FM 5S ProjectHousekeeping equipment storage
Spring 2014
FM 5S Projects
• Richard Smith provided overview training on April 9, 2014
– All FM team leaders attended
• Sort, Set in order, Shine, Standardize and Sustain
– Reviewed the 8 Wastes
• Lack of Focus, Excess Inventory, Transportation, Motion, Waiting, Defects, Over Processing and Over Production
Charter
1. Mission – To provide Berea College with clean dormitory and office areas in a highly efficient manner along with the highest level of customer service.
2. Process Description – Housekeeping staff stores and retrieves equipment and supplies from a centrally located storage area.
3. Problem Statement – Because the equipment and supplies are not organized systematically by type and because a large amount of obsolete or broken equipment is stored in this area there is not a logical or efficient way to retrieve the required equipment.
4. Sponsor – Wayne Orr / Jeff Reed
5. Process Owner – Teena Riddell
6. Team Lead – Teena Riddell
7. Facilitator – Richard Smith
8. Team – Teena Riddell, Ronnie Vanhook, Matt Partain, Lindsey Mullins, Teresa Barrett, Jeff Reed, Terry Bingham, Richard Smith, and Jonathan Taylor
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
Sustain
SustainLEAN AUDIT REPORT
Broom/mop bin meets visual standard
Hoses for water machines meet visual standard
Water machine storage area meets visual standard
Floor machine storage area meets visual standard
Floor polisher/buffer area meets visual standard
Fan storage area meets visual standard
Equipment/supply shelf meets visual standard
General cleanliness
Close Out Notes
• Safer work area
• Equipment retrieval time reduced from 30 minutes to 5 minutes.