FERNAS GROUP OF COMPANIES - Trans Adriatic Pipeline Dead weight testers Loaders Rock Drills Jack...
-
Upload
truongkhanh -
Category
Documents
-
view
221 -
download
2
Transcript of FERNAS GROUP OF COMPANIES - Trans Adriatic Pipeline Dead weight testers Loaders Rock Drills Jack...
1. FERNAS CONSTRUCTION,
2. MEGA INDUSTRIAL PLANTS, 3. PETGAS SERVICE, 4. FERPA INDUSTRY , 5. FERNAS GYPSUM PLASTER, 6. FERPA PLASTER BOARD, 7. FERCAN MACHINERY, 8. NAS ENERGY, 9. DİYARGAZ NATURAL GAS, 10. BİN CONCRETE, MINING, 11. FERGÜN MINING ASPHALT, 12. ANKİRA ENERGY COMPANY,
FERNAS GROUP’S SHAREHOLDINGS
• FOKUS TOURISM CONSTRUCTION & CONSULTING COMPANY • SUBOR GAP PIPE INDUSTRY & TRADE COMPANY • DAYEN AIR TRANSPORTATION
FERNAS GROUP OF COMPANIES
• Year of Registration
• Capital
• Turnover
• Employees
• Total Value of Ongoing Projects
• Open Credit
• Head Office
• President, Member of Board
FERNAS CONSTRUCTION COMPANY
BRIEF INFORMATION : 1982
: 43,850,000 USD
: 403 m USD
: 9.716
: 3,5 billion USD
: 1.5 billion USD
: Ankara / TURKEY
: Mr. Yaşar GİREGİZ
FERNAS CONSTRUCTION COMPANY FIELD OF ACTIVITIES
•Industrial Projects - Petrochemical Plant - Oil & Gas Pipelines, - Gas Treatment Facilities, Compressor & RMS Stations - Crude oil facilities and storage tanks - Natural gas underground storage surface facilities - Natural gas city distribution projects - Diesel power plant projects - HEPP, WEPP & SOLAR Power Projects
•Hydraulic Water Works and Projects •Road Construction Projects •Mining Projects •Telecommunication Projects •Building Construction Projects
MACHINERY & EQUIPMENT LIST
31 2
10 12
6 15
2 43
337 33
9 12
3 20
1 2
3
10
106
33 9
30 10
4 4
41
41
5 3
8 3
30 7
150 13
25 5
9 5
8
51
118
50.000
2
Compressors
Dead weight testers
Loaders
Rock Drills
Jack Hammers
PIPELINE MACHINERY
Pipe Layer (side-boom)
Pay welder
Bending Machines
Coating Machines
Welding Machines
Internal Clamps IPLC
Ultrasonic Test Equip.
Crawler
HEAVY CONSTRUCTION
Trenchers
Bulldozers
Graders
Excavators
Horizontal Drilling Machine
CONCRETE & ASPHALT PRODUCTION
Crushing Plants
Asphalt Finishers
Asphalt Plants
Mechanic Plants
X-Ray Equipment
TRANSPORTATION
Mobile Cranes
Truck Cranes
Trailers
Concrete Plants
Concrete Pumps
Concrete Finishers
Trans-mixers
Roller
Asphalt Distributors
Generators
Pumps
Vacuum Lifts
Containers (m2)
Ambulance
Dump Trucks
Gas & Water Trucks
Lubrication Trucks
Tractors and Forklifts
Low-Beds
Pick up, Jeep, Auto
Screening Plants
COMPLETED OIL & GAS PIPELINE PROJECTS
The total completed pipeline projects with various diameters (16-48”) is 2940 km as end of 2012.
Clients: BP, SHELL, OMV, BOTAS, TPAO, GAIL, PDO, QP
COMPLETED OIL & GAS PIPELINE PROJECTS SCOPE OF WORK EMPLOYER
Procurement, construction, installation, pre-commissioning and commissioning of 48" high
pressure natural gas pipeline with the length of 341.8 km. and 4 no's of Pig Stations and 11
no's of Block Valve Stations.
GAIL (India) Ltd.
The scope of works included the detail engineering, procurement ,construction,
installation, pre-commissioning and commissioning of 36”- 30km & 12”-12 km natural gas
pipeline and RMS stations and also for modification, up-gradation and expansion of the
existing Pressure Reduction & Metering Stations.
