Status of PPPs in Infrastructure Karnataka-Completed Project Major Sector Sector Project Name Location Exec. Agency Owner 2 Transport Road Highways NHAI 599.49 PPP 3 Transport Road Road KRDCL KRDCL 188.00 PPP 156 MSW Bangalore BBMP BBMP 30.00 PPP 157 Bangalore BBMP BBMP 35.00 PPP Sl no Project type / Sub sector Department/ Agency Estimated cost(Rs.in Crores) PPP or Non PPP Four Laning and streghtening of Km. 515 to Km 592 Belgaum - Maharashtra Border NH-4 in the State Belgaum district of Karnataka Ministry of Highways Four laning of Bangalore -Mysore Road (Bangalore - Maddur) Bangalore- Maddur Urban and Municipal Infrastructure MSW Managemen t Sanitary Landfills in Bangalore Urban and Municipal Infrastructure Commercial Development Commercia l Complex Madivala Commercial Plaza

Transcript of idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75%...

Page 1: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

Major Sector Sector Project Name Location Exec. Agency Owner

2 Transport Road Highways NHAI 599.49 PPP BOT-Annuity

3 Transport Road Road KRDCL KRDCL 188.00 PPP BOT-Annuity

156 MSW Bangalore BBMP BBMP 30.00 PPP BOT

157 Madivala Commercial Plaza Bangalore BBMP BBMP 35.00 PPP BOOT

Sl no

Project type / Sub sector

Department/Agency

Estimated cost(Rs.in Crores)

PPP or Non PPP

Structure (BOOT/BOT)

Four Laning and streghtening of Km. 515 to Km 592 Belgaum - Maharashtra Border NH-4 in the State

Belgaum district of Karnataka

Ministry of Highways

Four laning of Bangalore -Mysore Road (Bangalore -Maddur)

Bangalore-Maddur

Urban and Municipal Infrastructure

MSW Management

Sanitary Landfills in Bangalore

Urban and Municipal Infrastructure

Commercial Development

Commercial Complex

Page 2: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

28 Transport Airport Airport IDD KSIIDC BIAL 2470.29 PPP DBOOT

8 KUWSDB Apr-05 237.00 Management Contract

Sector Value Total 3599.78

0Airport

3490.29Bio-technology

522

422.82

Bangalore International Airport (BIAL)

Devenhalli, Bangalore

Water Supply & Sewerage

Water Supply & Sewerage

Belgaum, Gulbarga & Hubli-Dharwad

WB assisted Karnataka Urban Water Sector Improvement Project (KUWASIP)

Belgaum, Gulbarga & Hubli-Dharwad

Works under eight Priority Investment Packages (PI Works) are completed and

Agruculture and holticure markets

Commercial Development

Page 3: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

12Cultural Centres

1050Entertainment

152Hotels/ Resorts

363.603

50MRTS

3716MSW

236.83Port

2950

Common User facilities

Information Technology

Page 4: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

Power

14503.7Rail

0Road

20698.18Theme Park

20.49

0

41425.16Transport - terminal

9777.33Urban Infrastructure

9000

Health Infrasruture and facility

Township Development

Page 5: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

119.66

357Others

1.65

Total 108868.71

Warehousing infrastructure

Water Supply & Sewerage

Page 6: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

0

2

4

6

8

10

12

Distribution of Projects - Stage Wise

Stages

No.

of P

roje

cs

Page 7: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

0

2

4

6

8

10

12

Distribution of Projects - Stage Wise

Stages

No.

of P

roje

cs

Page 8: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

0

2

4

6

8

10

12

Distribution of Projects - Stage Wise

Stages

No.

of P

roje

cs

Page 9: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

Type of Funding Remarks

ICB Jul-04 1 50.51

Jun-03 Jan-04 Apr-06 10 Years

ICB Mar/03 May/04 Dec/05 NIL 0.00 15 years

Apr/05 Jun/05 NIL 0.00 30 years

Mode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of

Date of Completion

VGF Flag

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

ADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Debt : Equit 82 % : 18 % 

GoI support in terms of VGF

M/s North Karnataka Expressway Ltd., Belgaum and the main sponser is ILFS.

17 yrs & 6 months

Domestic Tender

Ms: Brindavan Infrastructure Co Ltd.,

Ramky Infrastructure Ltd., Hyderabad

Domestic Tender

Davanam Jewellery Bangalore

Page 10: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

ICB 6/28/1999 1/17/2002### 39540 1 350.00 350 Siemens Con

40155.00

30 years as per CA with MOCA

Page 11: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

0

2

4

6

8

10

12

Distribution of Projects - Stage Wise

Stages

No.

of P

roje

cs

Page 12: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

0

2

4

6

8

10

12

Distribution of Projects - Stage Wise

Stages

No.

of P

roje

cs

Page 13: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

0

2

4

6

8

10

12

Distribution of Projects - Stage Wise

Stages

No.

of P

roje

cs

Page 14: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

Land Details Current Status/ Remarks if any Brief Description

Completed

Support Infrastructure required

Expension Plan

Additional Investment

Issues

Risk Mitigatoin Plan

Completed on Jul-04 and toll is being collected since March, 2005

The project invovled wideing and strenghtening of exsiting 2 lanes to 4 lanes with divided carriageway & median plantation from Km 515 to 592 of NH-4 with facilities like drinking water & toilets, Bus bays, truck lay bus and services roads on either side

Due to this project, the travel comfort has increased and the travel time has come down. Fuel consumption and vehicle maintenance is reduced. Avalibility of good transportation facilities for agriculture produce and overall economic development.

The work is completed in June, 06. Entire amount will be paid on Annuity basis.

As per the Municipal Solid Waste (Management & Handling) Rules 1999. It is the responsibility of the Municipal authority to dispose municipal solid waste in a scientific manner. iDeCK has assisted in carrying out the project development activities includi

The Concession Agreement between BMP and the Successful Bidder has been signed in November 2005 and the concessionaire has commenced renovation of the Complex. Now, the project has been completed.

BMP has developed a commercial plaza (300,000 sq.ft.) at Madivala in Bangalore. Subsequently, in order to leverage the commercial potential of the complex, BMP has requested iDeCK to provide assistance in identification of a suitable private developer (th

Page 15: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

3884 acres 6 lane road already exists.elevated road planned by NHAI.Electricity- 66KVA from BESCOMWater- 30 lakh lpd from BWSSB

2nd runway & terminal expansion will handle 25 mn pax.

With private sector investment

Costs incured by the private operator on various

A committee has been set up by GOK to look into the costs incurred

Cost revised due to enhancement in the capacity of the airport. The project is operational.

Airport designed to handle an annual passenger traffic of 11mm & cargo of 350000 tones annually.

Works under eight Priority Investment Packages (PI Works) are completed and commissioned. Procurement and installation of pumping machineries under two goods packages are completed and commissioned.Bulk water supply improved to Belgaum, Gulbarga and Hubli

Page 16: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

1 NHAI Completed

1 Completed

1 Completed

1 Completed

PDF funding sought

PDF funding approved (Rs. in Lacks)

StageOPERATIO

Availble with PPP Cell / KRDCL

OPERATAvailabl

e with PPP Cell

OPERATION

Available with PPP Cell

OPERATION

Page 17: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka-Completed Project

1 Completed

Completed

Available with PPP Cell

OPERATION

Page 18: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Sl no. Sector Project Name Location Date of Award Current Status/ Remarks if any Stage

1 Airport Bijapur, Karnataka IDD 110.00 BOT Awarded

2 Airport Gulbarga Minor Airport Gulbarga IDD 110.00 DBOT 2010, April Project Development Activities underway. Awarded

3 Airport Shimoga Minor Airport Shimoga IDD 110.00 BOT 2010, April Project Development Activities underway. Awarded

4 Airport Construction of Hasan Airport Hassan IDD 690.00 BOT Awarded

5 Mysore 16.00 BOOT 2 Years Awarded

6 Construction of public toilet Bangalore BBMP 12.00 BOOT Bidding completed. The project has been awarded. Awarded

7 MSW Waste to Energy Project - Mandur BBMP 70.33 Awarded

8 MSW Shimoga 4.00 BOT Awarded

Depertment/Agency

Estimated cost(Rs.in Crores)

Structure(BOOT/BOT)

Likely Date of Completion

Development of Minor Airport at Bijapur

Financial bid opening- Sep 2008

The project cost excludes land cost. The bid process Underway. Awaiting administrative approval.

Date of signing-April 2008

Date of signing-April 2008

2 years from the date of handing over of site

1. Approval from the Union govt. is awaited.2. About 514 Acre of land is handed over to concessioner, balance 446 acre of land notified by KIIDB, final award is pending. 3. CA signed on Sept,07, 4. Site survey completed on March 08. 5. Project DPR submited feb 08. 6. Topographical & Geo technical survey completed. 7. Enviormentel approval application submitted on Feb 08, approvel expected by Dec 08.To be commissioned in Nov 2009.

Commercial Development

Development of Commercial Complex at Makkaji Chowk, Mysore

Mysore City Corporation (MCC)

The bid process has been completed. The Concession Agreement has been signed and project has been awarded.

Common User facilities

Mandur, Bangalore District, Karnataka

BOT-Annuity

Construction 

Inertisation and land fill facility Shimoga

DMA / Shimoga CMC

Bidding process completed. The project has been awarded.

Page 19: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

9 MSW Modern abattoir Bangalore BBMP 30.00 BOOT Bidding completed. The project has been awarded. Awarded

10 Road 445.00 BOT 04.09.2009 22.95% of physical progress achieved Awarded

11 Road 402.87 28.09.2006 Mar-09 Awarded

12 Road 450.00 BOT Mar/09 Awarded

13 Road 445.00 BOT Sep-09 14% of physical progress achieved Awarded

14 Road 441.00 BOT Jul-10 8.14% of physical progress achieved. Awarded

Design, Engineering, Financing, Construction, Operation and maintence of Access Controlled highway Project of Bangalore – Nelamangala of NH-4 from Km10/0 to Km 29/5 in the State of karnataka on BOT basis.

karnataka / Bangalore Rural and Urban

Dept. of road Transport & Highway / Ministry of Highways

1) Design,Construction,Development, Finance,operation and maintence of AP/Karnatka border-Avathi village section from 463 Km to 524Km. 2) Improvement,Operation and maintence of of Km.524.00 to 527.00 at Nandi Hill crossing

Karnataka/ Chickballpur/Chickballpur/

Ministry of Highways

BOT-Annuity

70% of physical progress is achieved

Construction of Elevated Highway Project of Bangalore Hosur Section of NH-7 from Silk Board (Km 8/765) to Electronic City (Km 18/750) on Built, Operate and Transfer (BOT) Basis.

Bangalore Rural and Urban

Dept. of road Transport & Highway / Ministry of Highways

85.525% of physical progress achieved

Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore - Nelamangala section of NH-4 in the state of Karnataka on BOT basis

Bangalore Rural and Urban

Ministry of Highways

Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Bangalore – Nelamangala (Nelamangala Junction) on NH-4 with NH-48 to Devihalli from Km 28 to Km 111(110) in the State

Tumku, Mandya, Hassan, Bangalore

Dept. of road Transport & Highway / Ministry of Highways

Page 20: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

15 Road 565.00 BOT Jul-10 Awarded

16 Road Wadi - Raichur KRDCL 82.38 Feb-04 Feb-06 Awarded

17 Road PWD 18.60 BOT Jun-06 18 months Awarded

Design, Engineering, Financing, Construction, Development, Operation and maintence of Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section from Km 237 Km to Km 318 NH-4 in

Kolar, Bangalore urban and Rural

Dept. of road Transport & Highway / Ministry of Highways

4.80% of physical progress achieved. The project is being developed under NHDP Phase IIIA, NH - 4.

Widening and strengthening of Wadi -Raichur Road

Private Participation by Cement comp.

Work on 69 out of 84 km completed. Cost of the project has increased from 60.48 to 82.38 cr. (Rs. 25.00 Cr. contributed by Cement Factories & balance by Govt)

Construction of Sandur Bye-Pass Road, Bellary District.

Sandur By pass road, Bellary, karnataka

Concessionaire agreement executed on 18/11/05, Ms: SOWIL was appointed as Independent Engineer and Tripartite Agreement was concluded on 29/08/06. The Concessionaire has commenced the work during last week of August 06.

Page 21: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

Sl no Sector Project Name Location Sponser Dept Stage

1 Road Tumkur Honovar BOT Pipeline

2 Road BOT Apr/09 Pipeline

3 Road 500.00 BOT March, 2009 RFQ under evalution Pipeline

4 Road BOT Pipeline

5 Road Belikere Pipeline

Estimated cost(Rs.in Crores)

Modality (BOOT/BOT)

Date of Award/ Likely Award

Current Status/ Remarks if any

4 laning of NH-206 from Tumkur-Sagar section

1. PD, KSHIP to provided TOR to the PPP Cell, IDD for appointment of TA and further action2. TA to be appointed

4/6 laning of NH-4A from Belgaum - KNT / GOA border (84Kms) in the state of Karnataka under NHDP phase - III

Belgaum district of Karnataka

NHAI,Ministry of Shipping,RoadTrasport and Highway.

PPPA committee approval is awaited.

4/6 lanning of Kundapur to Suratkal of NH-17 in the state of karnataka under NHDP phase -III programme(Package no. BHDP-III DL5/11)

Karnataka/Mangalore,/Dakshin Kannada

Dept. of road Transport & Highway / Ministry of Highways

Bangalore-Kanakpura-Tamilnadu (203KM)

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

Connectivity to Belikere Port

Public Works Departments

Page 22: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

6 Road 1000.00 BOT Pipeline

7 Road Bangalore BDA 5000.00 BOT Pipeline

8 Road 440.00 BOT Mar-09 Review of DPR under progrees Pipeline

9 Road 1112.00 BOT Apr/09 Draft DPR ongoing Pipeline

Construction of Expressway (State highway, Special) from Outer Ring Road to International Airport in Devanahalli Taluk

Devanhalli, Bangalore

Construction of Peripheral Ring Road around Bangalore City..

BDA land acquisition work at Rs. 702.00 coroes.

DPR is being prepared & Preparation of bidding documents are in Progress. .

Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Devilalli Hassan Section of NH- 48 from Km 110 to Km 191 in the state of Karnataka

Hassan, Karnataka

Dept. of road Transport & Highway / Ministry of Highways

Design, Engineering, Financing, Procurement, Construction, Operation and maintence of 4 & 6 laning from Km 202 to Km 299 of Hungund - Hospet Section of NH-13 in the state of Karnata under NHDP phase III on BOT

Bagalkot, Koppal & Bellary District.

Ministry of Highways

Page 23: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

10 Road 917.00 BOT Mar/09 Draft DPR ongoing Pipeline

11 Road BOT Pipeline

12 Road BOT Pipeline

13 Road PWD 25.00 BOT Pipeline

14 Road PWD 30.00 BOT Pipeline

Design, Engineering, Financing, Procurement, Construction, Operation and maintence of Bijapur - Hungund section of NH-13 from existing Km 102.00 to 202.00 in the state of Karntaka under NHDP phase III on BOT

Bijapur and Bagalkot

Ministry of Highways

Devanhalli-Vijipura-H-Cross-Kolar (60 Km)

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Development of Bilekere-Belur-Huliyur-Hiriyur Road (228 Km)

Chitradurga-Tumkur-Mandya

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Development of bypass road for Belekeri Port

Belekeri port, near NH17 on karnataka costal area

1. DPR for technical feasibility has been submitted to GoK2. Writ petition filed has been dismissed. 3. Bidding process to be initiated.

Development of Linkages to NH-13 and NH 63 at Hospet from Sandur-Hospet road in Bellary

Bellary, Karnataka

The project handed over to NH by PWD, GOK. DPR prepared by IDecK will be used to prepared new DPR for NH

Page 24: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

15 Airport IDD 110.00 BOT Awrded

15 Road PWD 230.00 BOT Pipeline

16 Road BOT Pipeline

17 Road BOT Pipeline

18 Road PWD 144.00 BOT Bids are to be invited Pipeline

19 Road BOT Pipeline

Development of Minor Airport at Bijapur

Bijapur, Karnataka

Financial bid opening- Sep 2008

The project cost excludes land cost. The bid process Underway. Awaiting administrative approval.

Development of roads in Torangallu, Bellary district

Torrangallu, bellary

1.Final DPR submitted to PWD, Waiting for approval, 2. Bidding process to be initiated.

Development of Shimoga-Tadas Road (189 Km)

Shimoga-Havere

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Development of Sira-Chikkaballapura-Mulbagal Road (171 Km)

Tumkur-Chikkaballapur-Kolar

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Development of Tornagallu-kudligi Road, Sandur Hospet Road and bypass in Toranagallu

Development ofvNippanai-Bagalkot-Badami-Kudalsangama-Tailkote Road(240 Km)

Belgaum-Bakalkot

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Page 25: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

20 Road 616.00 No Info RFQ invited Pipeline

21 Road BOT Pipeline

22 Road BOT Pipeline

23 Road BOT Pipeline

24 Road Annuity Pipeline

25 Road Hassan PWD 100.00 BOT KSHIP to undertake the project Pipeline

Four laning of Kundapur to Suratkal section ( Km 284 to 358) and Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis

Mangalore, Dakshin Kannada

Ministry of Highways

Ilakal-Gadag-Bankpura Cross (200Km)

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Improvement of Dabaspete-Hoskote-Tamilnadu (120Km)

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

Improvement of Hospete-Hubli-Ankola NH (271Km)

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

Improvement of Hunabad-Bijapura-Hubli (420Km)

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

Improvement of SH Chikkanayakanahalli to Hasssan (74 KM)

Page 26: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

26 Rail IDD

27 Airport IDD 2470.29 DBOOT 1/17/2002

28 Road 599.49

29 Road KRDCL 188.00 Jan-04

Hassan-Mangalore Gaugue Conversion

Hassan Bangalore

The gauge conversion is over and the operation of goods train has begun since May 2006. After the completion of statutory inspection and certification by the Railway Safety Commissioner, this line will be opened for passenger services.

