Heat RecoverySteam Generator
Heat RecoverySteam Generator
HRSG 2007.10.31 12:46 PM ˘ ` 4 ‰¯¿ł– •¡˙¨‰”
HRSG 2007.10.31 12:43 PM ˘ ` 1 ‰¯¿ł– •¡˙¨‰”
Design
2 Months
Basic Design- Performance- Component
Analysis
General Arrangement
Pressure Part Arrangement
Component
Detail Design
MaterialProcurement
2.5 Months
Fin Tube
Header
Link
Drum
Casing
Duct
Insulation
AuxiliaryEquipment
Shipping Erection
Bottom
Shop Fabrication
Harp Ass’y 4.0 MonthsModule Ass’y 4.5 Months
Hydro Test Final Inspection
Top
Bending & Welding
StorageMarking & Cutting Finning
The Core of DOOSAN module system ("COTHMOS") is an integrated design program developed by the company for basic engineering and computer designed component details.
COTHMOS integrates the HRSG engineering programs of thermal performance design, component design,flexibility analysis, noise evaluation, dynamic behavior and so on. It also automatically provides two dimensionalAuto-Cad detail drawings and the bill of materials based on three dimensional pressure part arrangementdrawings as well as three dimensional general arrangement drawings.
Core of DOOSAN HRSG Module SystemCOTHMOS
▶▶Design Flow
BASIC Design
Analysis
FINTUBE
·Heat Transfer ·Stress/Flexibility
·Structure ·Noise
·Fluent ·Dynamic Behavior
HEADER
LINK
DRUM
CASING
DUCT
INSULATION
P & ID
ComputerizedDrawings
Drum. exe Header. exe
Stack. exeDuct. exe
Insul. exe
Formod. exeHrsgsim. exeNatbm. exeCirc. exe
2D AUTODWG & BOMfor Pressure
Parts
Performance
Components
PPA3D Modeling
DESIGN
PRODUCTION LEAD TIME
Harp Ass’y Module Ass’y
GA 3D Modeling
HRSG 2007.10.31 12:45 PM ˘ ` 2 ‰¯¿ł– •¡˙¨‰”
DH0511/H
Doosan Hydro Technology, Inc.
9001 Brittany Way Tampa, Florida 33619, USATel. 1-813-549-0182, Fax. 1-813-549-0183
Doosan Heavy Industries & Construction Co., Ltd.www.doosanheavy.com
Seoul office1303-22, Seocho-Dong, Seocho-Gu. Seoul 137-920, Korea(C.P.O Box 1826, Seoul Korea)Tel. 82-2-2-513-6114, Fax. 82-2-513-6200Head office and Changwon plant 555, Guigok-dong, Changwon, Gyeongsangnam-do, 641-792, Korea Tel. 82-55-278-6114, 7114 Fax. 82-55-264-5551,5552
GLOBAL NETWORK
Doosan Heavy Industries America Corp.400 Kelby Street, Parker Plaza, 10th fl. Fort Lee, NJ 07024, USAPhone : 1 201 944 4554 Fax : 1 201 944 5022/ 5053Doosan Heavy Industries Japan Corp.Room2410,Mita Kokusai BLD.1-4-28,Mita Minato-ku, Tokyo, Japan 108-0073Phone : 81 3 3452 5451~3 Fax : 81 3 3452 5624Windsor OfficeWestinghouse Electric, 20 International Drive, Windsor, CT 06095, USA (Windsor, Schenectady)Phone : 1 860 731 6479 Fax : 1 860 731 6478Schenectady OfficeRoom 33-202A, General Electric Bldg, One River Road, Schenectady, NY 12345,USA (Windsor, Schenectady)Phone : 1 518 385 5218 Fax : 1 518 385 4984Beijing Office19F, Tower B Gateway Plaza, No. 18 Xiaguangli,North Road, East Third Ring, Chaoyang District, Beijing 100027Phone : 86 10 8454 7131~33 Fax : 86 10 8484 7139Shanghai OfficeRoom 2802. City Center of Shanghai Bldg.,100 Zunyi Rd, Changning District Shanghai 200051, ChinaPhone : 86 21 6237 2485/2486 Fax : 86 21 6237 2487Taipei OfficeRoom 704, No.51, Keelung Road Section 2,Taipei 110, TaiwanPhone : 886 2 