Qatar Petroleum
Engineering, procurement , construction, installation, pre-commissioning and
commissioning of 36" high pressure natural gas pipeline and RMS stations with custody
ultrasonic flow meters, gas leak detection system, ESD valves, HIPPS, PCV’s, MOV’s, FOC
and telecommunication & telemetry systems, SCADA PLC, ESD , F&G.
Qatar Petroleum
Engineering, procurement ,construction, installation, pre-commissioning and assistance in
commissioning of 30"�-100km and 28”-115km high pressure crude oil pipeline and 4 no of Pig
Stations. Scope of works also included 3 no of hot-tap operations and 1 no. of hot-tap /
stopple operation on the existing 28" crude oil pipeline.
PDO
The scope of works includes the detail engineering, procurement construction, installation,
pre-commissioning and commissioning of 24" - 51 km natural gas transmission pipeline
complete with pig launcher & receiver station and one block valve station. Scope of works
also includes 48"x24" hot tap operation.
OMV
The scope of works included the detail engineering, procurement (except free issued 40"
line pipes), construction, installation, pre-commissioning and commissioning for 40�" -60 km
high pressure natural gas pipeline and main line & take-off valve stations and 12“-17 km
high pressure natural gas pipeline and pig stations. (EPIC)
BOTAŞ
The scope of works included the detail engineering, procurement ,construction,
installation, pre-commissioning and commissioning for 40" high pressure natural gas
pipeline with the length of 162.1 km, (EPIC)BOTAŞ
The scope of works included the detail engineering, procurement (except free issued line
pipes), construction, installation, pre-commissioning and commissioning for 14�" high
pressure natural gas pipeline with the length of 99.3 km and 10" high pressure natural gas
pipeline with the length of 58.5 km. (EPIC)
BOTAŞ
The scope of works included the detail engineering, procurement, construction,
installation, pre-commissioning and commissioning for 16" -18.7 km high pressure natural
gas pipeline and hot-tap operation . (EPIC)
TOREADOR
The construction of 42�" crude oil pipeline with the total length of 70 km. (Construction) BOTAŞ
The scope of works included the detail engineering, procurement, construction,
installation, pre-commissioning and commissioning for 126 km. 36" high pressure natural
gas pipeline complete with 4 no of 36�" line valve stations, 2 no of 36" pig stations, and 24�"
take-off valve stations. In addition, 24�" x 24"� hot-tap operation was carried out. (EPIC)
BOTAŞ
The scope of works included the detail engineering, procurement, construction,
installation, pre-commissioning and commissioning for 291 km. 48" high pressure natural
gas pipeline complete with 2 no of 48�" pig stations, 10 no of 48" line valve stations and 4
no's of take-off valve stations. (EPIC)
BOTAŞ
PROJECT NAME
Dahej - Vijaipour Pipeline Up-gradation (DVPL-II)
Project / INDIA
COMPLETED OIL & GAS PIPELINE PROJECTS
EPIC for Consolidated Gas Supply To Mesaieed,
Ras Laffan and Umbab Areas / QATAR
EPIC of Gas Supply to Mesaieed Consumers -
QATAR
Hubara-Sahmah & Sahmah-KP-114 MOLs
Replacement Project / OMAN
Construction of a Natural Gas Pipeline for the
Combined Cycle Power Plant Project for the
Combined Cycle Power Plant Project in
Samsun/Turkey
Nazilli-İzmir Natural Gas Transmission Pipeline
Project Phase 2
Adıyaman-Şanlıurfa-Elazığ-Diyarbakır Natural Gas
Pipeline Phase 2 & Phase 3 Project
Ordu-Giresun Natural Gas Pipeline Phase-I and
Phase-II Project / TURKEY
Akçakoca Natural Gas Pipeline Project
Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project
Bozüyük – Adapazarı Natural Gas Pipeline Phase-I
& Phase-II Project
Doğu Bayazıt-Erzurum Natural Gas Main Pipeline
Project
COMPLETED OIL & GAS PIPELINE PROJECTS SCOPE OF WORK EMPLOYER
The scope of works included the detail engineering, procurement, construction, installation, pre-
commissioning and commissioning for 118.5 km. 36" high pressure natural gas pipeline complete
with 3 no's of 36" line valve stations and 48.3 km. 24" high pressure natural gas pipeline complete
with 2 no of 24" line valve stations.(EPIC)
BOTAŞ
Detail engineering, procurement, construction, installation, pre-commissioning and commissioning
for the entire intermediate pigging terminal equipped with 42" pig receiver and 42" pig launcher
complete with related equipment. (EPIC)BOTAŞ
SCOPE OF WORK EMPLOYER
This was the first UGS (Underground Gas Storage) Project in Turkey for the storage of 1.6 billion m³ of
natural gas in the existing North Marmara and Değirmenköy Gas Reservoirs. The scope of works
included the engineering, procurement, construction, installation, pre-commissioning and
commissioning for 4 no of centrifugal natural gas compressor units, gas dehydration system, HC dew
point control system for 600,000 Nm³/h capacity, custody flow metering unit, chemical injection
units, inlet gas heater, separators, slug catchers, flares and other gas process equipment and
instrumentation, UPS, DCS, HIPPS, ESDV system, MV switchgear system, PLC-SCADA systems, fire &
gas system, 40 km. 48 core FOC, piping to ANSI 900 and ANSI 600 classes, 20" high pressure natural gas
pipeline with the length of 3.3 km, 16" high pressure natural gas pipeline with the length of 12.9 km.