OPERATION

Bangalore International Airport (BIAL)

Devenhalli, Bangalore

Cost revised due to enhancement in the capacity of the airport. The project is operational.

OPERATION

Four Laning and streghtening of Km. 515 to Km 592 Belgaum - Maharashtra Border NH-4 in the State

Belgaum district of Karnataka

Ministry of Highways

BOT-Annuity

Completed on Jul-04 and toll is being collected since March, 2005

OPERATION

Four laning of Bangalore -Mysore Road (Bangalore -Maddur)

Bangalore-Maddur

BOT-Annuity

The work is completed in June, 06. Entire amount will be paid on Annuity basis.

OPERATION

Page 27: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

30 MSW Bangalore BBMP 30.00 BOT May/04 Completed

31 Bangalore BBMP 35.00 BOOT Jun/05

26 Road Uttara Kannada PWD 190.00 BOT KSHIP to undertake the project Pipeline

27 Road Annuity Pipeline

28 Road 203.00 BOT Jan-09 Pipeline

Sanitary Landfills in Bangalore

OPERATION

Commercial Development

Madivala Commercial Plaza

The Concession Agreement between BMP and the Successful Bidder has been signed in November 2005 and the concessionaire has commenced renovation of the Complex. Now, the project has been completed.

OPERATION

Improvement of SH Dhawrad to Ramnagara (60 KM)

Improvement of Tumkur-Honnavara(370Km)

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

Improvement to Chikkanayakanahalli-Tiptur-Hassan Road (Partly MDR and partly SH) for a length of 74.00 Km

District Tumkur and Hasan

PWD, Ports and Inland Water Transport Department, GoK

The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document will be issued after approval from Gov by november 2008

Page 28: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

29 Road 197.21 BOT Jan-09 Pipeline

30 Road 193.10 BOT Jan-09 Pipeline

31 Road 196.53 Pipeline

32 Road Tumkur-Mandya BOT Pipeline

33 Road Bellary Pipeline

Improvement to State Highway (SH-10) from Maharashtra Border to Andhra Pradesh Border via Aland, Gulbarga, Malkhed, Sedam, Ribbanpally,

Gulbargha District

PWD, Ports and Inland Water Transport Department, GoK

The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document will be issued after approval from Gov by november 2008

Improvements to Dharwad-Alnavar-Ramnagar-Anmod Road (SH-34)

District Dharwad & Belgaum

PWD, Ports and Inland Water Transport Department, GoK

The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document will be issued after approval from Gov by november 2008

Improvements to Wagdhari-Ribbanapally Road

PWD, Ports and Inland Water Transport Department, GoK

BOT Annuity

In principle approval granted by EI on 5-3-08

Malavalli-Maddur-Madhugiri-Andhra Border (218 Km)

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

Proposed to develop six lane road (76Km) from Bellary to Hospet and Four lane upto Gutti on NH-63 (370Km) from Hospet to Bellary .

Ministry of Shipping Road Transport and Highways government of India

Page 29: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

34 Road NA BOT Mar/09 Pipeline

35 Road BMRDA 5250.00 NA Pipeline

36 Road Bellary KRDCL ? 56.00 BOT Pipeline

37 Road BOT Pipeline

SUB TOTAL 19832.62

38 Port 500.00 BOOST Mar/08 Pipeline

Six Laning of NH-4 from Belgaum to Dharwad from Km 515 to Km 433 (80 Kms) in the state of Karnataka under NHDP Phase V

Belgaum & Dharwad district of Karnataka

NHAI,Ministry of Shipping,RoadTrasport and Highway.

Feasibility Report i.e. DPR is being finalised. Tender called. Prequalifi

STRR and ITRR roads in Bangalore Metropolitan Region

Bangalore Metropolitan Region (State Highway Special- 2)

BOT-Annuity

1. Compensation R&R packages to be approved. Mode of execution Annuity or BOOT with VGF needs to be approved. 2. Cabinet approval required.3. Land to be acquired.

Two diversion from Bannihatti to NH-63 at BPTCL(19Km) and Bannihatti to Gadiganur(9Km) on StateHighway (SH-40) from Sandur to Torangallu,

IDECK has submitted DPR to GOK as part of SH-40 development on BOT basis

Yelahanka-Hindupura (73Km)

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

2nd Stage Development of Modern Sea at Karwar on the costline of Karnataka

Costline at Karwar

Direcotor of Ports & Inland Water Transport

The RFQ has been invited and shortlisting is under process.

Page 30: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

39 Port 1350.00 BOOST Pipeline

40 Port Honavar 1100.00 BOOST Pipeline

SUB TOTAL 2950.00

41 KSIIDC 9000.00 BOT Jan-09 Pipeline

SUB TOTAL 9000.00

42 Power 4500.00 BOO Pipeline

Development of Modern Deep Sea Port at Ist Stage Malpe on the Costline of Karnataka Maritime State

Malpe, Costline of Karnataka

Direcotor of Ports & Inland Water Transport

The project proposal is submitted for the approval of Public Private Partnership (PPP) Committee.

Development of Honavar Port in Uttar Kannada District of Karnataka Maritime State

Direcotor of Ports & Inland Water Transport

The project proposal is submitted for the approval of Public Private Partnership (PPP) Committee.

Urban Infrastructure

Devanahalli Business Park (DBP)

Located on NH-7, adjoining the Northern Boundary BIAL Devanahalli Bangalore

Invitation of EOI from prospetive developers to be issued.-States recommendation to GoI for approval-Provision of Power and Water to the project-Assistance for obtaining statutory clearances to the extent possible.

1000-1320 MW Coal based power plant

Chamalpura, Mysore

Energy Department / ESCOMS / PCKL

RFQ bid evaluation is under process

Page 31: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

43 Power 5000.00 BOO Pipeline

44 Power 5000.00 BOO Pipeline

45 Power Mysore 3.70 BOO Jul-99 Pipeline

SUB TOTAL 14503.70

46 Airport Bellary IDD BOT Pipeline

1000-1320 MW Coal based power plant

Ghataprabha, Hukeri, Belgaum

Energy Department / ESCOMS / PCKL

RFQ bid evaluation is under process

1000-1320 MW Coal based power plant

Jewargi, Gulbarga

Energy Department / ESCOMS / PCKL

RFQ bid evaluation is under process

ADB assisted Karnataka Urban Infrastructure Development Project (KUIDP)

Mysore City Corporation (MCC)

Construction of new greenfield Airport at Bellary

1. AAI to conduct technical feasibility study and approve site for new airport.2. An amount of Rs. 3.50 Lac has been trasnfered to AAI for inspection.3. Bescom, PCB and Airforce are constulted for n/c clearances4. KSHIP / PWD to devleop apprach road5. Traffic assessment work has been started by IdecK6. PIM would be developed after site is identified

Page 32: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

SUB TOTAL

47 Pipeline

48 Bio-technology IT & BT / KBITS 522.00 BOT Pipeline

49 Bangalore 300.00 BOT Pipeline

50 Bangalore 106.82 BOT Pipeline

51 Cultural Centres Deptt of Tourism 1050.00 BOOT Pipeline

Agruculture and holticure markets

Development of Whole sale vegetable market

Bytarayna- pura, Yelenkha

Agriculture Marketting

The bid process for selection of management partner under way.

Establishment of Biotech Park Project

Electronic City, Doddathogur Village, Begur Hobli, Hosur Road, Bangalore

Yet to be commenced, inking of the agreement with PPP partner is not finalised

Commercial Development

Development of Land for Animal Husbandry

Animal Husbandry Department

Detailed feasibilty reports completed . Awaiting approval of land use conversion after which Bidding will be done.

Commercial Development

Development of 1.60 acres land along Hosur road

Karnataka Land Army Corporation Ltd.

Detailed feasibilty reports completed . Awaiting approval of land use conversion after which Bidding will be done.

Development of International Convention Center

Devenhalli, Bangalore

Draft cabinet note has been prepared .For bening taken up in the next cabenet metting

The process of finalization of bidding process is placed before the steering committee constituted for the purpose.Decision of the committee is awaited. The steering committee headed by Chief secretary to Government is planned for site inspection.

Page 33: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

52 NA Pipeline

53 Heritage Park 35.00 DBOOT Pipeline

54 Bangalore 50.00 Tenders to be invited Pipeline

55 Bangalore Pipeline

56 MRTS Bangalore IDD 3716.00 BOT Pipeline

57 Others 1.65 Apr/06 Pipeline

Health Infrasruture and facility

Adoption of PHC through scheme for involving private medicla colleges and other agencies in the management of primary health centres

Rural areas of Karnataka (All PHCs) at all districts

Health and Familiy Welfare / DH and FWO

Management Contract

Development of Heritage Park at vaccine institute Belgaum

Belgaum/ Karnataka

Project concept note prepared.Remarks- Funding, Guidence and suggestions are required for finalising the project.

Information Technology

Computerisation of Regional Transport Offices (RTOs) in Karnataka under PPP framework

Transport Department

Information Technology

Development of Facility for smart card based driving licence and registratio certificates for vehicles for all RTOS in karnataka

Transport Department

The bid process for selection of management partner under way.

Development of Express Rail Link to BIAL 1. Geo surveys undertaken

2. Traffic studies completed3. DPR submitted to GOK4. Bid process underway. 5. RFQ to be issued.

High Securtiy Registration Plate (HSRP)

All RTO'S offices in Karnataka

Transport Department

BOO-Management Contract

Awaiting price notification by government

Page 34: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

58 Theme Park Mysore 20.49 BOT Pipeline

59 UDD 40000.00 Aug-08 Pipeline

60 BDA 1425.16 BLMT Pipeline

61 Dept of Shipping 119.66 No Info Pipeline

62 Bijapur city DMA, CMC 120.00 PBDPS Pipeline

SUB TOTAL 47466.78

Development of Heritage Park in Mysore

Mysore City Corporation (MCC)

DPR prepared, Awaiting approval from JNNURM

Township Development

Bidadi Integradted Township

Bidadi - Ramnagara Taluk,

Management Contract

Land Acqusition notification to be issued. Agreement to be executed with DLF tld.

Township Development

Economically Weaker Section Housing Project

Around Bangalore City

Agencies have been qualified by the process of RFQ.RFQwill be issued after change of land use is obtained. From Govt. of Karnataka..

Change of use from Agriculture to residential zone & industrial to residential zone is under progress

Warehousing infrastructure

Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port

New Mangalore Port, Mangalore

Water Supply & Sewerage

Water Supply and Sanitation facility in Bijapur city

1. DPR of technical feasibility and has been prepared and approved. 2. Project has been cancelled and moved to ADB.

M75
PPPcell: Performance Based Defereed Payment Structure
Page 35: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

63 Entertainment Aquamarine park Magalore Deptt of Tourism No Info Project Development stage Pipeline

64 Entertainment 80.00 BOT 1. Under bidding Pipeline

65 Entertainment Mangalore Deptt of Tourism 40.00 No Info Submitted for Approval -CRZ Pipeline

66 Entertainment Bangalore KSTDC 32.00 Pipeline

SUB TOTAL 152.00

67 Hotels/ Resorts Deptt of Tourism 17.50 BOT Pipeline

Development of Various Tourism Facilities in Pilikula, Nisarga Dhama

Pilikula Nissarga Dhama at Dakshin Kannada, Mangalore

Pilikula Nisarga Dhama, NGO

Golf Course at ThannirBhavi

Luxury Tourist Train Project.

Management Contract

The bid process for selection of management partner under way.

3 Star Category hotel,Theme park,Restaurant,Organised Retail,Civic amenities

Jog Falls, Uttarkannda District

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Page 36: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

68 Hotels/ Resorts Belur Deptt of Tourism 29.60 BOT Pipeline

69 Hotels/ Resorts Deptt of Tourism 8.90 BOT Pipeline

70 Hotels/ Resorts Gokarna Deptt of Tourism 272.90 BOT Pipeline

71 Hotels/ Resorts Deptt of Tourism 4.20 BOT Pipeline

72 Hotels/ Resorts Deptt of Tourism 4.30 BOT Pipeline

73 Hotels/ Resorts Deptt of Tourism 2.00 BOT Pipeline

3 Star Category hotel,Theme park,Restaurant,Organised Retail,Civic amenities

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Budget Hotel,Restaurant,Organised Retail,Cuivic Amenities

Badami, Bagalkot District.

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Development of 5 Stat Dlx Hotel, Multi cusine Restaurant, Theme park, Multiplex, Retail shops, Civic Amenties

Economy Restaurant,Organised Retail,Civic Amenities

Banvasi, Uttarkannada District

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Economy Restaurant,Organised Retail,Civic Amenities

Agumbe, Shimoga District

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Economy Restaurant,Organised Retail,Civic Amenities

Patadakkal, Bagalkot District

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Page 37: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

74 Hotels/ Resorts Deptt of Tourism 4.20 BOT Pipeline

75 Hotels/ Resorts Deptt of Tourism 20.00 BOT Pipeline

SUB TOTAL 363.60

76 MSW Mysore 37.50 Pipeline

77 MSW Pipeline

78 MSW Bangalore BBMP 25.00 BOOT Jun/04 Pipeline

Economy Restaurant,Organised Retail,Civic Amenities

Aihole, Bagalkot District

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Theme park,Economy Restaurant,organised retail,Civic Amenities

Bijapur, Bijapur District

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

Development of Integrated MSW plan for city of Mysore

Mysore City Corporation (MCC)

Management Contract

Under approval (Detailed DPR of technical study has been submitted to MCC). The approval of funding under JNNURM is awaited from GOI.

Setting up of Municipal Solid Waste (MSW) treatment and landfill facilities in 8 towns in Karnataka

Hubli-Dharwad, Gulbarga, Belgaum, Shimoga, Raichur, Hassan, Tumkur, Chikmangalur.

Directorate of Municipal Administration (DMA)

Bidding process is underway in Shimoga town, Identification of landfill sites and technical studies at the other towns are underway.

Transfer station in Bangalore

The bidder has been selected. The process of awarding is underway.

Page 38: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

SUB TOTAL 62.50

79 Rail (High speed rail) IDD,GOK 10957.00 02.05.2009 Pipeline

80 Rail Bellary IDD Pipeline

81 Rail Bellary IDD Pipeline

Bangalore/Karnataka

DBFOT/BOT

Expression of interest was notified on 06.08.08. Preapplication conference was held on 15.09.2008. Represetatives from 27 interested firms attended the conference. Response to queries & proceedings of pre application conference to be released.

Banihatti to Nandihalli Railway line

Railway clearance for project is alredy approved. Land from hulikunte, Laxmipur & Bhujung Nagar of Sandur Taluk already have 66% farmer consent

Banihatti to Ramandurga Railway line

Railway clearance for project is alredy approved. Land from Krishnanagar, Daulatpur, Sushilnagar of Sandur Taluk (Revenue Land identification process is completed.

Page 39: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

82 Rail Daroji rail Connection Bellary IDD Pipeline

83 Rail Pipeline

SUB TOTAL 10957.00

84 Bellary 30.00 Pipeline

85 Bellary Pipeline

Railway clearance for project is alredy approved. Land from Torangallu & Daroji of Sandur Taluk (Revenue land identificatopm process is completed)

Proposed New railway Station for Passengers between Toaangallu-Gadiganur of Hospet to Bellary-Double Lane

Ch 172.15 between torangallu-gadiganur of hospet to bellary double lane Bellary

Feasibility Report-completed by M/s. URRC and submited to railway board. JSW is ready to invest under PPP as per Railways guidelines.

Transport - terminal

Tuck terminal between JSWSL and BTPCL

Transport - terminal

Bus terminus-Near New Railway station

Page 40: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

86.00 KSRTC Yet to be tendered Pipeline

87 Bangalore, KarnaKSRTC March, 2009 Yet to be tendered Pipeline

88 Bangalore, KarnaKSRTC 70.00 BOOT Yet to be tendered Pipeline

89 Bangalore, KarnaKSRTC BOOT March, 2009 Yet to be tendered Pipeline

90 KSRTC 900.00 BOOT 3/1/2009 Pipeline

91 Bangalore, KarnaKSRTC 53.00 BOOT Yet to be tendered Pipeline

Transport - terminal

Commcercial development with transport Infrastructure facilites to Davanagere bus station

Davanagere, Karnataka

BOOT(Swiss Chalange method)

Transport - terminal

Commcercial development with transport Infrastructure facilites to Jayanagar 9th block, Bangalore

BOOT(Swiss Chalange method)

Transport - terminal

Construction of inter model transit center at Byeyappanahalli, near NGEF- Bangalore

Transport - terminal

Construction of inter model transit center at Peenya Bangalore

Transport - terminal

Construction of Inter Modal Transit Center at Kempgowda Bus Station

Kempgowda Bus stand (main) at Bangalore

Require approval form GoK for Zone change from Traffic / Transport to Commercial. The approval is pending with GoK - UDD . Yet to be tenderd

Transport - terminal

Construction of mobality hub at Trumpet interchange, near Bangalore International Airport, Bangalore

Page 41: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

92 40.00 DBOT Jan-09 PipelineTransport - terminal

Development of Modern Bus Station and Commercial Building on NWKTRC site at Belgaum

Belgaum Central Bus Stand and Central Workshop Area located on Old Pune Highway, Link Road and Fort Road

KSRTC -NWKRTC

Ready for biddingAwaiting approval of project and Land use change to commercial. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed. To obtain Project approval from Belgaum Cantonment Board. Application submited by NWKRTC 2 months back. Once these are done and once SLWA clears the project, it can be out.

Page 42: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

93 25.00 DBOT Jan-09 Pipeline

94 Shimoga, Karnat KSRTC BOOT Yet to be tendered Pipeline

Transport - terminal

Development of Modern Bus Station and Commercial Building on NWKTRC site at Dharwad

Dhaward Old Bus Stand Area lcoated at the Junction on Subhash Road, Dharwad District.

