INSTALLATION AND OPERATION MANUAL - Fullriver...

24
WWW.FULLRIVERBATTERY.COM INSTALLATION AND OPERATION MANUAL fullriverbattery.com

Transcript of INSTALLATION AND OPERATION MANUAL - Fullriver...

Page 1: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com

INSTALLATION ANDOPERATION MANUAL

fullriverbattery.com

Page 2: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage b

CONGRATULATIONS ON YOUR PURCHASE OF A FULLRIVER BATTERY!

FULLRIVER BATTERY USA

4030 AdoLFo RoAd CAmARILLo, CA 93012

ToLL FREE: (800) 522-8191 InT’L: (805) 484-7900

www.FULLRIVERBATTERY.Com

© 2015 fullriver battery uSa all rightS reServed

This publication is protected by copyright. All rights are reserved. At no point, may any part of this publication be copied, reproduced, or transmitted by any means or any format without prior written consent from Fullriver Battery.

Fullriver Battery is not liable for direct, indirect, special, exemplary, incidental or consequential damages that may result from any information provided in or omitted from this manual, under any circumstances.

Fullriver Battery reserves the right to make adjustments to this manual at any time, without prior notice or obligation.

Fullriver Battery and the Fullriver Battery logo are registered trademarks of Fullriver Battery Mfg. Co. Ltd.

Maximize the performance of your new batteryby thoroughly reading this manual

Page 3: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page c

Table of Contents

1. GETTING STARTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1 - Safety 1.2 - Equipment checklist

2. INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 2.1 - Selecting the appropriate cable size 2.2 - Terminal connections 2.3 - Battery orientation 2.4 - Series connections 2.5 - Parallel connections 2.6 - Series / parallel connections 2.7 - Cross tying batteries in parallel packs 2.8 - Charging batteries before use

3. OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9 3.1-Temperatureeffectsonbatteryperformanceandlife 3.2 - Operating temperature range 3.3 - Depth of Discharge (D.O.D.) vs. Battery Life

4. CHARGING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-11 4.1 - Charger inspection 4.2 - Charging your Fullriver batteries 4.3 - Charging temperature range 4.4 - Charging parameters 4.4.1 - Current 4.4.2 - Voltage settings 4.4.3 - Temperature compensation

5. STORAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13 5.1-Batterystorageprocedure 5.2-Temperatureeffectsonself-discharge 5.3 - Storage temperature range

6. TESTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-15 6.1 - Test preparation 6.2 - Open circuit voltage test 6.3 - Discharge test 6.4 - Optional test 6.5 - Battery replacement instructions

7. YOUR CLEAN-GREEN ENERGY SOLUTION . . . . . . . . . . . . . . . . . . . . . . 16-17 7.1-Fullriverproducts 7.2 - Fullriver manufacturing 7.3 - Battery recycling

8. TRANSPORATION INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

A. APPENDIX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 A.1 - Temperature ranges A.2 - State of Charge (S.O.C.) vs. Open Circuit Voltage (O.C.V.)

Page 4: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 toll freePage d

Notes

Page 5: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 1

INSTALLATION ANDOPERATION MANUAL

Page 6: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 2

BeforeinstallingyourFullriverbattery,pleaseadheretothefollowingsafetyguidelinesandmakesurethatyouhavetheproperequipmentforinstallation,operationanddiagnostictesting.

1.1 - SAFETY

PROTECT YOURSELF AND PROTECT YOUR BATTERY

• Wearprotectivegear,includinggloves,whenhandlingabattery.

• Installandremoveabatteryusingtheliftinghandlesprovided.

• Useawrenchwitharubbercoatedhandleforinstalling,tightening,orremoving battery connections.

• Do not place any objects on top of a battery.

• Do not smoke near a battery.

• Keepflames,sparksandmetalobjectsawayfromabattery.

• Chargebatteriesinaventilatedarea-althoughAGMbatteriestypicallydonot release gas. The safety valve may open to alleviate excess pressure if the batteryisover-charged.

