in the world - ESI.info · in the world in Europe Complete range years of experience hub factories...

36

Transcript of in the world - ESI.info · in the world in Europe Complete range years of experience hub factories...

in the world

in Europe

Complete range

years of experience

hub factories

m2 productivearea

from to kW

SOMETIMES NUMBERSSAY MORE THAN A1.000 WORDSAnd sometimes even a thousands words are not enough.

Because it is hard to list all the reasons thatexplain why Climaveneta is the preferred partnerfor air conditionin in the most challengingprojects all around the world.Infact our success is a delicate balance ofvision, experience and cutting edge technology.

It is not just comfort, it is a question of flexibilityand care, adapting the system to therequirements of each building and application,emulating their users' needs.

All'over the worls, no matter how harsh theclimate, how demanding each project can be,every single choice is focussed on offering themost efficient reliable and sustainable solution.

Climaveneta. There are many reasons.

TO DEVELOPINNOVATIVE AIRCONDITIONINGSOLUTIONS IN ORDERTO EMULATE OURCUSTOMERS’EXPECTATIONS,COMBINING PERFECTCOMFORT AND HIGHESTENERGY EFFICIENCY INANY KIND OF BUILDING.Climaveneta is aware thattechnological systems areamong the most crucial elementsin modern buildings and urbandesign.

The usability, energy efficiencyand environmental sustainabilityof our surroundings dependupon these systems, as well ashealth and well-being of thepeople who spend their timethere.

No matter whether officeaccommodations or residentialbuildings, shopping centres orhotels, hospitals or leisurecentres, to proivde for perfectcomfort means to create theideal comfort conditionsdetermined by the usage of eachbuilding, and by the specificneeds of each customer. The whole taking greatest care

of the efficiency parametersconceived as the mostpragmatic approach to economicand environmental sustainabilityof each project.

That’s why our mission mightseem so simple and neverthelessis so complete.

Because taking such great careof our customers’ andstakeholders’ expectationsmeans to always provide themwith the most suitable airconditioning solution, ensuringperfect comfort, highest energyefficiency, optimized investments,lowest aesthetical impact andhighest standards ofcommitment to safeguarding theenvironment.

ComfortWe pursue a holistic concept of comfort,that takes greatest care of:� The particular requirements of each

application� Noise as a crucial element of high

quality and comfort� Aesthetical and environmental impact

of the chosen solutions

Energy efficiencyIn all our products and systems we strivealways for the highest energy efficiency.Because a responsible use of energy isthe best policy to reach:� lower operating costs� better environmental impact� better quality of comfort

Custom-made approach� Tailor made solutions, for the particular

needs of every customer, applicationand kind of building.

� All the quality and advantages of an industrialized manufacturing approachbased on large scale economies.

Sustainabilityminimizing the environmental impact ofour activities and solutions, because byperfect comfort we mean also highestsustainability.

FOR 40 YEARSMISSION AND VALUESHAVE BEEN LEADINGOUR ACTIVITY AND ARETHE BASIS OF OURRESULTS.

Turnover analysis by geographical areas

Turnover 2009 Analisys by technology

� European Union

82% - 154.000.000 €Italy 37% - 70.000.000 €

� Other Europe

7% - 13.000.000 €

81%Hydronic

�Middle and Far East

7% - 13.000.000 €

� Rest of the world

4% - 3.500.000 €

1%Others

4%Split units

5%Fan Coil

8%Roof Top

1971ESTABLISHED INBASSANO DELGRAPPA (ITALY)

1994ACQUIRED BY THEDE'LONGHI GROUP

188MILLIONS TURNOVER 2009

13%OF THE TOTALTURNOVER OF THEDE'LONGHI GROUP

56%OF THE TOTALTURNOVER OF THEPROFESSIONALDIVISION OF THEDE'LONGHI GROUP

Pieve d’Alpago (Belluno)Climaveneta Training centreProductive area: 7.000 m2

Employees: 50

Production of:� Air handling units

Mignagola (Treviso)Productive area: 20.000 m2

Employees: 160

Production of:� Split systems, multisplit� Chillers and Heat pumps up to

150kW� Hydronic fan coils from 1 to 30kW� Close control units� Telecommunications units

Parets del Valles (Spain) Productive area: 2.500 m2

Employees: 45

Production of:� Direc expansion units� Compact units� Rooftop units for small and medium

applications

Bassano del Grappa (Vicenza)HeadquartersProductive area: 12.500m2

Employees: 230

Production of:� Chillers: air and water cooled, from

30 to 700kW� Reversible units: air and water

cooled, up to 400kW � Multipurpose up to 400KW� Chillers with free-cooling up to 300kW

Pieve d’Alpago (Belluno)Productive area: 25.000 m2

Employees: 210

Production of:� Chillers: air and water cooled, from

200 to 1700kW� Heat pumps air and water cooled,

up to 2400KW� Multipurpose up to 700KW � Chillers with free-cooling up to

1250kW� Shell & tube evaporators � Roof-top units up to 500kW

Shanghai (China)Sales department for China and far eastProductive area: 25.000 m2

Employees: 330

Production of:� Air cooled chillers & heat pumps from

40 to 1700kW� Water cooled chillers & heat pumps

from 10 to 3070kW

Operations overview

CV comp prof ENG 22-11-2010 10:28 Pagina 7

OUR 40 YEARS OFLEADING EXPERIENCEIN COMFORT SOLUTIONSALLOWED US TOIDENTIFY SOMEMAJOR APPLICATIONS,SHARING SIMILARSTRUCTURALCHARACTERISTICSAND COMFORTREQUIREMENTS.

