IntelliDrive Research
Signal Phase & Timing (SPaT)and Related Messages
Edward FokOffice of Technical Service
San Francisco
Research Goal
• Define an open interface for two-way communication of traffic signal information between traffic signal controller and a mobile device
Purpose of SPaT
• Traffic signal control information that conveys the current movement state of each active phase in the system will provide the capability for:– Safety applications such as warnings and alerts for
crash avoidance– Mobility applications to enable dynamic and
efficient traffic management – Environment applications that allow savings in fuel
consumption and reduction in CO2 emissions.
Related Messages
• Map data that conveys the gemetric layout of the associated intersection
• Positioning data that allows the correlation of the signal and map data
SPaT Operation Overview
On Board Equipment (OBE)
No Dedicated turn signals
No Dedicated turn signals
Left turn and through signals
Left turn and through signals
X
Lane Centerline
Intersection Location X
X
X
X
X
Stopping Location X
Intersection ID: 23983
1 2
3
4
5
6 7
10
9
8
Lane ID 5 TrafficControl Device
DSRC radio
SPaT Processor
Positioning/GPS
Map storage/GID
MAP/GIDGPSC SPaT
Open Interface – Concept
Interface to be defined
Two-way communication
Mobile Equipment
SAEJ2735
Traffic Signal Controller
NTCIP1202
NEMA TS-X
2070
ATC
Others
Desirable Characteristics
• Minimize the need for new standard objects, or ideally: no new objects.
• Traffic Controller standard may reference SAE J2735
• SAEJ2735 reference NTCIP 1202• Updates expected for both Standards
Process for Development
• Review of relevant Past and Current research• Creation of user forums
– Traffic Control Industries– Modal Partners– Vehicle and Tier-1 OEM
• Concept of Operation Development• Prototype Development• Finalize Interface
Track 5
Track 1
Track 2
Project Mgmnt
Rqrmnts
Track 3
Track 4
Concept Definition
Testing
Prototype
Finalize Interface Definition
CY 20111Q 2Q 3Q 4Q
CY 20101Q 2Q 3Q 4Q
Con Ops
PMP & SEMP
UpdateRequirements
Build Environment for prototype evaluation
Develop (2) Prototypes
Develop Prototypes with additional vendors
Issue SOW
RequirementsWalkthrough
Cap Anal
Rsrch/ Lit Rev
Contract Award
Integrate SPaT with Map,
Positioning, & Security
Subject Matter Expert Workshop
CY 20121Q 2Q 3Q 4Q
Reqs
ConOps Walkthrough
DraftInterface Definition
Additional Prototype Testing Safety Pilot Model Deployment
Review Draft with Standards Stakeholders
Test initial Prototypes
Signal Phase and Timing Research Roadmap (planned)