Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) -...

13
Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate - 19*10 19 p.ot at the end of 2012, 84% of foreseen statistics - numu->nue analysis in progress - not decided about extension of run, yet OPERA should exploit its physics goal: numu->nutau appearance 9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 1

Transcript of Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) -...

Page 1: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

Fatti principali dei precedenti 12 mesi.

- Nuvel History (no comment, but RPC are excellent !)- management problems- financial problems

- 2° tau candidate- 19*1019p.ot at the end of 2012, 84% of foreseen statistics- numu->nue analysis in progress- not decided about extension of run, yet

OPERA should exploit its physics goal: numu->nutau appearance

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 1

Page 2: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 2

Page 3: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 3

Page 4: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 4

Page 5: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 5

Page 6: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 6

Lot of PHYSICS Analysis in progress…

Page 7: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 7

Page 8: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 8

New run with short-bunch narrow spacing beam for nu velocity measurement•Improved OPERA timing system + White Rabbit system for continuous fiber time delay monitoring •Independent OPERA timing system used in parallel exploiting RPC Timing Boards•Improvements in the systematic errors in progress….

Page 9: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

Microscopes in LNL

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 9

LNL scanning lab members

Test scanning on the microscope with a new type of scanning table(designed by C. Fanin) in progress.

Page 10: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 10

Interesting events: 1 kink topology +1 new charm candidate +1 nue candidate

81% located

2010 run

Scanning and analysis on 2011 run is going on.

Laboratorio LNL

Additionally to OPERA event analysis, PADOVA scanning lab is contributing on the study of the volcanoes by muon radiography using nuclear emulsion film. In this project, we collaborate with Tokyo, Napoli, Salerno, l’Aquila Universities and LNGS.

Page 11: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 11

U. Kose is contributing on numunue oscillations study and DATA/MC comparison. He is also co-supervising thesis work in Laurea Magistrale in Fisica, entitled ”Development of new tracking algorithm and Electromagnetic shower reconstruction tool in the OPERA nuclear emulsions using GPU.”

E. Medinaceli is contributing on MC study to improve of our understanding on charm analysis, mainly on the detection efficiencies and background estimations. He also works on the implementation of decay search tool in the MC.

Page 12: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

Impegni per Padova:Impegni per Padova:

1. Short run 2013 ?

2. Analisi

3. Automazione sviluppo

4. Lab. scanning emulsioni

Situazione del gruppo:Situazione del gruppo:

R.Bertolin (40%)R.Brugnera (30%)F.Dal Corso (10%) S. Dusini (60%). Responsabile LocaleA. Garfagnini (40%) C.Fanin (10%)C. Sirignano (80%)L.Stanco (40%)

4.4 F

TE

Permanenti:

Precari: Umut Kose (assegnista) (70%)Eduardo Medinaceli (ass. Univ.) 60%

Responsabilità nella collaborazione

- Luca Stanco: Publication&Talk board, CB - Stefano Dusini: Ad Interim Physics Coordinator, EC - Alessandro Bertolin: Project Leader RPC-XPC - Alberto Garfagnini: Slow Control supervisor - Chiara Sirignano / Umut Kose: Dark Matter

Contributi dall’OE e OM per turni specializzati al Gran Sasso di - Sviluppo fotografico delle emulsioni in camera oscura - Analisi automatica di Scanning dei CS

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 12

Page 13: Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

Richieste finanziarie 2013

Missioni Interne: 110.5 +12(s.j.)+10(DM)

Missioni Estero: 43 +10(DM)Trasporti: 0 K€

Inventario: 0 K€

Costruzione Apparati: 28 K€ Consumo: 43 K€

Richieste ai servizi per il 2013:Richieste ai servizi per il 2013:

Elettronica: 1 m.u. per supporto maintenance Elettr. RPC

3 m.u. per shifts presso i LNGS

Meccanica: 4 mesi uomo per shifts presso i LNGS

Uffico Tecnico: 2 mesi per sviluppo lab. Scanning (incluso Fanin)

Tot (Padova).: 224.5+12(s.j.) + 20(DM)

Common Funds (Italia) circa 480 K€

Manutenzione: 0 K€

9 Luglio 2012 Stefano Dusini / Luca Stanco - CdS Padova 13