� Airports

� Fairs

� Residential

� Office buildings

� Hotels

� Retail

� Theatres

� Sport facilities

� Universities

� Museums

� Multiplex cinemas

� Healthcare

� Industrial processes

� Telecommunications

� Hpac

� Naval

We develop tailor made solutionsfor each of them. Thus we blendthe advantages of dedicatedsystems for specific comfort needswith the quality and efficiency oflarge scale manufacturing,organized according to leanthinking principles.

2009 Portugal (Faro)Faro Airport

Hydronic systemTotal cooling capacity: 3500 kWInstalled appliances: 2 FOCS/B 8404

2006 Ukraine (Kiev)Borispol Airport

Hydronic systemTotal cooling capacity: 900kWInstalled appliances: 2 FOCS 1902,1 NECS 604/B, 12 CHD, 3 a-LIFE 330

PROJECTThe Lisbon Airport is the busiest andmost important airport in Portugal.

CHALLENGEIn order to meet the needs thatincreasing numbers of passengersand air traffic has brought about, theairport has invested in themodernisation and improvement ofservices on offer.

SOLUTIONThe air conditioning system is amongthe strong points of the newinfrastructure. It is based on severalClimaveneta large chillers and heatpumps with screw compressors inlow noise emissions versionsproviding with highest energyefficiency both for the very highcooling loads as well as and forheating needs of the building.

2009 Chile (Puerto Montt)El Tepual Airport

Hydronic systemTotal cooling capacity: 1256kWTotal heating capacity: 606.4kWInstalled appliances: 1 ERACS Q W 2502,1 FOCS WH 2402

Greece (Athens)Eleftherios Venizelos Airport

Hydronic systemTotal cooling capacity: 1300kWInstalled appliances: 5 NECS-N

AIRPORTS

Hydronic system

Total cooling capacity: 11970kW

Total heating capacity: 840kW

Installed appliances: 3 FOCS-CA/B 48222 RECS/LT 19626 FOCS-CA/LN 5403

2009 Portugal (Lisbon)

THE LISBON AIRPORT

2004 Italy (Milan)Milan Fair

Hydronic systemTotal cooling capacity: 621kWTotal heating capacity: 512kWInstalled appliances: more than 800hydronic fan coils

2005 Italy (Roma)Rome Fair

Hydronic systemTotal cooling capacity: 26000kWTotal heating capacity: 16000kWInstalled appliances: 168 rooftop units,34 air cooled chillers

2009 Italy (Verona)Verona Fair

Roof-top systemTotal cooling capacity: 6440kWTotal heating capacity: 6200kWInstalled appliances: 28 reversible Roof-topunits WISDOM/R, completed by 1 aircooled FOCS with low nois emissions

2005 Spain (Castellòn)Auditiorium and convetion centreArchitect: Carlos Ferrater

Hydronic systemTotal cooling capacity: 1400 kWTotal heating capacity: 1400 kWInstalled applainces: 1 air cooled chiller,3 multiuse INTEGRA units for for pipessystems in high temperature version

PROJECTThe Italian Pavilion at the ExpoShanghai 2010 is the showcase ofItalian excellence in all sectorscontributing to a higher quality of lifein urban areas.

CHALLENGEDesigned by Giampaolo Imbrighi, theItalian Pavilion blends the Italiancultural values with the innovation ofa scientific research more and morefocussed on sustainability

SOLUTIONClimaveneta is involved with a pivotalrole as supplier for the airconditioning system with a solutionbased on 29 WIZARD air handlingunits. With a total air flow of 350.000m3/h and thanks to their completelymodular concept, the units areprovided with all necessary devicesto guarantee optimum filtration,humidification and energy recovery,consistently with the sustainableapproach that features the wholepavilion.

Air handling unit

Total air flow: 350.000 m3/h

Installed appliances: 29 air handling units WIZARD Automatic

2010 China (Shanghai)

ITALIAN PAVILION EXPO SHANGHAI 2010Project: Giampaolo Imbrighi & Partners Architetcs

FAIRS

2004 Italy (Catania)Nato Base \ Sigonella

Hydronic systemTotal cooling capacity: 2000kWTotal heating capacity: 2000kWInstalled appliances: air cooled chillersand high efficiency hydronic terminals

2005 Italy (Bergamo)Passiv Haus

Hydronic systemTotal cooling capacity: 334kWTotal heating capacity: 41kWInstalled appliances: HYDRORELAXSYSTEM

2008 Slovakia (Bratislava - Slovakia)Gaudì - Bazova - Bratislava

Hydronic systemTotal cooling capacity: 508kWInstalled appliances: 2 FOCS-ME 1302

2009 Villa IngleseWorchester - United KingdomHydronic systemTotal heating capacity: 14 KWInstalled appliances: High efficiency dedicatdheat pump PRANA AWr/MTD, air cooled withintegrated domestic hot water production

RESIDENTIAL

PROJECTWith the Montevetro residentialdevelopement Richard Rogers andPartners created the new building,consisting of five connected blockswhich step from four storeys to a full20 storeys with a strongly modelledprofile.

CHALLENGEAll the 103 apartments which range insize from 1,000 to 2,500 sq.ft. are allprovided with generous balconiesoverlooking the Thames.The east façade, animated by the lifttowers, has a more solid aestheticwith panels of terracotta cladding.The whole is completed by a highquality air conditioning systemproviding perfect comfort and highestquality of life.

SOLUTIONA Climaveneta centralized hydronicsolution based on 4 low noise watercooled chillers for indoor installationhave been the RRP choice for airconditioning. Ensuring highestefficiency with minimum acousticemissions and no aesthetical impactthis solution perfectly suits the

innovative approach of the structurecontributing to its success.