KSRTC -NWKRTC

Project Structuring is underway and studies are going on. The apporx. Project cost is taken under consideration as per the similar projects undertaken in this sector. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Transport - terminal

Development of commcercial space above bus ststion at Shimoga

Page 43: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

95 28.00 DBOT Jan-09 Pipeline

96 KSRTC 3.00 BOOT Pipeline

Transport - terminal

Development of Commercial Complex on NEKRTC site at Bidar

Bidar Old Bus Stand, near Bidar Railway Station

KSRTC - NEKRTC

Ready for biddingAwaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NEKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Transport - terminal

Development of KSRTC Midway Plaza Facility Centre between Hiriyur & Chitradurga

KSRTC site at Bus Depot on NH-4, 10 Km from Hiriyur & 33 Km from Chitradurga in Chitradurga District

Ready for biddingAwaiting approval of project and Land use change to commercial

Page 44: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

97 40.00 DBOT Jan-09 Pipeline

98 KSRTC 30.00 BOOT Mar-09 Pipeline

Transport - terminal

Development of Modern Bus Station & Commercial building on NWKRTC at Hubli Bus Stand

Hubli Bus Stand, Hubli

KSRTC -NWKRTC

Ready for biddingAwaiting approval for Project Structure presnetation and Land use changeConceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed

Transport - terminal

Development of Modern Bus Station & Commercial Complex on KSRTC site and vacant land parcels at Puttur

KSRTC site at Puttur, Dakshin Kannada District

Ready for biddingAwaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Page 45: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

99 30.75 DBOT Dec-08 Pipeline

100 Hospet, Bellary HUDA 27.00 BOT Pipeline

101 IDD 22.50 BOT Pipeline

Transport - terminal

Development of Modern Bus Station & Commercial Complex on NEKRTC at Gulbarga Bus Stand

NEKRTC site at Gulbarga Main Road, Gulbarga

KSRTC - NEKRTC

Ready for biddingAwaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NEKRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Transport - terminal

Development of private truck terminal at Hospet, Bellary

1. DPR for technical feasibility has been submitted to DC & AC, Hospet. 2. - Land acquisition to commence. 3. Bidding process to be initiated subsequently

Transport - terminal

Devp of private truck terminal at Torangalu

Torangallu, Bellary

1. DPR and Project structuring completed. 2. Existing site found to be inadequate. 3. Additional land to be identified. 4. Bidding process to be initiated subsequently

Page 46: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

102 KSRTC 30.00 DBOT Jan-09 Pipeline

103 KSRTC 100.00 BOOT March, 2009 Pipeline

Transport - terminal

Project development of Bus stand and vaccant land parcels for KSRTC at Mangalore.

Mangalore, South Kannada

Ready for biddingAwaiting approval of project and Land use change to commercial. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Transport - terminal

Project development of terminals and vacant parcels for Transport Infrastructure and Commcercial development

Hassan new bus station at Hassan District

Ready for biddingAwaiting approval for Land use change to Commecia. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Page 47: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

104 350.00 DBOT Pipeline

105 BMTC 151.13 DBOT Pipeline

106 BMTC 153.00 DBOT Pipeline

107 BMTC 153.00 DBOT Pipeline

108 BMTC 196.90 DBOT Pipeline

109 BMTC 197.00 DBOT Pipeline

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Hebbal, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Sy no. 300, Hosakote, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

CA Site No. 38 , Sector IV, Hosur - Sarjapura Road layout, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

CITB-CA Site at Binnamangala 2nd Stage, Indiranagar, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Sy No. 32/1(58/22), Jayanagara 4th T Block, Bangalore

Bid process to commence upon approval from the GoK.

Page 48: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

110 BMTC 218.75 DBOT Pipeline

111 BMTC 109.40 DBOT Pipeline

112 BMTC 109.40 DBOT Pipeline

113 BMTC 86.00 DBOT Pipeline

114 BMTC 263.00 DBOT Pipeline

115 BMTC 87.50 DBOT Pipeline

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Sy No. 48,49,50 & 53, Kathiguppe, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Nagarbhavi 2nd Stagem, 10th Block C A site No. 6/12, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

BEML HBCS 5th Stage, Raja-rajeswaringr, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Sy. No 36(P), KIADB Industrial Area, Electronic City, Phase-2, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Sy. No. 69, Puttenhalli, Yelahanka, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Anjanpura, 10th Block, BDA layout, C A Site no. 14, Bangalore

Bid process to commence upon approval from the GoK.

Page 49: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

116 BMTC 219.00 DBOT Pipeline

117 BMTC 131.00 DBOT Pipeline

118 BMTC 250.00 DBOT Pipeline

119 BMTC 350.00 DBOT Pipeline

120 BMTC 219.00 DBOT Pipeline

121 BMTC 262.00 DBOT Pipeline

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Bidadi, KIADB Industrial Area, Plot No. 38,39 ,40 at Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

BSK 5th Stage, Pooranpragana Layout, C A Site No. 2 at Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Vaddarahalli, Sy No. 27,28, Bangalore North Taluk

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Peenya 4th Stage, KIADB Industrial Area, Plot No. 479, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Surya City, C A Site no. 12, Chandapura, Banagalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

ITI, Dooravani Nagar, K R Puram, Bangalore

Bid process to commence upon approval from the GoK.

Page 50: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

122 BMTC 130.00 DBOT Pipeline

123 BMTC 250.00 DBOT Pipeline

124 BMTC 250.00 DBOT Pipeline

125 BMTC 250.00 DBOT Pipeline

126 BMTC 250.00 DBOT Pipeline

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Bangalore International Airport, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Kogilu, Adjacent to proposed Peripheral Ring Road on Yelahanka Road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Dodda Gubbi, Adjacent to proposed Peripheral Ring Road on Hennur Road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Herandhalli, adjacent to proposed peripheral ring road on Old Madras Road

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Chikka Banahalli, adjacent to proposed peripheral ring road on Kadugodi, Bangalore

Bid process to commence upon approval from the GoK.

Page 51: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

127 BMTC 250.00 DBOT Pipeline

128 BMTC 250.00 DBOT Pipeline

129 BMTC 250.00 DBOT Pipeline

130 BMTC 250.00 DBOT Pipeline

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Kachamaranahalli, adjacent to proposed peripheral ring road on Sarjapura road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Huskur adjacent to proposed peripheral ring road on Hosur Road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Gollahalli, adjacent to proposed peripheral ring road on Bannerghatta Road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Kaggalipura, adjacent to proposed peripheral ring road on Kanakpura road, Bangalore

Bid process to commence upon approval from the GoK.

Page 52: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

131 Road 445.00 BOT

131 BMTC 250.00 DBOT Pipeline

132 BMTC 250.00 DBOT Pipeline

Design, Engineering, Financing, Construction, Operation and maintence of Access Controlled highway Project of Bangalore – Nelamangala of NH-4 from Km10/0 to Km 29/5 in the State of karnataka on BOT basis.

karnataka / Bangalore Rural and Urban

Dept. of road Transport & Highway / Ministry of Highways

22.95% of physical progress achieved

IMPLEMENTATION

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Challaghatta adjacent to proposed peripheral ring road on Mysore Road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Sulikere adjacent to proposed peripheral ring road in between Mysore road and Magadi road, Bangalore

Bid process to commence upon approval from the GoK.

Page 53: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

133 Road 402.87 28.09.2006

133 BMTC 250.00 DBOT Pipeline

1) Design,Construction,Development, Finance,operation and maintence of AP/Karnatka border-Avathi village section from 463 Km to 524Km. 2) Improvement,Operation and maintence of of Km.524.00 to 527.00 at Nandi Hill crossing an

Karnataka/ Chickballpur/Chickballpur/

Ministry of Highways

BOT-Annuity

70% of physical progress is achieved

IMPLEMENTATION

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Machahalli adjacent to proposed peripheral ring road on Magadi road, Bangalore

Bid process to commence upon approval from the GoK.

Page 54: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

134 KUWSDB 237.00 Apr-05

149 Airport Gulbarga Minor Airport Gulbarga IDD 110.00 DBOT Awrded

Water Supply & Sewerage

WB assisted Karnataka Urban Water Sector Improvement Project (KUWASIP)

Belgaum, Gulbarga & Hubli-Dharwad

Management Contract

Works under eight Priority Investment Packages (PI Works) are completed and commissioned. Procurement and installation of pumping machineries under two goods packages are completed and commissioned.Bulk water supply improved to Belgaum, Gulbarga and Hubli

OPERATION

Date of signing-April 2008

Project Development Activities underway.

Page 55: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

150 Airport Shimoga Minor Airport Shimoga IDD 110.00 BOT Awrded

151 Airport Hassan IDD 690.00 BOT Awrded

Date of signing-April 2008

Project Development Activities underway.

Construction of Hasan Airport

1. Approval from the Union govt. is awaited.2. About 514 Acre of land is handed over to concessioner, balance 446 acre of land notified by KIIDB, final award is pending. 3. CA signed on Sept,07, 4. Site survey completed on March 08. 5. Project DPR submited feb 08. 6. Topographical & Geo technical survey completed. 7. Enviormentel approval application submitted on Feb 08, approvel expected by Dec 08.To be commissioned in Nov 2009.

Page 56: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

152 Road 450.00 BOT Construction of Elevated Highway Project of Bangalore Hosur Section of NH-7 from Silk Board (Km 8/765) to Electronic City (Km 18/750) on Built, Operate and Transfer (BOT) Basis.

Bangalore Rural and Urban

Dept. of road Transport & Highway / Ministry of Highways

85.525% of physical progress achieved

IMPLEMENTATION

Page 57: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

153 Road 445.00 BOT Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore - Nelamangala section of NH-4 in the state of Karnataka on BOT basis

Bangalore Rural and Urban

Ministry of Highways

14% of physical progress achieved

IMPLEMENTATION

Page 58: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

154 Road 441.00 BOT Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Bangalore – Nelamangala (Nelamangala Junction) on NH-4 with NH-48 to Devihalli from Km 28 to Km 111(110) in the State

Tumku, Mandya, Hassan, Bangalore

Dept. of road Transport & Highway / Ministry of Highways

8.14% of physical progress achieved.

IMPLEMENTATION

Page 59: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

155 Road 565.00 BOT

156 Road Wadi - Raichur KRDCL 82.38 Feb-04

Design, Engineering, Financing, Construction, Development, Operation and maintence of Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section from Km 237 Km to Km 318 NH-4 in

Kolar, Bangalore urban and Rural

Dept. of road Transport & Highway / Ministry of Highways

4.80% of physical progress achieved. The project is being developed under NHDP Phase IIIA, NH - 4.

IMPLEMENTATION

Widening and strengthening of Wadi -Raichur Road

Private Participation by Cement comp.

Work on 69 out of 84 km completed. Cost of the project has increased from 60.48 to 82.38 cr. (Rs. 25.00 Cr. contributed by Cement Factories & balance by Govt)

IMPLEMENTATION

Page 60: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

157 Road PWD 18.60 BOT Jun-06

158 MSW BBMP 70.33

134 BMTC 250.00 DBOT Pipeline

135 MSW Shimoga 4.00 BOT

136 MSW Kannahalli BBMP 40.00 BOOT Jun/04 Construction is over.

Construction of Sandur Bye-Pass Road, Bellary District.

Sandur By pass road, Bellary, karnataka

Concessionaire agreement executed on 18/11/05, Ms: SOWIL was appointed as Independent Engineer and Tripartite Agreement was concluded on 29/08/06. The Concessionaire has commenced the work during last week of August 06.

IMPLEMENTATION

Waste to Energy Project - Mandur

Mandur, Bangalore District, Karnataka

BOT-Annuity

Construction  IMPLEMENTATION

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Kudaregere adjacent to proposed peripheral ring road on Dasanpura Hobli, Bangalore North Taluk

Bid process to commence upon approval from the GoK.

Inertisation and land fill facility Shimoga

DMA / Shimoga CMC

Bidding process completed. The project has been awarded.

IMPLEMENTATION

Integrated Municipal solid waste treatment Kannahalli

OPERATION

Page 61: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

135 BMTC 250.00 DBOT Pipeline

136 MSW Modern abattoir Bangalore BBMP 30.00 BOOT

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Horohalli adjacent to proposed peripheral ring road on Doddaballapura road, Yelahanka Hobbli, Bangalore

Bid process to commence upon approval from the GoK.

Bidding completed. The project has been awarded.

IMPLEMENTATION

Page 62: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

137 Bangalore BBMP 12.00 BOOTCommon User facilities

Construction of public toilet

Bidding completed. The project has been awarded.

IMPLEMENTATION

Page 63: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

138 Mysore 16.00 BOOT

136 BMTC 250.00 DBOT Pipeline

Commercial Development

Development of Commercial Complex at Makkaji Chowk, Mysore

Mysore City Corporation (MCC)

The bid process has been completed. The Concession Agreement has been signed and project has been awarded.

IMPLEMENTATION

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Kalatammanhalli, adjacent to proposed peripheral ring road on Hesargathha Hobli, Bangalore North Taluk

Bid process to commence upon approval from the GoK.

Page 64: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

137 BMTC 250.00 DBOT Pipeline

138 BMTC 395.00 DBOT Pipeline

139 BMTC 100.00 BOT Pipeline

140 KSRTC 100.00 BOOT March, 2009 Pipeline

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Kambipura adjacent to proposed peripheral ring road in between Mysore Road and Kanakpura Road, Magadi Road at Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Bayappanhalli NGEF, Old Madras Road, Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Chikkanagamangala, Near Electronic City Bangalore

Bid process to commence upon approval from the GoK.

Transport - terminal

Transport Infrastructure and Commcercial development

In front of Channarayapatna Bus stand on NH-48 at Channaryapatna, Hassan District

Ready for biddingAwaiting approval of project and Land use change to commercial. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to KSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Page 65: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

141 Tumkur Depot KSRTC 100.00 Pipeline

142 KSRTC 100.00 March, 2009 Pipeline

143 KSRTC 50.00 March, 2009 Pipeline

144 KSRTC 200.00 March, 2009 Pipeline

Transport - terminal

Transport Infrastructure and Commcercial development

BOOT(Swiss Chalange method)

Require approval from GoK for Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities. Yet to be tenderd,

Transport - terminal

Transport Infrastructure and Commcercial development

Kolar Bus Station

BOOT(Swiss Chalange method)

Require approval from GoK for Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities.

Transport - terminal

Transport Infrastructure and Commcercial development

ShantiNagar Block Banaglore

BOOT(Swiss Chalange method)

Require approval from GoK for Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities.

Transport - terminal

Transport Infrastructure and Commcercial development

Banimantap. Mysore

BOOT(Swiss Chalange method)

Require approval from GoK for Zone change from Traffic / Transport to Commercial. Persuing to get recommendation from local developmental authorities.

Page 66: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

Status of PPPs in Infrastructure Karnataka - Pipeline

145 KSRTC 40.00 BOOT Pipeline

SUB TOTAL 14069.51

GRAND TOTAL 111754.91

Transport - terminal

KSRTC site at Bus Depot on old NH-4 at Chitradurga District

Ready for biddingAwaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Modeling, Business plan for 30 years, Financial to NWKSRTC, Retrun to Developer, Project Stucturing Presentation, Finalization of bid documents ( RFP) & RFP Advertisement are completed.

Page 67: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 67 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. AgencySl.No.

Project type / Sub sector

Page 68: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 68 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. AgencySl.No.

Project type / Sub sector

119 Transport Road Road Torrangallu, bellary PWD PWD

120 Transport Road Road PWD PWD

122 Transport Road Road Gulbargha District PWD KRDCL

124 Transport Road Road PWD PWD

129 Transport Road Uttara Kannada PWD KSHIP

130 Transport Road Hassan PWD KSHIP

145 Transport Road Road Belikere PWD

152 Transport Road Road PWD PWD

Development of roads in Torangallu, Bellary district

Development of Tornagallu-kudligi Road, Sandur Hospet Road and bypass in Toranagallu

Improvement to State Highway (SH-10) from Maharashtra Border to Andhra Pradesh Border via Aland, Gulbarga, Malkhed, Sedam, Ribbanpally,

Development of bypass road for Belekeri Port

Belekeri port, near NH17 on karnataka costal area

State highway

Improvement of SH Dhawrad to Ramnagara (60 KM)

State highway

Improvement of SH Chikkanayakanahalli to Hasssan (74 KM)

Connectivity to Belikere Port

Construction of Sandur Bye-Pass Road, Bellary District.

Sandur By pass road, Bellary, karnataka

Page 69: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 69 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. AgencySl.No.

Project type / Sub sector

Page 70: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 70 Government of Karnataka

Remarks Category

Info. Received for PPP database

Page 71: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 71 Government of Karnataka

Remarks Category

Info. Received for PPP database

yes

yes

Duplicate

yesDuplicate

Duplicate

Duplicate

Duplicate

Page 72: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 72 Government of Karnataka

Remarks Category

Info. Received for PPP database

Page 73: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 73 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency Owner

1 Energy Power Generation Chamalpura, Mysore 4500.00 PPP BOO

2 Energy Power Generation 5000.00 PPP BOO

3 Energy Power Generation Jewargi, Gulbarga 5000.00 PPP BOO

4 Tourism Gokarna Deptt of Tourism KSIIDC Deptt of Tourism 272.90 PPP DBOT

5 Transport Rail Rail Bellary IDD PPP

6 Transport Rail Rail Bellary IDD PPP

7 Transport Rail Rail Daroji rail Connection Bellary IDD PPP

8 Transport Rail Rail IDD PPP

Sl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

1000-1320 MW Coal based power plant

Energy Department / ESCOMS / PCKL

Energy Department / ESCOMS / PCKL

1000-1320 MW Coal based power plant

Ghataprabha, Hukeri, Belgaum

Energy Department / ESCOMS / PCKL

Energy Department / ESCOMS / PCKL

1000-1320 MW Coal based power plant

Energy Department / ESCOMS / PCKL

Energy Department / ESCOMS / PCKL

Hotels/ Resorts

Hotels/ Resorts

Development of 5 Stat Dlx Hotel, Multi cusine Restaurant, Theme park, Multiplex, Retail shops, Civic Amenties

Banihatti to Nandihalli Railway line

Banihatti to Ramandurga Railway line

Proposed New railway Station for Passengers between Toaangallu-Gadiganur of Hospet to Bellary-Double Lane

Ch 172.15 between torangallu-gadiganur of hospet to bellary double lane Bellary

Page 74: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 74 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

9 Transport KSRTC - NWKRTC KSIIDC 25 PPP DBOT

10 Transport Bangalore, Karnataka KSRTC KSRTC 70 PPP BOOT

11 Transport Bangalore, Karnataka KSRTC KIPDC PPP BOOT

12 Transport Shimoga, Karnataka KSRTC KSRTC PPP BOOT

Transport - terminal

Bus Terminal

Development of Modern Bus Station and Commercial Building on NWKTRC site at Dharwad

Dhaward Old Bus Stand Area lcoated at the Junction on Subhash Road, Dharwad District.

