Environmental Monitoring Report
# Semiannual Report July-December 2020 December 2020
INO: West Kalimantan Power Grid Strengthening Project – Part 2 Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development Bank.
-
CURRENCY EQUIVALENTS (as of 31 December 2020)
Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0. 0000712251
$1.00 = Rp14,040
NOTE (i) In this report, "$" refers to US dollars.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
-
APPENDIX 1
PROJECT ORGANIZATION CHART
-
PROJECT ORGANIZATION CHART
Note: TL : Transmission Line SS : Substation
-
2.a Vegetation Management
ROW maintenance procedures no. SMK3/UP3B/IK/22.001
-
SISTEM MANAJEMEN K3
INSTRUKSI KERJA
PEMELIHARAAN ROW PADA SUTT 150kV DAN SUTET 275kV
NO. DUKUMEN : SMK3/UP3B/IK/22.001
EDISI : 00
REVISI : 00
PT PLN (PERSERO)
UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN
KALIMANTAN BARAT
Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3 UP3B – KALBAR
TANGGAL : 3 MARET 2020
-
PT PLN (Persero) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT
INSTRUKSI KERJA PEMELIHARAAN ROW PADA SUTT 150kV DAN SUTET 275kV
Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3 UP3B – KALBAR
4. TANGGUNG JAWAB DAN WEWENANG
5.1. Manager bertanggung jawab atas kebijakan dan pemenuhan peraturan yang
berlaku pada kegiatan pemeliharaan ROW yang di bawah wewenangnya.
5.2 Manager Bagian Penyaluran bertanggung jawab terhadap pemantauan dan
pengawasan terhadap pemeliharaan ROW pada jalur SUTT dan SUTET.
5.3. Masing-masing Manager ULTG bertanggung jawab terhadap proses kegiatan
Inspeksi dan pemeliharaan ROW di masing-masing jalur SUTT yang menjadi
tanggung jawab area kerjanya.
5.4. Supervisor Pemeliharaan TRAGI bertanggung jawab terhadap pengolahan
tehadap rekap data inspeksi dan pembersihan ROW.
5.5. Supervisor K4 ULTG bertanggung terhadap Keselamatan dan Kesehatan Kerja
pada proses inpeksi dan pembersihan ROW.
5.6. Pejabat Pelaksana Lingkungan bertanggung jawab dan memastikan
pembersihan ROW dilakukan tanpa menggunakan Herbisida dalam mengatasi
tumbuhan yang dapat mengganggu operasional instalasi penyaluran tenaga
listrik.
6. URAIAN PROSEDUR
6.1 Petugas Ground Patrol melaksanakan breafing dan gelar peralatan kerja bersama
koordinator Gardu Induk setiap minggunya di lokasi Gardu Induk masing-masing
jalur SUTT sebelum melaksanakan inspeksi.
6.2 Petugas Ground Patrol yang bertanggung jawab mengawasi beberapa buah tower
melaksanakan tugas memantau secara visual komponen dan lingkungan pada area
transmisi dengan menelusuri jalur transmisi dengan berjalan kaki dan hanya
dilakukan pemantauan dari bawah dan maksimal memanjat sampai dengan leg 1
bagian tower apabila diperlukan untuk melihat kondisi ROW yang tertutupi oleh
pohon.
6.3 Petugas Ground Patrol menggunakan aplikasi Srintami yang sudah terinstal pada
smartphone yang merupakan salah satu perangkat kerja untuk memasukan laporan
inspeksi.
6.4 Koordinator Petugas Ground Patrol melaporkan hasil inspeksi kepada koordinator
Gardu Induk dengan mengunggah hasil data inspeksi dari aplikasi Mobile Srintami
ke Server Srintami.
No. Dokumen SMK3/UP3B/IK/22.001 Edisi / Revisi 00 / 00 Berlaku Efektif 3 Maret 2020 Halaman 6 dari 7
pusmankonHighlight
-
2.b Increased Access
No permanent access roads to RoW in T.171 Bengkayang District.
-
2.c Health and Safety
Anti-Climbing Devices (ACD) in T.10 Tiga Berkat Village, Bengkayang District.
The tower has been equipped with lock nut in T.10 Tiga Berkat Village, Bengkayang Dsitict.