2739 2255(ARS) Fax : 886 2 2739 2266Hanoi Office#1101, Daeha Business Center, 360 Kim Ma,Ba Dinh District, Hanoi, VietnamPhone : 84 4 273 0545~8 Fax : 84 4 273 0550Bangkok Office10th Floor, M-thai Tower, Wireless Road, Bangkok, ThailandPhone : 66 2 654 0690~2 Fax : 66 2 654 0693New Delhi Office2A, 2nd Floor, Lotus Towers, Community Centre, New Friends Colony, New Delhi-110 065, IndiaPhone : 91 11 4132 8031 Fax : 91 11 4132 8039Mumbai Office1109&1110, 11th Floor, Maker Chambers-V,Nariman Point, Mumbai 400021, IndiaPhone : 91 22 2202 6504 Fax : 91 22 2202 6557Dubai OfficeOffice No. 308, Al Serkal Building, Airport Road PO Box 11859, Dubai, UAE (Dubai, Abu Dhabi)Phone : 971 4 294 4699 Fax : 971 4 294 9930
Abu Dhabi OfficeAl Ghaith Tower 5th Floor, Room 508, Hamdan Street, P.O. Box 27767, Abu Dhabi, UAE (Dubai, Abu Dhabi)Phone : 971 2 627 6273 Fax : 971 2 627 6274
Riyadh OfficeP.O.Box 9656, Riyadh 11423, Saudi ArabiaPhone : 966 1 419 1920/1696 Fax : 966 1 419 1995
Kuwait OfficeVilla 15, Street 24, Block 4, Sabah Al-Salem Area, KuwaitPhone : 965 551 8452/8436 Fax : 965 551 8453
Frankfurt OfficeFrankfurt Office 9th Floor, Arabella Center, Lyoner Strasse 44-48, 60528 Frankfurtam Main, GermanyPhone : 49 69 69 5004 0 Fax : 49 69 69 5004 10
Tripoli OfficePhone : 971 50 459 2759 / 218 91 380 8021
MAJOR SUBSIDIARIESDoosan Babcock Energy Limited11 The Boulevard, Crawley West Sussex, United Kingdom RH10 1UXPhone : 44 1293 584 990 Fax :44 1293 584 918
Doosan Heavy Industries Vietnam Co., Ltd.[Doosan Vina]No.1 An Duong Vuong Street, Quangngai City, Quangngai Province, VietnamPhone : 84 55 713 001~7 Fax : 84 55 713 008
Doosan IMGB104 Berceni Road, Bucharest 4, RomaniaPhone : 40 21 301 2602 Fax : 40 21 301 2502
Doosan Engineering & Services India Pvt. Ltd.3rd Floor DLF Building No. 8, DLF Cyber City Phase -•±, Gurgaon Haryana (122-002), India Phone : 91 124 439 8200 Fax : 91 124 414 7006
Doosan Hydro Technology, Inc.9001 Brittany Way Tampa, Florida 33619Phone : 1 813 549 0182 Fax : 1 813 471 0713
Doosan HF Controls Corp.16650 Westgrove Drive, Suite 500 Addison, Texas 75001, USAPhone :1 972 367 4657 Fax : 1 972 367 4699
Ceylon Heavy Industries & Construction Co., Ltd. [CHICO]Oruwala Athurugiriya Sri LankaPhone : 94 114 440031 2 Fax : 94 114 440030
Hanjung Power Ltd.P.O.Box 2803, Boroko, NCD Papua New GuineaPhone : 675 320 0529 Fax : 675 321 2984
Han-Viet Heavy Industry & Construction Corp. [HANVICO]933 Ton Duc Thang Street, Hong Bang District, HaiPhong, VietnamPhone : 84 31 371 2710 Fax : 84 31 712 714/715
HRSG 2007.10.31 12:45 PM ˘ ` 3 ‰¯¿ł– •¡˙¨‰”
INTRODUCTION
▲SEOINCHON C.C.P.P. #1, 2, 3, 4
Established in 1962, Doosan Heavy Industries & Construction Co., Ltd. (DOOSAN) has played major roles in the development of Korea'spower plant business with the cutting edge technology and high-caliberproduction facilities.
DOOSAN has extensive experience in supplying equipment for various typesof power plants. DOOSAN has its own HRSG shop with a prodution capacityover 39 units per year. In particular, it has supplied over 150 units of HRSG forcombined cycle power plants around the globe.