Transport - terminal

Bus Terminal

Construction of inter model transit center at Byeyappanahalli, near NGEF- Bangalore

Transport - terminal

Bus Terminal

Construction of inter model transit center at Peenya Bangalore

Transport - terminal

Bus Terminal

Development of commcercial space above bus ststion at Shimoga

Page 75: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 75 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

13 Around Bangalore City BDA BDA 1425.16 PPP BLMTUrban and Municipal Infrastructure

Township Development

EWS Housing

Economically Weaker Section Housing Project

Page 76: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 76 Government of Karnataka

Type of Funding VGF Flag

ICB Aug-07 Pvt. Contribution

ICB Aug-07 Pvt. Contribution

ICB Aug-07 Pvt. Contribution

Jul-99 Aug-02

One year

One year

One year

Mode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

48 months after PPA

48 months after PPA

48 months after PPA

Page 77: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 77 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

ICB 39722 39814 39995 41275

Domestic VGF GOI-20%

Domestic 39814 March, 2009 March, 2009 40603 VGF GOI-20%

Domestic VGF GOI-20%

Debt : Equit 50 % : 50 % 

Page 78: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 78 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

NCB To be invited Pvt. Contribution3 years from the date of award

Page 79: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 79 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

Stage NosBidding 0completed 0

0

0

0

0

Total 0

OpearationalIdentificationUnder ConstructionDevelopment

Page 80: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 80 Government of Karnataka

Remarks Land Details Expansion Plan

25 years

25 years

25 years

ADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Land area of around 45 acres

Total Land requried-236 acres including 50acres yard in Nandihalli and width of land required 30-50mtrs

Total Land requried-160 acres and width of land required-30-50mtrs

Total Land requried-75 acres and width of land required-30-50mtrs

75acres of land required for Station, Railway sidings and foe future expensions

Page 81: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 81 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Land

Yet to be finalised Yet to be finalised NILL

Yet to be finalised

Yet to be finalised Yet to be finalised NILL

2+30 years (initial 2 years for construction of bus stand)

Land use conversion 45% FAR for commercial development has to be approved. Once this this is done and onces SLWA approves, the project can be bid out.

Land is in possession of BMRCL

Power & Water supply Road widening by Muncipality

KSIIDC-IL&FS Project Development Company Limited (KIPDC) 1st floor, AUM plaza. Near

Land is in possession of KSRTC

Power & Water supply Road widening by Muncipality

Land is in possession of KSRTC

Power & Water supply Road widening by Muncipality

Page 82: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 82 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Land at 50% of guidance value

Page 83: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 83 Government of Karnataka

Issues Brief Description PDF funding sought

1

1

1

1

1

1

1

1

Additional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

PDF funding approved (Rs. in Lacks)

RFQ bid evaluation is under process

It is proposed to establish 1000-1320 MW Coal based power plant on long term basis to overcome the power crises. It is power procurement through competivtive bidding as pe MOP

RFQ bid evaluation is under process

It is proposed to establish 1000-1320 MW Coal based power plant on long term basis to overcome the power crises. It is power procurement through competivtive bidding as pe MOP

RFQ bid evaluation is under process

It is proposed to establish 1000-1320 MW Coal based power plant on long term basis to overcome the power crises. It is power procurement through competivtive bidding as pe MOP

The land extend is 45 acres. The land owenership is private - recoemmended for acquisition. DoT approved the project and would seek the land cost report from the concerned DC. The land acquisition being higher, DOT suggested to explore to structuring the

Railway clearance for project is alredy approved. Land from hulikunte, Laxmipur & Bhujung Nagar of Sandur Taluk already have 66% farmer consent

Railway clearance for project is alredy approved. Land from Krishnanagar, Daulatpur, Sushilnagar of Sandur Taluk (Revenue Land identification process is completed.

Railway clearance for project is alredy approved. Land from Torangallu & Daroji of Sandur Taluk (Revenue land identificatopm process is completed)

Feasibility Report-completed by M/s. URRC and submited to railway board. JSW is ready to invest under PPP as per Railways guidelines.

Page 84: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 84 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

PDF funding approved (Rs. in Lacks)

1

Yet to be tendered

NILL Yet to be tendered

Yet to be tendered

Financially not viable without Viablity Gap Funding. We'll provide the Advertisement are completed.

Project Structuring is underway and studies are going on. The apporx. Project cost is taken under consideration as per the similar projects undertaken in this sector. Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conc

• Project Components:- Modern Bus Station (1.81 acres): consisting of 22 bus bays, Passenger Amenities, NWKRTC station office, 200 two wheeler parking and 5 car parking lots .- Commercial Building (0.30 acres): with a built-up area of 61,970 sqft and a

• Project Benefits: - Modern Bus Station with 22 Bus bays, passenger amenities, NWKRTC station office, 200 two wheeler parking and 5 car parking, worth Rs.5.0 Cr.- Commercial Building of 61,970 Sqft after 30 years- Half early lease rental for lease pe

Conversion from Transport Zone to Commercial zone-change of land use

Conversion from Transport Zone to Commercial zone-change of land use

Conversion from Transport Zone to Commercial zone-change of land use

Page 85: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 85 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

PDF funding approved (Rs. in Lacks)

1Agencies have been qualified by the process of RFQ.RFQwill be issued after change of land use is obtained. From Govt. of Karnataka..

Change of use of land from Agriculture to residential zone & industrial to residential zone is under progress

Construction of 45000 tenements (units) for urban poor in 3 years span Area of each tenement =325 Sq. ft. at 15000 per year 8 numbers of package.

Around Bangalore City : Viz 1. Gunjur Sy No. 138 2. Doddabanahalli Sy No. 33. Tippasandra Sy No. 1

It will enable economic weaker section around bangalore to own a house as their basic need

Page 86: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 86 Government of Karnataka

Stage Contact Details

Energy Deptt ] BIDDING

Energy Deptt Bidding BIDDING

Energy Deptt Bidding BIDDING

Initial Project Identification

JSW proposal Concept Project Identification

JSW proposal Concept Project Identification

JSW proposal Concept Project Identification

JSW proposal Concept Project Development

Department of Tourism

Page 87: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 87 Government of Karnataka

Stage Contact Details

KSRTC Initial Project Development

Project Identification

Project Identification

Project Identification

Page 88: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 88 Government of Karnataka

Stage Contact Details

BDA Bidding RFP/Stage

Page 89: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 89 Government of Karnataka

Remarks Category

Dropped

Dropped

Dropped

No This project is dropped Dropped

Dropped

Dropped

Dropped

Dropped

Info. Received for PPP database

This project is droped from PPP mode as said by the Exec.Engg. Energy dept.

This project is droped from PPP mode as said by the Exec.Engg. Energy dept.

This project is droped from PPP mode as said by the Exec.Engg. Energy dept.

Page 90: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 90 Government of Karnataka

Remarks Category

Info. Received for PPP database

No Dropped

Dropped

Dropped

Dropped

Page 91: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 91 Government of Karnataka

Remarks Category

Info. Received for PPP database

No Dropped

BDA is informed that this project is dropped from the PPP mode

Page 92: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 92 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency Owner

1 Agri-Infrastructure Bytarayna- pura, Yelenkha Agriculture Marketing 550.00 PPP BOT

2 Agri-Infrastructure Agriculture Marketing

18.36 PPP

BOT

3 Agri-Infrastructure Mysore/karnataka Agriculture Marketing APMC Mysore

PPP

BOT

4 Healthcare Arogya Bandhu NGO Govt. of karnataka NA PPP

5 Healthcare Mobile health clinics NGO Govt. of karnataka 4.56 PPP

6 Healthcare Thayi Bhagya Govt. of karnataka 1.20 PPP

7 IT , BT ,S&T KBITS IT , BT ,S&T 522.00 PPP BOT

8 KSIIDC KIPDC KSIIDC 9000.00 PPP DBOT

9 Tourism Theme Park Mysore 20.49 PPP BOT

10 Tourism Dept of Tourism KSIIDC Deptt of Tourism 18.00 PPP DBOT

11 Tourism Dept of Tourism KSIIDC Deptt of Tourism 21.00 PPP DBOT

12 Tourism Belur Dept of Tourism KSIIDC Deptt of Tourism 28.00 PPP DBOT

Sl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

Agriculture and horticulture markets

Devleopment of Veg Market

Development of Whole sale vegetable market

Special APMC for fruits & Vegetables, Bangalore

Secretary ,Special APMC for fruits & Vegetables

Agriculture and horticulture markets

Devleopment of Veg Market

Developmant of APMC yard Nellikay road, Mangalore

Mangalore / south canara/Karnataka

APMC Mangalore

Secretary,APMC Mangalore

Agriculture and horticulture markets

Devleopment of Veg Market

Developmant of Commercial complex at veg. market yard, Mysore

Secretary,APMC Mysore

Health Infrastructure and facility

Health and Famility welfare

Rural areas of Karnataka (All PHCs) at all districts

Health and Familiy Welfare / DH and FWO

Management Contract

Health Infrastructure and facility

Health and Famility welfare

Under served areas in the state

Health and Familiy Welfare / DH and FWO

Management Contract

Health Infrastructure and facility

Health and Famility welfare

Six C category district of North karnataka and Chamaraja nagar dist.

Health and Familiy Welfare / DH and FWO

Pvt. Service provider

Management Contract

Industrial Infrastructure

Bio-technology

Bio-tech park project

Setting up of sector specific Special Economic Zone for Biotechnology sector at Electronic city , Phase - III, Bangalore

Electronic City, Doddathogur Village, Begur Hobli, Hosur Road, Bangalore

Industrial Infrastructure

Information Technology

Business Park

Devanahalli Business Park (DBP)

Located on NH-7, adjoining the Northern Boundary BIAL Devanahalli Bangalore

Heritage Park

Development of Heritage Park in Mysore

Mysore City Corporation (MCC)

Mysore City Corporation (MCC)

Hotels/ Resorts

Hotels/ Resorts

3 Star Category hotel,Theme park,Restaurant,Organised Retail,Civic amenities

Jog Falls,Banavasi & Agumbe Shimoga & Uttara Kannada District

Hotels/ Resorts

Hotels/ Resorts

Development of Tourism Infrastructure Projects at Badami, Pattadakal & Aihole

Badami,Pattadakal & Aihole, Bagalkot District.

Hotels/ Resorts

Hotels/ Resorts

3 Star Category hotel,Theme park,Restaurant,Organised Retail,Civic amenities

Page 93: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 93 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

13 Tourism Bijapur, Bijapur District Dept of Tourism KSIIDC Deptt of Tourism 21.00 PPP DBOT

14 Tourism Entertainment Ideck 80.00 PPP BOT

15 Tourism Entertainment Mangalore Dept of Tourism KSIIDC Deptt of Tourism 40.00 PPP DBOT

16 Tourism Entertainment Aquamarine park Mangalore Dept of Tourism KSIIDC Deptt of Tourism PPP No Info

17 Tourism Devenhalli, Bangalore Dept of Tourism Ideck 1050.00 PPP BOOT

18 Tourism Entertainment Bangalore KSTDC Ideck 32.00 PPP

19 Tourism Heritage Park Belgaum/ Karnataka BUDA 35.00 PPP DBOOT

20 Transport Airport Airport Bijapur, Karnataka IDD IDD Private 110.00 PPP BOT

21 Transport Airport Airport Devenhalli, Bangalore IDD KSIIDC BIAL 2470.29 PPP DBOOT

22 Transport Airport Airport Bellary IDD IDD PPP BOT

23 Transport Airport Gulbarga Minor Airport Gulbarga IDD IDD 110.00 PPP DBOT

Hotels/ Resorts

Hotels/ Resorts

Theme park,Economy Restaurant,organised retail,Civic Amenities

Cultural Centres

Development of Various Tourism Facilities in Pilikula, Nisarga Dhama

Pilikula Nissarga Dhama at Dakshin Kannada, Mangalore

Pilikula Nisarga Dhama, NGO

Golf Course

Golf Course at ThannirBhavi

Aquamarine park

Cultural Centres

Cultural Centres

Development of International Convention Center

Tourist Train

Luxury Tourist Train Project.

Management Contract

Heritage Park

Development of Heritage Park at vaccine institute Belgaum

Belgaum Urban Development Authority, Belgaum/

Development of Minor Airport at Bijapur

Bangalore International Airport (BIAL)

Construction of new greenfield Airport at Bellary

Minor Airport

Gulbarga Airport Pvt. Ltd.

Page 94: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 94 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

24 Transport Airport Shimoga Minor Airport Shimoga IDD IDD 110.00 PPP BOT

25 Transport Airport Airport Hassan IDD IDD Jupitar Aviation 690.00 PPP BOT

26 Transport Port Minor port Coastline at Karwar 788.00 PPP BOOST

27 Transport Port Minor port 1350 PPP BOOST

28 Transport Port Minor port 1100 PPP BOOST

29 Transport Rail Rail Hassan Bangalore IDD PPP No Info

30 Transport Rail Bangalore IDD KSIIDC 3716.00 PPP BOT

31 Transport KSRTC - NEKRTC KIPDC NEKRTC 29.60 PPP DBOT

Minor Airport

Shimoga Airport Pvt. Ltd.

Construction of Hasan Airport

2nd Stage Development of Modern Sea at Karwar on the costline of Karnataka

Direcotor of Ports & Inland Water Transport

Exec. Agency will be selected by ICB

Direcotor of Ports & Inland Water Transport

Development of Modern Deep Sea Port at Ist Stage Malpe on the Costline of Karnataka Maritime State

Malpe, Costline of Karnataka

Direcotor of Ports & Inland Water Transport

Exec. Agency will be selected by ICB

Direcotor of Ports & Inland Water Transport

Development of Honavar Port in Uttar Kannada District of Karnataka Maritime State

Honavar Coastline of karnataka

Direcotor of Ports & Inland Water Transport

Exec. Agency will be selected by ICB

Direcotor of Ports & Inland Water Transport

Hassan-Mangalore Gaugue Conversion

Express Rail link

Development of Express Rail Link to BIAL

Transport - terminal

Bus Terminal

Development of Modern Bus Station & Commercial Complex on NEKRTC at Gulbarga Bus Stand

NEKRTC site at Gulbarga Main Road, Gulbarga

Page 95: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 95 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

32 Transport KSRTC KIPDC KSRTC 15.00 PPP DBOT

33 Transport KSRTC KIPDC KSRTC 20.70 PPP DBOT

34 Transport KSRTC KIPDC KSRTC 91.00 PPP DBOT

35 Transport KSRTC KIPDC KSRTC 37.00 PPP DBOT

36 Transport KSRTC - NEKRTC KSIIDC 28 PPP DBOT

37 Transport KSRTC - NWKRTC KSIIDC NWKRTC 30.00 PPP DBOT

38 Transport Hebbal, Bangalore BMTC BMTC 350 PPP DBOT

39 Transport Hospet, Bellary HUDA Ideck 26.00 PPP BOT

40 Transport Torangallu, Bellary IDD Ideck 29.00 PPP BOT

41 Transport Bellary No Info PPP No Info

Transport - terminal

Bus Terminal

Development of Modern Bus Station & Commercial Complex on KSRTC site and vacant land parcels at Puttur

KSRTC site at Puttur, Dakshin Kannada District

Transport - terminal

Bus Terminal

Project development of Bus stand and vaccant land parcels for KSRTC at Mangalore.

Mangalore, South Kannada

Transport - terminal

Bus Terminal

Project development of vacant parcels for Transport Infrastructure and Commcercial development

Hassan new bus station at Hassan District

Transport - terminal

Bus Terminal

Project development of vacant parcels for Transport Infrastructure and Commcercial development

KSRTC site at Bus Depot on old NH-4 at Chitradurga District

Transport - terminal

Bus Terminal

Development of Commercial Complex on NEKRTC site at Bidar

Bidar Old Bus Stand, near Bidar Railway Station

Transport - terminal

Bus Terminal

Development of Modern Bus Station and Commercial Building on NWKTRC site at Belgaum

Belgaum Central Bus Stand and Central Workshop Area located on Old Pune Highway, Link Road and Fort Road

Transport - terminal

Bus Terminal

Traffic & TransitManagement Centre (TTMC) along with commercial development

Transport - terminal

Truck Terminal

Development of private truck terminal at Hospet, Bellary

Transport - terminal

Truck Terminal

Devp of private truck terminal at Torangalu

Transport - terminal

Bus Terminal

Bus terminus-Near New Railway station

Page 96: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 96 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

42 Transport Bellary No Info 30.00 PPP No Info

43 Transport Hubli Bus Stand, Hubli KSRTC - NWKRTC KIPDC NWKRTC 40.00 PPP DBOT

44 Transport port Dept of Shipping Dept of Shipping 119.66 PPP No Info

45 Transport Karnataka Transport Department 50.00 PPP BOMT

46 Transport Road Highways NHAI NHAI 1112.00 PPP BOT

47 Transport Road Highways Hassan, Karnataka NHAI NHAI 440.00 PPP BOT

48 Transport Road Highways NHAI NHAI 616.00 PPP No Info

49 Transport Road Road District Tumkur and Hasan KRDCL KRDCL 203.00 PPP BOT

50 Transport Road Road KRDCL KRDCL 193.10 PPP BOT

51 Transport Road Highways NHAI NHAI 599.49 PPP

52 Transport Road Road Bangalore-Maddur KRDCL KRDCL 188.00 PPP

53 Transport Road Highways NHAI NHAI PPP BOT

Transport - terminal

Truck Terminal

Tuck terminal between JSWSL and BTPCL

Transport - terminal

Bus Terminal

Development of Modern Bus Station & Commercial building on NWKRTC at Hubli Bus Stand

Warehousing infrastructure

Setting up of Iron ore handling facilities on BOT basis at New Mangalore Port

New Mangalore Port, Mangalore

Information Technology

Computerisation and issue of smart cards for RC and DL

Computerisation of Regional Transport Offices (RTOs) in Karnataka under PPP framework

M/s Rosmerta Technologies Pvt. Ltd

Transport Department

Design, Engineering, Financing, Procurement, Construction, Operation and maintence of 4 & 6 laning from Km 202 to Km 299 of Hungund - Hospet Section of NH-13 in the state of Karnata under NHDP phase III on BOT

Bagalkot, Koppal & Bellary District.

Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Devilalli Hassan Section of NH- 48 from Km 110 to Km 191 in the state of Karnataka

Four laning of Kundapur to Suratkal section ( Km 284 to 358) and Mangalore-Kerala border section (km 375.300 to 376.700 and from Km3.700 to 17.200) of NH 17 Under NHDP Phase III on BOT Basis

Mangalore, Dakshin Kannada

Improvement to Chikkanayakanahalli-Tiptur-Hassan Road (Partly MDR and partly SH) for a length of 74.00 Km

Improvements to Dharwad-Alnavar-Ramnagar-Anmod Road (SH-34)

District Dharwad & Belgaum

Four Laning and streghtening of Km. 515 to Km 592 Belgaum - Maharashtra Border NH-4 in the State

Belgaum district of Karnataka

BOT-Annuity

Four laning of Bangalore -Mysore Road (Bangalore -Maddur)

BOT-Annuity

4/6 laning of NH-4A from Belgaum - KNT / GOA border (84Kms) in the state of Karnataka under NHDP phase - III

Belgaum district of Karnataka

Page 97: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 97 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

54 Transport Road Highways NHAI NHAI NA PPP BOT

55 Transport Road Road Bangalore BDA BDA 5000 PPP BOT

56 Transport Road Road Torrangallu, bellary PWD PWD 230.00 PPP BOT

57 Transport Road Road PWD PWD 144.00 PPP BOT

58 Transport Road Road KRDCL KRDCL 196.53 PPP

59 Transport Road Road Bellary, Karnataka NHAI PWD 30.00 PPP BOT

60 Transport Road Road PWD PWD 25.00 PPP BOT

61 Transport Road Devanhalli, Bangalore No Info 1000.00 PPP BOT

62 Transport Road Bellary KRDCL KRDCL 56.00 PPP BOT

63 Transport Road Bellary NHAI NHAI PPP No Info

64 Transport Road IDD PPP BOT

65 Transport Road No Info PPP Annuity

Six Laning of NH-4 from Belgaum to Dharwad from Km 515 to Km 433 (80 Kms) in the state of Karnataka under NHDP Phase V

Belgaum & Dharwad district of Karnataka

Construction of Peripheral Ring Road around Bangalore City..

Development of roads in Torangallu, Bellary district

Development of Tornagallu-kudligi Road, Sandur Hospet Road and bypass in Toranagallu

Improvements to Wagdhari-Ribbanapally Road

BOT-Annuity

Development of Linkages to NH-13 and NH 63 at Hospet from Sandur-Hospet road in Bellary

Development of bypass road for Belekeri Port

Belekeri port, near NH17 on karnataka costal area

Express way

Construction of Expressway (State highway, Special) from Outer Ring Road to International Airport in Devanahalli Taluk

State highway

Two diversion from Bannihatti to NH-63 at BPTCL(19Km) and Bannihatti to Gadiganur(9Km) on StateHighway (SH-40) from Sandur to Torangallu,

National Highway

Proposed to develop six lane road (76Km) from Bellary to Hospet and Four lane upto Gutti on NH-63 (370Km) from Hospet to Bellary .

National Highway

Improvement of Hospete-Hubli-Ankola NH (271Km)

North Canara - Hubli - Koppal - Bellary District

National Highway

Improvement of Hunabad-Bijapura-Hubli (420Km)

Page 98: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 98 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

66 Transport Road No Info PPP BOT

67 Transport Road No Info PPP BOT

68 Transport Road Shimoga-Havere KSHIP PPP BOT

69 Transport Road KSHIP PPP BOT

70 Transport Road Belgaum-Bakalkot KSHIP PPP BOT

71 Transport Road KSHIP PPP BOT

72 Transport Road Tumkur Honovar KSHIP & IDD PPP BOT

73 Transport Road NHAI NHAI 500.00 PPP BOT

74 Transport Road Highways Karnataka/ Chikkaballapur NHAI NHAI 402.87 PPP

75 Transport Road Highways Bangalore Rural and Urban NHAI NHAI 450.00 PPP BOT

76 Transport Road Highways Bangalore Rural and Urban NHAI NHAI 445.00 PPP BOT

77 Transport Road Highways NHAI NHAI 441.00 PPP BOT

National Highway

Improvement of Dabaspete-Hoskote-Tamilnadu (120Km)

National Highway

Bangalore-Kanakpura-Tamilnadu (203KM)

State highway

Development of Shimoga-Tadas Road (189 Km)

State highway

Development of Sira-Chikkaballapura-Mulbagal Road (171 Km)

Tumkur-Chikkaballapur-Kolar

State highway

Development ofvNippanai-Bagalkot-Badami-Kudalsangama-Tailkote Road(240 Km)

State highway

Development of Bilekere-Belur-Huliyur-Hiriyur Road (228 Km)

Chitradurga-Tumkur-Mandya

National Highway

4 laning of NH-206 from Tumkur-Sagar section

Highways(NHDP Phase)

4/6 lanning of Kundapur to Suratkal of NH-17 in the state of karnataka under NHDP phase -III programme(Package no. BHDP-III DL5/11)

Karnataka/Mangalore,/Dakshin Kannada

1) Design,Construction,Development, Finance,operation and maintence of AP/Karnatka border-Avathi village section from 463 Km to 524Km. 2) Improvement,Operation and maintence of of Km.524.00 to 527.00 at Nandi Hill crossing an

BOT-Annuity

Construction of Elevated Highway Project of Bangalore Hosur Section of NH-7 from Silk Board (Km 8/765) to Electronic City (Km 18/750) on Built, Operate and Transfer (BOT) Basis.

Construction of Access Controlled Highways from Km. 10/0 to Km. 29/5 of Bangolore - Nelamangala section of NH-4 in the state of Karnataka on BOT basis

Design, Engineering, Financing, Construction, Operation and maintence of Four Laning of Bangalore – Nelamangala (Nelamangala Junction) on NH-4 with NH-48 to Devihalli from Km 28 to Km 111(110) in the State

Tumkur, Mandya, Hassan, Bangalore

Page 99: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 99 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

78 Transport Road Highways NHAI NHAI 565.00 PPP BOT

79 Transport Road

Karnataka State

KRDCL

603.36 PPP

DBOT

80 Transport Road

Karnataka State

KRDCL

867.4 PPP

DBOT

81 Transport Road

Karnataka State

KRDCL

356.48 PPP

DBOT

82 Transport Road

Karnataka State

KRDCL

1381.8 PPP

DBOT

83 Transport Road

Karnataka State

KRDCL

710.16 PPP

DBOT

84 Transport Road

Karnataka State

KRDCL

366.52 PPP

DBOT

85 Transport Road

Karnataka State

KRDCL

299.6 PPP

DBOT

86 Transport Road

Karnataka State

KRDCL

1432.4 PPP

DBOT

Design, Engineering, Financing, Construction, Development, Operation and maintence of Widening of Existing Two Lane carriageway to Four/Six lane divided carriageway configuration of Bangalore -Hoskate - Mulbagal section from Km 237 Km to Km 318 NH-4 in

Kolar, Bangalore urban and Rural

State Highways,

Major District

Roads & Rural Roads

Development of existing 4-lane road from

Bangalore to Hunsur via Mysore and other

Connecting roads into 6-lane roads. (Package

1)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road Shimoga-Honnalli-

Harapanahalli-Kudligi-Sandur-Thoranagal and other connecting roads.

(Package 2)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road Thamilnadu border to

Attibele-Sarjapur-Hoskote-Jangamakote-Shidlgatta join SH-58 and other connecting

roads.

( Package 3)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from SH-17

Srirangapatana-Padavapura-

Nagamandala-Chikkanayakanahalli-Hiriyuru-Challakere-

Bellary-A.P.Border (SH-19).

( Package 4)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Bangalore-Magadi-

Huliyuru Durga and other connecting roads.

( Package 5)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road Hassan-Arakalgud-

Ramnathpura-Piriyapatna and other

connecting roads.

( Package 6)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road Yelahanka to A.P

Border via Gowribidanur (SH-09).

( Package 7)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road Sira-Madugiri-Gowribidanur-

Chikkaballapura-Shidalgatta-Chithamani-Srinivasapur-Mulbagal

(SH-58) and other connecting roads.

( Package 8)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

Page 100: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 100 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

87 Transport Road

Karnataka State

KRDCL

572.4 PPP

DBOT

88 Transport Road

Karnataka State

KRDCL

388.46 PPP

DBOT

89 Transport Road

Karnataka State

KRDCL

216.8 PPP

DBOT

90 Transport Road

Karnataka State

KRDCL

305.82 PPP

DBOT

91 Transport Road

Karnataka State

KRDCL

569.74 PPP

DBOT

92 Transport Road

Karnataka State

KRDCL

319.44 PPP

DBOT

93 Transport Road

Karnataka State

KRDCL

349.34 PPP

DBOT

94 Transport Road

Karnataka State

KRDCL

546.48 PPP

DBOT

95 Transport Road

Karnataka State

KRDCL

283.32 PPP

DBOT

State Highways,

Major District

Roads & Rural Roads

Development of road from Hoskote-Mallur-

Tekal-Bangarpet-Baythmangal-AP Border (SH-95) and connecting roads.

( Package 9)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Nelamangala-Taverekere-Kengeri-Kanakapura road -

Jigani-Anekal and other connecting roads.

( Package 10)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Bangarpet-Kolar-Chithamani-Bagepalli -

joining NH-7 (SH-05). ( Package 14)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Chikkaballapur

(NH-7) Vijipur-Vemagal-Kolar-Nandi cross and

other connecting roads.

( Package 15)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Mandya-Dudda-

Melukote-Santhebachalli-

Sravanabelagola-Channarayapatha (SH-

47) and other connecting roads.

( Package 16)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Mandya-Dudda-

Melukote-Santhebachalli-

Sravanabelagola-Channarayapatha (SH-

47) and other connecting roads.

( Package 17)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Kushalnagara-Madikere-Sampaji-

Sulya-Puttur joining NH-48 (SH-88) and other

connecting roads. ( Package

18)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Hunsur-Verajpet, Madakeri-Somavarpet

road and other connecting roads.

( Package 19)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Hassan-

Holenarasipura road, Holenarasipura-

Channarayapatna road and other connecting

roads.

( Package 20)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

Page 101: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 101 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

96 Transport Road

Karnataka State

KRDCL

214.72 PPP

DBOT

97 Transport Road

Karnataka State

KRDCL

323.88 PPP

DBOT

98 Transport Road

Karnataka State

KRDCL

350.44 PPP

DBOT

99 Transport Road

Karnataka State

KRDCL

163.62 PPP

DBOT

100 Transport Road

Karnataka State

KRDCL

309.6 PPP

DBOT

101 Transport Road

Karnataka State

KRDCL

625.22 PPP

DBOT

102 Transport Road

Karnataka State

KRDCL

370.1 PPP

DBOT

103 Transport Road

Karnataka State

KRDCL

273.48 PPP

DBOT

104 Transport Road

Karnataka State

KRDCL

228.2 PPP

DBOT

105 Transport Road

Karnataka State

KRDCL

428.3 PPP

DBOT

State Highways,

Major District

Roads & Rural Roads

Development of road from Huliyur-Tiptur-

Nuggenahalli-Shravanabelagola road

(SH-47) and other connecting roads.

( Package 21)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Kadur-

Chikkamangalur-Mudigere-Belthangadi-

Bantwal road (SH-64).

( Package 22)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Mangalore-

Shimoga(NH-13 to NH-48) via Belthangadi-

Kokkada (SH-37) and other connecting roads. ( Package 23)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from NH-17 Kundapura-Thirthhalli road (SH-52).

( Package 24)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Channagiri-

Davanagere-Jaglur (SH-65) and other

connecting road (SH-45).

( Package25)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Badravathi-Shimoga-Honalli-

Shikaripura (SH-57) and other connecting roads.

( Package 26)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Haveri-Hirekeruru-

Thalagundi-Soraba-Sagar road and other

connecting road.

( Package 27)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Tadas-Mundgod-

Sirsi-Sampakhand-Kumta road (SH-69).

( Package 28)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Mysore-

Manadwadi (SH-33) road and other

connecting roads.

( Package 29)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Katak-Chincholi-

Jalasangi near SH-105 (SH-75), from

Maharastra border nerar Kamlanagar-Sangam-

AP Border near Goonalli and other connecting

roads. (Package

30)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

Page 102: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 102 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

106 Transport Road

Karnataka State

KRDCL

225.48 PPP

DBOT

107 Transport Road

Karnataka State

KRDCL

507.38 PPP

DBOT

108 Transport Road

Karnataka State

KRDCL

492.16 PPP

DBOT

109 Transport Road

Karnataka State

KRDCL

447.46 PPP

DBOT

110 Transport Road

Karnataka State

KRDCL

500.2 PPP

DBOT

111 Transport Road

Karnataka State

KRDCL

627.84 PPP

DBOT

112 Transport Road

Karnataka State

KRDCL

468.68 PPP

DBOT

113 Transport Road

Karnataka State

KRDCL

585.04 PPP

DBOT

114 Transport Road

Karnataka State

KRDCL

458.98 PPP

DBOT

115 Transport Road

Karnataka State

KRDCL

685.76 PPP

DBOT

116 Transport Road

Karnataka State

KRDCL

721.24 PPP

DBOT

State Highways,

Major District

Roads & Rural Roads

Development of road from Bidar to Humnabad

(SH-105) and other connecting roads.

(Package 31)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Afzalpur-

Ghattarga, Sarasamba with Ribbanapalli and

other connecting roads.

(Package 32)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Devangaon bridge-Afzalpur-Gulbarga and

other connecting roads.

(Package 33)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from TN Border-

Kodihalli-Kanakpura-Ramnagar-Magadi-

Solur-Davaspet-Kottigere (SH-03) and

other connecting roads.

( Package 11)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Nanjangud-

Chamarajnagar, and other connecting roads. ( Package 12)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Mysore-Bannur-

Mallavali-Maddur-Huliyuru durga-Kunigal-

Tumkur-Koratagere (SH-33) and other

connecting roads.

( Package 33)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from AP border near

Kothadoddi-Yaragara-Purthipalli to join SH-23 near Kapgal and other

connecting roads. (Package

34)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Tawargere -

Hulihyder-Kanakgeri-Gonal-Chikka Jantakal - Kuditheni (SH-29).

(Package 35)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Gangavathi-

Karatgi-Sindanoor-Kalmali joining SH-20

(SH-23), and other connecting roads. (Package

36)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Gorabal on SH-23-Dhadesugur-Desanur-Sindegeri-Bellary and

other connecting roads .

(Package 37)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Gangavathi -NH-63 at Koppal-Mundargi and other connecting roads.

(Package 38)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

Page 103: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 103 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

117 Transport Road

Karnataka State

KRDCL

566.2 PPP

DBOT

118 Transport Road

Karnataka State

KRDCL

423.56 PPP

DBOT

119 Transport Road

Karnataka State

KRDCL

483.9 PPP

DBOT

120 Transport Road

Karnataka State

KRDCL

398.74 PPP

DBOT

121 Transport Road

Karnataka State

KRDCL

850.2 PPP

DBOT

122 Transport Road

Karnataka State

KRDCL

328.22 PPP

DBOT

123 Transport Road

Karnataka State

KRDCL

363.6 PPP

DBOT

124 Transport Road

Karnataka State

KRDCL

402 PPP

DBOT

125 Transport Road

Karnataka State

KRDCL

323 PPP

DBOT

126 Transport Road

Karnataka State

KRDCL

444.82 PPP

DBOT

127 Transport Road

KRDCL

261.04 PPP

DBOT

State Highways,

Major District

Roads & Rural Roads

Development of road from Lokapura-

Varchagal-Govanakop and other connecting

roads. (Package

39)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Ramdurga-

Chunchur-Manoli-Sogal-Bailhongal-

Chikkabagewadi-Bagewai and other

connecting roads.

(Package 40)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Annigere-

Navalgund-Datnal-Ron and other connecting

roads. (Package

41)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Raichur to Bachi

(Bachi to Hungund SH-20).

(Package 42)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Yaragatti -

Thavalgeri - Maldinni near SH-31, Nesargi to

AP Border near Ananthapur (SH-31) and other connecting roads. (Package

43)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Lokapura-Halki-Mallapur to join NH-4 near Gotur and other

connecting roads. (Package

44)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Lokapur to Mudhol

(SH-34), Mudhol-Sidapur-Kanakawadi-Nipani (SH-18) and

other connecting roads. (Package 45)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Shiraguppi-

Molwad-Ainapur (SH-72) and other

connecting roads. (Package 46)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from Maharastra border

to Sankeshwara - Navalihal (SH-12) and

other connecting roads.

