Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG...

13
Heat Recovery Steam Generator Heat Recovery Steam Generator HRSG 2007.10.31 12:46 PM ˘ `4 ‰¯¿l– •¡˙¨‰”

Transcript of Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG...

Page 1: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

Heat RecoverySteam Generator

Heat RecoverySteam Generator

HRSG 2007.10.31 12:46 PM ˘ ` 4 ‰¯¿ł– •¡˙¨‰”

Page 2: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG 2007.10.31 12:43 PM ˘ ` 1 ‰¯¿ł– •¡˙¨‰”

Page 3: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

Design

2 Months

Basic Design- Performance- Component

Analysis

General Arrangement

Pressure Part Arrangement

Component

Detail Design

MaterialProcurement

2.5 Months

Fin Tube

Header

Link

Drum

Casing

Duct

Insulation

AuxiliaryEquipment

Shipping Erection

Bottom

Shop Fabrication

Harp Ass’y 4.0 MonthsModule Ass’y 4.5 Months

Hydro Test Final Inspection

Top

Bending & Welding

StorageMarking & Cutting Finning

The Core of DOOSAN module system ("COTHMOS") is an integrated design program developed by the company for basic engineering and computer designed component details.

COTHMOS integrates the HRSG engineering programs of thermal performance design, component design,flexibility analysis, noise evaluation, dynamic behavior and so on. It also automatically provides two dimensionalAuto-Cad detail drawings and the bill of materials based on three dimensional pressure part arrangementdrawings as well as three dimensional general arrangement drawings.

Core of DOOSAN HRSG Module SystemCOTHMOS

▶▶Design Flow

BASIC Design

Analysis

FINTUBE

·Heat Transfer ·Stress/Flexibility

·Structure ·Noise

·Fluent ·Dynamic Behavior

HEADER

LINK

DRUM

CASING

DUCT

INSULATION

P & ID

ComputerizedDrawings

Drum. exe Header. exe

Stack. exeDuct. exe

Insul. exe

Formod. exeHrsgsim. exeNatbm. exeCirc. exe

2D AUTODWG & BOMfor Pressure

Parts

Performance

Components

PPA3D Modeling

DESIGN

PRODUCTION LEAD TIME

Harp Ass’y Module Ass’y

GA 3D Modeling

HRSG 2007.10.31 12:45 PM ˘ ` 2 ‰¯¿ł– •¡˙¨‰”

Page 4: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

DH0511/H

Doosan Hydro Technology, Inc.

9001 Brittany Way Tampa, Florida 33619, USATel. 1-813-549-0182, Fax. 1-813-549-0183

Doosan Heavy Industries & Construction Co., Ltd.www.doosanheavy.com

Seoul office1303-22, Seocho-Dong, Seocho-Gu. Seoul 137-920, Korea(C.P.O Box 1826, Seoul Korea)Tel. 82-2-2-513-6114, Fax. 82-2-513-6200Head office and Changwon plant 555, Guigok-dong, Changwon, Gyeongsangnam-do, 641-792, Korea Tel. 82-55-278-6114, 7114 Fax. 82-55-264-5551,5552

GLOBAL NETWORK

Doosan Heavy Industries America Corp.400 Kelby Street, Parker Plaza, 10th fl. Fort Lee, NJ 07024, USAPhone : 1 201 944 4554 Fax : 1 201 944 5022/ 5053Doosan Heavy Industries Japan Corp.Room2410,Mita Kokusai BLD.1-4-28,Mita Minato-ku, Tokyo, Japan 108-0073Phone : 81 3 3452 5451~3 Fax : 81 3 3452 5624Windsor OfficeWestinghouse Electric, 20 International Drive, Windsor, CT 06095, USA (Windsor, Schenectady)Phone : 1 860 731 6479 Fax : 1 860 731 6478Schenectady OfficeRoom 33-202A, General Electric Bldg, One River Road, Schenectady, NY 12345,USA (Windsor, Schenectady)Phone : 1 518 385 5218 Fax : 1 518 385 4984Beijing Office19F, Tower B Gateway Plaza, No. 18 Xiaguangli,North Road, East Third Ring, Chaoyang District, Beijing 100027Phone : 86 10 8454 7131~33 Fax : 86 10 8484 7139Shanghai OfficeRoom 2802. City Center of Shanghai Bldg.,100 Zunyi Rd, Changning District Shanghai 200051, ChinaPhone : 86 21 6237 2485/2486 Fax : 86 21 6237 2487Taipei OfficeRoom 704, No.51, Keelung Road Section 2,Taipei 110, TaiwanPhone : 886 2 2739 2255(ARS) Fax : 886 2 2739 2266Hanoi Office#1101, Daeha Business Center, 360 Kim Ma,Ba Dinh District, Hanoi, VietnamPhone : 84 4 273 0545~8 Fax : 84 4 273 0550Bangkok Office10th Floor, M-thai Tower, Wireless Road, Bangkok, ThailandPhone : 66 2 654 0690~2 Fax : 66 2 654 0693New Delhi Office2A, 2nd Floor, Lotus Towers, Community Centre, New Friends Colony, New Delhi-110 065, IndiaPhone : 91 11 4132 8031 Fax : 91 11 4132 8039Mumbai Office1109&1110, 11th Floor, Maker Chambers-V,Nariman Point, Mumbai 400021, IndiaPhone : 91 22 2202 6504 Fax : 91 22 2202 6557Dubai OfficeOffice No. 308, Al Serkal Building, Airport Road PO Box 11859, Dubai, UAE (Dubai, Abu Dhabi)Phone : 971 4 294 4699 Fax : 971 4 294 9930

