Red Hill Bay Shallow Water Habitat
Restoration Project
presentation to ASCE-IV Branch
Graeme R. DonaldsonProgram Manager Salton Sea Initiative
October 26, 2016
![Page 2: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/2.jpg)
www.iid.com
2
Salton Sea Activities Overview
• Legislative/state agencies status and update
• Restoration proposals
SSWIFT plan (development funded by SSA, but not adopted)
Salton Sea Restoration & Renewable Energy Initiative (IID/IC)
Salton Sea Management Program (SSMP)
• Near-term projects
Red Hill Bay Project (RHB)
Species Conservation Habitat (SCH)
Salton Seawater Marine Habitat Pilot Project (SSMHP)
IID Backbone Infrastructure Project development
![Page 3: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/3.jpg)
www.iid.com
Salton Sea activities June, 2002 – Salton Sea legislation giving state responsibility for restoration under the QSA.
November 18, 2014 – IID submits a Petition to the State Water Resources Control Board requesting it
exercise its continuing authority over the water transfers to ensure the state of California live up to its
Salton Sea restoration obligation in order to avoid devastating air quality and habitat impacts.
March 18, 2015 – SWRCB holds Salton Sea workshop.
May 2015 – Governor establishes Salton Sea Task Force that includes CNRA, CDWR, CDFW, CEC,
CARB, EPA and SWRCB.
September 2015 – Governor appoints Bruce Wilcox assistant secretary for Salton Sea policy.
October 9, 2015 – AB1095 (Garcia) signed into law by Governor Brown.
The Salton Sea Restoration Act requires the Secretary of the CNRA in consultation and coordination with Salton Sea
Authority (SSA), to lead Salton Sea Restoration efforts.
The Act will require on or before March 31, 2016 the CNRA to submit to legislature a list of “shovel ready” Salton
Sea restoration projects.
January 4, 2016 – IID Board of Directors approve on a 5-0 vote the initiation of Backbone infrastructure
project, phase #1.
January 5, 2016 – State Water Resources Control Board (SWRCB) held public workshop to receive
updates from (CNRA/CRRWQCB/CARB/CEC) & public comment re: Task Force actions.
March 31, 2016 – AB1095 deadline for CNRA to submit to legislature a list of “shovel ready” Salton
Sea restoration projects. Most important will be the backbone infrastructure implementation.
3
![Page 4: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/4.jpg)
www.iid.com
Salton Sea Task Force Agency Actions
• Begin immediate implementation and further development
of Salton Sea management plan
• Improve public outreach and local partnership
• Accelerate project implementation and delivery
• Meet a short-term (2016-2017) goal of 9,000-12,000 acres of
habitat creation and dust suppression projects at the sea
• Set medium-term (2018-2023) goal of 18,000-25,000 acres
of habitat creation and dust suppression projects at the sea
Ensure Oversight by Regulatory Agencies
• Consider opportunities for increasing renewable energy
development at and around the Salton Sea.
4
![Page 5: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/5.jpg)
www.iid.com
SSWIFT Lake Concept (SSA)
5
![Page 6: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/6.jpg)
www.iid.com
SSRREI proposal (IID/IC)
6
![Page 7: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/7.jpg)
www.iid.com
7
![Page 8: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/8.jpg)
www.iid.com
8
IID Grant Projects
![Page 9: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/9.jpg)
www.iid.com
Aerial View of Red Hill Bay Restoration Site
9
The US Fish and Wildlife
Service, in partnership with
the Imperial Irrigation District,
intends to restore the habitat
values of the Red Hill Bay
with blended water from the
Salton Sea and nearby drain
water from the Alamo River.
Red Hill Bay is located on the
southeast shore of the Salton
Sea and is part of the Sonny
Bono Salton Sea National
Wildlife Refuge.
![Page 10: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/10.jpg)
www.iid.com
Red Hill Bay Project (original configuration)
10
![Page 11: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/11.jpg)
www.iid.com
![Page 12: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/12.jpg)
www.iid.com
12
OverviewRed Hill Bay Shallow Water Habitat: USFWS partnered with IID
Project Description: up to 640 acre Shallow shorebird habitat created by
building low berms and mixing pumped Alamo River water & pumped Salton
Sea water to a desired salinity range of 25 to 40 ppt.
Project Summary:
Budget - USFWS (FAP grant funding) $1,194,154
USFWS Refuge funding $ 332,760
IID in-kind (inc.land lease) $ 130,000
IID (WCB grant funding) $1,850,000
Total $3,506,914
Permitting - All environmental permitting is complete.