2000 United Kingdom (London)

MONTEVETRO RESIDENTIALProject: Richard Rogers and Partners

Hydronic system

Total cooling capacity: 1000kW

Installed appliances: 4 low noise water cooled chillerfor indoor installation

2008 Italy (Milan)World Join Centre

Hydronic systemTotal cooling capacity: 2500kWTotal heating capacity: 2700kWInstalled appliances: 5 air-cooledERACS-Q-LT, low noise levels andlow temperature kit.

2004 Germany (Munich)High Light TowersProject: Murphy & Jahn

Hydronic systemTotal cooling capacity: 4000kWInstalled appliances: 5 air cooled superlow noise chillers

OFFICE BUILDINGS

PROJECTDesigned by Foster and Partners,the Willis building is London’s fourthhighest skyscraper and theheadquarter of Willis Group, theworld's third largest insurance broker.

CHALLENGEIn order to achieve its excellentenvironmental rating these twoadjoining structures of 10 and 28storeys required an air conditioningsystem designed to the moststringent requirements. The system,besides ensuring highest energyefficiency, also ensures lowest noiseemissions, compact sizing oftransformer and power supply, andthe most favourable selection of theprotection devices between thesedevices and the unit.

Hydronic system

Total cooling capacity: 6000kW

Installed appliances: 7 TECS

2007 United Kingdom (London)

THE WILLIS BUILDINGProject: Foster + Partners

SOLUTIONThe most suitable choice was based on7 compact TECS mini centrifugal aircooled chillers.They allow simplified logistics,unbeatable energy efficiency at partloads, lowest inrush current andextremely quiet operation.Hydronic fan coils in the false ceilingsensure optimum comfort conditionswith minimal aesthetic impact to theoffice interiors.

2006 Poland (Warsaw)Mercedes Benz office building

Hydronic systemInstalled appliances: Several air cooledchillers with screw compressors andfree cooling

2009 Italy (Milan)Garibaldi Station ComplexProject: Tekser s.r.l.

Hydronic systemTotal cooling capacity: 1900kWTotal heating capacity: 2000kWInstalled appliances: 2 water-cooled ERACS-WQunits optimized for geothermal systems

2003 Italy (Arezzo)Le Case del Borgo Hotel

Hydronic systemTotal cooling capacity: 200kWInstalled appliances: 1 Multiuse EnergyRaiser Climaveneta Unit

2004 Morocco (Marrakech)Club Med Village

Hydronic systemTotal cooling capacity: 1400kWInstalled appliances: 4 FOCS - CA

2006 Holland (Andriessen)Golden Tulip Hotel

Hydronic systemTotal cooling capacity: 166kWInstalled appliances: NECS

2008 Germany (Seeheim)Lufthansa Training and ConferenceCentre Seeheim

Hydronic systemTotal capacity: 1400kWInstalled appliances: 2 FOCS-W 2602

HOTELS

PROJECTThe two imposing futurist buildings ofthe NH Hotel Fiera Milano designedby the famous French architectDominique Perrault, build a modern,functional and stylish hotel 398standard, superior, deluxe rooms andsuites.

CHALLENGEEach of the areas of the complex,from the rooms to the congresscentre to the NHUBE multifunctional

area are fitted with avantgardeequipment and a dynamic top-levelstructure for any kind of guest andbusiness meeting

SOLUTIONFor the perfect comfort of thesebuildings the consultants havechosen 4 Climaveneta multiuseINTEGRA units, air cooled, providingsimultaneous heating and cooling,with highest energy efficiency andvery low acoustic emsissions.

Hydronic system

Total cooling capacity: 1900kW

Total heating capacity: 2100kW

Installed appliances: 4 multiuse INTEGRA ERACS-Q/SL 2022 units

2008 Italy (Milan)

NH HOTELS FIERA MILANOProject: Dominique Perrault

More than 65 outlets in the U.K.Marks & SpencerHydronic systemsTotal cooling capacity: between 30kWand 2500kW

2006 Italy (Naples)Complesso Auchan Giugliano

Roof-top systemTotal cooling capacity: 7000kWInstalled appliances: over 70 roof-top andair-handling units

Over 22 shopping centre in GermanyMFI - Arcaden

Hydronic systemsTotal cooling capacity: between 400kWand 4500kW

Over 70 shopping centre in GermanyECE - Center

Hydronic systemTotal cooling capacity: between 350kWand 5000kW

RETAIL

PROJECTCare for environment and sustainabilityare among IKEA core values.The IKEA Rimini store envisions thisuncompromised approach to efficiencyand sustainability bleding cutting edgetechnologies and renewable resources inan unprecedented system solution.

CHALLENGEThe air conditioning and heating systemcouples water cooled units with a groundsource system. It meets the difficultchallenge of sizing geothermal probes inorder to optimize and balance the heatexchange both during winter and summermode, employing at the same time thebest performing units on the market inorder to maximize global performancesboth in heating and cooling mode.

SOLUTIONThe system is based on 2 Climavenetahigh efficiency water cooled reversibleTECS units. Utilizing geothermal probesto absorb heat during winter and rejectit during summer, the operatingconditions are always optimized withEER up to 15,0. The variable flowpumps precise management furtherenhance the energy saving.

Hydronic system

Total cooling capacity: 2800kW

Total heating capacity: 3000kW

Installed appliances: 2 reversible water cooled TECS-HF units

2008 Italy (Rimini)

IKEA RIMINI

Germany (Berlin)O2 World ArenaAnschutz Entertainment Group

Hydronic systemTotal capacity: over 400kWInstalled appliances: 2 NECS-C unitswith free cooling

2005 Spain (Valencia)Hemisferic

Hydronic systemTotal cooling capacity: 450kWTotal heating capacity: 500kWInstalled appliances: 1 chiller and 1 totalheat recovery heat pump

2006 Spain (Valencia)Art Palace Reina Sofia

Hydronic systemTotal cooling capacity: 500kWInstalled appliances: 1 high efficiency aircooled chiller

2006 Italy (Turin)Teatro Regio

Hydronic systemTotal cooling capacity: 3000kWInstalled appliances: 4 FOCS

THEATRES

PROJECTThe “Gran Teatro La Fenice” is one ofthe most precious jewels of Veniceand one of the best knownmonuments of art and music in theworld. A marvellous building fromevery aspect, even concerning theair-conditioning system.

