Flow Assurance Model of Gas Gathering Network with Seperation & Compression System

1

Click here to load reader

Transcript of Flow Assurance Model of Gas Gathering Network with Seperation & Compression System

Page 1: Flow Assurance Model of Gas  Gathering Network with Seperation & Compression System

Wed Jan 25 19:09:01 2017 Case: C:\Users\Yousaf\Desktop\FOR SHARE WITH OMV\1062-6596_Scanario-01 (Aug-2017).hsc Flowsheet: Case (Main)

4-Gas

4-Water

op-100

Water

MIX-100

4-a4-0

ADJ-1

A

14-Gas

14-Water

Water-2

op-10114a

ADJ-1-2

A

MIX-101

14-0

Choke(FV-1411)

4-1

Choke(FV-11411)

14-1

E-1401

E-11401A/B

4-2

14-2

AH-100

H 4-5

5-Gas

5-Water

op-102

Water-3

5-0MIX-102

5aADJ-1-3

A Choke(FV-1511)

5-1

E-1501/02

5-2

15-Gas

15-Water

Water-4

op-103

15aMIX-103

15-0Choke(FV-11511)

15-1

E-11501/02

15-2

AH-101

H5-7

9-Water

9-Gas

Water-5

op-1049a

MIX-104

9-0

ADJ-1-4

A

Choke(FV-1911)

9-1

E-1901/02

9-2

8-Gas

Water-6

8-Water

op-105

8a

MIX-105

8-0

ADJ-1-5

A

Choke(FV-1811)

8-1

E-1801/02

8-2

AH-102

H9-7

MIX-106

20

2-Gas

2-Water

Water-7

op-106

2a

MIX-107

2-0

ADJ-1-6

A

Choke(FV-1211)

2-1

E-1201

2-2

3-Gas

3-Water

Water-8

op-1073a

MIX-108

3-0

ADJ-1-7

A

Choke(FV-1311)

3-1

E-1301

11

10-Gas

10-Water

Water-9

op-10810a

MIX-109ADJ-1-8

A

10-0Choke(FV-11011)

10-1

E-11001/02

10-2

Compression-S-10 2

Sawan-11Wellhead

T11-0

Choke(FV-11111)

11-1

E-11301/02

11-2

Sawan-13Wellhead

T13-0

Choke(FV-11311)

13-1

E-11101/31101

13-2

AH-103

H402-VIR

op-109

VS

Sawan-01Wellhead

T1-0.

Choke(FV-1111)

13

E-1101/02

1-2AH-104

H

Sawan-07Wellhead

T7-0

Choke(FV-1711)

7-1

E-1701/02/03A-B

7-2AH-105

H 7-4

1-4

MIX-110

M1-01

T2-Gas

T2-ProducedWater

P-8

M1-03

LP-Gas

LP-ProducedWater

P1

P4

T1-ProducedWater

Train-01/02Manifold

Q-105

ManifoldtoTrain-01SlugCatcher

P3

Manifoldto LPSlugCatcher

P6

Q-106

Q-107

ManifoldtoTrain-02SlugCatcher

Q-108

T1-CompressorInlet Header

41

Q-109

LP toCompressorInlet Header

36

Q-110

T2-ToCompressorInlet Header

31

Q-111

T2-CompressorInlet Headera

ToHeader

33

Q-112

37 39

Q-113

To FECCompressors

Q-114

42

MIX-103-2

16

Sawan PW toHydro-cyclones

17

T2-Gas-2

T2-ProducedWater-2

P-8-2

Manifoldto TestSeparator

Q-108-2

Test ToCompressorInlet Header

31-2

Q-111-2

1

TestManifold

Q-105-2

24

SET-1

S

TestSeparator(V-2004)

SawanPWVolume

Tie-In-12

ToFECInlet

Tie-In-11

Train-01SlugCatcherV-2001

FlowSpliter

LP SlugCatcher(V-5002)

Train-02Slugacatcher(V-3001)

E-5001A

18-2-2V-5001A

25-2-2

TEE-104-2-2

96-2-2

97-2-2

LP-1-2-2

28-2-2

LP-2-2-2

29-2-2

P-LP1-2-2

P-LP2-2-2

MIX-106-2-2

30-2-2

BAL-2-2-2

B P-LP1+2-2-2

E-5002A

V-5001B

35-2-2

40-2-2

44-2-2

LP-3-2-2

45-2-2

P-LP3-2-2

E-5002B

46-2-2

E-5001B

49-2-2

E-5001D-2-2

53-2-2 V-5001D

54-2-2

HP (ExisitngK-5001D)-2-2

55-2-2

56-2-2

P-HP-2-2

E-5002D-2-2

NewPipingFrom(Train-A-B)

Q-100

PIPE-100

49-3

PIPE-101

50-3

PIPE-102

51-3

Q-101Q-102

Q-103

PIPE-103

52-3

Q-104

48-3

PIPE-104

53

Q-115

PIPE-10554

Q-116

PIPE-106

55

Q-117

PIPE-107

56

Q-118

PIPE-111

61

Q-122

PIPE-112

62

Q-123

63

PIPE-110-2

Q-121-2

PIPE-113

65

Q-124

PIPE-114

66

Q-125

67

PIPE-115

Q-126

PIPE-118

70

Q-129

PIPE-119

71

Q-130

22

HPDischarge-2-2

FECIN+op-110

VS

3

4

ADJ-2

A

Yousaf.Muhammad1
Callout
Model of Gas Gathering Network. (For FLOW ASSURANCE) To check the complete gas gathering network behavior in future while flow rates of gas become low & with increasing liquid flow rate. and for prediction of pressure at down stream of choke valves. which well will remain adequate and which well will not flow in future scenarios. to predict the lower flow rates of wells for which existing network will remain adequate for specific pressure at FEC upstream
Yousaf.Muhammad1
Callout
SEPERATION SYSTEM. to check the adequacy of liquid handling (Treatment +Disposal of Produced Water )system. how much liquid will be . And hydraulics of in plant piping.
Yousaf.Muhammad1
Callout
FEC FRONT END COMPRESSION SYSTEM. To check the compression train behavior & in plant Hydraulics, & adequacy of AFCs.