Presentation to Salton Sea Authority
Backbone Infrastructure Project
Graeme R. Donaldson
Program Manager Salton Sea Initiative
February 18, 2016
www.iid.com
Background & Goals• State has been slow to initiate Salton Sea restoration projects.
• Develop the infrastructure required to collect, store, manage and
release IID drainage water to accommodate future uses leading
to and onto the Salton Sea playa including:
Uses by IID consistent with its core water delivery and drainage
functions.
Uses by the State of California to fulfill its obligations related to and
consistent with the restoration of the Salton Sea.
Uses by other public and private entities related to and consistent with
the restoration of the Salton Sea.
2
www.iid.com
Project Objectives• Enable and ensure continued functionality of IID’s drains, including
existing and anticipated operations and maintenance of the system.
• Reconfigure the existing IID drainage system to the extent required to
incorporate the backbone infrastructure facilities and functions.
• Incorporate flexibility and durability into the reconfigured IID drainage
system to accommodate anticipated fluctuations in drainage flows and
incremental development of restoration and other uses over time.
• Provide water of sufficient quality to protect existing infrastructure and
support identified uses, including specific habitats.
• Design infrastructure to minimize effects on species of fish and wildlife
dependent on the Salton Sea and promote habitat where possible.
3
www.iid.com
Salton Sea Backbone Infrastructure
What it is?
4
www.iid.com
Water Management Backbone
• Uses by IID consistent with
its core water delivery &
drainage functions.
• Divert agricultural return
water
• Treat to reduce nutrients
and sediment
• Distribute to playa
• Mitigate for pupfish
• Allow other infrastructure
5
www.iid.com
Water Management
• Allows for all current and required uses
• Manages IID water and land efficiently
6
www.iid.com
www.iid.com
8
www.iid.com
9
www.iid.com
10
www.iid.com
Salton Sea Backbone Infrastructure Project
Define (goals, objectives, purpose and needs)
Design (up to approximately 30% to 40%)
Engineer (up to approximately 30% to 40%)
Permit (commence permitting prior to 3.31.16)
11
www.iid.com
Intended Scope (phase #1 Jan-Jun 2016)
• Develop Backbone Infrastructure
a) definition, b) purpose, c) limitations, d) uses
• Develop goals, objectives and metrics
• Develop conceptual designs and operations and linkages to
other projects
• Develop compliance plans
• Develop draft NOP/NOI and scoping plans
• Develop NEPA/CEQA and 404 alternatives
12
www.iid.com
Resource & cost allocation
13
www.iid.com
Questions?Please contact Graeme Donaldson Cell # 760 457 6565,