CHALLENGEA project that has no comparison inits technical complexity, logisticalconstraints, acoustic and aestheticrequirements and where the chiller

units that provide this comfort had tobe absolutely silent, in terms ofsound levels as well as in vibrations.

SOLUTIONClimaveneta developed specialcompact and modular units, thatcould be installed in restricted spacesand to enable their transportationthrough the canals. They weredesigned to achieve very high energyefficiency, enhanced by an integratedheat recovery system, and incrediblylow sound emissions with novibrations.

Hydronic system

Total cooling capacity: 2192kW

Installed appliances: FOCS

2003 Italy (Venice)

GRAN TEATRO LA FENICEProject: Gian Antonio Selva

2007 Italy (Turin)Palavela

Hydronic systemTotal cooling capacity: 3240kWInstalled appliances: 4 Powerful air-cooledliquid chillers

2002 United Kingdom (Manchester)City of Manchester Stadium

Hydronic systemTotal cooling capacity: 1200kWInstalled appliances: 2 FOCS-W, 1 TECS

2008 United Kingdom (London)Twickenham Stadium

Hydronic systemTotal capacity: 3500kWInstalled appliances: 7 TECShigh efficiency chillers

2005 Ukraine (Kiev)Skating Ring Slava Ploshad

Hydronic systemTotal cooling capacity: 750kWInstalled appliances: 1 FOCS-CA

PROJECTAt the heart of Valencia’s industrialport the Foredeck is the central basefor all America’s Cup teams andsponsors. It is also a futuristicmultifunctional building that includesbars, restaurants and informationpoints.

CHALLENGEDavid Chipperfield’s Four floors oflarge terraces revealing daringarchitectural choices is already one ofthe most celebrated sights of themodern part of the city.A success due also to the airconditioning system.

SOLUTIONA four pipe heat pump system isequipped with Climaveneta unitsproviding simultaneously hot and coldwater in the different circuits all yearround. Climaveneta’s FOCS WH unitsare specifically designed to use seawater and perfectly meet the project’sstrict flexibility, efficiency, quietnessand aesthetical impact requirements.

Hydronic system

Total cooling capacity: 1700kW

Installed appliances:2 FOCS-WH 3203 optimized forsea water applications

2006 Spain (Valencia)

VELES ET VENTSProject: David Chipperfield Architects

SPORT FACILITIES

2005 United Kingdom (Cambridge)Cambridge University

Hydronic systemTotal cooling capacity: 1600kWTotal heating capacity: 2300kWInstalled appliances: 1 ERACS-Q

2006 China (Beijin)Sieeb University

Hydronic systemTotal cooling capacity: 1200kWInstalled appliances: 2 FOCS-W, 1 TECS

PROJECTThe University of Stellenbosch isone of the oldest and mostprestigeous Universites in SouthAfrica with an history dating back to1866.

CHALLENGEInfrastructure play a crucial role inthe quality of teaching, as well as insocial life, hence StellenboschUniversity is equipped with leadingedge technical systems.Climaveneta is partner for airconditioning, providing a total of4000kW with its units in severalbuildings of the campus.

SOLUTIONClimaveneta’s hydronic systems arebased on high efficiency air cooledFOCS and TECS chillers. The first isequipped with screw compressors,the second uses cutting edgemagnetic levitation compressors,delivering very high performancesboth at full as well as at part load,with minimum noise levels.

2006 Italy (Milan)Bocconi University

Hydronic systemTotal cooling capacity: 200kWTotal heating capacity: 240kWInstalled appliances: 1 NECS-Q

2007 Italy (Milan)Milano Bicocca

Hydronic systemTotal cooling capacity: 520kWTotal heating capacity: 570kWInstalled appliances: 1 ERACS-Q

UNIVERSITIES

Hydronic system

Total cooling capacity: 4000kW

Installed appliances:1 TECS, 1 FOCS

2007 Stellenbosch (Sud Africa)

UNIVERSITY OF STELLENBOSCH

2004 United Kingdom (Glasgow)Glasgow Science Centre

Hydronic systemTotal cooling capacity: 1500kWInstalled appliances: FOCS-CA,FOCS-W-CA

2005 Spain (Malaga)Museum Picasso

Hydronic systemTotal cooling capacity: 1000kWTotal heating capacity: 1200kWInstalled appliances: 5 ERACS-Q,NECS-Q

2004 Italy (Turin)Museum Mole Antonelliana

Hydronic systemTotal cooling capacity: 500kWInstalled appliances: GHP

2006 Sud Africa (Capetown)Museum Iziko

Hydronic systemTotal cooling capacity: 1500kWInstalled appliances: 2 FOCS-CA

Hydronic system

Total cooling capacity: 400kW

Total heating capacity: 400kW

Installed appliances: 2 ERACS-Q

2006 Italy (Milan)

TRIENNALE

MUSEUMS

PROJECTTriennale is a point of reference in thecultural and economic life of Milan,the meeting point of an intensedialogue among society, art andentrepeneurship.

CHALLENGEGae Aulteni’s innovative architecture isstill the heart of the foundation,equipped with the most moderntechnologies in order to be the ideedcontext for any kind of exhibition andcultural event.