(Package 47)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from NH-218 to

Mulawad- Babaleshwar-Mudhol and other

connecting roads. (Package 48)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from SH-53 near Kudachi-Raibag-

Bagewadi-Zangathaal (SH-73) and other

connecting roads. (Package 49)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

Page 104: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 104 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

128 Transport Road

Karnataka State

KRDCL

290 PPP

DBOT

129 Transport Road

Karnataka State

KRDCL

448.92 PPP

DBOT

130 Mysore KUIDFC 3.70 PPP BOO

131 MSW MSW DMA PWD No Info

132 MSW Bangalore BBMP BBMP 30.00 PPP BOT

133 Bangalore BBMP BBMP 35.00 PPP BOOT

134 Bangalore KSIIDC 106.82 PPP DBOT

135 MSW MSW Mysore 37.50 PPP

136 Bijapur city DMA, CMC KUIDFC 120.00 PPP PBDPS

137 KUIDFC KUWSDB 237.00 PPP

State Highways,

Major District

Roads & Rural Roads

Development of road from Devangaon-

Vibuthihal-Indi-Atharga-Bijapur (SH-34) and

other connecting roads.

(Package 50)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

State Highways,

Major District

Roads & Rural Roads

Development of road from NH-13 near

Hungund-Mudagal (SH-20), Sindhanur-

Lingasugur-Maski-Chikmudbal to NH-218 at Jewargi and other

connecting roads. (Package 51)

Karnataka Road Development Corporation

Limited.

Government of Karnataka

Urban and Municipal Infrastructure

Urban Infrastructure

Urban local bodies

ADB assisted Karnataka Urban Infrastructure Development Project (KUIDP)

DMA/Mysore City Corporation (MCC)

Urban and Municipal Infrastructure

Setting up of Municipal Solid Waste (MSW) treatment and landfill facilities in 8 towns in Karnataka

Hubli-Dharwad, Gulbarga, Belgaum, Shimoga, Raichur, Hassan, Tumkur, Chikmangalur.

Urban and Municipal Infrastructure

MSW Management

Sanitary Landfills in Bangalore

Urban and Municipal Infrastructure

Commercial Development

Commercial Complex

Madivala Commercial Plaza

Urban and Municipal Infrastructure

Commercial Development

Hospitality and retail space

Development of 1.60 acres land along Hosur road

Karnataka Land Army Corporation Ltd.

Karnataka Land Army Corporation Ltd.

Urban and Municipal Infrastructure

Development of Integrated MSW plan for city of Mysore

DMA/Mysore City Corporation (MCC)

Mysore City Corporation (MCC)

Management Contract

Urban and Municipal Infrastructure

Water Supply & Sewerage

Water Supply

Water Supply and Sanitation facility in Bijapur city

Urban and Municipal Infrastructure

Water Supply & Sewerage

Water Supply

WB assisted Karnataka Urban Water Sector Improvement Project (KUWASIP)

Belgaum, Gulbarga & Hubli-Dharwad

Management Contract

N137
PPPcell: Performance Based Defereed Payment Structure
Page 105: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 105 Government of Karnataka

Major Sector Sub Sector Project Name Location Sponsor Dept Exec. Agency OwnerSl.No.

Project type / Sub sector

Estimated cost(Rs.in Crores)

PPP or Non PPP

Modality (BOOT/BOT)

138 MSW MSW BBMP BBMP 70.33 PPP

139 Bidadi - Ramnagara Taluk, UDD BMRDA 40000.00 PPP

140 MSW Shimoga DMA/ Shimoga CMC Shimoga CMC 3.64 PPP BOOT

141 MSW MSW Kannahalli BBMP BBMP 40.00 PPP BOOT

142 MSW MSW Bangalore BBMP BBMP 25.00 PPP BOOT

143 MSW MSW Modern abattoir Bangalore BBMP BBMP 30.00 PPP BOOT

144 Bangalore BBMP BBMP 12.00 PPP BOOT

145 Mysore BBMP 16.00 PPP BOOT

146 Mysore 75.00 PPP BOOT

147 MSW Belguam DMA / Belguam CMC 5.12 PPP BOOT

148 Agri-Infrastructure Bangalore KSIIDC 300.00 PPP DBOT

Urban and Municipal Infrastructure

Waste to Energy Project - Mandur

Mandur, Bangalore District, Karnataka

BOT-Annuity

Urban and Municipal Infrastructure

Township Development

Township Development

Bidadi Integradted Township

Management Contract

Urban and Municipal Infrastructure

Urban local bodies

Inertisation and land fill facility Shimoga

Urban and Municipal Infrastructure

Integrated Municipal solid waste treatment Kannahalli

Urban and Municipal Infrastructure

Transfer station in Bangalore

Urban and Municipal Infrastructure

Urban and Municipal Infrastructure

Common User facilities

Public Utilies

Construction of public toilet

Urban and Municipal Infrastructure

Commercial Development

Commercial Complex

Development of Commercial Complex at Makkaji Chowk, Mysore

DMA/Mysore City Corporation (MCC)

Urban and Municipal Infrastructure

Commercial Development

Commercial complex

Development of Makkaji Chowka Commercial complex

DMA/Mysore City Corporation (MCC)

Mysore City Corporation (MCC)

Urban and Municipal Infrastructure

Urban local bodies

Inertisation and land fill facility Belgaum

Belgaum City Corporation

Commercial Development

Hospitality and retail space

Development of Land for Animal Husbandry

Animal Husbandry Department

Animal Husbandry Department

Page 106: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 106 Government of Karnataka

Type of Funding VGF Flag

19th FEB 2008 NA Other NA NA NA NA

To be invited

- - -

Other NA NA NA NA

To be invited

- - -

Other NA NA NA NA

24 months Pvt. Contribution 1

2012 Government 100%

2012 Government 100%

NCB Jan/09 6/1/2009 Equit and Debt 1 14.45

NCB

NCB

NCB 26th FEB 2009

NCB

NCB 26th FEB 2009

Mode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

Global Tender

Tender is under process

Tender is under process

Global Tender

Global Tender

Screening committee - negotiated

Screening committee - negotiated

Screening committee - negotiated

4 years from the date of award

Date of Invitation for EOI 15th Sep 2008

Debt : Equit 60 % : 40 % 

Page 107: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 107 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

NCB 26th FEB 2009

NCB Pvt. Sector

NCB

NCB

29-05-2007 Successful bidder

Negotiated Govt. funds

ICB 6/28/1999

Through bid process

Domestic Tender

Domestic Tender

Domestic Tender

Page 108: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 108 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

ICB Nov-07

ICB Apr/09

ICB ---

ICB ---

ICB

NCB 25th FEB 2009

Domestic Tender

The entire funding for the project will have to be borne by the concessionair.The GoK will hand over the available port land and The entire funding for the project will have to be borne by the concessionaire. The Government of Karnataka will hand over the available port land The entire funding for the project will have to be borne by the concessionaire. The Government of Karnataka will hand over the available port land and waterfront area required for the development of Honnavar port in Uttara Kannda District of Karnataka mar

Private +VGF+ GoK Support+ BIAL

Debt : Equit 50 % : 50 % 

Page 109: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 109 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

NCB Feb-09

NCB Dec-08

NCB Feb-09

NCB Feb-09

ICB 39722

NCB Feb-09

ICB Equity & Debt

Debt : Equit 50 % : 50 % 

Debt : Equit 50 % : 50 % 

Debt : Equit 50 % : 50 % 

Debt : Equit 50 % : 50 % 

Domestic Tender

Domestic Tender

Pvt. (950)+GoI VGF(1300) lacs

Page 110: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 110 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

NCB 25th FEB 2009

Nov/07 Dec/08 8/25/2009 Nil Nil Nil Nil Nil

ICB Dec/08

ICB Dec-08 VGF

domestic VGF

domestic VGF

ICB

Jun-03

ICB Dec/08 VGF

Debt : Equit 50 % : 50 % 

Global tender

10-01-2008 / 31-03-2008

Fully funded by PPP partner M/s Rosmerta Technologies Pvt. Ltd

Equit and Debt VGF will be known after RFP is received from the bidder.

Pre-qualification complleted and bids are yet to be invited from Pre-qualified agency

Pre-qualification complleted and bids are yet to be invited from Pre-qualified agency

Debt : Equit 82 % : 18 % 

Domestic Tender

Page 111: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 111 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

ICB RFQ invited VGF

ICB To be invited Pvt. Contribution

Pvt. Contribution

ICB

Pvt. (2500)Domestic Tender

Page 112: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 112 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

2/16/2009 Not yet decided

2/16/2009 Not yet decided

2/16/2009 Not yet decided

2/16/2009 Not yet decided

ICB RFQ invited VGF

ICB

ICB VGF

ICB VGF

ICB VGF

VGF / Pvt. Contribution

Page 113: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 113 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

ICB VGF

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Page 114: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 114 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Page 115: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 115 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Page 116: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 116 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Page 117: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 117 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

28-01-2009 Private

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Competative Bidding

Page 118: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 118 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

28-01-2009 Private

28-01-2009 Private

Dec-98

ICB Mar/03 NIL

Apr/05 NIL

NCB

Pvt. Contribution

ICB Sep-04

Competative Bidding

Competative Bidding

Domestic Tender

Capital cost Grant to MCC

Domestic Tender

Domestic Tender

GoK(375)+MCC(375)+GoI VGF(3000)

WB Loan is 182 Cr.

Page 119: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 119 Government of Karnataka

Type of Funding VGF FlagMode of Award

Date of Bid Invitation

Date of Award/ Likely Award

Date of financial Closure

Likely Date of Completion

Amount of Govt Support

Amount of Govt Support (GoK) provided (Rs. in Cr.)

Amount of Govt Support (GoI) required (Rs. in Cr.)

Amount of Govt Support (GoI) provided (Rs. in Cr.)

ICB Aug/06 Pvt. Contribution

NCB Sep/05 Service provider

NIL

NIL

Mar/05 NIL

Jan/05 NIL

Jun/05 NIL

ICB 6/25/2005

NCB 38974

NCB

Domestic Tender

Domestic Tender

Domestic Tender

Domestic Tender

Domestic Tender

Private contribution

Capital investment for the project was by the service provider

Page 120: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 120 Government of Karnataka

Remarks Land Details Expansion Plan

NA NA NA 30 iDecK NA

NA NA NA

- 25 - About 2.1 Acre

NA

NA NA NA

- - - About 9 Acre

NA

upto 2012

upto 2012

60 years iDecK

ADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Bid process not yet completed

32 Acre available with Deptt at Yelenkha

100% of salary component and other support

5 years initially subject to review and confirmation after two years

Land - 56 acres and 1445.45 lakh grant from GoI

Tender under process

Land - 56 acres at Phase - III Electronic city

30 years with automatic renewel for another 30 years

KSIIDC-IL&FS Project Development Company Limited (KIPDC) 1st floor, AUM plaza. Near hotel ballal residency, No. 73, 3rd cross, residency road, Banbalore-560025

Land area of around 408 acres

Page 121: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 121 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 122: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 122 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 123: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 123 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 124: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 124 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Nil Nil Nil Nil 15 M/s iDecK Nil Paperless officeRosmerta Technologies Pvt. Ltd

Page 125: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 125 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 126: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 126 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 127: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 127 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 128: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 128 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 129: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 129 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 130: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 130 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 131: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 131 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 132: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 132 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 133: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 133 Government of Karnataka

Remarks Land Details Expansion PlanADB / WB support in form of Grant or Loan (Rs. in Cr.)

Any other agency (Rs. in Cr.)

Type of financial support details/

Name of Private developer

Period of Contract Concession (Yr)

Consultant / TA for the project.

Support Infrastructure required

Page 134: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 134 Government of Karnataka

Issues Brief Description PDF funding sought

1

RFP to be invited

1

RFP to be invited

1

1

1

1

1

1

1

Process of Rebidding 1

1

1

Additional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

Technical proposal submitted to Govt. for Approval.

41 PHC are under agreement and are working - management contract

Implementation of National Health Programe, Primary curatives services within designated PHC area. 43 PHC's handed over throught the state. The Salary of staff upto 75% will be reiumbsered by the Govt.

90 mobile units are working in tribal and under served areas in different districts of the state

The NGO will provide staff vehicle and medicine and will serve the area as per mutually agreed program cost reambursement 100% done by the Govt.

40 private nursing homes and govt. have entered into a contract

Recognised private medical service providers will be rreambursed at Rs. 3 Laks/100 deliveries service being free to the SC/ST and BPL families in the region including surgeries.

Tenders are invited, Last date for submission of Bids is on 25th March 2009

Part B - Biotechnology incubation centre and common instrumentation facilityPart C - Development of Bio cluster units.Effluent treatment plantConvention centre

Development of World Class Bio-Tech park in the state and also Government will receive annual payments from the PPP partner.

Invitation of EOI from prospetive developers was issued, 8 PROSPECTIVE DEVELOPERS HAVE EXPRESSED INTEREST, EVALUATION OF EOI UNDER PROCESS.-States recommendation to GoI for approval-Provision of Power and Water to the project-Assistance for obtaining s

• Total Site Area: Around 408 acres• Site for Govt. Organisations:104 acres• Site for Development on PPP: Around 304 acres• Project Components:IT-ITES Parks/SEZs, Multi-specialty Hospitals,5-Star Hotels, Financial District, Office Complexes, Retail&

Project Benefits: - Lease Premium of more than Rs.1100 Cr to the State Exchequer- Development of 30 million sqft of built-up space would revert to the State Government at the end of 60 years’ lease period- Employment generation for around 6 lakh person

PFD 75% required for Project development (37.50 lacs)

DPR prepared, Awaiting approval from JNNURM

The Mysore City has been granted the status of heritage city under Jawaharlal Nehru National Urban National Mission (JNNUNM). The Mysore City Corp. intends to develop a amusement park on the lines of NTR garden in the

The heirtage Park is being developed with an intention to : 1. To harness Mysore Reputation as a tourism city2. To provide a entertainment facility for the tourists

PFD 75% required for Project development (29.25 lacs)

The existing structure within the site cannot be demosihed as per DOT. The same can however be redesigned and re-furbished to be an integrated part of the proposed project. The land of 3.0 acre would be used.

KSIIDC -Nodal Agency and project Development done through Joint venture of KSIIDC & ILFS Infrastructure Develoment Corporation

1. Preparation of bid documents is in progress. 2. EOI Published and good response received

The land extent is 2.00 acres. The Land ownership is private - recommended for acquisition. DoT approved to acquire the required land parcel.

Invitation for Bids published on 26th Feb 2009

Near Yagachi Dam and Behind the Temple : DoT has planned an International category hotel (3 star) on a portion of 10 acre Land parcel available. The balance availabe land around 7 acres would be made available to KSIIDC for development. The land allocati

Page 135: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 135 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1. Under bidding 1

1

1

1

1

1

1

1

1

1

Invitation for Bids published on 26th Feb 2009

Land extent is 5.00 acres. It was suggested by DoT to consider developing a 3 star hotel and devleopment of the lake front within the land parcel as part of the project.

The Pilikula Nisarga Dhama is an NGO with an objective to facilitating and enhancing the experiences of visitor by crreating rope ways, Lake, Aquarium, restaurant, Ayurvedic spa and resort etc.

PFD 75% required for Project development (17.10 lacs)

Approval obtained from KSCZMA and submitted for arroval for NCZMA

The proposed development is 18 hole link golf course in 135 acres land parcel between Arabian sea and Gurupur river

Project Development stage

The proposed development is Aquamarine park in 20 acres land parcel between Arabian sea and Gurupur river

Bid process is completed and the Private developer has been identified. Agrrement between Dept and the selected bidder yet to be signed

The project will be having a main Convention hall of 6000 seating capacity, 20 conference rooms with a seating capacity ranging 50 to 25,banquet hall,exhibition halls, five star category hotel with 300 rooms, food court, parking complexes, enterainment zo

The bid process for selection of management partner completed and the agrrement b/w KSTDC and Management partner was entered into.

KSTDC has proposed to introduce a luxury tourist train  to showcase unique tourist attractions in Karnataka.

Project concept note prepared.Remarks- Funding, Guidence and suggestions are required for finalising the project.

FACILITIES 1. Constuction of compound wall for surrounding park area.2. Walkers pathway3.Joggers pathway4.Swimming pool5.Children amusement park and zoo6. Musical fountain and water falls7. Boating arrange

About 650 acres of land has been acquired and additional 100 acres of land is being acquired. Rs. 950 lakhs has been paid as part compensation. Remaining compensation is yet to be released to KIADB. FD has sought clarification on the acquition of Govt. la

Airport is being developed for ATR 72 type of aircraft.

Improved linkages between the state capital and other districts, easy access to tourism centers and promotion of balanced regional development across the state.

PFD 75% required for Project development (16.88 lacs)

Cost revised due to enhancement in the capacity of the airport. The project is operational.

Airport designed to handle an annual passenger traffic of 11mm & cargo of 350000 tones annually.

KIADB has identified about 1713 acres of land near Saganakal-Moka road. AAI has also approved the loaction. Due to the recent development and agitation of the land loosers, it has felt to limit the land requirement to 1250 acres. Joint measurement survey

567 acres of land has been acquired for Gulbarga airport.Project developer M/s Maytas consortia were identified. Priliminary clearances and NoCs have been obtained. Construction work yet to start. Meanwhile, a decision has been taken by the cabinet

Extent of Land and Location : 567 acres 10 guntas of land has been acquired near Sreenivasa Saradagi village in Gulbarga. Develop this airport on PPP basis and seek approvals/clearances from GOI and other statutory authorities. Expression of Interest(EO

Page 136: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 136 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

660 acres of land has been acquired for shimoga airport.Project developer M/s Maytas consortia were identified. Priliminary clearances and NoCs have been obtained. Construction work yet to start. Meanwhile, a decision has been taken by the cabinet

Location: 660 acres of land has been identified in Shimoga and Badravathi Taluk . Rs 5.83 crores released for acquisition and development Develop this airport on PPP basis and seek approvals/clearances from GOI and other statutory authorities. Express

About 960 acres of land is identified. 536.24 acres acquired and handed over to the developer. Remaining 423.15 acres is also under acquition by KIADB for which Rs. 3588 lakhs has been sought for the same is being clarified. M/s Jupiter Aviation & Logisti

1. Location and Extent of Land : 514 acres of land in Bhuvanahalli village near Hassan abutting the Bangalore-Mangalore National Highway. 2. Public Works Department of Government of Karnataka to develop this airport on PPP basis and to seek approvals/cl

The RFQ process has been completed. Bidding process is under progress

No land acquisition is envisaged. The selected developer has to carryout the rehabilitation of Baithkol and Aligadda village which have already been acquired by GOK. But not vacated. The approximate area is 54-12-00 acres and needs.