-
2.d Avian Collisions
Avian Collisions Report
-
APPENDIX 3
IMPLEMENTATION OF MITIGATION MEASURES
AT 275 kV BENGKAYANG SUBSTATIONS (OPERATION PHASE)
-
3.a Noise
Noise Monitoring Result
-
PT PLN (Persero) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT
FORMULIR PEMANTAUAN LINGKUNGAN No. Dokumen SMK3/UP3B/F/05.001 Edisi / Revisi 00 / 00 Berlaku Efektif 1 Juli 2019 Halaman 1 dari 1
Lokasi : GITET DAN GI BENGKAYANG Waktu : 3 NOVEMBER 2020 Cuaca : Cerah Berawan
No. Lokasi / Peralatan
Kebisingan Keterangan Hasil Ukur
(dB) Max (dB)
1 TRAFO 2 150 KV 62,7 85 BAY 150 KV
2 TRAFO 1 150 KV 62,3 85 BAY 150 KV
3 ANTARA TRAFO 1&2 66,2 85 BAY 150 KV
4 TENGAH SWITCHYARD 51,3 85 BAY 150 KV
5 REAKTOR 275 KV 13,4 85 TIDAK OPERASI (275 KV)
6 IBT 1 PHASA R 68,3 85 BAY 275 KV
7 IBT 1 PHASA S 69,4 85 BAY 275 KV
8 IBT 1 PHASA T 65,1 85 BAY 275 KV
9 IBT 2 PHASA R 67,3 85 BAY 275 KV
10 IBT 2 PHASA S 66,3 85 BAY 275 KV
11 IBT 2 PHASA T 66,5 85 BAY 275 KV
12
13
14
Pelaksana Pengukur
(ROSSY YUWANA BASTIAN)
-
3.b Health and Safety
The availability of security post in 275 kV Bengkayang Substation (3 November 2020)
Fire Extinguisher in 275 kV Bengkayang Substation (3 November 2020)
Switchyard area 275 kV Bengkayang Substation (3 November 2020)
PPE in 275 kV Bengkayang Substation (3 November 2020)
-
4.b Health and Safety
Warning signs in tower T.35 Bengkayang – Ngabang 150kV TL (16 November 2020)
Tower has been equipped with anti-climbing devices in tower T.18 Bengkayang – Ngabang 150kV TL
(16 November 2020)
-
4.c Avian Collisions
Avian Collisions Report
-
5.a Noise
Noise Monitoring Result
-
PT PLN (Persero) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT
FORMULIR PEMANTAUAN LINGKUNGAN No. Dokumen SMK3/UP3B/F/05.001 Edisi / Revisi 00 / 00 Berlaku Efektif 1 Juli 2019 Halaman 1 dari 1
Lokasi : GI NGABANG Waktu : 3 NOVEMBER 2020 Cuaca : Mendung
No. Lokasi / Peralatan
Kebisingan Keterangan Hasil Ukur
(dB) Max (dB)
1 Depan Lobby GI 38,4 85 BAY 150 KV
2 TRAFO 1 150 KV 59,7 85 BAY 150 KV
3 TRAFO 2 150 KV 50,4 85 Tidak Operasi
4 TENGAH SWITCYARD 46,9 85 BAY 150 KV
5 ARAH JALAN RAYA 73,4 85 Kondisi Jalanan Sedang
6
7
8
9
10
11
12
13
14
Pelaksana Pengukur
(ROSSY YUWANA BASTIAN)
-
5.b Health and Safety
Warning sign in the switchyard of 150 kV TayanSubstation (12 November 2020)
Security office at the 150 kV Ngabang Substation(3 November 2020)
PPE for the visitors in 150 kV NgabangSubstation (3 November 2020)
Fire extinguishers in the switchyard area of 150 kVTayan Substation (12 November 2020)
-
APPENDIX 6
THE MITIGATION IMPLEMENTATIONS OF
150 kV TAYAN EXTENSION, SANGGAU AND SEKADAUSUBSTATIONS (CONSTRUCTION PHASE)
-
6.a Vegetation Clearing
-
Attendance List of Toolbox Meeting for socializing the prohibition of herbicides use and burningvegetation and waste
-
6.b Soil Erosion
-
The Checklist Related to Soil Erosion Control in Quarterly Report
-
The switchyard area with gravelling in Sanggau Substations (28 October 2020)
The switchyard area with gravelling in Sekadau Substations (14 November 2020)
-
6.c Drainage
Drainage construction in the Sanggau Substation (20 September 2020)
Drainage construction in the Sekadau Substation
-
6.d Water Quality Impacts
Temporary oil and fuel storage at Sanggau SS (30 July 2020)
-
6.e Air Quality Impacts
The water spraying was conducted at the Sanggau SS construction site, since dust level is consideredhigh (24 July 2020)
-
6.f Construction Waste Management
Organic and non-organic waste has already separated in Sanggau SS (16 September 2020)
Sekadau Final disposal facilities, in Sekadau-Sanggau street Km. 6, Sekadau Hilir Sub-district (20September 2020)
-
6.g Encroachment into Protected Forests, Hunting, Wood Collection
-
Attendance List of Toolbox Meeting for socializing the prohibition of hunting and wood collectionand cultural heritage
-
Prohibition of hunting in Sekadau Substation (16 September 2020)
-
6.h Occupational Health and Safety
-
PPE usage for the workers in Sekadau SS (17 July2020)
First aid kit inspection (13 September 2020)
Emergency Respons Procedures EHS statistic board
-
Socialization regarding to Covid-19 and wash hand awareness
-
6.l Community Health and Safety
-
Emergency vehicle services by Contractor in Sanggau Substation
Provide Fire Extinguisher in Sanggau Substation(17 July 2020)
Fire Extingusher Inspection in Sekadau Substation(17 November 2020)
-
Safety sign around construction site in Sanggau substation (20 September 2020)
Safety sign around construction site in Sekadau substation