ALWAYS USE CAUTION AROUND A BATTERY

1.2 - EQUIPMENT CHECKLIST

Gloves

Wrenchwithinsulated/rubbercoatedhandle

Voltmeter

Charger

Discharger (if available)

Getting Started

Page 7: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 3

Properbatteryinstallationisthefirststepingettingthebestperformanceoutofyour Fullriver battery.

2.1 - SELECTING THE APPROPRIATE CABLE SIZE

Cablesmustbesizedtocarrythemaximumexpectedload.Under-sizedcablescanresultinover-heating,meltedconnectionsandareapotentialfirehazard.

Refer to TABLE 1belowforthecurrentcarryingcapacitybycablesize.Thesevaluesare for cable lengths of 6 feet (1.83 meters) or less. It is preferable that all cables in a series connection or in a parallel connection are the same length.

Tosignificantlyreducetheamountofheatgeneratedattheterminals,usecableswithsolder-dippedends.

Installation

25

30

40

55

75

95

130

150

170

265

360

Ampacity (Amps)14

12

10

8

6

4

2

1

1/0

2/0

3/0

Cable Gauge (AWG)

TABLE 1

Page 8: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 4

2.2 - TERMINAL CONNECTIONS

Terminalconnectionsmustbetightenedusingthecorrecttorquevaluesasdefinedin TABLE 2below.Overorundertightenedconnectionscanresultinterminalbreakage,over-heatingand/ormeltdown.Usingthepropertorquevaluewillprovideoptimumconductivity.Toavoidashortcircuit,useawrenchwithaninsulatedorrubbercoatedhandlewhenmakingterminalconnections.SeeDIAGRAM 1belowforproperwasherplacement.

NEVERplaceawasherbetweenthematingsurfacesoftheterminalsandcables.Thiswillcompromiseelectricaltransmissionandincreaseresistance,resultinginextremeheatgenerationandprobableterminalmelting.

Loctite®Threadlockermaybeusedtobettersecuretheterminalconnections. Be careful not to get Loctite®betweenthematingsurfacesof the terminal.

5.6 - 7.9

7.9 - 10.1

9.6 - 10.7

12.2 - 14

50 - 70

70 - 90

85 - 95

110 - 125

4.2 - 6.0

6.0 - 7.5

7.1 - 8.0

9.2 - 10.4

AP,DT(AP),M6,M6M(stud),

TP07 (AP), TP08 (AP)

FR45

M8

DT(stud),M10M(stud)

Nmin-lbsft-lbsTerminal Type

TABLE 2

Installation

DIAGRAM 1

Page 9: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 5

2.3 - BATTERY ORIENTATION

Theidealplacementofbatteriesisupright.AGMbatteriescanbeplacedontheirsideifnecessary.Itispreferredthatallthebatterieswithinapackbeplacedinthesame orientation.

NEVERplacebatteriesinaninvertedorientation.

2.4 - SERIES CONNECTIONS

There is more than one option to meet your voltage requirements. For example, for a12voltsystem,youmayuseone(1)12voltbatteryortwo(2)6voltbatterieswiredinaseriestomakeupthe12volts.Youmayuseasmanybatteriesasyouneedtomake up the system voltage. Connect the positive of one battery to the negative of the next through the entire string. See DIAGRAM 2belowfortheproperseriesconnection.

Installation

Series Connection:Voltage is increased in a series connection

Two 6V, 224AH batteries = 12V, 224AH

DIAGRAM 2

Page 10: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 6

2.5 - PARALLEL CONNECTIONS

There is more than one option to meet your energy requirements. For example, to meet the requirements for a 210 Amp-Hour system, you may use one (1) 210 Amp-Hourbatteryortwo(2)105Amp-Hourbatterieswiredinparalleltomakeupthe210Amp-Hours.Connectallthepositiveterminalstogetherandallthenegative terminals together in the string. See DIAGRAM 3belowforproperparallelconnection.

