savills Estate Agency office fitout framework

• Repeat business levels at 70% of turnover and growing

• Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites

• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London

• Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead

• Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build

• OD Expand office space to take another floor at Sun St HQ

COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD has over 50 years collective experience as London and South East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects.

We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a project team’s expectations.

Page 5: Intro to od 021013

182 8 10 12 14 164 60

(Turnover £m April-April)

2011/2012

20 2422 26

2012/2013

Secured2013/2014 (Projected)

(Turnover £m April-April)

OD Solutions

Secured

Secured OD Interiors

OD Projects

2013/2014 (Projected)

2 8 10 12 144 60

OD GROUP TURNOVER

Secured

Secured2014/2015 (Projected)

TURNOVERRecently Od were delighted to announce the formation of the Od Group (Od Holdings)

This has provided a transparent platform for our service to continually improve, allowing our key staff to drive their core skills specifically within their respective specialist division

The group organisation commenced from the 2013/ 2014 financial period and is currently forecasting an overall turnover of £24million, £12 million of our forecast was secured prior to commencement of the new April to Apil financial period.

Page 6: Intro to od 021013

OD HOLDINGS

OD INTERIORSOD PROJECTS OD SOLUTIONS

Specialising in interior fit out and construction to the professional construction industry.

Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients.

Covering all sectors including Commercial, Retail and Leisure

Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors

Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.

OD INTERIORS

Jon KearneyManaging Director

Steve CherryConstruction Director

Greg PinchinCommercial Director

Andy TorlotDirector

Jon KearneyDirector

Andrew WrightDirector

** Company No: 06494819 ** Company No: 5029142 ** Company No: 8401423

** 1 Sun Street, London, EC2A 2EP

Page 7: Intro to od 021013
Page 8: Intro to od 021013
Page 9: Intro to od 021013

Procurement: Design & Build

Architect GenslerProject Manager GenslerQuantity Surveyor Montie

Duration 11 WeeksValue £600,000Size 3000 sq ft

SAPINDALEVEL 5, 25 PARK LANE, W1

• New Cellularized Offices,

• New Meeting and Board rooms,

• High spec stone reception,

• Stone flooring,

• Specialist joinery,

• New Lighting inclusive of feature lighting installed throughout into the existing suspended ceiling and the new plasterboard.

Strip out and new fit out of existing occupied offices in two separate phases.

The works undertaken comprised:

Page 10: Intro to od 021013
Page 11: Intro to od 021013

Procurement: Design & Build

Project Manager GenslerArchitect Gensler

Duration 10 weeksValue £535,000 Size 7000 sqft

HARRIS WILLIAMSLEVEL 2, BROOK STREET MAYFAIR

• High quality bespoke joinery,

• Mechanical & electrical modifications,

• Double glazed BENE partitions & doors,

• Handmade carpet flooring,

• Audio visual installations.

CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.

The works comprised:

Page 12: Intro to od 021013
Page 13: Intro to od 021013

PARADIGM HOUSINGHIGH WYCOMBE

Quantity Surveyor: HeasmansArchitect: Mansfield Monk

Duration: 9 weeksSize: 40,000 sq ft

• Structural modifications;

• Revision of basebuild services;

• Dedicated comms room with UPS backups;

• Formation of new glazed offices;

• General fit out of office space over all floors;

• New Reception;

• 5 New kitchens & Breakout station;

• Board room with integral AV installation;

• Third project in UK to achieve Silver SKA Rating for sustainability.

The 40,000sq ft fit out from CAT A of Building 1A, Glory Park for Paradigm Housing Association to provide them with their headquarters. Works included:

Page 14: Intro to od 021013
Page 15: Intro to od 021013

Procurement: Design & Build

Architect: Edge Quantity Surveyor: ArcadisServices Consultant: Arcadis

Duration: 12 weeks Value: £1mSize: 30,000 sq ft

DOW JONESGRAYS INN RAOD, LONDON

• Strip out• Installation of new electrical & mechanical

services• Glass partitions• Fit Out of new toilets

• Tea Points• High specification restaurant• Floor coverings

Refurbishment of office floor whilst the building remained in full occupation, works included:

Page 16: Intro to od 021013
Page 17: Intro to od 021013

Architect: Pure DesignProject Manager: Savills

Project Value: £1,100,000Duration: 14 Weeks

WINCOR NIXDORFDARTFORD

• Raised floor & ceilings;

• New partition layout including glazed walls;

• Air conditioning;

• Toilet fit out;

• External works.