DOOSAN has continually been engaged in research and development on theHeat Recovery Steam Generator ("HRSG"). The R&D center has beendeveloping once-through technology, which will be applied to higher efficiencycombined cycle power plant.
Meanwhile, DOOSAN has received 12 certificates of authorization from theASME, allowing the company to use the ASME Code stamp for components, In addition, the company was awarded ISO 9000 series and ISO 14000certifications for all its power plants components including the HRSG.
▲ESSAR C.C.P.P 515MW
HRSG 2007.10.31 12:46 PM ˘ ` 5 ‰¯¿ł– •¡˙¨‰”
Vertical gas flow with forced circulation in top supported type as well as horizontal gas flow, natural circulationbottom/ top supported type is composed of shop maximum assembled modules, properly braced for shipment andlifting in the field.
Large drums ensure proper steam purity and reduce water surge during start-up.
Heat transfer is achieved through extended surface spiral fins welded to the tubes. Generating tubes are rolled inmodule headers.
Standard headers for the economizers and superheaters provide uniform parts and shorter lead time. The tubing is strength welded to these headers for increased reliability.
Multiple steam pressure available; single, double and triple pressure range. (high, intermediate, low pressure)
FEATURE
MAJOR COMPONENTS
Optional Equipment
Vertical Type
- Duct Burner For Supplemental Firing - Selective Catalystic Reduction System (SCR)- CO Catalyst - Exhaust Silencer- Bypass Dampers and Stack - Expansion Joints, Piping, Deaerators, etc.- Control System
Horizontal Type
12
3 4 5
6
8
9
16
151413
12
11
10
7
1
4
6
1817
1920
21
78 9
1112
1013 14
5
2
16
3
15
❶ ByPass Stack❷ Exhaust Stack❸ Sliencer for HP Steam Line❹ Sliencer for LP Steam Line❺ Sliencer for Blow Down Tank❻ Sliencer for LP Drum❼ Slincer for HP Drum❽ LP Drum❾ HP Drum❿ Seal Air Fan Unit
Inlet DuctBlow Down TankLP Circulation Pump (B)LP Circulation Pump (A)HP Circulation Pump (B)HP Circulation Pump (A)
❶ Stack❷ HP Drum❸ IP S/H & Drum❹ LP Drum❺ Deaerator❻ Reheat Sky Vent Silencer❼ HP STM Start-Up Silencer❽ Reheat Inlet S/V Silencer❾ HP Drum 2 Silencer❿ LP STM Silencer
LP Drum 1 SilencerIP Drum 1 SilencerIP STM SilencerIP Drum 2 Silencer LP Drum 2 SilencerDuctIP Drum 1 SilencerIP Sky Vent SilencerReheat Outlet S/V SilencerHP Drum 1 Silencer
(21) F/W Heater ReCIR. Pump
HP SystemIP SystemLP SystemS/V Exhaust LinePPA
HRSG 2007.10.31 12:46 PM ˘ ` 6 ‰¯¿ł– •¡˙¨‰”
HRSG 2007.10.31 12:47 PM ˘ ` 7 ‰¯¿ł– •¡˙¨‰”
HRSG 2007.10.31 12:48 PM ˘ ` 8 ‰¯¿ł– •¡˙¨‰”
HRSG Experience 1) DOMESTIC
CLIENT PROJECT GT TYPE WORK PERIOD
KOREA ELECTRIC POWER CORP. (KOREA)
KOREA ELECTRIC POWER CORP. (KOREA)
KOREA ELECTRIC POWER CORP. (KOREA)
KOREA ELECTRIC POWER CORP. (KOREA)