SOLUTIONIn this project Climaveneta provides forperfect comfor twith 2 multiuse INTEGRAunits ERACS-Q.Featured by the capability of producingsimultaneously heating and cooling with onesinlge unit, they are particularly suitable for thecomfort requirements of modernmultifunctional buildings, featured bysimultaneous loads. They ensure highestenergy efficiency with reduced footprint andsignificant system simplification.

2005 Italy (Bari)Molfetta Outlet - Cinestar Multi Screen

Roof-top systemTotal cooling capacity: 1130kWInstalled appliances: 12 ROOFTOPClimaveneta units

2005 ItalyMultiplex Cinema Porto Sant'Elpidio

Roof-top systemTotal cooling capacity: 977kWInstalled appliances: SeveralROOFTOP units

PROJECT11 halls multiplex equipped withcutting edge projectiontechnologies, the Montano LucinoCINESTAR multiplex is completelyair conditioned by Climavenetaunits, and controlled by an FWSsupervision system also byClimaveneta.

CHALLENGEClimaveneta has managed the airconditiong of the whole complex,pomprising 11 halls, foyer,projection rooms, offices, shops andtecnical rooms.

SOLUTION16 Rooftop HALL-MX reversibleunits ad designed on purpose tosuite multiplex applications are

dedicated to the 11 halls, entranceand foyer, with 170.000 m3/h airflow. Offices are equipped with areversible hydronic system with30kW total cooling capacity and32kW, whereas the cash desks,technical areas and shops employ adirect expansion sistem providing65kW total cooling capacity and 72total heating capacity.

2009 Portugal (Lisbon)Cinema Monumentale - Medeira Films

Hydronic systemTotal cooling capacity: 161kWInstalled appliances: 1 NECS SL 704

2009 Portugal (Loulé)Cine-teatro Louetano

Hydronic systemTotal cooling capacity: 190.3kWTotal heating capacity: 206kWInstalled appliances: 1 ERACS-Q/SL 1062

Rooftop system

Total air flow170.000 m3/h

Installed appliances16 WHISPER-HALL units

2006 Italy (Como)

CINESTAR

MULTIPLEX CINEMAS

2002 Spain (Barcelona)San Paolo Hospital

Hydronic systemTotal cooling capacity: 10 MWTotal heating capacity: 7MWInstalled appliances: 9 chiller with screwcompressors for 4 pipes systems

2005 Italy (Florence)Careggi's Teaching Hospital

Hydronic systemTotal cooling capacity: 3000kWInstalled appliances: 4 FOCS-CA/SL

2007 United Kingdom (Southampton)Princess Anne Hospital

Hydronic sysetmTotal cooling capacity: 590kWInstalled appliances: 2 TECS-HF 2AS

2009 Switzerland (Aarau)Klinik Hirslanden

Hydronic systemTotal cooling capacity: 340kWInstalled appliances: FOCS-W D 1502

Hydronic system

Total cooling capacity:3000kW

Installed appliances:3 FOCS 4822/B

2008 Dubai (Rehabilitation centre at Al Quisais)

REHAB CENTRE

HEALTHCARE

PROJECTThe Al Quisais Rehabilitation centreoffers high quality medical treatmentin that prestigious region in Dubai.

CHALLENGEThe relevance of ideal comfort forhealth and recovery, together with thewill to keep also from this point ofview the high standards of the clinicrequired an air conditioning systemconceived for offering perfecttemperature and humidity conditions,with lowest sound levels and noaesthetical impact on the moderndesign of the building.

SOLUTIONFor this project the consultants chosethree Climaveneta air cooled FOCS4822/B units, with screwcompressors and R-134a, that canprovide a very versatile, efficient andsilent solution for ensuring the highestlevel of comfort, all year round withvery extended operating limits andthe absolute reliability of a worldleader in air conditioning.

2005 Spain (Martorell)Seat Industries

Hydronic systemTotal cooling capacity: 4500kWInstalled appliances: several water and aircooled Climaveneta chillers

2007 Danemark (Ringkøbing)Vestas

Hydronic system2 MW Total capacityInstalled appliances: 14 NECS-W 704

2008 Russia (Moscow)Logoprom Viktorya

Hydronic systemTotal cooling capacity: 1800kWInstalled appliances: 2 FOCS MECHILLERS

2009 Chile (Santiago)Concha Y Toro

Hydronic systemTotal cooling capacity: 377kWTotal heating capacity: 522kWInstalled appliances: 1 ERACS-Q/B 2622

INDUSTRIAL PROCESSES

PROJECTWith over 5.400 employees and 45hectare built area, the BMW PlantLeipzig is a masterpiece ofarchitecture, efficiency andsustainability.

CHALLENGEThe iconic central building of thefamous London Architect Zaha Hadidelegantly links the everal productionblocks, organized for highestsustainability and careful andenvironmental friendly use ofresources.

SOLUTIONFor the process cooling of severalproduction blocs BMW has chosenClimaveneta BH/SRAT and NECSair-cooled high efficiency chillers,featured by extended operating limitsand by an extraordinary energyefficiency ratio at full and part load.

Hydronic system

Total cooling capacity:About 3MW

Installed appliances:Several Climaveneta chillersand NECS

2007 Germany (Leipzig)

BMW PLANT LEIPZIGProject: Zaha Hadid

PROJECTTelefonica Chiler is a majortelecommunications company inChile, owning 65% of the telecomlines of the whole country.

CHALLENGEThe very high thermal loads of this largeinstallation required an articulatedsolution combining high precision airconditioners with water cooler chillersand condenserless units.

SOLUTION2 Condenserless units FOCS-ME and2 FOCS-W water cooled chillers withscrew compressors are combinedwith 9 ACCURATE high precision airconditioners AC 70 and 4 AC 40ensuring optimal performances bothat full as well at part loads.