The complete strip out of the existing office building and installation of a CAT B fit out comprising

Page 18: Intro to od 021013
Page 19: Intro to od 021013

Procurement: Design & Build

Architect: BLDA

Duration: 12 WeeksValue: £700,000Size 9000 sq ft

MARCUS EVANSSIMMONSCOURT HOUSE DUBLIN

• New Offices,

• New Meeting and Board rooms,

• High spec reception,

• Staff break out areas,

• New comms Room,

Cat B commercial office fit out at Simmonscourt House in Dublin,

Works included:

Page 20: Intro to od 021013

SUSTAINABILITYOd is taking positive steps to reduce its own carbon footprint – from the office environment to the manufacturing process. Wherever possible we control emissions, recycle, use renewable resources and conserve energy.

We and have received numerous environmental awards and accreditations including:

• SKA – Silver

• BREEAM – Excellent

• LEED™ – Silver

• Green Apple Award

Page 21: Intro to od 021013

Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result.Well done, great team effort and thank you once again

Philip SuttonDevelopments Project Manager - Property Royal London Asset Management

“ ”

Page 22: Intro to od 021013

PAGE 96 PREPARED BY OD SOLUTIONS FOR TEMASEK INTERNATIONAL (EUROPE) LIMITED

Issue Date: 16 September 2011 Site ID: 52602

Robert Biggs Chairman, Considerate Constructors Scheme Ltd.

Presented to

Patrick Mcloone

Of

OD Developments and Projects Ltd

For

Portland Building

CERTIFICATIONCERTIFICATION

Page 23: Intro to od 021013

CERTIFICATION

Fit‐out Sustainability AssessmentThis is to certify that

Paradigm Housing GroupBuilding A1 Glory Park

High Wycombe Bucks HP10

has achieved the Ska rating of

Silver

Accredited Assessor 

Pringle Brandon LLP

On behalf of 

Paradigm Housing Group

Project Manager 

Savills Commercial Ltd

Architect 

Mansfield Monk

Contractor 

OD Projects

Building Services Engineer 

Capita Symonds

Certificate Reference 

Glory Park, High Wycombe

Date 

29/06/2010

This certificate has been produced using Ska Rating Offices version 1.0 

SUSTAINABLE CREDENTIALS

Page 24: Intro to od 021013

COMPANY

STAGE 1 – PLANNING FOR QUALITY•ZeroDefectsIntroductionMeeting•DetailedDesignReview•IdentifyQualityRisks•IdentifyWorkZones/Sequencing/Phasing•Sub-contractorTargetProgramme

STAGE 2 – INFORMATION RELEASE•Drawing/InformationReleaseSchedule•SampleSchedule•OffSiteInspectionSchedule

STAGE 3 – SETTING QUALITY STANDARDS•Benchmarking•SampleApproval•KeyInspections•ProtectionRegime

STAGE 4 – REVIEW & QUALITY CONTROL SIGN OFF•Review•Monitoring•Handover

STAGE 5 – SNAGGING & DEFECTS•DefectsProcess•IdentifyingDefects•SiteMarkUps•Sub-ContractorDefectManagement•DefectReporting

STAGE 6 – PROJECT CLOSE OUT•FinalisationPlan•CloseOutProgrammes•DefectReporting•RecordDocument•ClientFamiliarisation

Od operates a ‘zero defects’ plan. This is more commonly known as a quality plan. The plan is written at the commencement of theprojectandsetsouttoachieveashighaqualitydeliveryaspossible.Thisisnotjustinthefinishedproduct,itcoverseverystage of the project including management techniques as follows;

ZER efects