KOREA ELECTRIC POWER CORP.(KOREA)
KOREA ELECTRIC POWER CORP.(KOREA)
KOREA ELECTRIC POWER CORP. (KOREA)
KOREA ELECTRIC POWER CORP. (KOREA)KOREA ELECTRIC POWER CORP. (KOREA)
HANWHA ENERGY CO., LTD.(KOREA)
HANWHA ENERGY CO., LTD.(KOREA)
KOREA ELECTRIC POWER CORP.(KOREA)
KOREA ELECTRIC POWER CORP.(KOREA)
KOREA ELECTRIC POWER CORP.(KOREA)
KOREA ELECTRIC POWER CORP.(KOREA)
HANWHA ENERGY CO., LTD.(KOREA)
HANWHA ENERGY CO., LTD.(KOREA)
POSCO(KOREA)
KOREA ELECTRICPOWER CORP.(KOREA)
LG / SIEMENS(KOREA)
KOREA ELECTRICPOWER CORP.(KOREA)
KUNSAN CC POWER PLANT
YUNGWOL CC POWER PLANT
SEOINCHONCC #1,2
POWER PLANT
PYONGTAEKPOWER PLANT
ILSAN CC POWER PLANT
PUCHON CC POWER PLANT
SEOINCHONCC #3,4
POWER PLANT
BUNDANG CC #2POWER PLANT
HANLIM CC POWER PLANT
HEC NO.1 REPOWERING
HEC NO.2 REPOWERING
ILSAN CCPOWER PLANT(EXTENSION)
ULSAN CC POWER PLANT
PORYONG CCPOWER PLANT
ULSAN NO.1 REPOWERING
HEC NO.3 CC POWER PLANT
HEC NO.4 CCPOWER PLANT
POSCO POHANG CC POWER PLANT
PUSAN CCPOWER PLANT
LG-IPP CCPOWER PLANT
INCHEON
GE MS7B
GE MS7B
GE PG7E
GE MS7EA
WH 501D5
WH 501D5
GE PG7FA
ABB GT11N2
GE MS6B
WH 501D5
WH 501D5
WH 501D5
WH 501F
ABB GT24
WH 501D5
WH 501D5
WH 501D5
ABB GT11N2
GE 7FA
SIEMENSV84.3
SIEMENSV84.3
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGEBOP PACKAGE
HRSG PACKAGEBOP PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGEBOP PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG, BOPPACKAGE
STEAM TURBINEPACKAGE
HRSG PACKAGE
HRSG PACKAGE
76. 11 - 78. 07
76. 11 - 78. 07
90. 05 - 92. 12
92. 07 - 95. 06
93. 05 - 95. 04
93. 05 - 95. 04
94. 10 - 97. 06
94. 10 - 96. 03
95. 11 - 97. 06
95. 12 - 97. 06
95. 12 - 97. 12
96. 01 - 97. 05
96. 01 - 97. 06
96. 04 - 00. 06
96. 11 - 98. 06
97. 11 - 99. 01
97. 11 - 99. 01
97. 10 - 01. 02
00. 09 - 02. 03
98 . 11 - 01. 06
03.05 – 04.08
94 X 4 UNIT
94 X 4 UNIT
425.7 X 8 UNITS(171.7, 200, 35.8,
18.2)
159 X 4 UNITS(128, 24, 7)
224.1 X 4 UNITS(169.3, 54.8)
224.1 X 3 UNITS(169.3, 54.8)
438.1 X 8 UNITS(174.4, 202.4, 36.8,
26.4)
164.5 X 3 UNITS(127.8, 36.7)
69.9 X 2 UNITS(61.9, 8)
312.5 X 3 UNITS(116.3, 140, 25.9,
30.3)
312.5 X 3 UNITS(116.3, 140, 25.9,
30.3)
224.1 X 2 UNITS(169.3, 54.8)
472.2 X 4 UNITS(216.3, 200, 27.9,
28.0)
436.5 X 8 UNITS(187.5,203.6,23.6,21.8)
204.2 X 2 UNITS(166.7, 37.5)
323.4 X 3 UNITS(123.9, 146.8, 27.4,
25.3)
323.4 X 3 UNITS(123.9, 146.8, 27.4,
25.3)
200.3 X 2 UNITS(160.6, 39.7)
458.9 X 8 UNITS(182,212.8,38.1,26.0)
455.2 X 2UNITS(178.9, 212.0,40.3,
24.8)
463.8 X 2UNIT(182.6,216.4,42.8,22)
63.5
63.5
10023
25.54
92239
928
928
12525
27.53
654
6110.8
90.230.632.03.5
90.230.632.03.5
928
12935.136.54.5
10625.728.53.5
60.28.0
108.031
32.45.8
108.031
32.45.8
73.94.6
131.526.629.04.2
133.029.431.53.8
13527294
427
427
542.3542.3287.6252.9
498256207
505SAT
505SAT.