2.6 - SERIES / PARALLEL CONNECTIONS

Batteriescanbeconnectedinbothseriesandparalleltoattainthedesiredsystemvoltageandenergyrequirements.SeeDIAGRAM 4belowforproperseries/parallelconnections.

Foroptimumperformance,thesystemspositiveandnegativeleadsshouldbeconnecteddiagonallyopposite(catty-corner)fromeachother.

Installation

Parallel Connection:Capacity is increased in a parallel connection

Two 12V, 105AH batteries = 12V, 210AH

DIAGRAM 3

Series/Parallel Connection:Voltage and capacity are increased in aseries/parallel connection

Four 12V, 115AH batteries = 24V, 230AH

DIAGRAM 4

Page 11: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 7

2.7 - CROSS TYING BATTERIES IN PARALLEL PACKS

Inordertomaintainbalanceinparallelbatterypacks,itisbesttocrosstiethe batteries.Thismethodofconnectionwillmaximizetheperformanceandlifeofyourbatterysystem.Cross-tyingbatteriesmeansconnectingpositivetopositivesandnegativestonegativesofeachadjacentbatteryintheset.SeeDIAGRAM 5belowforpropercrosstyingconnections.Thedottedlinesrepresentthecrosstiedcables.

Leavesomespacebetweenbatteriesforairflowandminorbatteryexpansion.

2.8 - CHARGING BATTERIES BEFORE USE

NewAGMbatteriesthathaveonlybeenstoreduptosixmonthswillnotneedtobechargedpriortobeingputintoservice.

IfnewAGMbatterieshavebeenstoredformorethansixmonths,and/orinan exceptionally hot environment, a charge may be necessary prior to being put into service.Also,ifthebatteriesarenotchargedpriortobeingputintoservice,youmayexperienceaslightreductioninrangeonthefirstcycle.

Checktheopencircuitvoltage(O.C.V.)ofeachbatteryinthesetandifanybatterywithinthesetislessthanthevaluesinTABLE 3below,rechargethebatteryset.Ifthechargerhasamaintenancemode,selectthatmodetoboostchargethebatteries.Otherwise,runthenormalchargecycle.

Installation

< 2.0 Volts

< 6.2 Volts

< 8.3 Volts

< 12.5 Volts

Open Circuit Voltage (O.C.V.)2 Volt

6 Volt

8 Volt

12 Volt

Battery Nominal Voltage

TABLE 3

DIAGRAM 5

Page 12: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 8

Theperformanceandlifeofabatterywillvarywiththeapplication,usage,temperatureanddepthofdischarge.AGMbatteriestendtodeliverahighercapacitythanrated(upto10-15%higher)unitltheyarebrokenin(approximately30cycles)andsettleattheirratedcapacity.

3.1 - TEMPERATURE EFFECTS ON BATTERY PERFORMANCE AND LIFE

Operatingbatteriesabove80°F(27°C)willyieldruntimesabovetheratedcapacitywhileoperatingbatteriesbelow80°F(27°C)willyieldruntimesbelowtherated capacity.Coldtemperaturescansignificantlyreducebatterycapacity(asshowninthechartbelow).

Although higher temperatures increase the battery capacity, they also accelerate corrosionandreduceoverallbatterylife.Forexample,batteriesoperating continuouslyat100°F(37.8°C),couldexperienceasmuchasa25%reductioninlife.

Operation

Page 13: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 9

3.2 - OPERATING TEMPERATURE RANGE

3.3 - DEPTH OF DISCHARGE VS. BATTERY LIFE

Batterycyclelifewillvarysignificantlydependingonthedepthofdischarge.The deeperthedepthofdischarge,thefewerthecyclesabatterywilldeliver.Conversely,theshallowerthedepthofdischarge,themorecyclesabatterywilldeliver(asshowninthechartbelow).

Tooptimizethehealthofyourbattery,limitdischargeto80%.

Operation

-40°F to 160°F

(-40°C to 71°C)

Maximum5°F to 104°F

(-15°C to 40°C)

Recommended

TABLE 4

Page 14: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 10

UsingtheproperchargeriscriticaltotheperformanceandlifeofyourAGMbattery.IfyouarenotsureifyouhavetherightchargerforAGMbatteries,pleasecallourtechnical support line at (800) 522-8191 or email [email protected] for verification.