2004 ItalyH3G

Hydronic systemTotal cooling capacity: 276kW

2006 ItalyShelter Tim

Hydronic systemTotal cooling capacity: 1125kW

2006 ItalyShelter Tower Co. \ Rai Way \ H3G

Hydronic systemTotal cooling capacity: 600kW

2006 ItalyShelter Vodafone

Hydronic systemTotal cooling capacity: 700kW

TELECOMMUNICATIONS

Hydronic system

Total cooling capacity: 1200kW

Installed appliances: over 20 DX aircooled unitsamong which,Accurate AXO 55Accurate AXU 60Accurate AXO 20Accurate AXO 07Accurate AXU 50

2009 Chile

TELEFONICA CHILE

SpainEADS - CASA

DX aircooled unitsAccurate DXO 18

FranceBuygues Telecom

DX aircooled unitsAccurate ACU 25 ECAccurate ACU 70 ECAccurate ACU 70 ECAccurate ACU 90 ECAccurate ADU 20Accurate ADU 77

RomaniaAlphabank

8 Dual fluid unitsAccurate ATO 77BEAccurate ATO 60BE

2008 Poland (Wroclaw)Hewlett Packard - Server Room

Hydronic systemTotal cooling capacity: 145kWInstalled appliances: 10 AWO.10-15.EC

HPAC

PROJECTOne of the largest IBM server room inPoland, this Warsaw hub plays apivotal role in IBM operations.

CHALLENGEThe very high thermal loads of thislarge installation required anarticulated solution combining highprecision air conditioners with watercooler chillers and condenserlessunits.

SOLUTION2 Condenserless units FOCS-ME and2 FOCS-W water cooled chillers withscrew compressors are combinedwith 9 ACCURATE high precision airconditioners AC 70 and 4 AC 40ensuring optimal performances bothat full as well at part loads.

Hydronic system

Installed appliances: 3 FOCS-ME 15029 ACU.070EC,4 ACU.041EC1800A2 FOCS-W 1902 SME

2007 Poland (Warsaw)

IBM SERVER ROOM

2004 Italy (Genoa)Admiral 85 Open\ Lavagna Shipyard

Hydronic systemTotal cooling capacity: 54kWInstalled appliances: NAVAL UNITS

2004 Italy (Messina)Rodriquez TMV 50 \ Messina Shipyard

Dedicated heat pumpsTotal cooling capacity: 403kWTotal heating capacity: 4075kW

2004 Italy (Pietra Ligure)Rodriquez Exploration Yacht 72 \ PietraLigure Shypiard

Dedicated heat pumpsTotal cooling capacity: 872kWTotal heating capacity: 1097kWInstalled appliances: Ductable and flexibleHYDRONIC TERMINALS in lagged spiralaluminium.

PROJECTBuild by the Jordan Arab Brige, withits 84 meters the RodriquezAquastrada TMV 84/2 is conceivedfor transporting over 700passengers and 70 cars, at a speedof 40 nodes.

CHALLENGEFor the prefect comfort of thepassengers this application requiredan advanced system, that with ahigh energy efficiency could providefor perfect temperature control andoptimum air renewal.

SOLUTIONFor this application Climaveneta hascreated a centralized supervisionsystem with touch screen controlling7 water/water heat pumpsdeveloped on pourpose for navalapplication, equipped with titaniumintermediate exchanger.

Thanks to the chance to employ seawater for heat exchange, the systemis extremely efficient.

The system is completed by 45hydronic terminals ducted withflexible alluminium ducts.

Dedicated heat pumps

Total cooling capacity 1050kW

Total heating capacity1113kW

2004 Italy (Cantieri Navali Pietra Ligure)

RODRIQUEZ AQUASTRADATMV84/2 Project: Arab Bridge

NAVAL

COM

PLET

E RA

NGE FROM

2 TO 2.400 KW

COMPLETETECHNOLOGICAL

SOLUTIONS,UNBEATABLE KNOW-HOW,

SYSTEMATIC R&DINVESTMENTS ARE

THE PILLARS OF THETECHNICAL

SUPERIORITY OFCLIMAVENETA'S

SOLUTIONS.This is lastly the true strength ofClimaveneta: the widest range ofproducts and systems in order toalways offer the most suitablesolution for any comfortrequirement, with the reliability,know-how and quality of 35 yearsexperience in air-conditioning.

An overall quality reflected both bythe high performances andreliability of each units, as well asthrough the trust on certificationand the strong infrastructuralinvestmens for wittness testsconceived as the best guaranteetowards our partners andsuppliers.