558558325274
499153
507226
484484347138
484484347138
505SAT
540540347262
568568313SAT
433SAT
505505317233
505505317233
506275
567.7567.7324.3274.2
545.0545.0332.0235.4
568565334239
WORKINGP.@
SHO(kg/㎠㎠g)
CAPACITYTON/HR x UNITS
WORKINGT.@
SHO(℃℃ )
**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 1 ‰¯¿ł– •¡˙¨‰”
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
DUBAI ELECTRICCORP. (U.A.E)
ESSAR POWER CORP.(INDIA)
KPCL (INDIA)
MYANMAR ELECTRICPOWER ENTERPRISE(MYANMAR)
FIRST ENERGY /SIEMENS (PHILLIPPINES)
ENRON / SIEMENS(BRAGIL)
CMS / SIEMENS(UAE)
SCOTTISH HYDRO-ELECTRIC / SIEMENS (SCOTLAND)
H.P. / PARSONSPOWERGROUP INC.(CROATIA)
ISAGEN / PARSON(COLOMBIA)
GREAT YAMOUTHLTD., / GE(ENGLAND)
AES /WESTINGHOUSE (USA)
EMPRESAS PUBLICAS DEMEDELLIN E.S.P /GE (COLUMBIA)
HSIN TAO POWERCORPORATION / GE(TAIWAN)
LAEM CHABANGPOWER / FORTUM(TAILAND)
ELECTRICITY OF VIETNAM (EVN)
I.P.D.C. / MAPNA(IRAN)
JABEL ALI POWERPLANT
ESSAR 500MW POWER PLANT
KPCL CCPOWER PLANT
MYANMA CC POWER PLANT
SANTA RITA1000MW CCPP
CUIABA CCPOWER PLANT
AL-TAWEELHA A2
PETERHEAD CCPOWER PLANT
TETO ZAGREBCC POWER PLANT
TERMOCENTRO
GREAT YARMOUTH
IRONWOOD CCPOWER PLANT
EPM LA SIERRACC POWER PLANT
EVERGREEN -HSIN TAO
POWER PLANT
LAEM CHABANGPOWER PLANT
BARIA Ⅱ POWERPLANT
FARS
AEG PG9E
GE PG9E
ALSTHOM 9E
GE 6B
SIEMENSV84.3A
SIEMENS 84.3
SIEMENSV94.3
SIEMENSV94.3A
GE 6FA
WH 501D
GE 9FA
WH 501G
GE 7FA
GE 7FA
GE 6B
GE 6B
GE 9E
TURNKEYCONTRACT
(supplementary firing)
HRSG, BOP PACKAGESTEAM TURBINE
PACKAGE
HRSG PACKAGE
HRSG MODULES
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE, GAS TURBINE
HRSG PACKAGE
HRSG PACKAGEBOP PACKAGE
86. 02 - 88. 10
94. 04 - 95. 11
97. 10 - 00. 12
95. 06 - 96. 03
97. 12 - 2000. 09
98. 02 - 2000. 05
98. 11 – 2001. 06
98. 06 - 00. 02
98. 12 - 00. 10
99. 01 - 00. 01
99. 01 - 01. 01
99. 02 – 99. 12
99. 03 – 00. 11
99. 06 –00.04
99. 10 – 01. 06
99. 11 – 00.11
00.01 – 01.01
250 X 3 UNITS(250)
210.4 X 3 UNITS(176.2, 34.2)
227.4 X 2 UNITS(185.9,26.2,15.3)
48 X 6 UNITS(48.0)
479.4 X 4 UNITS(198.2, 222.9, 39.9,
18.4)
433.3 X 2 UNITS(179.7, 201.5, 29.0,
23.1)
600 X 3 UNITS(600)
664.5 X 3 UNITS(287.0, 311.5, 36.0,
30.0)
122.4 X 2 UNITS(108.9, 13.5)
177.8 X 2 UNITS(145.2, 32.6)
684 X 1 UNIT(287.0, 317.6, 39.0,
40.4)
615.3 X 2 UNITS(238, 285.8, 57.3,
34.2)
461.3 X 2 UNIT(184.0, 211.6, 33.4,
32.3)
387.2 X 3UNITS(165. 180.8, 22.4,
19.0)
75.1 X 2UNITS
(64.2, 10.9)
74.5 X 3UNITS(62.3, 12.2)
179.9 X 6UNITS(144.7, 35.2)
11
79.55.3
90.219.43.9
52.0
111.329
31.53.9
110.729.031.53.9
74
137.039405.3