The bidder has to offer the highest amount of revenue per annum with an esclation of 10% per year. It is expected that it will be to the tune 10 cr. Approx.

The project proposal is submitted for the approval of Public Private Partnership (PPP) Committee.Project is cleared in 15th SHLCC

The Government of Karnataka has decided to develop the Malpe Port in Udupi District of Karnataka Maritime State on Build Own Operate Shasre and Transfer (BOOST) basis on the lines of Karwar Port (2nd stage) through open Bid route on the Gujarat and Mahara

The bidder has to offer the highest amount of revenue per annum with an esclation of 10% per year. It is expected that it will be to the tune 10 cr. Approx.

The Government approval is sought for issue of Request For Proposals (RFP) for appointment of consultants for the preparation of the Detailed project report. In the circumstances explained above the approval of the Government is sought for issue of Notifi

The Government of Karnataka has decided to develop the Honnavar Port in Uttara Kannada District of Karnataka Maritime State on Build Own Operate Shasre and Transfer (BOOST) basis on the lines of Karwar Port (2nd stage) through open Bid route on the Gujara

The bidder has to offer the highest amout of revenue per annum with an escalation 10% per year.

The gauge conversion is over and the operation of goods train has begun since May 2006. After the completion of statutory inspection and certification by the Railway Safety Commissioner, this line will be opened for passenger services.

Gauge conversion of Hassan-Mangalore railway line is one of the first PPP railway project in India. A Special Purpose Vehicle: Hassan – Mangalore Railway Development Company has been set up by GoK and GoI for this project.

1. Geo surveys undertaken2. Traffic studies completed3. DPR submitted to GOK4. Bid process underway. 5. RFQ to be issued.

Tp provide fast access to the new BIAL airport a dedicated rail link facility (35KM) for airport users is being planned. It will be developed on International standard and would offer services at par with other airports in the world. Rs 148 Crore Contrib

1. Faster and cheaper mode of tranport2. Ensure multiple transport linkages to Airport3. Reduce traffic congestion on highway linkgin to airport

PDF funding 75% from GOI of Rs. 73.2 lacks

Invitation for Bids was published on 25th Feb 2009

• Project Components:Modern Intracity Bus Station on project site-I around (1.27 acres): Bus Station with 3 Platforms to accomodate 12 bus bays, bus circulation and two wheeler parking areas, ATM Kiosks, Shops and Toilets

•• Proposed Built-up area: 1, 31,000 sq. ft.• Project Benefits: - Modern Bus Station worth~ 1.75 Cr.- Commercial Building of 1,31000 sqft after 30 years

Page 137: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 137 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

1

1

Invitation for Bids was published on 25th Feb 2009

Project Components:- New Bus Station on Project Site-I of around 3 acres with commercial complex.Bus Station with 27 bus bays, bus circulation & parking areas, auto-rickshaw bays, parking for private vehicles, passenger facilities &

• Project Benefits: - New Bus Station for the town- Total Benefits to KSRTC: ~Rs. 7.2 Cr.- Employment generation- First of its kind development will boost economic activity in the town Invitation for Bids was

published on 25th Feb 2009

• Site Area: Around 1.063 acres• Project Components:- KSRTC Premises: consisting of KSRTC offices, KSRTC guest house and associated infrastructure and parking

• Proposed Built-up area: ~ 1.3 lakh sq. ft.• Project Benefits: - Total Benefits to KSRTC: ~Rs.13.3 Cr.

Invitation for Bids was published on 25th Feb 2009Cleared by SLSWA and reconmended to SHLC for approval

• Project Components:Hassan:- Retail Block Retail & office spaces, restaurants, Multiplex with 3 screens & associated facilities- Hospitality Block: 3-star category hotel with 100 guest rooms, banquet hall, restaurant & associated facilities

• Proposed Built-up area: (i) Hassan: 411,427 sq. ft.• Project Benefits: - Employment generation- First of its kind development will boost economic activity in both the towns

Invitation for Bids was published on 25th Feb 2009

Project Components (Phase I):- KSRTC Premises: reservation counters and office, guest house and associated infrastructure, including parking.- Suggested Product Mix: Retail/ Commercial Block

Project Benefits: - Total Benefits to KSRTC: Rs. 20.27 Cr.- Employment generation- First of its kind development will boost economic activity in the townReady for bidding

Awaiting approval of project and Land use change to commercial Conceptualization, Market study, Demand Assessment, Topo Survey & Soil Testing, Conceptual architectural designs, 3-D moves of proposed & comml. Development, Financial Model

• Project Components:- Suggested commercial development on Project Site of around 1.86 acres:Retail shops, office space, banks, restaurants, 60 rooms Business Hotel and 2 screen air-conditioned movie theatre and associated facilities.

• Project Benefits: - Commercial Building of 1,45,000 sqft after 30 years- Total Minimum Benefit to NEKRTC: ~Rs. 0.9 Cr.- Employment generation- First of its kind development in Bidar & expected to boost economic activity in the town

Invitation for Bids was published on 25th Feb 2009RFP Documents drafts are prepared and under scrutiny, permission from the chief election commissioner is expected to publish in the State tender bulletin.Probably date are to be postponned after election

• Project Components:- Modern Bus Station (3.76 acres): consisting of 41 bus bays, Passenger Amenities, NWKRTC station office, 450 two wheeler parking and 40 car parking lots .- Commercial Building (2 acres): with a built-up area of 92000 sqft and a sug

• Project Benefits: - Modern Bus Station with 41 Bus bays, passenger amenities, NWKRTC station office, 450 two wheeler parking and 40 car parking, worth Rs.10.2 Cr.- Commercial Building of 92000 Sqft after 30 years- Half early lease rental for lease p

Bid process to commence upon approval from the GoK.BMTC requested UDD that a suitable amendment may be issued allowing ancillary land use of Trafrfic & Transportation category upto 45% of total built up area instead of 45% of the permissible

BMTC has appointed M/s Ernst & Young as its financial advisor per the KTPP for assisting BMTC.

World Class Bus Terminal and maintenance facility for 150 buses, passenger amenity, parking facility for 250 cars, transit facility, park and ride facility, besides being nodes providing interchnage between various mode of transport, viz. 2 wheelers, car

1. DPR for technical feasibility has been submitted to DC & AC, Hospet. 2. - Land acquisition to commence. 3. Bidding process to be initiated subsequently

Hospet is key loading point of iron ore. The rapid growth in export of iron ore has resulted in volume of trucks traffic through Hospet. In order to address the problem of traffic congestion on the roads and to faciliate smooth traffic truch operation Hos

1. reduction in congestion on roads network in the area. 2. Better facilities for truckers, such as wash room/ dormitory / secure space for parking etc.3. generation of local employment through service repair shops / petrol pumps / shops / offices area

PDF funding 75% from GOI of Rs. 15.75 lacs

1. DPR and Project structuring completed. 2. Existing site found to be inadequate. 3. Additional land to be identified. 4. Bidding process to be initiated subsequently

Torangullu is fast developing as major industrial area and is likely to witness exponential growth with Jindal Vijaynagar Steel plans to expand steels production level 1.6mpta to 10mpta, setting up of KPCL power plan and increasing export of iron ore from

1. reduction in congestion on roads network in the area. 2. Better facilities for truckers, such as wash room/ dormitory / secure space for parking etc.3. generation of local employment through service repair shops / petrol pumps / shops / offices area

PDF funding 75% from GOI of Rs. 12.75 lacs

New Tourist entry point for Hampi-World Heritage site

Page 138: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 138 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

The proposal approved on 29-08-2006. 1

1

Ideck Draft DPR ongoing 1

1

RFQ invited The proposal approved on 30-04-2008 1

1

1

1

1

1

Parking space for 1000 regular and trailer trucks catering to JSW, BTPCL and other industries. Facilities like service centers, dormitories, dhaba,

Invitation for Bids was published on 25th Feb 2009RFP Documents drafts are prepared and under scrutiny, permission from the chief election commissioner is expected to publish in the State tender bulletin.Probably date are to be postponned after election

Project Components:- Modern Bus Station (2.66 acres): consisting of 38 bus bays, Passenger Amenities, NWKRTC station office, 445 two wheeler parking and 9 car parking lots .- Commercial Building (1.37 acres): with a built-up area of 179,958 sqft and a s

• Project Benefits: - Modern Bus Station with 38 Bus bays, passenger amenities, NWKRTC station office, 445 two wheeler parking and 9 car parking, worth Rs. 7.6 Cr.- Commercial Building of 179,958 Sqft after 30 years- Half early lease rental for leas

1 crore RC & 1 crore DL or 15 years whichever earlier

Already pilot project going on

Agreement signed on 25th Feb 2009Completion of bid process , management partner has been idenfied and agrrement entered between transport Dept. and management partner

Project Involves supply of computer and peripherals and maintenance of these facilities for a period of agreement . It also involves converting the existing database into electronic form as well as training the personnel in using these facilties and prov

4 laning from Km 202 to Km 286.925 & 6 laning from Km 286.925 to Km 299.00 minimizing accidents, free movement of NH trafffic, decreased vehcile operating costs.

Review of DPR under progrees

4 lane length 77 KmChannaraypatna Bybass - 9 KM4 lane main carriageway with 5.5 m bituminous cart track on both sides5 nos. of VUP & one ROBService Road 46.2 KMVehicular under passes 10 nos. Pedestrian under passes 4 nos.ROB cum interchnage - 2 no.

The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval. The bid document issued & date of submission 27/02/09

The project road "Chikkanyakanahalli-Titpur Hassan Road' lies in the southern part of Karnataka and provides vital connectivity between SH-19 (Srirangpattana - Biddar Road) at Chikkanyakanhalli with NH-48 (Neelmangala - Mangalore Road) at Hassan. The impr

The improvent envisaged include widening to 2 lane road, reconstruction of road and CD structure, junciton inprovement, drainage and enhancement of rad safety. The proposal also includes construction also includes of bypass, ROB across railway crossing,,

The revised bid documents as per the MCA prescribed by Planning commission and submitted to Govt. for approval.

The project invloves widening and improvement of existing Dharward-Ramnagar section of SH-34 in the karnataka State to two lane road with paved shoulders.. The project road is importent link between Hubli-Dharwad and Goa.Total projects length is 60.4 Kms

The Road will also cater for heavy truck traffic carrying manganese and iron ore to Goa port from Hospet regions.

Completed on Jul-04 and toll is being collected since March, 2005

The project invovled wideing and strenghtening of exsiting 2 lanes to 4 lanes with divided carriageway & median plantation from Km 515 to 592 of NH-4 with facilities like drinking water & toilets, Bus bays, truck lay bus and services roads on either side

Due to this project, the travel comfort has increased and the travel time has come down. Fuel consumption and vehicle maintenance is reduced. Avalibility of good transportation facilities for agriculture produce

The work is completed in June, 06. Entire amount will be paid on Annuity basis.

PPPA committee approval is awaited.

The project invovled wideing and strenghtening of exsiting 2 lanes to 6 lanes divided carriageway from Belgaum-KNT / GOA border with with facilities like drinking water & toilets, Bus bays, truck lay bus and services

Page 139: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 139 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

Bids are to be invited 1

1

1

1

1

1

1

1

1

Feasibility Report i.e. DPR is being finalised. Tender called. Prequalifi

The project invovled wideing and strenghtening of exsiting 4 lanes to 6 lanes from Km 515 to Km 433 of NH-4 with facilities like drinking water & toilets, Bus bays, truck lay bus and services roads on either side for local, traffic.

BDA land acquisition work at Rs. 702.00 coroes.

DPR is being prepared & Preparation of bidding documents are in Progress. .

RFQ from the eligible contractors is invited in two packages each package Rs.1400.00 Crores.Last date for submission of applica

Phase I - Rs.3000 Crore (Including LA)Phase II - Rs. 2000 Crore ( Including LA)

1. Total length – 116 Kms, 2. Proposed to be taken up in two phases Phase 1 – Tumkur Road to Housur Road via Ballary Road. Old Madras Road, Sarjapur Road

1.Final DPR submitted to PWD, Waiting for approval, 2. Bidding process to be initiated.

The projects envisges road linkages which necessary to provide key linkages in the area and to insulate the residential cluster from heavy truck movement

PDF funding 75% from GOI of Rs. 22.5 lacks

Diversion road from State Highway to TRF Road (atTorangallu Station). Bypass road to Taranagar Link road to Toranagallu Railway Station to JVSL plant. Sandur-Hospet Road(added subsequently)

Bids invited & bidding date of submission 27/02/09

The project handed over to NH by PWD, GOK. DPR prepared by IDecK will be used to prepared new DPR for NH

The Sandur-Hospet roads (28Km) is major distric road (MDR) which provides a vital link for movement of iron ore traffic (50% of total traffics) from sandur mines towards Hospet.

PDF funding 75% from GOI of Rs. 22.5 lacks

1. DPR for technical feasibility has been submitted to GoK2. Writ petition filed has been dismissed. 3.At the instance of IDD the DPR and draft bid documents submitted to KRDCL by iDecK4. Bidding process to be initiated by KRDCL.

PWD has come up with development of this bypass road which would connect direcelty from bilekeri minor port to NH-17.

To reduce the commercial traffic movement through the village

PDF funding 75% from GOI of Rs. 18.00 lacks

IDECK has submitted DPR to GOK as part of SH-40 development on BOT basis

This road will reduce the distance between Sandur And Bellary/Hospet by 4-5Kms and trip by 15-20 minutes. And will remove the traffic conjestion at Torangallu.

Present traffic density 16500 PCU. Present lane width 7.00mt twolane in very bad condition subgrade condition. Major villages to bypassed -Kariganur, Papinayaan halli, Gadiiganur, Kudadhini.

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI.

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI.

Page 140: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 140 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

RFQ under evalution 1

1

1 Ideck PDF report

1

1

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI.

1. CE, NHAI to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above NH has been identifed for improvement though VGF funding from GOI.

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI.

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI.

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI.

1. PD, KSHIP to provide project details with relevant maps.2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above State Highway has been identifed for improvement though VGF funding from GOI.

1. PD, KSHIP to provided TOR to the PPP Cell, IDD for appointment of TA and further action2. TA to be appointed

GoK has been working for Road Network imporvment in Karnataka. As decided by Hon'able CM the above National Highway has been identifed for improvement BOT project.

Widenig of existing 2- lane carriageway to 4-lanes.

70% of physical progress is achieved

Project starts from AP - KNT border to Avathi village conncting Chickballapur town thru a bypass. 2 toll plaza are proposed in the project limit and this project will cater to the traffic plying from Bangalore to Hyderbad.

85.525% of physical progress achieved

Construction of 9 Km long 4 lane Elevated Highway.Construction of interchange at Electronic city junction.Widening of existing 4- lane carriageway to 6 lanes.Construction of missing length (about 10 Km) of 2 lane service roadConstruction of 4 pedestri

14% of physical progress achieved

Elevated Highway : 4.25 Kms of 4 LanesGround Level 4 lane from Km 10/150 to 14/5006 lane from Km 14/500 - 29/500 - access controlled Service Road length 39.0 KmVehicular Under Passes 7Nos.Pedestrian Under Passes 14 Nos.

8.14% of physical progress achieved.

4 lane length 80 KmKunigal Bybass - 15 KM4 lane main carriageway with 5.5 m bituminous cart track on both sides5 nos. of VUP & one ROBService Road 44.17 KMVehicular Over Passed 9 nos. Pedestrian under passes 6 nos.ROB cum interchnage - 1 no.Major

Page 141: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 141 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

1

4.80% of physical progress achieved. The project is being developed under NHDP Phase IIIA, NH - 4.

6 lane length 16 km (KR puram to Hostake)4 lane length 64 KmService road length 69.20 KmVehicular Over passes 12 nos.Pedestrian under passes 3 nos.ROB cum interchnage 1 no.Major bridges 2 nos.Minor Bridges 9 nos.Culverts 116 nos.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Page 142: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 142 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

1

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Page 143: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 143 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

1

1

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Page 144: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 144 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

1

1

1

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Page 145: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 145 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

1

1

1

1

1

1

1

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Page 146: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 146 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

1

Completed 1

1

1

1

1

1

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Bid Submission date is 17.04.2009

The State Highways & Major District Roads for a length of 9772 Kms is

planned to be developed along with Feeder Rural Roads. These Roads will form Core Road Network of Karnataka.

Estimated cost Rs.2.89 cr. Awarded cost Rs.3.70 cr.

Bidding process is underway in Shimoga town, Identification of landfill sites and technical studies at the other towns are underway.

iDeCK has been mandated to provide assistance in setting up MSW treatment and disposal landfill facilities in the following towns in Karnataka through private participation on a BOT basis. Hubli-Dharwad, Gulbarga, Belgaum, Shimoga, Raichur, Hassan, Tumkur

As per the Municipal Solid Waste (Management & Handling) Rules 1999. It is the responsibility of the Municipal authority to dispose municipal solid waste in a scientific manner. iDeCK has assisted in carrying out the project development activities includi

The Concession Agreement between BMP and the Successful Bidder has been signed in November 2005 and the concessionaire has commenced renovation of the Complex. Now, the project has been completed.

BMP has developed a commercial plaza (300,000 sq.ft.) at Madivala in Bangalore. Subsequently, in order to leverage the commercial potential of the complex, BMP has requested iDeCK to provide assistance in identification of a suitable private developer (th

Cleared by SLSWA and recommended for approval by SHLC

Development of land parcel to Hypermarket,KLAC Ofiice space,3 Star Business Hotel.

The land is being developed with an intention to : 1.Office space for KLAC2. To unlock the value of real estate to provide KLAC with additional revenues

Under approval (Detailed DPR of technical study has been submitted to MCC). The approval of funding under JNNURM is awaited from GOI.