Abu Dhabi OfficeAl Ghaith Tower 5th Floor, Room 508, Hamdan Street, P.O. Box 27767, Abu Dhabi, UAE (Dubai, Abu Dhabi)Phone : 971 2 627 6273 Fax : 971 2 627 6274

Riyadh OfficeP.O.Box 9656, Riyadh 11423, Saudi ArabiaPhone : 966 1 419 1920/1696 Fax : 966 1 419 1995

Kuwait OfficeVilla 15, Street 24, Block 4, Sabah Al-Salem Area, KuwaitPhone : 965 551 8452/8436 Fax : 965 551 8453

Frankfurt OfficeFrankfurt Office 9th Floor, Arabella Center, Lyoner Strasse 44-48, 60528 Frankfurtam Main, GermanyPhone : 49 69 69 5004 0 Fax : 49 69 69 5004 10

Tripoli OfficePhone : 971 50 459 2759 / 218 91 380 8021

MAJOR SUBSIDIARIESDoosan Babcock Energy Limited11 The Boulevard, Crawley West Sussex, United Kingdom RH10 1UXPhone : 44 1293 584 990 Fax :44 1293 584 918

Doosan Heavy Industries Vietnam Co., Ltd.[Doosan Vina]No.1 An Duong Vuong Street, Quangngai City, Quangngai Province, VietnamPhone : 84 55 713 001~7 Fax : 84 55 713 008

Doosan IMGB104 Berceni Road, Bucharest 4, RomaniaPhone : 40 21 301 2602 Fax : 40 21 301 2502

Doosan Engineering & Services India Pvt. Ltd.3rd Floor DLF Building No. 8, DLF Cyber City Phase -•±, Gurgaon Haryana (122-002), India Phone : 91 124 439 8200 Fax : 91 124 414 7006

Doosan Hydro Technology, Inc.9001 Brittany Way Tampa, Florida 33619Phone : 1 813 549 0182 Fax : 1 813 471 0713

Doosan HF Controls Corp.16650 Westgrove Drive, Suite 500 Addison, Texas 75001, USAPhone :1 972 367 4657 Fax : 1 972 367 4699

Ceylon Heavy Industries & Construction Co., Ltd. [CHICO]Oruwala Athurugiriya Sri LankaPhone : 94 114 440031 2 Fax : 94 114 440030

Hanjung Power Ltd.P.O.Box 2803, Boroko, NCD Papua New GuineaPhone : 675 320 0529 Fax : 675 321 2984

Han-Viet Heavy Industry & Construction Corp. [HANVICO]933 Ton Duc Thang Street, Hong Bang District, HaiPhong, VietnamPhone : 84 31 371 2710 Fax : 84 31 712 714/715

HRSG 2007.10.31 12:45 PM ˘ ` 3 ‰¯¿ł– •¡˙¨‰”

Page 5: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

INTRODUCTION

▲SEOINCHON C.C.P.P. #1, 2, 3, 4

Established in 1962, Doosan Heavy Industries & Construction Co., Ltd. (DOOSAN) has played major roles in the development of Korea'spower plant business with the cutting edge technology and high-caliberproduction facilities.

