H. PERO, E uropean Commission

14
H. PERO, European Commission European policy developments and challenges in the field of Research Infrastructures

description

European policy developments and challenges in the field of Research Infrastructures. H. PERO, E uropean Commission. RIs are at the core of an efficient EU Research & Innovation strategy. - PowerPoint PPT Presentation

Transcript of H. PERO, E uropean Commission

Page 1: H. PERO, E uropean Commission

H. PERO, European Commission

European policy developments and challenges

in the field of Research Infrastructures

Page 2: H. PERO, E uropean Commission
Page 3: H. PERO, E uropean Commission

Designed and operated to attract and host the best researchers in the world (open access - size of research facilities is not the issue, excellence is !)

Help responding to Grand Challenges but need world-level quality in all aspects of their activities: scientific, educational, technical and managerial

Important role in the advancement of knowledge and technology, liberating creative potential of staff, users and providers, thus being crucial socio-economic drivers

RIs are at the core of an efficient

EU Research & Innovation strategy

Page 4: H. PERO, E uropean Commission

Research Infrastructures are facilities where basic research as well as applied

research are interacting to generate innovations for our daily life

Page 5: H. PERO, E uropean Commission

ESFRI projectsCurrent Preparatory Phases

Page 6: H. PERO, E uropean Commission

Although the ESFRI projects are very visible,the “integrating activities” are the most important EC

actions

278

209

29

147

25

352

202

20130

53

45

0

100

200

300

400

500

600

700

IntegratingActivities

ICT basede-Infrastructures

Design Studies Construction -Preparatory Phase

Construction -Implementation

Policydevelopment

M€

Remaining Budget (Calls 5 to 11) ~ 802 M€

Budget used (Calls 1 to 4) ~ 687 M€

New RIs370 M€( 25% )

Existing RIs1041 M€(70 %)

Page 7: H. PERO, E uropean Commission

Number of RIs has more than doubled

in FP7 versus FP6

0

20

40

60

80

100

120

140

160

180

200

FP2(1987-91)

FP3(1990-94)

FP4(1994-98)

FP5(1998-2002)

FP6(2002-06)

FP7(2007-13)

6300

248

557

6000

users / year

Number of RIs

Page 8: H. PERO, E uropean Commission

Distribution of projects per scientific domain and activity

(since 2007: 137 projects, average funding 8 M€)

0

5

10

15

20

25

30

35

40

45

50

e-infrastructures Physics andAstronomy

Life Sciences Environmentand EarthSciences

Social sciencesand Humanities

Engineeringand Energy

Mathematicsand Computer

Sciences

others

Num

ber o

f pro

ject

s

Policy development (23)

Design Studies (14)

Construction - Preparatory Phase (34)

ICT based e-infrastructures (28)

Integrating Activities (38)

Page 9: H. PERO, E uropean Commission

Next FP7 actions

WP 2011 To be launched in July 2010 (closing end 2010) ERANETs continued a specific support measure

to prepare an FP8 dedicated action for instrumentation

WP 2012 To be prepared by March 2011 Input welcome from experts, YOU…

International Cooperation?

Page 10: H. PERO, E uropean Commission

1 October - Rome

European Strategy Forum on Research Infrastructures ESFRI

• Importance of excellent research services (harmonized evaluation criteria needed) and of service-oriented e-infrastructures

• EU RI policy based on a partnership approach

between regional, national, EU, global levels(need for roadmaps)

• Importance of human resources for the setting-up and operation of attractive and sustainable RIs

• Involving technology suppliers from an early stage.

The future…More than 500 people

discussing during two days

Page 11: H. PERO, E uropean Commission

• For Europe, a fully integrated, consistent, efficient eco-system of Research Infrastructures, serving researchers and society in all S&T fields

• At global level, co-operation to tackle global Challenges, based on / feeding excellent research facilities and widely used & efficient e-infrastructures (need for increased inter-agencies cooperation)

• Research Infrastructures should act as knowledge industry for the knowledge society: a major cultural change for scientific institutions and agencies

A joint vision should

be agreed...

Page 12: H. PERO, E uropean Commission

We need addressing the key factors

affecting the vision and the capacity to change

• Capacity (or not) to work together / pool resources (thus coordination of national strategies)to face more complex problems / costly solutions

• Capacity (or not) to develop a favorable / catalytic environment for EU & Int’l research & innovation

• Capacity (or not) to strengthen relations with education, the people, and with industry

• Capacity (or not) to face research internationalization

Four EC communications

to come within the next

18 months

Page 13: H. PERO, E uropean Commission

• Global issues• To be targeted through international

cooperation (Carnegie meeting in Nov 2010?)• GSF-OECD specific action• Energy RI conference (29-30 Nov 2010,

Brussels)• Bilateral actions?

• Workshop on 1 Oct. 2010, in Roma • More US participation in the EC calls• AAAs specific workshops in 2011,• Exchange of experts, etc.

Looking for developing more international cooperation

Page 14: H. PERO, E uropean Commission

Facing Challenges... A formula:

U x V x C x F > R

Understanding, Vision, Capacity to Change, Feasibility,

facing the Resistance to change

Role of this W

S