4.1 - CHARGER INSPECTION

1. Thechargercableshouldbeinsulatedandfreeofbreaksorcuts.

2. Thecableconnectorsshouldbecleanandproperlymatedwiththebattery terminals to ensure a snug connection.

3. Thecharger’sACcordshouldbefreeofbreaksorcutsandthewallplugshouldbeclean.

4.2 - CHARGING YOUR BATTERIES

1. UseanAGMchargerorsettingwheneveravailable.

2. NeveruseaGELchargerorsettingonanAGMbattery,asitwillunderchargethebatteryandsignificantlyreducebatterycapacityandlife.

3. Many,butnotall,wetbatterychargerswillworkforanAGMbattery.Calltechnical support at (800) 522-8191 or email [email protected] toverifyyourcharger.Bepreparedtoprovidethemakeandmodelofyourcharger.

4. Batteriesshouldbefullychargedaftereachuse.Opportunitychargingcanbedone,butthebatteriesshouldbefullychargedatleasteveryotherdayiftheyareuseddaily.

5. Chargeinaventilatedarea,asgassesmaybereleasedthroughthepressurereliefvalveifthebatteriesareexcessivelyover-charged.

6. Ifthechargerdoesnothaveatemperaturecompensation,abovechargingattemperatures above 122°F (50°C).

4.3 - CHARGING TEMPERATURE RANGE

Charging

Yes

No

5°F to 122°F (-15°C to 50°C)

32°F to 104°F (0°C to 40°C)

Temp Compensation Recommended

TABLE 5

-40°F to 160°F (-40°C to 71°C)

5°F to 122°F (-15°C to 50°C)

Maximum

Page 15: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 11

4.4 - CHARGING PARAMETERS

Mostchargerscomepre-setfromthefactory.Ifyourchargerispre-programmed,usetheinformationbelowtocheckifthesettingsarecompatiblewithAGMbatteries.Ifyouhaveaprogrammablechargerorinverter,usethefollowinginformation for settings.

4.4.1 - CURRENT

Therecommendedbulkcurrentis20%ofthe20Hr.AHcapacityor0.20xC20 (20 Hr. capacity in AH).

Example: DC115-12 is rated at 115AH @ 20 Hrs. The recommended bulk current is 0.20 x 115 = 23 Amps

Themaximumallowablebulkcurrentis35%ofthe20Hr.AHcapacityor0.35xC20(20Hr.capacityinAH),unlessotherwisestated.

Example: DC115-12 is rated at 115AH @ 20 Hrs. The recommended bulk current is 0.35 x 115 = 40 Amps

4.4.2 - VOLTAGE SETTINGS

4.4.3 - TEMPERATURE SETTINGS

If you have a programmable charger or inverter that has a temperature compensationsetting,itshouldbesetto-4mV/°C/cellor-2mV/°F/cell.TABLE 7belowhasthetemperaturecompensationvoltagevaluesfora12Vbattery.Fora24V, 36V or 48V system, multiply the values in the table by 2, 3 or 4 respectively.

Charging

TABLE 6

Bulk

Absortion

Float

Charge State14.7 V

14.7 V

13.7 V

12 Volt Battery29.4 V

29.4 V

27.3 V

24 Volt Battery44.1 V

44.1 V

41.0 V

36 Volt Battery58.8 V

58.8 V

54.6 V

48 Volt Battery

Bulk

Absortion

Float

Charge Stage

15.30 V

15.30 V

14.25 V

32°F (0°C)

15.06 V

15.06 V

14.01 V

50°F (10°C)

14.82 V

14.82 V

13.77 V

68°F (20°C)

14.70 V

14.70 V

13.65 V

77°F (25°C)

14.58 V

14.58 V

13.53 V

86°F (30°C)

14.34 V

14.34 V

13.29 V

104°F (40°C)

TABLE 7

Page 16: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 12

AGMbatterieshaveamuchlongershelflifethanwet,lead-acidbatteries.Withaself- dischargeofonly1-3%permonth,AGMbatteriescanbestoredforayearorlonger withoutneedingtobecharged.