DOOSAN has extensive experience in supplying equipment for various typesof power plants. DOOSAN has its own HRSG shop with a prodution capacityover 39 units per year. In particular, it has supplied over 150 units of HRSG forcombined cycle power plants around the globe.

DOOSAN has continually been engaged in research and development on theHeat Recovery Steam Generator ("HRSG"). The R&D center has beendeveloping once-through technology, which will be applied to higher efficiencycombined cycle power plant.

Meanwhile, DOOSAN has received 12 certificates of authorization from theASME, allowing the company to use the ASME Code stamp for components, In addition, the company was awarded ISO 9000 series and ISO 14000certifications for all its power plants components including the HRSG.

▲ESSAR C.C.P.P 515MW

HRSG 2007.10.31 12:46 PM ˘ ` 5 ‰¯¿ł– •¡˙¨‰”

Page 6: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

Vertical gas flow with forced circulation in top supported type as well as horizontal gas flow, natural circulationbottom/ top supported type is composed of shop maximum assembled modules, properly braced for shipment andlifting in the field.

Large drums ensure proper steam purity and reduce water surge during start-up.

Heat transfer is achieved through extended surface spiral fins welded to the tubes. Generating tubes are rolled inmodule headers.

Standard headers for the economizers and superheaters provide uniform parts and shorter lead time. The tubing is strength welded to these headers for increased reliability.

Multiple steam pressure available; single, double and triple pressure range. (high, intermediate, low pressure)

FEATURE

MAJOR COMPONENTS

Optional Equipment

Vertical Type

- Duct Burner For Supplemental Firing - Selective Catalystic Reduction System (SCR)- CO Catalyst - Exhaust Silencer- Bypass Dampers and Stack - Expansion Joints, Piping, Deaerators, etc.- Control System

Horizontal Type

12

3 4 5

6

8

9

16

151413

12

11

10

7

1

4

6

1817

1920

21

78 9

1112

1013 14

5

2

16

3

15

❶ ByPass Stack❷ Exhaust Stack❸ Sliencer for HP Steam Line❹ Sliencer for LP Steam Line❺ Sliencer for Blow Down Tank❻ Sliencer for LP Drum❼ Slincer for HP Drum❽ LP Drum❾ HP Drum❿ Seal Air Fan Unit

Inlet DuctBlow Down TankLP Circulation Pump (B)LP Circulation Pump (A)HP Circulation Pump (B)HP Circulation Pump (A)

❶ Stack❷ HP Drum❸ IP S/H & Drum❹ LP Drum❺ Deaerator❻ Reheat Sky Vent Silencer❼ HP STM Start-Up Silencer❽ Reheat Inlet S/V Silencer❾ HP Drum 2 Silencer❿ LP STM Silencer

LP Drum 1 SilencerIP Drum 1 SilencerIP STM SilencerIP Drum 2 Silencer LP Drum 2 SilencerDuctIP Drum 1 SilencerIP Sky Vent SilencerReheat Outlet S/V SilencerHP Drum 1 Silencer

(21) F/W Heater ReCIR. Pump

HP SystemIP SystemLP SystemS/V Exhaust LinePPA

HRSG 2007.10.31 12:46 PM ˘ ` 6 ‰¯¿ł– •¡˙¨‰”

Page 7: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG 2007.10.31 12:47 PM ˘ ` 7 ‰¯¿ł– •¡˙¨‰”

Page 8: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG 2007.10.31 12:48 PM ˘ ` 8 ‰¯¿ł– •¡˙¨‰”

Page 9: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG Experience 1) DOMESTIC

CLIENT PROJECT GT TYPE WORK PERIOD

KOREA ELECTRIC POWER CORP. (KOREA)

KOREA ELECTRIC POWER CORP. (KOREA)

KOREA ELECTRIC POWER CORP. (KOREA)

KOREA ELECTRIC POWER CORP. (KOREA)

KOREA ELECTRIC POWER CORP.(KOREA)

KOREA ELECTRIC POWER CORP.(KOREA)

KOREA ELECTRIC POWER CORP. (KOREA)

KOREA ELECTRIC POWER CORP. (KOREA)KOREA ELECTRIC POWER CORP. (KOREA)

HANWHA ENERGY CO., LTD.(KOREA)

HANWHA ENERGY CO., LTD.(KOREA)

KOREA ELECTRIC POWER CORP.(KOREA)

KOREA ELECTRIC POWER CORP.(KOREA)