Schedule - April to July 2016: Contracted with firm DCE for project
engineering and design. Completed 7.29.16!
- August to November Construction RFP. Bid award.
- November 2016 to September 2017 project construction
- September 2017 Red Hill Bay habitat in operation.
![Page 13: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/13.jpg)
www.iid.com
SA
LIN
ITY
TO
LE
RA
NC
ES Tilapia survival
Emergent vegetation
Mosquito control Mosquitoes Survive
SUPPRESS MOST VEGETATION
Selenium Loading
OPTIMAL SURVIVAL AND REPRODUCTION
SCH OPERATIONS
Salinity in Ponds0 ppt 10 20 30 40 50 60 70
Cardno/ENTRIX 2011
LESS RISKMORE RISK
MOSQUITO SUPPRESSION
Salinity Constraints and ThresholdsCalifornia Department of Water Resources
![Page 14: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/14.jpg)
www.iid.com
14
![Page 15: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/15.jpg)
www.iid.com
15
Project Overall
![Page 16: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/16.jpg)
www.iid.com
16
Project Acreage
![Page 17: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/17.jpg)
www.iid.com
17
Water Systems (Saline & River)
![Page 18: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/18.jpg)
www.iid.com
18
Power supply (Saline & River)
![Page 19: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/19.jpg)
www.iid.com
19
Salt Water Intake Floating Pump Station Cross Section Years 2016 to 2021
![Page 20: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/20.jpg)
www.iid.com
20
Salt Water Intake Floating Pump Station Cross Section Years 2021 to 2036
![Page 21: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/21.jpg)
www.iid.com
21
Comparable Jack-up saline pump barge
![Page 22: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/22.jpg)
www.iid.com
22
Saline pump barge plan view
![Page 23: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/23.jpg)
www.iid.com
23
Saline pump barge side elevation
![Page 24: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/24.jpg)
www.iid.com
24
Saline pump
station wet well Fish screen
![Page 25: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/25.jpg)
www.iid.com
25
Hidrostal submersible
pumps for both saline
and Alamo river waters
Pump characteristics:1. “Fish Friendly”
2. Saline pump – 145 HP
River pump – 110 HP
Both pumps configured for
extreme arduous duty.
Double mechanical seals &
hermitically sealed & oil
filled motors.
3. Low speed application
which in the case of the Red
Hill Bay project both pumps
will be Vfd driven.
4. Saline pump design focus on
highly corrosive
environment and change of
pumping head over life of
project. Ease of impellor
change-out when needed.
5. River pump design focus on
highly erosive environment
due to sedimentation.
![Page 26: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/26.jpg)
www.iid.com
26
Saline & River anticipated pump flows over the project life
![Page 27: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/27.jpg)
www.iid.com
27
Alamo River Structure & Sedimentation Settling Basin
![Page 28: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/28.jpg)
www.iid.com
28
Saline and Alamo river waters mixing station
![Page 29: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/29.jpg)
www.iid.com
29
![Page 30: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/30.jpg)
www.iid.com
30
![Page 31: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/31.jpg)
www.iid.com
31
‘SSKGRA’
‘Red Hill Bay’
![Page 32: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/32.jpg)
www.iid.com
32
![Page 33: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/33.jpg)
www.iid.com
33
![Page 34: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/34.jpg)
www.iid.com
34
![Page 35: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/35.jpg)
www.iid.com
35
![Page 36: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/36.jpg)
www.iid.com
The Source of the Problem
Reduced Sea inflows due to Water Transfers
![Page 37: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/37.jpg)
www.iid.com
The Related Problem
Salinity rises until the Salton Sea is a Dead Sea
![Page 38: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/38.jpg)
www.iid.com
38
Land
Owners
of Playa
to be
Exposed
Orange: IID
Green: Federal
(USBR)
These lands will be
exposed when the Sea
recedes to its lowest
forecast level or No
Action scenario
![Page 39: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/39.jpg)
www.iid.com
39
Red Hill Bay-Garst
Rd. All 3 photos taken
within 30 minutes!
Red Hill Bay is Very
Emissive Playa
![Page 40: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/40.jpg)
www.iid.com
40
![Page 41: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/41.jpg)
www.iid.com
41
![Page 42: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/42.jpg)
www.iid.com
![Page 43: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/43.jpg)
www.iid.com
![Page 44: IID ASCE_Red Hill Bay projecy-10.26a.16](https://reader033.fdocuments.us/reader033/viewer/2022042605/5874b8ba1a28ab1b098b7e39/html5/thumbnails/44.jpg)
www.iid.com
44