96.110.8
92.311.9
100.721.723.73.1
12534.036.43.4
128.223.728.14.3
121.121.022.64.8
73.912.6
73.46.4
89.76.4
SAT
525210.4
513291
181.8
510
540540325235
550550320
234.7
522
540540325240
540285
513295
567567312256
568568272268
567566322317
567.7567.7312.0309.0
511.4286
512213
512229
CAPACITYTON/HR x UNITS
WORKINGP.@
SHO(kg/㎠㎠g)
WORKINGT.@
SHO(℃℃ )
**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 2 ‰¯¿ł– •¡˙¨‰”
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
LA COMPANIA DEELECTRICIDAD / SIEMENS
CEYLONELECTRICITYBOARD (CEB) / TPK
SARGENT & LUNDY AND ZACHARY
TAMPA ELECTRICCOMPANY (USA)
TAMPA ELECTRICCOMPANY (USA)
BECHTEL(MEXICO)
GE(MALAYSIA)
GE(SPAIN)
SARGENT & LUNDY(USA)
SIEMENS(MALAYSIA)
GE(MEXICO)
UAE OFFSET GROUP(UAE)
PARSONS(USA)
GE(BRAZIL)
SANPEDRO
KELANITISSA CCPP
CORPUS CHRISTI
TECO BAYSIDEPOWER PLANT
TECO BAYSIDEPOWER PLANT
(Extension)
LAROSITA
SKS
CASTEJON
SANDHILL
PANGLIMA
ALTAMIRA
FUJAIRAH
CHEHALIS
THERMOPERNANBUCO
SIEMENS64.3A
GE 9E
GE 7FA
GE 7FA
GE 7FA
WH 501FD
GE 9FA
GE 9FA
GE 7FA
V94.3A
GE 7FA
GE 9E
GE 7FA
GE 7FA
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
00.02 - 01.09
00.06 – 01.03
00.06 – 01.07
00.06 – 04.05
00.10-04.05
00.11 – 01.07
00.12 – 01.12
01.01 – 01.12
01.03 – 02.06
01.03 – 02.12
01.03 – 02.06
01.06– 03.06
01.07 – 02.04
01.07 – 02.11
130.3 X 3UNITS(117.0, 13.3)
221.7 X 1UNIT(185.8, 35.9)
461.3 X 2UNITS(184, 211.6, 33.4,
32.3)
477.7 X 3UNITS(207, 226, 23.8, 18.9)
477.7 X 3UNITS(207, 226, 23.8, 18.9)
477.7 X 3UNITS(207, 226, 23.8, 18.9)
479.8 X 3UNITS(185,224,37,33.8)
656 X 1UNITS(282, 303, 33, 38)
648 X 1UNIT(278,297,36,37)
425.6 X 1UNIT(188.3,184.2,33.9,
19.2)
658.9 X 2UNITS(267,307.2, 48.7,36)
514 X 4UNIT(222, 243, 22, 27)
313.6 X 4UNITS(313.6)
466.1 X 2UNITS(188.2,220.8, 34.3,
22.8)
551 X 2UNIT(246,267, 17, 21)
82.24.0
74.36.3
128.223.728.14.3
10737.739.6
9
10737.739.6
9
10737.739.6
9
13129.4314.5
9923244.1
9523244.1
72.111.813.81.1
135.931.532.85.2
11427.529.54.9
65
112.523.825.74.6
132.231364.9
542200
511.4214.8
567566322317
543.3543.3312.8235.5
543.3543.3312.8235.5
543.3543.3312.8235.5
568568319317
567567298295
567567298295
568568287240
568565335240
567567309307
532.4
566565318316
567567322320
CAPACITYTON/HR x UNITS
WORKINGP.@
SHO(kg/㎠㎠g)
WORKINGT.@
SHO(℃℃ )
**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 3 ‰¯¿ł– •¡˙¨‰”
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
HYUNDAI(BRAZIL)
SIEMENS(VIETNAM)
ENEL POWER(QATAR)
TOSHIBA(TAIWAN)
SIEMENS(ISRAEL)
SIEMENS(SPAIN)
GE(SPAIN)
SIEMENS(ISRAEL)