and 6" high pressure natural gas pipeline with the length of 1.1 km. (LSTK)
Turkish Petroleum
Integrated Utilities & Offsite Packages &Tanks for Dahej Petrochemical Complex. (EPIC)
The planned complex will comprise an ethylene cracker and associated units and polymer plants to
manufacture 1.1 million tones of ethylene, 400,000 tones of propylene, 150,000 tones of benzene,
and 115,000 tones of butadiene per year.
OPaL
Engineering, procurement (except free issued line pipes), construction, installation, pre-
commissioning and commissioning of 36“-30km high pressure natural gas pipeline and Pressure
Reduction and Metering Stations. The Stations shall be equipped with pig traps, ESDV systems,
custody flow metering units, pressure reduction units, flare systems, IA System, UPS, PLC-SCADA
systems, Fire & Gas systems, 60 km. Long FOC and telecommunication and telemetry systems.
Qatar Petroleum
The EPIC of Gas Compressor Station project. Two Gas compressors, designed for a flow of 14.225
MMSCD, both run by gas turbines. Gas turbines as well as compressors both are supplied by M/s
Solar USA. Compressors are designed to compress the gas from 75 bar upto 110 bar. (1W+1S) (9.86
MW each 19.72 MW)
Gujarat State
Petronet
Construction of the complete Power Plant was undertaken by FERNAS Construction Company as EPIC
Contractor. To operate mobil power plant through leasing for 5 years and produce 4.257.254.605 kWh
electricity
Electricity Generation
Oil Storage Tanks 14,500 bbls, Fuel Tanks, Installation of Centrifugal, Reciprocating and Submersible
Pumps, Chemical Injection Systems, Flare Line, Power Generating Center (3x1,000 kVA) and
Syncronizing Systems, High and Low Voltage Switchboards, Transformers, Oil, Gas and Process Piping
Shell Turkey
3 x 15,000 bbls Oil Storage Tanks, Underground Drainage and Condensate Tanks, Oil Metering Station,
2 x 300 m³/h 60 bar. Centrifugal Pumps, Fire Fighting and Tank Cooling Systems, Underground Water
Tanks.
Kazakturkmunay Ltd
PROJECT NAME
COMPLETED OIL & GAS PIPELINE PROJECTS
Russia-Turkey Natural Gas Pipeline Renewing and
Expansion Project
Kastel Crude Oil Block Station and Surface
Facilities / TURKEY
EPIC for Fuel Gas Supply To Umbab and QAFCO-5 /
QATAR
Aporrny Surface Facilities
Construction/KAZAKHISTAN
Baku-Tbilisi-Ceyhan Crude Oil Pipeline IPT-2
Intermediate Pigging Terminal Project
COMPLETED OIL & GAS PROJECTS FACILITIESPROJECT NAME
Dahej Petrochemical Complex Project / INDIA
LSTK Contract for Gas Compressor Station Project
at Location, Gana / INDIA
Build & Operate of BATMAN 100 MW Power Plant
/ TURKEY
North Marmara & Değirmenköy Underground
Natural Gas Storage Surface Facilities / TURKEY
IRRIGATION •Main Channel 860 km. •Discharge Channel 306 km. •Tunnel 7,500 m •Siphon 21,000 m
MINING •Excavation 357 M m³ •Kolemanit OPM 113 M T •Gold OPM by Excavation 32 M m³
ROADS •Asphalt Roads 1,250 km. •Other Roads 1,100 km. •Tunnels (Highway) 3,000 m.