CEProduct quality certificatefor the European Union

GOSTProduct quality certificatefor Russian Federation

Safety QualityLicenceProduct quality certificatefor Popular Republic of China

Certifications

CHILLERSChillers V

RONIC TERMINALSHydronic Terminals

Air source for outdoor installation

BRAT4,9 - 32,9 kW NECS33,8 - 885 kW

SCROLL

FOCS145 - 1744 kW FOCS-XL272 - 1180 kW FOCS-CA310-1381 kW i-FOCS511 - 842 kW

SCREW

Air source with free-cooling Water source

BRH5,5 - 35,1 kW NECS-W (H)43,4 - 371 kW

SCROLL

FOCS-W (H)87 - 2432 kW FOCS2-W (H)321-1228 kW

TECS-HF Vision 2.0242 - 1950 kW

SCREW

Condenserless

HE FF4,7 - 32,4 kW HE39,1 - 158 kW

NECS-ME39,5 - 432 kW

SCROLL

FOCS-ME79,2 - 2240 kW

SCREW

CENTRIFUGAL

NECS-FC (NG)41,5 - 377 kW

SCROLL

FOCS-FC (NG)329 - 1229 kW

SCREW

SHELL & TUBES

Air source modular

TECS2 Vision 2.0220 - 1325 kW

MICS18,2 - 44,7 kW

SCROLL

Air source for indoor installation

CENTRIFUGAL

SCROLL

BRA4,9 - 15,4 kW MICS-C18,2 - 31,8 kW NECS-C37,1 - 325 kW

PLATES

PLATES PLATES

PLATESCOOLING

COOLING

SHELL & TUBES

SHELL & TUBES

COOLING

SHELL & TUBESCOOLING

SHELL & TUBESCOOLING

SHELL & TUBESCOOLING

SHELL & TUBESCOOLING

SHELL & TUBES SHELL & TUBES

SHELL & TUBES

COOLING

SHELL & TUBESCOOLING

COOLING

COOLING PLATESCOOLING PLATESCOOLING PLATESCOOLING

PLATESCOOLING

PLATESCOOLING

PLATESCOOLING

PLATESCOOLING

PLATESCOOLING

SCROLL

COOLING HEATING

COOLING

COOLING

HEATING

COOLING

HEATING

HWD / HWD-HP4,8 - 60,4 kW

Ducted terminals

CHD2,7 - 9,3 kW

Cassette

i-LIFE1,41 - 7,47 kW

Residential fancoils

a-LIFE1,45 - 22,4 kW

Professional fancoils

NFT / NFC0,9 - 16,4 kW

MHD1,9 - 4,6 kW

Hi-wall terminals

FAN COIL FAN COIL

a-LIFE-HP2,83 - 19,3 kW

FAN COILDUCT

CENTRIFUGAL CENTRIFUGAL CENTRIFUGAL

CENTRIFUGAL CENTRIFUGAL

DUCT CENTRIFUGAL

TANGENTIALTANGENTIAL WALL

CASSETTE

Remote condensers

NHCR8,6 - 41,9 kW NCE38,4 - 434 kW FCE78,8 - 1144 kW

SCROLL

AXIAL

COOLING

COOLING

AXIAL

COOLING AXIAL

FREE COOLING

FREE COOLING

NECS-ST53 - 341 kW

PATENTPENDING

SHELL & TUBES

VERSIBLE UNITSReversible Units

VERSIBLE UNITSReversible Units with total heat reclaim for the production of domestic hot waterINTEGRA ENERGY Line - units for 4 pipe-systems

PATENTPENDING

Air source reversible unitswith total heat reclaim

NECS-NR36 - 823 kW

SCROLL

FOCS-NR200 - 826 kW

SCREW

Water source reversible unitswith total heat reclaim

NECS-Q36 - 823 kW

SCROLL SCROLL

PLATES

COOLING HEATING

ERACS2-Q200 - 826 kW

SCREW SCREW

SHELL & TUBES

FOCS-WNR194 - 891 kW

SCREW

SHELL & TUBES

SHELL & TUBES

NECS-WQ45,7- 491 kW

4 pipe-systems

Air source for outdoor installation

BRAN4,6 - 35,5 kW NECS-N35,8 - 466 kW

NECS-ST-N50,3 - 322 kW

SCROLL

RECS195 - 385 kW FOCS-N439 - 1160 kW

WWr-MTD5,2 - 41,7 kW NECS-WN43,4-371 kW

Water source

SCROLL

SCREW

RECS-W174 - 801 kW

SCREW

PLATES PLATES

PLATES

COOLING HEATING

i-SACS5,4 - 14,7 kW

SCROLL

PLATESCOOLING HEATING

Air source modular

MICS-N17,3 - 47,9 kW

SCROLL

PLATESCOOLING HEATING COOLING HEATING

COOLING HEATING

Air source for indoor installation

BRN4,6 - 16,8 kW MICS-CN17,3 - 33,9 kW NECS-CN36,0 - 303 kW

SCROLL

PLATES

PLATES

PLATES

COOLING HEATING

COOLING HEATING

COOLING HEATINGPLATESCOOLING HEATING

COOLING HEATING

SHELL & TUBESCOOLING HEATING

SHELL & TUBESPLATESCOOLING HEATING

SHELL & TUBES

HEAT PUMP

REVERSIBLE

ERACS-WQ194 - 891 kW

ENERGY lineAir source units for4 pipe systems

PLATES

COOLING HEATING

HEAT PUMP

REVERSIBLE

COOLING HEATING

SHELL & TUBES

HEAT PUMP

REVERSIBLE

COOLING HEATING

SHELL & TUBES

HEAT PUMP

REVERSIBLE

COOLING HEATING

i-FX-Q479 - 811 kW

SHELL & TUBES

HEAT PUMP

REVERSIBLE

COOLING HEATING

COOLING HEATING

NECS-WNR45,7 - 491 kW

PLATES

COOLING HEATING

PATENTPENDING

PATENTPENDING

SHELL & TUBES

SHELL & TUBES

COOLING HEATING

PATENTPENDING

SHELL & TUBES

SCROLL

PLATES

COOLING HEATING

RANA LINEPRANA LineDedicated heat pumps

CKAGED LINEPackaged line

SCROLL

WWR-MTD7,2 - 43,8 kW BWR-MTD5,4 - 33,3 kW

Water (brine) source, reversibile,medium water temperature

SCROLL

AW-HT10,4 - 19,7 kW

High water temperature,air source, heating only

SCROLL

AWR-MTD16,9 - 17,4 kW AWR-MTD XE6,3 - 17,9 kW

Air source, reversible,medium water temperature

SCROLL

WWR-HT Slim8,3 - 14,1 kW BWR-HT Slim6,2 - 10,6 kW WWR-HT Cube8,3 - 35,9 kW BWR-HT Cube6,2 - 27 kW

