FP420 NCC
description
Transcript of FP420 NCC
FP420 NCCFrom Design to Installation
courtesyR. Folch S. Atieh TS / MME
D. Swoboda @ FP420 meeting 2
New Connection Cryostat
16 July 2008
D. Swoboda @ FP420 meeting 3
Critical Components
16 July 2008
bottom trayscold feetetc.
busbar and cables
shuffling box
D. Swoboda @ FP420 meeting 4
Design and Manufacturing Issues
16 July 2008
•Material requirements•Vacuum requirements•Cryogenic calculations•Integration of beam screens • Integration of cold/warm transitions•Electrical specification and calculations•Instrumentation and cabling•Standard required tests•Cold test (if required)
D. Swoboda @ FP420 meeting 5
Important components
16 July 2008
•Beam screens •Cold-warm transitions•Vacuum chambers and vacuum systems•Standard LHC components (cold feet, bottom trays, AL-SS transitions, etc.)
•Instrumentation devices
D. Swoboda @ FP420 meeting 6
Critical components/delays
16 July 2008
•Superconducting bus-bar and cables (to be produced)•Shuffling box (problematic if not from LHC)
•Supporting beam ~ 3-4 month delay•Vacuum vessel ~ 4 month delay
D. Swoboda @ FP420 meeting 7
Minimal Project Schedule
months 1 2 3 4 5 6 7 8 9 10
11
12
1 2 3 4 5 6 7
Project Approval
Remaining Design
Engineering review
Production
Assembly 1 1 1 1 2 2 2 3 3 3 4 4
Start Installation
16 July 2008
• Installation constraint by LHC shutdown periods• Replacement of a connection cryostat requires
warm up of complete sector!
D. Swoboda @ FP420 meeting 8
Starting conditions
16 July 2008
Approval of FP420 & funding WP approval (EDMS 823322) * Pre-design approval Pressure equipment ⇒ AWP’s and
welder qualifications
Assembly in bldg. 112 is desirable & possibleTransport and alignment (available in TS department)
* detailed cost evaluation required; i.e. Bus-bars, instrumentation, tooling,
...
D. Swoboda @ FP420 meeting 916 July 2008
D. Swoboda @ FP420 meeting 1016 July 2008