KOREA ELECTRIC POWER CORP.(KOREA)

KOREA ELECTRIC POWER CORP.(KOREA)

HANWHA ENERGY CO., LTD.(KOREA)

HANWHA ENERGY CO., LTD.(KOREA)

POSCO(KOREA)

KOREA ELECTRICPOWER CORP.(KOREA)

LG / SIEMENS(KOREA)

KOREA ELECTRICPOWER CORP.(KOREA)

KUNSAN CC POWER PLANT

YUNGWOL CC POWER PLANT

SEOINCHONCC #1,2

POWER PLANT

PYONGTAEKPOWER PLANT

ILSAN CC POWER PLANT

PUCHON CC POWER PLANT

SEOINCHONCC #3,4

POWER PLANT

BUNDANG CC #2POWER PLANT

HANLIM CC POWER PLANT

HEC NO.1 REPOWERING

HEC NO.2 REPOWERING

ILSAN CCPOWER PLANT(EXTENSION)

ULSAN CC POWER PLANT

PORYONG CCPOWER PLANT

ULSAN NO.1 REPOWERING

HEC NO.3 CC POWER PLANT

HEC NO.4 CCPOWER PLANT

POSCO POHANG CC POWER PLANT

PUSAN CCPOWER PLANT

LG-IPP CCPOWER PLANT

INCHEON

GE MS7B

GE MS7B

GE PG7E

GE MS7EA

WH 501D5

WH 501D5

GE PG7FA

ABB GT11N2

GE MS6B

WH 501D5

WH 501D5

WH 501D5

WH 501F

ABB GT24

WH 501D5

WH 501D5

WH 501D5

ABB GT11N2

GE 7FA

SIEMENSV84.3

SIEMENSV84.3

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGEBOP PACKAGE

HRSG PACKAGEBOP PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGEBOP PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG, BOPPACKAGE

STEAM TURBINEPACKAGE

HRSG PACKAGE

HRSG PACKAGE

76. 11 - 78. 07

76. 11 - 78. 07

90. 05 - 92. 12

92. 07 - 95. 06

93. 05 - 95. 04

93. 05 - 95. 04

94. 10 - 97. 06

94. 10 - 96. 03

95. 11 - 97. 06

95. 12 - 97. 06

95. 12 - 97. 12

96. 01 - 97. 05

96. 01 - 97. 06

96. 04 - 00. 06

96. 11 - 98. 06

97. 11 - 99. 01

97. 11 - 99. 01

97. 10 - 01. 02

00. 09 - 02. 03

98 . 11 - 01. 06

03.05 – 04.08

94 X 4 UNIT

94 X 4 UNIT

425.7 X 8 UNITS(171.7, 200, 35.8,

18.2)

159 X 4 UNITS(128, 24, 7)

224.1 X 4 UNITS(169.3, 54.8)

224.1 X 3 UNITS(169.3, 54.8)

438.1 X 8 UNITS(174.4, 202.4, 36.8,

26.4)

164.5 X 3 UNITS(127.8, 36.7)

69.9 X 2 UNITS(61.9, 8)

312.5 X 3 UNITS(116.3, 140, 25.9,

30.3)

312.5 X 3 UNITS(116.3, 140, 25.9,

30.3)

224.1 X 2 UNITS(169.3, 54.8)

472.2 X 4 UNITS(216.3, 200, 27.9,

28.0)

436.5 X 8 UNITS(187.5,203.6,23.6,21.8)

204.2 X 2 UNITS(166.7, 37.5)

323.4 X 3 UNITS(123.9, 146.8, 27.4,

25.3)

323.4 X 3 UNITS(123.9, 146.8, 27.4,

25.3)

200.3 X 2 UNITS(160.6, 39.7)

458.9 X 8 UNITS(182,212.8,38.1,26.0)

455.2 X 2UNITS(178.9, 212.0,40.3,

24.8)

463.8 X 2UNIT(182.6,216.4,42.8,22)

63.5

63.5

10023

25.54

92239

928

928

12525

27.53

654

6110.8

90.230.632.03.5

90.230.632.03.5

928

12935.136.54.5

10625.728.53.5

60.28.0

108.031

32.45.8

108.031

32.45.8

73.94.6

131.526.629.04.2

133.029.431.53.8

13527294

427

427

542.3542.3287.6252.9

498256207

505SAT

505SAT.

