I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was...

17
'Jfffif 't'lilCf>liIGOVERNMENT OF INDIA ~ <1?1lclll MINISTRY OF RAILWAYS ~ ~ RAILWAY BOARD) No.2009/M(C)/137/1 Vol-ii New Delhi, dated: I> .11.2017 Chief Mechanical Engineers All Indian Railways Sub: Replacement of suspected Bolster Spring of ICF design coaches (MIs R.L. Steel Make) Ref: CMElICF's D.O. No. MEIWS/65/2017-18 dated 07.11.2017 ******* The above reference letter regarding identification of suspected Bolster springs made out of steel bars supplied by MIs R.L. Steels has been received from ICF. The letter along with list of coaches being fitted with the suspected springs is enclosed for ready reference and necessary action. #4/1\ (Navaid TaUb) Dir. Mech. Engg. (Chg.) Railway Board

Transcript of I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was...

Page 1: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat

'Jfffif 't'lilCf>liIGOVERNMENT OF INDIA~ <1?1lclll MINISTRY OF RAILWAYS

~ ~ RAILWAY BOARD)

No.2009/M(C)/137/1 Vol-ii New Delhi, dated: I> .11.2017

Chief Mechanical EngineersAll Indian Railways

Sub: Replacement of suspected Bolster Spring of ICF designcoaches (MIs R.L. Steel Make)

Ref: CMElICF's D.O. No. MEIWS/65/2017-18 dated 07.11.2017*******

The above reference letter regarding identification of suspectedBolster springs made out of steel bars supplied by MIs R.L. Steels hasbeen received from ICF. The letter along with list of coaches being fittedwith the suspected springs is enclosed for ready reference and necessaryaction.

#4/1\(Navaid TaUb)

Dir. Mech. Engg. (Chg.)Railway Board

Page 2: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat

I~ R.flJ..35) /S9. /:).f)J?, ,.

~.~o~~ mille!; ,,,,1r.r4'lL.C. TRIVEDI

Chief Mechanical Engineer

~ m'<fiT<, ~~mffit ~ 'lfI'rnIAT

1Ft - 600 038Govt. of India, Min. of Railways

Integral Coach FactoryChennai - 600 038

D.O.No:ME/WS/65/2017-18 Date: 07/11/2017

Dear Shri Gupta,

Sub : Replacement of suspected Bolster spring of ICF design coaches(MIs. R L Steel Make).

ReI' : Your D.O. letter No:20091M(C)l13711 Vol.(ii)Pt. dt.02/1112017.

The Conventional Coach springs are made as per RDSO specification W/D-O 1-HLS-94, the 12 digit identification code punched as per the specification is without the heatnumber which is required for identifying the supplier. The specification RDS0/2017/CG-01

f1 for the manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new1"' specification requires stamping of the heat number for identifying the spring bar supplier.

~\ 1 The new Spring Plant under commissioning at ICF is for manufacture ofq'" \s~rings for FIAT Bogies and Conventional Bogies. The 15 digit code including the heatit number will be punched on both Conventional and FJAT Bogie springs. The recording of the

.C-- ML ldenttttcatlOn code has not been done and will be introduced. In the absence of data of rawe,7 (~ material supplier of springs fitted on Coaches, ICF issued advisory to Zonal Railways for/ weeding out the springs made with steel bars supplied by RL Steels.

The requirement of Zonal Railways for replacing the defective springs will be metafter commissioning of the new Spring Plant sanctioned under the Works Programme and thedetails of spring identification code for the spares supplied to Zonal Railways will also be done.The production from the new Spring Plant is expected to commence by January 2018. Tillthen, Zonal Rail ways are required to take springs from RSK.

Enclosed is the list of coaches where springs were provided made out ofM/s.R.L.Steel bars.

9\l\ Encl: As above.

~~~

Yours sincerely.i\

(L.C. Trivedi)Shri Raman Lal Gupta,Additional Member (ME),Railway Board.New Delhi - 110001.

Tete: DOT: +91-44-26263507 (0) Fax: 91-44-26264135E-mail: [email protected]:http://v../ww.icf.indianrailways.gov.in!9S5.2(llS

OIAMOND JUtll.U Y~A11

Page 3: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 4: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 5: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 6: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 7: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 8: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 9: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 10: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 11: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 12: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 13: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 14: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 15: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 16: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat
Page 17: I> .11indianrailways.gov.in/railwayboard/uploads...f1 forthe manufacture of FIAT Bogie springs was issued in January 2017 by RDSO. The new 1"' specification requires stamping oftheheat