Ground Floor Works
1
RR THULASI BUILDERS (I) PVT. LTD. Site: Bedford Academy Date: 25.10.2014 Ground floor Works 1) West wing boy’s toilet tiles closet area and change of broken tiles. 2) Primer coat for doors 3) Providing thick silver hook instead of ‘L’ clamp to lock door when it is open.( Remove ‘L’ clamp) 4) Polishing granite. 5) Skirting work. 6) Doors. Windows, ventilators fixing for east wing. 7) Below centre block staircase cable trench work. 8) East wing girl’s toilet- wall tile laying near lintel.
-
Upload
kannan-kandappan -
Category
Documents
-
view
213 -
download
1
description
general rquirements
Transcript of Ground Floor Works
RR THULASI BUILDERS (I) PVT. LTD.Site: Bedford AcademyDate: 25.10.2014Ground floor Works1) West wing boys toilet tiles closet area and change of broken tiles.2) Primer coat for doors3) Providing thick silver hook instead of L clamp to lock door when it is open.( Remove L clamp)4) Polishing granite.5) Skirting work.6) Doors. Windows, ventilators fixing for east wing.7) Below centre block staircase cable trench work.8) East wing girls toilet- wall tile laying near lintel.