Rapid Urbanization has resulted in an increase in the quantum of MSW generation and increased problems of handling MSW over part few years. In view of the MoEF has framed MSW rules which reuqires all Municiple authorities to manage MSW sciintifically

The Mysore city generate 220 MT of MSW daily covering 65 municiple wards. The city does not have a disposal site conforming to the Municiple solid Waste rules. The above project would enable provision of sustainable hygine MSW management services.

PDF funding 75% from GOI of Rs. 50.25 Lacs + VGF of 3000 lacs is required

1. DPR of technical feasibility and has been prepared and approved. 2. Project has been cancelled and moved to ADB.

Most ULB is Karnataka receive water only for few hours on alternate days due to limitation in distribution networks, erratic power supply amd poor management practices among other operating constraints. ULB also suffer from sub-optimal service delivery d

A Performance based deffered payment structure (PBDPS) is being used for implementation of the project. The contracter will design and methodology to meet performance targets and payment will based on that.

PDF funding 75% from GOI of Rs. 24.75 lacs

Works under eight Priority Investment Packages (PI Works) are completed and commissioned. Procurement and installation of pumping machineries under two goods packages are completed and commissioned.Bulk water supply improved to Belgaum, Gulbarga and Hubli

The three towns selected for investments in the first phase are Belgaum, Gulbarga & Hubli-Dharwad. Subsequent phases of the Project will involve scaling up to the rest of the areas in the three cities and also to more cities.

Rs.28cr for Operator Remune

This is a project for reforms & service improvements through Private Sector Participation (PSP) in the water sector in Karnataka. The project mainly seeks to implement the strategy enunciated in the Urban Drinking Water & Sanitation Policy of GoK. It will

Page 147: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 147 Government of Karnataka

Issues Brief Description PDF funding soughtAdditional Investment

Risk Mitigatoin Plan

Current Status/ Remarks if any

Processing column

PDF funding approved (Rs. in Lacks)

1

1

1

Construction is over. 1

1

1

1

1

1

1

1

Construction  Project involves setting up a 8 MW solid waste based power plant covering an area of 85 acres land.

Land Acqusition notification to be issued. Agreement to be executed with DLF tld.

Township is being developed with the theme of work, live and play. 9178.29 acres of Land has been proposed to to be acquired.

Population and traffic pressure will be reduced in Bangalore. The GoK is geeting financial benefit of Rs 3450 Cr. Towards pre. Dev. Charges paid to GoK by DLF. Ltd.

Operationalised on 2nd October 2008

As per Municipal Solid Wastes ( Management & Handling) rules 2000, all the Urban Local Bodies are responsible for treatment and safe disposal (sanitary landfill) of municipal solid waste generated in their limits.

Compliance of the rules, value returns in the form of compost, safe disposal of waste, protection of environment etc

The bidder has been selected. The process of awarding is underway.

Bidding completed. The project has been awarded.

Bidding completed. The project has been awarded.

BMP proposes to provide public toilets in Bangalore on BOT basis. BMP has invited for expression of interest (EOI) and has received responses to the same. iDeCK was requested to assist in evaluation of EoIs submitted and prepare Request for Proposal and C

The bid process has been completed. The Concession Agreement has been signed and project has been awarded.

MCC requested iDeCK to assist in the development of a commercialcomplex at Makkaji Chowk, Mysore through private sector participation.The project was envisaged to be developed on a BOT basis and rehabilitate the existing shops on the same site.

Rehabilitation Building - 50% under progressMain commercial complex - 50% under progressThe construction of both the buildings are under progress

The extent of Makkaji Chowk site is 4.19 acres. This project comprises of two buildings i.e., Main Commercial complex and rehabilitation building to existing tenants of old building. MCC will get income in the form of rent which will be fixed after words

Undre construction (final stage)

As per Municipal Solid Wastes ( Management & Handling) rules 2000, all the Urban Local Bodies are responsible for treatment and safe disposal (sanitary landfill) of municipal

Compliance of the rules, value returns in the form of compost, safe disposal of waste, protection of environment etc

Detailed feasibilty reports completed . Awaiting approval of land use conversion after which Bidding will be done.

Development of land parcel to commercial space, Star Business Hotel.

The land is being developed with an intention to : 1.Office space for Animal Husbandry2. To unlock the value of real estate to provide Animal husbandry with additional revenues

Page 148: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 148 Government of Karnataka

Stage

Agri Marketing Initial 4 Bidding

yesAgri Marketing Initial

yesAgri Marketing Initial

yesInitial

6 Implementation

yes6 Implementation

yesIT&BT Bidding 4 Bidding

yesKSIIDC / ILFS Bidding

yesBidding 5 Financial Close

Bidding

yesBidding

yesBidding

yes

Info. R

3 Request for Proposal

3 Request for Proposal

Medical & Health Dept

1 Project Identification

yes

1 Project Identification

Ideck PDF Report

yes

Department of Tourism / KSIIDC

3 Request for Proposal

Department of Tourism / KSIIDC

3 Request for Proposal

Department of Tourism / KSIIDC

3 Request for Proposal

Page 149: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 149 Government of Karnataka

Stage Info. R

Bidding

yesBidding 4 Bidding

yesInitial

yesInitial

yes

yesIDD website 4 Bidding

yes

yesIdeck / IDD Evaluation 4 Bidding

yesCompleted 7 Operation

yesInitial

NoIdeck / IDD

yes

Department of Tourism / KSIIDC

3 Request for Proposal

Ideck PDF Report

KSIIDC / ILFS over email

1 Project Identification

KSIIDC / ILFS over email

2 Project Development

3 Request for Proposal

Implemen- tation

1 Project Identification

Available with PPP Cell

2 Project Development

Implemen- tation

2 Project Development

Page 150: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 150 Government of Karnataka

Stage Info. R

Ideck / IDD

yesIDD Award

yesPorts Deptt Bidding 4 Bidding

YesPorts Deptt Initial

YesPorts Deptt Initial

Yes7 Operation

yesInitial 4 Bidding

yesNEKRTC Initial 4 Bidding

yes

Implemen- tation

2 Project Development

2 Project Development

1 Project Identification

1 Project Identification

Ideck PDF Report

Page 151: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 151 Government of Karnataka

Stage Info. R

KSRTC Initial 4 Bidding

yesKSRTC Initial 4 Bidding

yesKSRTC Initial 4 Bidding

yesKSRTC Initial 4 Bidding

yesKSRTC Initial 4 Bidding

yesNWKRTC Initial 4 Bidding

yesBMTC Initial

yesInitial

yesInitial

yesJSW proposal Concept

yes

3 Request for Proposal

Ideck PDF Report

3 Request for Proposal

Ideck PDF Report

3 Request for Proposal1 Project Identification

Page 152: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 152 Government of Karnataka

Stage Info. R

JSW proposal Concept

yesNWKRTC Initial 4 Bidding

yesPPP website No Info

yes6 Implementation

YesNHAI Bidding

YesNHAI Bidding

yesNHAI Bidding 4 Bidding

yesKRDCL Bidding 4 Bidding

YESKRDCL Bidding 4 Bidding

YESNHAI Completed 7 Operation

yesCompleted 7 Operation

YESNHAI Initial

yes

1 Project Identification

1 Project Identification

2 Project Development

2 Project Development

Availble with PPP Cell / KRDCL

1 Project Identification

Page 153: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 153 Government of Karnataka

Stage Info. R

NHAI Initial

yesBDA Initial

yesInitial

yesInitial

yesppp website Initial

YESInitial

yesInitial

yesInitial

JSW proposal Concept

yesJSW proposal Concept

yesInitial

Need to checkInitial

2 Project Development

3 Request for Proposal

Ideck PDF Report

3 Request for Proposal

Ideck PDF Report

3 Request for Proposal1 Project Identification

Ideck PDF Report

2 Project Development

Ideck PDF Report

2 Project Development

1 Project Identification

No

2 Project Development

1 Project Identification

1 Project Identification

1 Project Identification

Bijapur

Page 154: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 154 Government of Karnataka

Stage Info. R

Initial

STRRInitial

STRRInitial

yesInitial

yesInitial

yesInitial

yesInitial

yes4 Bidding

yesNHAI 6 Implementation

yesNHAI 6 Implementation

yesNHAI 6 Implementation

yesNHAI 6 Implementation

yes

1 Project Identification

1 Project Identification

1 Project Identification

1 Project Identification

1 Project Identification

1 Project Identification

1 Project Identification

Implemen- tation

Implemen- tation

Implemen- tation

Implemen- tation

Page 155: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 155 Government of Karnataka

Stage Info. R

NHAI 6 Implementation

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes

Implemen- tation

Page 156: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 156 Government of Karnataka

Stage Info. R

4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes

Page 157: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 157 Government of Karnataka

Stage Info. R

4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes

Page 158: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 158 Government of Karnataka

Stage Info. R

4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes

Page 159: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 159 Government of Karnataka

Stage Info. R

4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes4 Bidding

yes

Page 160: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 160 Government of Karnataka

Stage Info. R

4 Bidding

yes4 Bidding

yes

not yet finalised4 Bidding

shimoga and belguamCompleted 7 Operation

yesCompleted 7 Operation

yesInitial

yesInitial

yesInitial

6 Implementation

Available with PPP Cell

Implemen- tation

2 Project Development

Available with PPP Cell

Available with PPP Cell

KSIIDC / ILFS over email

2 Project Development

Ideck PDF Report

2 Project Development

Ideck PDF Report

2 Project Development

yes

Available with PPP Cell / KUIDFC web site

Implemen- tation

yes

Page 161: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 161 Government of Karnataka

Stage Info. R

PPP website 6 Implementation

yesBMRDA

yes7 Operation

yes7 Operation

yes6 Implementation

yes6 Implementation

yes6 Implementation

yes6 Implementation

yes

yes6 Implementation

yesInitial

yes

Implemen- tation

Implemen- tation

2 Project Development

Available with PPP Cell

Implemen- tation

Available with PPP Cell

Implemen- tation

Available with PPP Cell

Implemen- tation

Available with PPP Cell

Implemen- tation

Available with PPP Cell

Implemen- tation

Available with PPP Cell

Implemen- tation

2 Project Development

KSIIDC / ILFS over email

2 Project Development

Page 162: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 162 Government of Karnataka

Bidding

Pipeline

Pipeline

Bidding

PipelinePipeline

Pipeline

Pipeline

Pipeline

Stage (Bidding,Implementation,Pipeline)

Implementation

Implementation

Implementation

Page 163: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 163 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Pipeline

Bidding

Pipeline

Pipeline

Pipeline

Bidding

Pipeline

Bidding

Pipeline

Pipeline

Implementation

Page 164: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 164 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Pipeline

Pipeline

Bidding

Pipeline

Pipeline

Bidding

Bidding

Implementation

Page 165: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 165 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Pipeline

Pipeline

Pipeline

Pipeline

Page 166: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 166 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Pipeline

Bidding

Pipeline

Pipeline

Pipeline

Bidding

Bidding

Bidding

Pipeline

Implementation

Implementation

Implementation

Page 167: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 167 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Pipeline

Pipeline

Pipeline

Pipeline

Pipeline

Pipeline

PipelinePipeline

Pipeline

Pipeline

Pipeline

Pipeline

Page 168: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 168 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Pipeline

Pipeline

Pipeline

Pipeline

Pipeline

Pipeline

Pipeline

Bidding

Implementation

Implementation

Implementation

Implementation

Page 169: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 169 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Implementation

Page 170: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 170 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Page 171: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 171 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Page 172: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 172 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Page 173: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 173 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Bidding

Page 174: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 174 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Bidding

Bidding

Pipeline

Bidding

Pipeline

PipelinePipeline

Implementation

Implementation

Implementation

Page 175: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

LIST OF PPP PROJECTS IN KARNATAKA STATE

Infrastructure Development Department 175 Government of Karnataka

Stage (Bidding,Implementation,Pipeline)

Pipeline

Pipeline

Pipeline

Implementation

Implementation

Implementation

Implementation

Implementation

Implementation

Implementation

Implementation

Page 176: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

#8, PPP Cell, IDD 176

Brief Summary of the Projects

Distribution of Projects Major Sector wise

Major Sector Nos Value (Rs Cr)Transport 110 48338.74Urban and Municipal Infrastructure 18 40847.11Tourism 11 1345.49Energy 0 0Industrial Infrastructure 2 9522Other 0 0Agri-Infrastructure 4 868.36Healthcare 3 5.76

Total 148 100927

Distribution of Projects Sub Sector wise

Sub Sector Nos Value (Rs Cr)Road 84 36998.49Transport - terminal 13 726.3Hotels/ Resorts 4 88MSW 9 241.59Airport 6 3490.29Rail 2 3716Commercial Development 5 532.82Entertainment 4 152Power 0 0Port 3 3238Agriculture and horticulture markets 3 568.36Health Infrastructure and facility 3 5.76Township Development 1 40000Water Supply & Sewerage 2 357Information Technology 2 9050Others 0 0Bio-technology 1 522Common User facilities 1 12Cultural Centres 1 1050MRTS 0 0Theme Park 1 20.49Urban Infrastructure 1 3.7Warehousing infrastructure 1 119.66Heritage Park 1 35Total 148 100927

Distribution of projects - at various stages

Stage Nos Value (Rs.Cr.)1 Project Identification 22 128712 Project Development 18 432163 Request for Proposal 13 69354 Bidding 71 317635 Financial Close 1 206 Implementation 15 27557 Operation 8 3366

Total 148 100927

Page 177: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

#8, PPP Cell, IDD 177

Distribution of projects - by Sponsoring Deptt.

Name of the Sponsoring Deptt / Agency Nos Value (Rs.Cr.)Agriculture Marketing 3 568Animal Husbandry Department 1 300BBMP 7 242BDA 1 5000BMTC 1 350BUDA 1 35Dept of Shipping 1 120Dept of Tourism 7 1178Direcotor of Ports & Inland Water Transport 3 3238DMA 1 0DMA / Belguam CMC 1 5DMA/ Shimoga CMC 1 4DMA, CMC 1 120DMA/Mysore City Corporation (MCC) 4 132Health and Familiy Welfare / DH and FWO 3 6HUDA 1 26IDD 10 7235IT , BT ,S&T 1 522Karnataka Land Army Corporation Ltd. 1 107KRDCL 56 24998KSHIP 4 0KSHIP & IDD 1 0KSIIDC 1 9000KSRTC 4 164KSRTC - NEKRTC 2 58KSRTC - NWKRTC 2 70KSTDC 1 32KUIDFC 1 237Mysore City Corporation (MCC) 1 20NHAI 14 5601No Info 6 1030Pilikula Nisarga Dhama, NGO 1 80PWD 3 399Transport Department 1 50UDD 1 40000

Total Value 148 100927

Distribution of Projects PPP Modality wise

Mode Nos Value (Rs.Cr.)Annuity 1 0BLMT 0 0BOMT 1 50BOO 1 4BOO-Management Contract 0 0BOOST 3 3238BOOT 10 1292BOOT(Swiss Chalange method) 0 0BOT 40 16736BOT-Annuity 5 1457DBFOT/BOT 0 0DBOOT 2 2505DBOT 69 34448Management Contract 7 40312No Info 8 766O&M PPP 0 0PBDPS 1 120Private Participation by Cement comp. 0 0

Total 148 100927

Page 178: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

#8, PPP Cell, IDD 178

RoadTransport - terminal

Hotels/ ResortsMSW

AirportRail

Commercial DevelopmentEntertainment

PowerPort

Agriculture and horticulture marketsHealth Infrastructure and facility

Township DevelopmentWater Supply & Sewerage

Information TechnologyOthers

Bio-technologyCommon User facilities

Cultural CentresMRTS

Theme ParkUrban Infrastructure

Warehousing infrastructure

0 10 20 30 40 50 60 70 80 90

8413

49

62

54

0333

122

0111

0111

Distribution of Projects Sub Sector Wise in Nos

Nos

Transp

ort

Urban

and M

unicipal I

nfrastr

ucture

Touris

mEn

ergy

Industrial

Infra

structu

reOther

Agri-In

frastr

ucture

Health

care

0

20

40

60

80

100

120 110

1811

0 2 0 4 3

Distribution of Projects Major Sector wise in Nos

Nos

1 Project Identification

2 Project Development

3 Request for Proposal

4 Bidding

5 Financial Close

6 Implementation

7 Operation

0 10 20 30 40 50 60 70 80

22

18

13

71

1

15

8

Stage Wise distribution of Projects in Nos

Nos

Page 179: idd.kar.nic.inidd.kar.nic.in/Project/Infra_Projects_total_148.xls · XLS file · Web viewPDF 75% required for Project development ... The bid document will be issued after approval

#8, PPP Cell, IDD 179

Agriculture MarketingAnimal Husbandry Department

BBMPBDA

BMTCBUDA

Dept of ShippingDept of Tourism

Direcotor of Ports & Inland Water TransportDMA

DMA / Belguam CMCDMA/ Shimoga CMC

DMA, CMCDMA/Mysore City Corporation (MCC)

Health and Familiy Welfare / DH and FWOHUDA

IDDIT , BT ,S&T

Karnataka Land Army Corporation Ltd.KRDCLKSHIP

KSHIP & IDDKSIIDCKSRTC

KSRTC - NEKRTCKSRTC - NWKRTC

KSTDCKUIDFC

Mysore City Corporation (MCC)NHAI

No InfoPilikula Nisarga Dhama, NGO

PWDTransport Department

UDD

0 10 20 30 40 50 60

31

71111

73

1111

43

110

11

564

11

422

111

146

13

11

Dept wise No of Projects

Nos

Transp

ort

Urban

and M

unicipal

Infrastr

ucture

Touris

mEn

ergy

Industrial

Infrastr

ucture

Other

Agri-In

frastr

ucture

Health

care

0

10000

20000

30000

40000

50000

60000

48338.74

40847.11

1345.49 0

9522

0 868.36 5.76

Distribution of Projects Sector wise in Value (Rs Cr)

Value (Rs Cr)