558558325274

499153

507226

484484347138

484484347138

505SAT

540540347262

568568313SAT

433SAT

505505317233

505505317233

506275

567.7567.7324.3274.2

545.0545.0332.0235.4

568565334239

WORKINGP.@

SHO(kg/㎠㎠g)

CAPACITYTON/HR x UNITS

WORKINGT.@

SHO(℃℃ )

**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 1 ‰¯¿ł– •¡˙¨‰”

Page 10: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

DUBAI ELECTRICCORP. (U.A.E)

ESSAR POWER CORP.(INDIA)

KPCL (INDIA)

MYANMAR ELECTRICPOWER ENTERPRISE(MYANMAR)

FIRST ENERGY /SIEMENS (PHILLIPPINES)

ENRON / SIEMENS(BRAGIL)

CMS / SIEMENS(UAE)

SCOTTISH HYDRO-ELECTRIC / SIEMENS (SCOTLAND)

H.P. / PARSONSPOWERGROUP INC.(CROATIA)

ISAGEN / PARSON(COLOMBIA)

GREAT YAMOUTHLTD., / GE(ENGLAND)

AES /WESTINGHOUSE (USA)

EMPRESAS PUBLICAS DEMEDELLIN E.S.P /GE (COLUMBIA)

HSIN TAO POWERCORPORATION / GE(TAIWAN)

LAEM CHABANGPOWER / FORTUM(TAILAND)

ELECTRICITY OF VIETNAM (EVN)

I.P.D.C. / MAPNA(IRAN)

JABEL ALI POWERPLANT

ESSAR 500MW POWER PLANT

KPCL CCPOWER PLANT

MYANMA CC POWER PLANT

SANTA RITA1000MW CCPP

CUIABA CCPOWER PLANT

AL-TAWEELHA A2

PETERHEAD CCPOWER PLANT

TETO ZAGREBCC POWER PLANT

TERMOCENTRO

GREAT YARMOUTH

IRONWOOD CCPOWER PLANT

EPM LA SIERRACC POWER PLANT

EVERGREEN -HSIN TAO

POWER PLANT

LAEM CHABANGPOWER PLANT

BARIA Ⅱ POWERPLANT

FARS

AEG PG9E

GE PG9E

ALSTHOM 9E

GE 6B

SIEMENSV84.3A

SIEMENS 84.3

SIEMENSV94.3

SIEMENSV94.3A

GE 6FA

WH 501D

GE 9FA

WH 501G

GE 7FA

GE 7FA

GE 6B

GE 6B

GE 9E

TURNKEYCONTRACT

(supplementary firing)

HRSG, BOP PACKAGESTEAM TURBINE

PACKAGE

HRSG PACKAGE

HRSG MODULES

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE, GAS TURBINE

HRSG PACKAGE

HRSG PACKAGEBOP PACKAGE

86. 02 - 88. 10

94. 04 - 95. 11

97. 10 - 00. 12

95. 06 - 96. 03

97. 12 - 2000. 09

98. 02 - 2000. 05

98. 11 – 2001. 06

98. 06 - 00. 02

98. 12 - 00. 10

99. 01 - 00. 01

99. 01 - 01. 01

99. 02 – 99. 12

99. 03 – 00. 11

99. 06 –00.04

99. 10 – 01. 06

99. 11 – 00.11

00.01 – 01.01

250 X 3 UNITS(250)

210.4 X 3 UNITS(176.2, 34.2)

227.4 X 2 UNITS(185.9,26.2,15.3)

48 X 6 UNITS(48.0)

479.4 X 4 UNITS(198.2, 222.9, 39.9,

18.4)

433.3 X 2 UNITS(179.7, 201.5, 29.0,

23.1)

600 X 3 UNITS(600)

664.5 X 3 UNITS(287.0, 311.5, 36.0,

30.0)

122.4 X 2 UNITS(108.9, 13.5)

177.8 X 2 UNITS(145.2, 32.6)

684 X 1 UNIT(287.0, 317.6, 39.0,

40.4)

615.3 X 2 UNITS(238, 285.8, 57.3,

34.2)

461.3 X 2 UNIT(184.0, 211.6, 33.4,

32.3)

387.2 X 3UNITS(165. 180.8, 22.4,

19.0)

75.1 X 2UNITS

(64.2, 10.9)

