5S Good Housekeeping And Safe Working Cycle

38
5S Good Housekeeping And Safe Working Cycle

Transcript of 5S Good Housekeeping And Safe Working Cycle

Page 1: 5S Good Housekeeping And Safe Working Cycle

5S Good Housekeeping And Safe Working Cycle

Page 2: 5S Good Housekeeping And Safe Working Cycle

Contents

• Definition of 5S

• Advantages for Implementing 5S

• How to Implement 5S at Workplace

2

Page 3: 5S Good Housekeeping And Safe Working Cycle

What is 5 S?

3

Page 4: 5S Good Housekeeping And Safe Working Cycle

Definition of 5S

In Japanese In Chinese In English

Seiri 整理 Organization

Seiton 存放 Neatness

Seiso 清潔 Cleanliness

Seiketsu 標準 Standardization

Shitsuke 修養 Discipline

4

Page 5: 5S Good Housekeeping And Safe Working Cycle

5S Good Housekeeping

• A effective tool for managing workplace

• Come from factory management

• Origin: Japan

5

Page 6: 5S Good Housekeeping And Safe Working Cycle

1st “S” - Organization“Sort out and handle needed and not needed things”

(Aim:Release space from workplace)

1.Review all the items at workplace and decide what are useful and what are not useful

2.For items not useful – Remove from workplace

3.For useful items – Keep them and storage in a systematic manner

6

Page 7: 5S Good Housekeeping And Safe Working Cycle
Page 8: 5S Good Housekeeping And Safe Working Cycle

物件的有用性 –如不需要應棄置

物件的需要性 –不常用的可以存放他處

物件的用量性 –如使用有

限,多出的應棄置或存放他處

Page 9: 5S Good Housekeeping And Safe Working Cycle

2nd “S” - Neatness“Arrange and store things in order”

(Aim: To ease the searching of items and minimize searching time)

1.All items have its specific storage location

2.Labeling for item’s name, storage location, max / min stock level, etc.

3.“First-in-first-out” arrangement

4.Decide storage location by frequency of use of items

9

Page 10: 5S Good Housekeeping And Safe Working Cycle

〔Label〕

Raw Materials

Page 11: 5S Good Housekeeping And Safe Working Cycle

Materials: Finished and Semi-finished goods

Page 12: 5S Good Housekeeping And Safe Working Cycle

Tools

Page 13: 5S Good Housekeeping And Safe Working Cycle
Page 14: 5S Good Housekeeping And Safe Working Cycle

3rd “S” - Cleanliness“Keep workplace free of dirt and rubbish”

(Aim: Keep working environment, facilities and tools clean, neat and in good condition)

1.Assign responsible person for each area

2.Establish cleaning standard and procedure

3.Inspect the condition of workplace, facilities and tools during cleaning

14

Page 15: 5S Good Housekeeping And Safe Working Cycle

4th “S” - Standardization“Standardize and systemize the housekeeping work”

(Aim: Provide standard for previous 3S and create good safety habit and culture)

1.Aim the last “S” – Discipline (by setting standard and rules)

2.Examples: “Visual management”, colour code system, demarcation on floor

15

Page 16: 5S Good Housekeeping And Safe Working Cycle

The concept of a “Visual Factory”.

Page 17: 5S Good Housekeeping And Safe Working Cycle
Page 18: 5S Good Housekeeping And Safe Working Cycle
Page 19: 5S Good Housekeeping And Safe Working Cycle

5th “S” – Discipline“Rules followed and conditions improved by

employees in a self-disciplined and voluntary manner”

(Aim: Let employees have good 5S habit and follow safety rules and procedures)

1.Require employees to strictly follow previous 4S

2.Employees have good 5S habit

3.Create good 5S and safety culture

19

Page 20: 5S Good Housekeeping And Safe Working Cycle

• Improve product and service quality

• Increase efficiency

• Reduce chance for failure of device

• Create safe working environment

• Create good safety culture

20

Advantages of Implementing 5S

Page 21: 5S Good Housekeeping And Safe Working Cycle

21

Page 22: 5S Good Housekeeping And Safe Working Cycle

How to Implement 5S?

22

Page 23: 5S Good Housekeeping And Safe Working Cycle

Step 1: Establish 5S Policy

• 5S Policy• Signed by top management

• State the importance of good housekeeping

• Committed for implement 5S• Provide adequate resources

• Set targets

23

Page 24: 5S Good Housekeeping And Safe Working Cycle

Step 2: Establish Steering Committee

• 5S Steering Committee• Chaired by top management representative

• Members come from different department (also include frontline workers)

• Assign responsibilities for implementing 5S

• Establish schedule

• Establish communication channel

• Provide 5S training

• Promote 5S in workplace

• Review effectiness

24

Page 25: 5S Good Housekeeping And Safe Working Cycle

Step 3: Establish & Implement 5S Plan

• 5S Plan• Good housekeeping Targets

• Action details, implementation schedule, responsible staff

• 5S standards, rules and procedures

25

Page 26: 5S Good Housekeeping And Safe Working Cycle

26

Page 27: 5S Good Housekeeping And Safe Working Cycle

27

Page 28: 5S Good Housekeeping And Safe Working Cycle

28

Page 29: 5S Good Housekeeping And Safe Working Cycle

Step 4: Evaluate Effectiveness

• Record the implementation progress

• Evaluate effectiveness

• Follow-up actions (if required)

29

Page 30: 5S Good Housekeeping And Safe Working Cycle

Safe Working Cycle

1. K Y (Kiken Yochi) activities (risk prediction) is used to eliminate of at-risk behaviour of workers

2. Site K Y activities are carried out at each construction site

3. K Y activities will cover: Checking safety facilities, etc

Recognizing risk areas

Setting today’s action goal

30

Page 31: 5S Good Housekeeping And Safe Working Cycle
Page 32: 5S Good Housekeeping And Safe Working Cycle

Enhancement Of Safe Working Cycle (HK) 2004

At-risk Behaviours

Unsafe Conditions

Page 33: 5S Good Housekeeping And Safe Working Cycle

Proposed

Enhancement

Of

Safe Working

Cycle (HK)

P – Plan

D – Do

C – Check

A - Act

Page 34: 5S Good Housekeeping And Safe Working Cycle

Morning Safety Meeting

Page 35: 5S Good Housekeeping And Safe Working Cycle

Common Characteristics

• Safe Working Cycle

Page 36: 5S Good Housekeeping And Safe Working Cycle
Page 37: 5S Good Housekeeping And Safe Working Cycle

Enhancement Of Safe Working Cycle (HK)

1. Hazard Identification Activities (KY) by Risk Assessment approach

2. Group operation approach of SWC can be strengthened by individual KY activities

3. Each New operation with different risks need KY activities

4. Pointing and calling practice

37

Page 38: 5S Good Housekeeping And Safe Working Cycle

Benchmarking site visits

Good site housekeeping

38