5.1 - BATTERY STORAGE PROCEDURE

1. Chargebatteriesbeforetheyareplacedinstorage.

2. Disconnectbatteriesfromtheequipmentandchargertoeliminateanyparasiticloads.

3. CheckthebatteriesbasedonconditionsandscheduleinTABLE 8below.

4. Check the open circuit voltage (OCV) of each battery in the set. If any battery withinthesetislessthanthevaluesinTABLE 9below,rechargethebatteryset.

5. Ifthechargerhasamaintenancemode,selectthatmodetoboostcharge batteries.Otherwise,runthenormalchargecycle.

6. IfthebatteriesarestoredshorterthanthetimeperiodsinTABLE 8,theydonotneedtoberechargedpriortobeingputbackintoservice.

AGMbatteriesdonothaveamemoryeffect;sothereisnoneedtofullydischargebatteriespriortocharging.

Storage

9 months

6 months

3 months

Storage Time PeriodBelow68°F(20°C)

68°F to 86°F (20°C to 30°C)

Above 86°F (30°C)

Storage Temperature

TABLE 8

< 2.0 Volts

< 6.2 Volts

< 8.3 Volts

< 12.5 Volts

Open Circuit Voltage (O.C.V.)2 Volt

6 Volt

8 Volt

12 Volt

Battery Nominal Voltage

TABLE 9

Page 17: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 13

Storage5.2 - TEMPERATURE EFFECTS ON SELF-STORAGE

Ifthestorageenvironmentishot,batterieswillself-dischargefasterthaninacoldenvironmentasshowninCHART 3below.

BatteriesCANbesafelystoredonconcretefloorswithoutanynegativeeffects.ConcretefloorsDONOTdrainbatteries.

5.3 - STORAGE TEMPERATURE RANGE

Storebatteriesinacool,dryenvironmenttominimizeselfdischarge.

-40°F to 160°F (40°C to 71°C)

Maximum5°F to 122°F (-15°C to 50°C)

Recommended

TABLE 10

Page 18: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 14

Testingbatteriescanbecomplexandtherearemanyapplicationspecificvariablesthatcannotbeconsideredinonesimpletest.Thissectionisaguidetohelpyoudeterminetheoverallconditionofyourbatteries.ContactyourlocalFullriverBatterydistributorforassistance.

6.1 - TEST PREPARATION

1. Checkthatthebatterycablesareingoodworkingcondition.Replaceanydamagedorbrokencables.

2. CheckthatallterminalconnectionsaretightenedtopropertorquespecificationasdescribedinTABLE 2.

3. Fully charge batteries.

4. Let batteries rest for at least 8 hours once charging is complete.

6.2 - OPEN CIRCUIT VOLTAGE TEST

1. Checkandrecordopencircuitvoltage(O.C.V.)ofeachbattery.

2. Ifallofthebatteriesarebelow6.1V(6Vbattery),8.1V(8Vbattery)or12.2V(12Vbattery)thesethasfailed.Replacetheentiresetofbatteries.Inthissituation,thebatterysethadeitherprovidedallofitsavailableenergyorwasseverleyabused.

3. Otherwise,anybatterythatis0.25Vlowerthanthehighestbatteryvoltage(6Vbattery),0.35Vlowerthanthehighestbatteryvoltage(8Vbattery),0.5Vlowerthanthehighestbatteryvoltage(12Vbattery),mighthavefailed.Makenoteofthese batteries.

Allbatteriesinagoodsetshouldbeabove6.4V(6Vbattery),8.5V(8Vbattery),and12.7V(12Vbattery)whenfullychargedafteratleast8hoursofrest.