BUILDINGS •Hotel 33,700 m² •School 47,500 m² •Library 3,500 m² •Bus Station 20,000 m²
SUMMARY OF OTHER COMPLETED PROJECTS
TELECOMMUNICATION •Copper cable 8,200 km. (20/0.4-1800/0.5) •FOC (12-96 cores) 1,860 km.
ONGOING PROJECTS LIST EMPLOYER
TANAP DOĞALGAZ İLETİM A.ŞGas Transmission Company Limited
IOCL
Diyarbakır Natural Gas Distribution CO.
EMPLOYER
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
EMPLOYER
DSİ - State Hydraulics Works / TURKEY
KRG-IRAQ Ministry
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
DSİ - State Hydraulics Works / TURKEY
EMPLOYER
General Directorate of Highways/TURKEY
General Directorate of Highways/TURKEY
General Directorate of Highways/TURKEY
General Directorate of Highways/TURKEY
General Directorate of Highways/TURKEY
General Directorate of Highways/TURKEY
General Directorate of Highways/TURKEY
EMPLOYER
Enerjisa Electricity Generation Inc.
General Directorate Turkish Coal Enterprises
KOZA Gold Operations Company
General Directorate of Mining Operations/TURKEY
ONGOING MINING & STRIPPING PROJECTSPROJECT NAME
TUFANBEYLİ MINE OPERATION PROJECT
36,500,000 tones of Coal Production -Eynez-Soma
ONGOING ROAD PROJECTSPROJECT NAME
Bala - Aksaray - Ereğli Road Construction (216 KM) Project / TURKEY
Trabzon-Gümüşhane Road&Tunnels Construction Project / TURKEY
Balıkesir-Dursunbey-Harmancık-Tavşanlı Road Construction Project / TURKEY
Batman Right Bank Irrigation System Project / Batman / TURKEY
Batman Left Bank Irrigation System Project / Batman / TURKEY
GEMBOS Derivation & Yeşildağ Irrigation Project / Konya / TURKEY�
GARZAN Dam & HEPP (49.0 MW)
Çukuralan Open Quarry Overburden Project
Simav Open Boron Quarry Overburden Project
Diyarbakır-Mardin Road Construction Project / TURKEY
Denizli- Horsunlu Road Construction Project
Çanakkale- Çan Road Construction Project
Giresun- Espiye Highway Tunnels Construction Project / TURKEY
ONGOING ENERGY PROJECTS
ERUH Dam & HEPP (61.80 MW)
PROJECT NAME
ONGOING IRRIGATION & POTABLE WATER PROJECTSPROJECT NAME
KARASU REG. & HEPP (31.58 MW)
ŞİRVAN Dam & HEPP (31.40 MW)
ANKİRA REG. & HEPP (12.76 MW)
Kars Dam Irrigation Pipeline KARS/ TURKEY
ERBIL Water Supply Improvement System& DUHOK Distribution Network /Erbil/ IRAQ
Gazipaşa Antalya Irrigation Project/Antalya/ TURKEY�
Adana Misis Second Phase Irrigation Project / Adana/ TURKEY
ÇAĞ ÇAĞ HEPP (15.60 MW)
Diyarbakır City Natural Gas Distribution Project (BO)
ONGOING OIL & GAS PROJECTSPROJECT NAME
Trans Anatolian Natural Gas Pipeline Project (TANAP) Lot-1 (56"- 375 KM ) / TURKEY
Bakhrabad-Siddhirganj Gas Transmission Pipeline Project/ BANGLADESH(30“-60km)�
EPC Works for Laying of Pipeline and Composite Works for South Jetty Pipeline
FERNAS’ SUBCONTRACTOR LIST FOR TAP PROJECT
Catering
Field Services (Work Permit,Local Taxes,Insurances,Medical &First Aid,Security,etc)
Engineering Works
Building Works
Transportation Works
Environmental Consultant
Civil Works (Grading, Excavation,Rebar, Concrete,etc)
Electrical & Instrumentation Works
Cathodic Protection
Mechanical Works ( Equipment Installation, Piping )
Civil & Pipeline Equipment Provider (Sales/Rental)
Hydrostatic Test Works
Third Parties
NDT & Ultrasonic Test Works
Office Container and Panelized System Site Building Suppliers