FP420 NCC

10
FP420 NCC From Design to Installation courtesy R. Folch S. Atieh TS / MME

description

FP420 NCC. From Design to Installation courtesy R. Folch S. Atieh TS / MME. New Connection Cryostat. Critical Components. shuffling box. bottom trays cold feet etc. busbar and cables. Design and Manufacturing Issues. Material requirements Vacuum requirements - PowerPoint PPT Presentation

Transcript of FP420 NCC

Page 1: FP420 NCC

FP420 NCCFrom Design to Installation

courtesyR. Folch S. Atieh TS / MME

Page 2: FP420 NCC

D. Swoboda @ FP420 meeting 2

New Connection Cryostat

16 July 2008

Page 3: FP420 NCC

D. Swoboda @ FP420 meeting 3

Critical Components

16 July 2008

bottom trayscold feetetc.

busbar and cables

shuffling box

Page 4: FP420 NCC

D. Swoboda @ FP420 meeting 4

Design and Manufacturing Issues

16 July 2008

•Material requirements•Vacuum requirements•Cryogenic calculations•Integration of beam screens • Integration of cold/warm transitions•Electrical specification and calculations•Instrumentation and cabling•Standard required tests•Cold test (if required)

Page 5: FP420 NCC

D. Swoboda @ FP420 meeting 5

Important components

16 July 2008

•Beam screens •Cold-warm transitions•Vacuum chambers and vacuum systems•Standard LHC components (cold feet, bottom trays, AL-SS transitions, etc.)

•Instrumentation devices

Page 6: FP420 NCC

D. Swoboda @ FP420 meeting 6

Critical components/delays

16 July 2008

•Superconducting bus-bar and cables (to be produced)•Shuffling box (problematic if not from LHC)

•Supporting beam ~ 3-4 month delay•Vacuum vessel ~ 4 month delay

Page 7: FP420 NCC

D. Swoboda @ FP420 meeting 7

Minimal Project Schedule

months 1 2 3 4 5 6 7 8 9 10

11

12

1 2 3 4 5 6 7

Project Approval

Remaining Design

Engineering review

Production

Assembly 1 1 1 1 2 2 2 3 3 3 4 4

Start Installation

16 July 2008

• Installation constraint by LHC shutdown periods• Replacement of a connection cryostat requires

warm up of complete sector!

Page 8: FP420 NCC

D. Swoboda @ FP420 meeting 8

Starting conditions

16 July 2008

Approval of FP420 & funding WP approval (EDMS 823322) * Pre-design approval Pressure equipment ⇒ AWP’s and

welder qualifications

Assembly in bldg. 112 is desirable & possibleTransport and alignment (available in TS department)