6.3 - DISCHARGE TEST (if you do not have a discharger, proceed to section 6.4)

1. Connectandstartdischarger.

2. Recordminutes(runtime)whendischargeiscomplete.Correctruntimeminutesforbatterytemperatureusingthefollowingformula: Mc = Mr [1 - 0.009 (T-27)] Where Mcisthecorrectedminutes,MristheminutesrecordedandT is the temperatureattheendofthedischargein°C.

Testing

Page 19: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 15

3. Ifthesetrunsmorethan50%ofitsratedcapacity,thebatteriesaregoodandthe test is complete.

4. Ifthesetrunslessthan50%ofitsratedcapacity,reconnectthedischarger.Whileunderthedischargeload,recordtheendofthedischargevoltageforeach battery.

5. Thebatteriesthatare0.5Vlowerthanthehighestendofdischargevoltageshouldbenoted.

6. Ifthesetdeliveredlessthan50%ofitsratedcapacity,andthesamebatteriesthatwerenotedinSTEP 3 of SECTION 6.2werealsotheonesnotedinSTEP 5 of SECTION 6.3,thosebatteriesaremostlikleyfailedandshouldbereplaced.FollowthereplacementinstructionsinSECTION 6.5below.

7. Otherwise,pleasecontactyourlocalFullriverBatterydistributortoreviewyourdataindetail..Youcanalsoreachtechnicalsupportbycalling (800) 522-8191 or emailing help@fullriverbattery.com.Additionaltestingmayberequireddependingonyourspecificapplication.

6.4 - OPTIONAL TEST

After completing SECTION 6.1andSECTION 6.2,followthesesteps:

1. Operatethevehicle/equipmentuntilbatteryperformancedecreases.

2. Recordvoltagesduringandafteroperation.

3. Recordtimeanddistanceofoperation.

4. Providethevoltage,timeanddistancedatatoaFullriverBatterydistributororto Fullriver Battery techincal support at (800) 522-8191 or email [email protected].

5. Thisdatawillbeanalyzedincomparisontowhatisexpectedofthe vehicle/equipment.

6.5 - BATTERY REPLACEMENT INSTRUCTIONS

Aslongasitissafetodoso,chargethesetofbatteriesbeforereplacingthefailedonestomakesurethegoodbatteriesarefullycharged.

Ifpossible,replacefailedbatterieswithgoodbatteriesaroundthesameagefromanotherpieceofequipment.Trytoavoidmixingnewbatteriesinequipmentwitholdbatteries.Putallnewbatteriesinthesamepieceofequipment.

Forbatteryreplacement,followtheinstallationinstructionsinSECTION 2.

Testing

Page 20: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 16

7.1 - FULLRIVER PRODUCTS

FullriverBatteryproducessealed,maintenance-freebatteriesthatarenon-hazardous,non-spillableandaremadefromapproximately80%recycledmaterials.Duringnormaloperation,ourbatterieswillnotreleaseanyharmfulgassesandwillnotleakanyacidicelectrolyteintotheenvironment.

Fullriverbatteriesareclassifiedassafeforair,sea,andgroundtransportation.Theymeet all requirements of the International Air Transport Association (I.A.T.A.), the InternationalCivilAviationOrganization(I.C.A.O.),theInternationalMaritime DangerousGoods(I.M.D.G.),andtheDepartmentofTransportation(D.O.T.).

Morethan98%oftheleadinbatteriesisrecycled-placinglead-acidbatteriesatthetopofthelistofmosthighlyrecycledconsumerproducts.Therecyclingloopofalead-acidbatterygoesonindefinitelyasshownintheRECYCLING DIAGRAM on Page 17.

7.2 - FULLRIVER MANUFACTURING

FullriverBatterymanufacturesbatteriesinaccordancewithinternational environmentalregulations.Wecontinuallyimproveourprocessinordertominimizewaste,recycleallwastethatisrecyclableanddiscardwastethatisnotrecyclableinaccordancewithlocaldisposalregulations.Westrictlyenforcetheuseofproper ventilationandprotectivegear.Thisenforcementhelpsminimizeemployeeexposuretoleadatapointwellbelowsuggestedlevels.