High water temperature, water(brine) source, reversible

SCROLL

Rooftop compact units formedium crowding applications

WORK-T34,7 - 200 kW

SCROLL

Rooftop units for mediumcrowding applications

WHISPER35,7 - 197 kW WHISPER-T35,8 - 197 kW WISDOM-R34,5 - 422 kW WISDOM-T-R34,7 - 425 kW

SCROLL

Rooftop units with advancedenergy management for mediumcrowding applications

WET line - water loop unitsfor indoor installation

WET line - water loop unitsfor outdoor installation withadvanced energy management

WET-RFT37,2 - 396 kW

SCROLL

WET ENTHALPY50,6 - 262 kW

SCROLL

WET line - water loop unitsfor outdoor installation

WET-RTF37,2 - 468 kW WET-RTF-R44,8 - 468 kW

SCROLL

WHISPERENTHALPY47,4 - 243 kW WHISPERENTHALPY-T47,4 - 243 kW

SCROLL

Rooftop units with advanced energymanagement for high crowdingapplications

WHISPERHALL45,9 - 146 kW

SCROLL

COOLING

COOLING THERMODYNAMIC

COOLING THERMODYNAMIC

COOLING THERMODYNAMIC

THERMODYNAMICCOOLING HEATING

THERMODYNAMIC

COOLING HEATING

THERMODYNAMICCOOLING HEATING

WORK37,4 - 198 kW THERMODYNAMICCOOLING HEATING

COOLING HEATING

COOLING HEATING

COOLING HEATING

COOLING HEATING

WET-RMT7,2 - 44,8 kW COOLING HEATING

COOLING HEATING

HEATING

COOLING HEATING HOT WATER

COOLING HEATING HOT WATER

COOLING HEATING HOT WATER

COOLING HEATING HOT WATER

WWR-DHW6 - 40,5 kW

BWR-DHW4,5 - 29,7 kW

Water (brine) source withtotal heat reclaim

SCROLL

HOT WATERHEATING +

HOT WATERCOOLING +

COOLING HEATING

HOT WATER

HOT WATERHEATING +

HOT WATERCOOLING +

COOLING HEATING

HOT WATER

COOLING HEATING HOT WATER

COOLING HEATING HOT WATER

COOLING HEATING HOT WATERHOT WATER

COOLING HEATING HOT WATER

ROTARY

ROTARY

i-WHISPERENTHALPY-T87 - 338 kW THERMODYNAMICCOOLING HEATING ROTARY

ROTARY

ROTARY

i-NRG17,8 kW

Air source with total heatreclaim

HOT WATERHEATING +

HOT WATERCOOLING +

COOLING HEATING

HOT WATER

AWR-DHW7,7 - 35,5 kW

SCROLL

HOT WATERHEATING +

HOT WATERCOOLING +

COOLING HEATING

HOT WATER

SCROLL

PLATES

HPACHPAC High Precision Air Conditioning

HANDLING UNITSAir Handling Units

Direct expansion ACCURATEclose control air-conditioners

Axial RemoteCondensers

AX7 - 90 kW AW7 - 90 kW AD20 - 100 kW AT20 - 100 kW AF20 - 105 kW

SCROLL

COOLING RE-HEATING

COOLING

COOLING

RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING

RE-HEATING

DEHUMIDIFICATION

Chilled water ACCURATEclose control air-conditioners

AC8 - 198 kW AB20 - 110 kW

SCROLL

Telecom unitsStandard

MED7,2 - 34,4 kW MID4,5 - 15 kW HED + HCAT4,5 - 15 kW LED2,2 - 5 kW

SCROLL

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

COOLING RE-HEATING DEHUMIDIFICATION

Telecom unitsInverter

MULTIPLO3 - 6 kW

SCROLLSCROLL

BRE13,4 - 118 kW

BRC13 - 120 kW

COOLING RE-HEATING DEHUMIDIFICATION INVERTER

WIZARD300 - 100,000 m3/h

SCROLL

Condensing units

HCAT38 - 160 kW

MANAGER 3000

Regulation devices

HRD290 - 400 m3/h

SCROLL

FWS3

FWS3000

STARTOUCH

Supervision solutions

COOLING

MCAT119 - 325 kW COOLING

RECIPROCATING

CENTRIFUGALCOOLING HEATING

HUMIDIFICATION

WALLMOUNTED

OUTDOOR

INDOOR

SPLIT

AXIAL

ACCURATE close controlair-conditioners

i-AX6 - 90 kW

Centrifugal RemoteCondensers

ARCC14 - 116 kW

Dry Coolers

BDC14 - 135 kW

AXIAL

CENTRIFUGAL

COOLING

i-AW6 - 90 kW

� delivery service � payment service

� installation � service � spare - parts

...after sales phase...sale phase

Secondary services

...pre sale phase

� consulting � information

acquisition service fulfillment service after sales service

FROM THE VERY BEGINNING OF THETHROUGH THE WHOLE LIFE

Quality of a solution, the excellence of theperformances and the satisfaction of the final user

depend very much upon how the company supportsthe customer after the sales and the commissioning.

Hence after sales service is a core component ofClimaveneta's marketing mix.

PROJECT, TO THE DELIVERYCYCLE OF THE SYSTEM.

Our after sales networkensures the closestpresence to thecustomers, every wherein the world, through:

� More than 50 technicalassistance centres in Italy.

� The technical assistance centresof our subsidiaries in Germany,France, Spain and China.

� More than 100 assistancecentres in the world.

A complete range of contractsolutions for assistance throughthe whole life cycle of thesystem.

To get in touch with our sales andservice centres or to find out more about us,our products and services,please refer to our website:www.climaveneta.com