SIEMENS(SPAIN)
SIEMENS(SPAIN)
GE(SPAIN)
GE(SPAIN)
CEGCO(JORDAN)
THERMONORTE
Phu My III CCPP
RAS LAFFAN
CHIAHUI
GEZER / HAIFA
GIBRALTAR
AMOREVIETA
HAIFA 3
PALOS
PALOS (Extension)
SABON
ACECA
REHAB
GE 7EA
V94.3A
GE 9E
GE 7FA
V94.3A
V94.3A
GE 9FA
V94.3A
V94.3A
V94.3A
GE9FA
GE9FA
GE9E
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE(supplementary firing)
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
01.08 – 02.06
01.10 – 02.09
01.10 – 03.02
01.11 – 02.10
02.01 –
02.03 –
02.05 –
02. 11–
02. 02–
03. 01– 04.12
03. 01– 04.02
03. 01– 04.02
03.06-04.06
122.8 X 3UNITS(122.8)
660 X 2UNITS(279,311,26,44)
384.1 X 4UNITS(384.1)
442 X 3UNITS(184,212,32,14)
666 X 3UNITS(265,311,51,39)
634 X 2UNITS(288,264,46,36)
664.4 X 2UNITS(266.6,314.9,49.7,33.2)
665 X 1UNITS(265,311,51,38)
683.8 X 2UNITS(278.3,320.9,48.2,36.4)
683.8 X 1UNITS(278.3,320.9,48.2,
36.4)
675.5 X 1UNIT(282.7,312,39.6,41.2)
675.5 X 1UNITS(282.7,312,39.6,41.2)
190.6 X 2UNITS(160, 30.6)
91.5
116.129.630.94.7
96.3
132.531.634.26.1
131.430.131.43.65
126.225.326.66.6
12424.827.35.3
131.430.131.43.65
12130.632.73.8
12130.632.73.8
99.223.025.05.1
99.223.025.05.1
10415.5
502
551.2550.3322.8237.3
567.0
538.3537.5325.0295.7
567.4550.2331.5236.8
540550325235
566.9566.3314.1309.6
567.4550.2331.5236.8
538.3550.0328.2239.7
538.3550.0328.2239.7
566.7566.1300.6297.8
566.7566.1300.6297.8
518260
CAPACITYTON/HR x UNITS
WORKINGP.@
SHO(kg/㎠㎠g)
WORKINGT.@
SHO(℃℃ )
**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 4 ‰¯¿ł– •¡˙¨‰”
HRSG Experience 2) OVERSEAS
CLIENT PROJECT GT TYPE WORK PERIOD
SIEMENS(SAUDI)
TOSHIBA(UAE)
TOSHIBA(UAE)
MAPNA(IRAN)
MARUBENI(VIETNAM)
DAEWOO E&C(LIBYA)
SGCC(OMAN)
HYUNDAI E&C(LIBYA)
AL JUBAIL
JEBEL ALI
UMM AL NAR
MAPNA
PHYMY 2.1EXT. ADD-ON
BENGHAZI
SOHAR
ZAIWA
WH501DA
GE9FA
GE9FA
WH701D
GE9E
V94.2
V94.2
GT13E
V94.2
GT13E
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
HRSG PACKAGE
03.06-05.01
03.07-04.05
03.07-06.06
03.07-04.05
03.07-04.10
03.07-07.10
03.12 – 05.01
04.03 – 05.02
04.09 – 05.10
04.10 – 05.10
255 X 2UNITS(255)
720 X 3UNITS(720)
580 X 5UNITS(580)
273.6 X 2UNITS(241.2, 32.4)
273.6 X 2UNITS(241.2, 32.4)
273.6 X 40UNITS(241.2, 32.4)
274.2 X 2UNITS(211.2,34.3,28.7)
269 X 4UNITS(220,49)
453 X 3UNITS(395,58)
267 X 4UNITS(218,49)
51
95
89.4
90.68.4
90.68.4
90.68.4
101.924.33.8
83.65.1
88.73.6
92.69.6
402
562
569
520233
520233
520233
532533150
512262
543246
513276
CAPACITYTON/HR x UNITS
WORKINGP.@
SHO(kg/㎠㎠g)
WORKINGT.@
SHO(℃℃ )
**HRSG 4P-1118-5 2007.10.31 12:49 PM ˘ ` 5 ‰¯¿ł– •¡˙¨‰”