74.5 X 3UNITS(62.3, 12.2)

179.9 X 6UNITS(144.7, 35.2)

11

79.55.3

90.219.43.9

52.0

111.329

31.53.9

110.729.031.53.9

74

137.039405.3

96.110.8

92.311.9

100.721.723.73.1

12534.036.43.4

128.223.728.14.3

121.121.022.64.8

73.912.6

73.46.4

89.76.4

SAT

525210.4

513291

181.8

510

540540325235

550550320

234.7

522

540540325240

540285

513295

567567312256

568568272268

567566322317

567.7567.7312.0309.0

511.4286

512213

512229

CAPACITYTON/HR x UNITS

WORKINGP.@

SHO(kg/㎠㎠g)

WORKINGT.@

SHO(℃℃ )

**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 2 ‰¯¿ł– •¡˙¨‰”

Page 11: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

LA COMPANIA DEELECTRICIDAD / SIEMENS

CEYLONELECTRICITYBOARD (CEB) / TPK

SARGENT & LUNDY AND ZACHARY

TAMPA ELECTRICCOMPANY (USA)

TAMPA ELECTRICCOMPANY (USA)

BECHTEL(MEXICO)

GE(MALAYSIA)

GE(SPAIN)

SARGENT & LUNDY(USA)

SIEMENS(MALAYSIA)

GE(MEXICO)

UAE OFFSET GROUP(UAE)

PARSONS(USA)

GE(BRAZIL)

SANPEDRO

KELANITISSA CCPP

CORPUS CHRISTI

TECO BAYSIDEPOWER PLANT

TECO BAYSIDEPOWER PLANT

(Extension)

LAROSITA

SKS

CASTEJON

SANDHILL

PANGLIMA

ALTAMIRA

FUJAIRAH

CHEHALIS

THERMOPERNANBUCO

SIEMENS64.3A

GE 9E

GE 7FA

GE 7FA

GE 7FA

WH 501FD

GE 9FA

GE 9FA

GE 7FA

V94.3A

GE 7FA

GE 9E

GE 7FA

GE 7FA

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

00.02 - 01.09

00.06 – 01.03

00.06 – 01.07

00.06 – 04.05

00.10-04.05

00.11 – 01.07

00.12 – 01.12

01.01 – 01.12

01.03 – 02.06

01.03 – 02.12

01.03 – 02.06

01.06– 03.06

01.07 – 02.04

01.07 – 02.11

130.3 X 3UNITS(117.0, 13.3)

221.7 X 1UNIT(185.8, 35.9)

461.3 X 2UNITS(184, 211.6, 33.4,

32.3)

477.7 X 3UNITS(207, 226, 23.8, 18.9)

477.7 X 3UNITS(207, 226, 23.8, 18.9)

477.7 X 3UNITS(207, 226, 23.8, 18.9)

479.8 X 3UNITS(185,224,37,33.8)

656 X 1UNITS(282, 303, 33, 38)

648 X 1UNIT(278,297,36,37)

425.6 X 1UNIT(188.3,184.2,33.9,

19.2)

658.9 X 2UNITS(267,307.2, 48.7,36)

514 X 4UNIT(222, 243, 22, 27)

313.6 X 4UNITS(313.6)

466.1 X 2UNITS(188.2,220.8, 34.3,

22.8)

551 X 2UNIT(246,267, 17, 21)

82.24.0

74.36.3

128.223.728.14.3

10737.739.6

9

10737.739.6

9

10737.739.6

9

13129.4314.5

9923244.1

9523244.1

72.111.813.81.1

135.931.532.85.2

11427.529.54.9

65

112.523.825.74.6

132.231364.9

542200

511.4214.8

567566322317

543.3543.3312.8235.5

543.3543.3312.8235.5

543.3543.3312.8235.5

568568319317

567567298295

567567298295

568568287240

568565335240

567567309307

532.4

566565318316

567567322320

CAPACITYTON/HR x UNITS

WORKINGP.@

SHO(kg/㎠㎠g)

WORKINGT.@

SHO(℃℃ )

**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 3 ‰¯¿ł– •¡˙¨‰”

Page 12: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

HYUNDAI(BRAZIL)

SIEMENS(VIETNAM)

ENEL POWER(QATAR)

TOSHIBA(TAIWAN)

SIEMENS(ISRAEL)

SIEMENS(SPAIN)

GE(SPAIN)

SIEMENS(ISRAEL)

SIEMENS(SPAIN)

SIEMENS(SPAIN)

GE(SPAIN)

GE(SPAIN)

CEGCO(JORDAN)