Your Clean-Green Energy Solution

Page 21: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 17

7.3 - BATTERY RECYCLING

Your Clean-Green Energy Solution

Page 22: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

(800) 522-8191 Toll FreePage 18

Transportation InformationFullriverbatteriesaresealedlead-acidbatteriesmadewithAbsorbantGlassMat(AGM)technology.Theelectrolyteisabsoredintothefiberglassseparatormaterialratherthaninafree-flowingliquidform.

Fullriver batteries are non-spillable electric storage batteries. They are exempt from therequirementsofDOT’shazardousmaterialsregulationssincetheyadheretothe requirementsofcode49CFRSection173.159(D),whichstates:

A non-spillable, wet, electric storage battery is exempt from all other requirements of this subchapter under the following conditions:

• The battery must be protected against short circuits and securely packaged

• The battery and outer packaging must be plainly and durably marked “NON-SPILLABLE” or “NON-SPILLABLE BATTERY“

• The battery must be capable of withstanding the Vibration and Pressure Differential test specified in 49 CFR 173.159(d)(3)(i) and 49 CFR 173.159(d)(3)(ii); and

• At a temperature of 131°F (55°C), the battery must not contain an unabsorbed, free-flowing liquid, and must be designed so that elecrolyte will not flow from a ruptured or cracked case.

Fullriverbatteriesareprotectedagainstshortcircuitsandaresecurelypackaged.Boththebatteriesandtheouterpackagingareclearlymarked“NON-SPILLABLE“.FullriverbatteriesweretestedbyathirdpartylabanddetermindedtobeincompliancewithDOTregulationsasstatedincode49CFRSection173.159(D).

SinceFullriverbatteriesmeetalltherequirements,theyareconsiderednon-hazardousandthereforedonotrequireaUNnumberoradditionalDOThazardousmaterial labeling.

This notice is to clarify to shippers and transporters that our batteries are packaged and marked in accordance to 49 CFR 173.159(D) and are determined to be in compliance with DOT HMR49 Non-Hazardous Materials, and the Internaitonal Air Transportation Association (IATA), Special Provisions S.P. A67 & A48.

Therefore, Fullriver batteries are not restriced for shipment by air or any other mans of transporation and are exempt from the hazardous material category.

Page 23: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

www.fullriverbattery.com Page 19

AppendixA.1 - TEMPERATURE RANGES

A.2 - STATE OF CHARGE (S.O.C) VS. OPEN CIRCUIT VOLTAGE (O.C.V.)

Storage

Operation

ChargewithTC

Chargew/oTC

5°F to 122°F (-15°C to 50°C)

5°F to 104°F (-15°C to 40°C)

5°F to 122°F (-15°C to 50°C)

32°F to 104°F (0°C to 40°C)

Condition Recommended

-40°F to 160°F (-40°C to 71°C)

-40°F to 160°F (-40°C to 71°C)

-40°F to 160°F (-40°C to 71°C)

5°F to 122°F (-15°C to 50°C)

Maximum

2.14

2.12

2.10

2.08

2.06

2.03

2.01

1.99

1.96

1.94

2V100

90

80

70

60

50

40

30

20

10

State of Charge (S.O.C.)

Open Circuit Voltage (O.C.V.)

6.42

6.36

6.30

6.24

6.17

6.10

6.03

5.96

5.88

5.81

6V8.56

8.48

8.40

8.32

8.23

8.14

8.04

7.94

7.84

7.74

8V12.83

12.72

12.60

12.47

12.34

12.20

12.06

11.91

11.76

11.61

12V

At 80°F (27°C)

Page 24: INSTALLATION AND OPERATION MANUAL - Fullriver …resources.fullriverbattery.com/.../installation-manuals/batteries.pdf · provided in or omitted from this manual, ... Page 3 Proper

fullriverbattery.com

4030 AdoLFo RoAd CAmARILLo, CA 93012

ToLL FREE: (800) 522-8191 InT’L: (805) 484-7900