THERMONORTE

Phu My III CCPP

RAS LAFFAN

CHIAHUI

GEZER / HAIFA

GIBRALTAR

AMOREVIETA

HAIFA 3

PALOS

PALOS (Extension)

SABON

ACECA

REHAB

GE 7EA

V94.3A

GE 9E

GE 7FA

V94.3A

V94.3A

GE 9FA

V94.3A

V94.3A

V94.3A

GE9FA

GE9FA

GE9E

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE(supplementary firing)

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

01.08 – 02.06

01.10 – 02.09

01.10 – 03.02

01.11 – 02.10

02.01 –

02.03 –

02.05 –

02. 11–

02. 02–

03. 01– 04.12

03. 01– 04.02

03. 01– 04.02

03.06-04.06

122.8 X 3UNITS(122.8)

660 X 2UNITS(279,311,26,44)

384.1 X 4UNITS(384.1)

442 X 3UNITS(184,212,32,14)

666 X 3UNITS(265,311,51,39)

634 X 2UNITS(288,264,46,36)

664.4 X 2UNITS(266.6,314.9,49.7,33.2)

665 X 1UNITS(265,311,51,38)

683.8 X 2UNITS(278.3,320.9,48.2,36.4)

683.8 X 1UNITS(278.3,320.9,48.2,

36.4)

675.5 X 1UNIT(282.7,312,39.6,41.2)

675.5 X 1UNITS(282.7,312,39.6,41.2)

190.6 X 2UNITS(160, 30.6)

91.5

116.129.630.94.7

96.3

132.531.634.26.1

131.430.131.43.65

126.225.326.66.6

12424.827.35.3

131.430.131.43.65

12130.632.73.8

12130.632.73.8

99.223.025.05.1

99.223.025.05.1

10415.5

502

551.2550.3322.8237.3

567.0

538.3537.5325.0295.7

567.4550.2331.5236.8

540550325235

566.9566.3314.1309.6

567.4550.2331.5236.8

538.3550.0328.2239.7

538.3550.0328.2239.7

566.7566.1300.6297.8

566.7566.1300.6297.8

518260

CAPACITYTON/HR x UNITS

WORKINGP.@

SHO(kg/㎠㎠g)

WORKINGT.@

SHO(℃℃ )

**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 4 ‰¯¿ł– •¡˙¨‰”

Page 13: Heat Recovery Steam Generator - Daumcfs9.blog.daum.net/upload_control/download.blog?fhandle=...HRSG Experience 1) DOMESTIC CLIENT PROJECT GT TYPE WORK PERIOD KOREA ELECTRIC POWER CORP.

HRSG Experience 2) OVERSEAS

CLIENT PROJECT GT TYPE WORK PERIOD

SIEMENS(SAUDI)

TOSHIBA(UAE)

TOSHIBA(UAE)

MAPNA(IRAN)

MARUBENI(VIETNAM)

DAEWOO E&C(LIBYA)

SGCC(OMAN)

HYUNDAI E&C(LIBYA)

AL JUBAIL

JEBEL ALI

UMM AL NAR

MAPNA

PHYMY 2.1EXT. ADD-ON

BENGHAZI

SOHAR

ZAIWA

WH501DA

GE9FA

GE9FA

WH701D

GE9E

V94.2

V94.2

GT13E

V94.2

GT13E

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

HRSG PACKAGE

03.06-05.01

03.07-04.05

03.07-06.06

03.07-04.05

03.07-04.10

03.07-07.10

03.12 – 05.01

04.03 – 05.02

04.09 – 05.10

04.10 – 05.10

255 X 2UNITS(255)

720 X 3UNITS(720)

580 X 5UNITS(580)

273.6 X 2UNITS(241.2, 32.4)

273.6 X 2UNITS(241.2, 32.4)

273.6 X 40UNITS(241.2, 32.4)

274.2 X 2UNITS(211.2,34.3,28.7)

269 X 4UNITS(220,49)

453 X 3UNITS(395,58)

267 X 4UNITS(218,49)

51

95

89.4

90.68.4

90.68.4

90.68.4

101.924.33.8

83.65.1

88.73.6

92.69.6

402

562

569

520233

520233

520233

532533150

512262

543246

513276

CAPACITYTON/HR x UNITS

WORKINGP.@

SHO(kg/㎠㎠g)

WORKINGT.@

SHO(℃℃ )

**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 5 ‰¯¿ł– •¡˙¨‰”