Environmental Monitoring Report # Semiannual Report July-December 2020 December 2020 INO: West Kalimantan Power Grid Strengthening Project – Part 2 Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development Bank.

Transcript of Environmental Monitoring Report...CURRENCY EQUIVALENTS (as of 31 December 2020) Currency unit –...

  • Environmental Monitoring Report

    # Semiannual Report July-December 2020 December 2020

    INO: West Kalimantan Power Grid Strengthening Project – Part 2 Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development Bank.

  • CURRENCY EQUIVALENTS (as of 31 December 2020)

    Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0. 0000712251

    $1.00 = Rp14,040

    NOTE (i) In this report, "$" refers to US dollars.

    This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

  • APPENDIX 1

    PROJECT ORGANIZATION CHART

  • PROJECT ORGANIZATION CHART

    Note: TL : Transmission Line SS : Substation

  • 2.a Vegetation Management

    ROW maintenance procedures no. SMK3/UP3B/IK/22.001

  • SISTEM MANAJEMEN K3

    INSTRUKSI KERJA

    PEMELIHARAAN ROW PADA SUTT 150kV DAN SUTET 275kV

    NO. DUKUMEN : SMK3/UP3B/IK/22.001

    EDISI : 00

    REVISI : 00

    PT PLN (PERSERO)

    UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN

    KALIMANTAN BARAT

    Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3 UP3B – KALBAR

    TANGGAL : 3 MARET 2020

  • PT PLN (Persero) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT

    INSTRUKSI KERJA PEMELIHARAAN ROW PADA SUTT 150kV DAN SUTET 275kV

    Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3 UP3B – KALBAR

    4. TANGGUNG JAWAB DAN WEWENANG

    5.1. Manager bertanggung jawab atas kebijakan dan pemenuhan peraturan yang

    berlaku pada kegiatan pemeliharaan ROW yang di bawah wewenangnya.

    5.2 Manager Bagian Penyaluran bertanggung jawab terhadap pemantauan dan

    pengawasan terhadap pemeliharaan ROW pada jalur SUTT dan SUTET.

    5.3. Masing-masing Manager ULTG bertanggung jawab terhadap proses kegiatan

    Inspeksi dan pemeliharaan ROW di masing-masing jalur SUTT yang menjadi

    tanggung jawab area kerjanya.

    5.4. Supervisor Pemeliharaan TRAGI bertanggung jawab terhadap pengolahan

    tehadap rekap data inspeksi dan pembersihan ROW.

    5.5. Supervisor K4 ULTG bertanggung terhadap Keselamatan dan Kesehatan Kerja

    pada proses inpeksi dan pembersihan ROW.

    5.6. Pejabat Pelaksana Lingkungan bertanggung jawab dan memastikan

    pembersihan ROW dilakukan tanpa menggunakan Herbisida dalam mengatasi

    tumbuhan yang dapat mengganggu operasional instalasi penyaluran tenaga

    listrik.

    6. URAIAN PROSEDUR

    6.1 Petugas Ground Patrol melaksanakan breafing dan gelar peralatan kerja bersama

    koordinator Gardu Induk setiap minggunya di lokasi Gardu Induk masing-masing

    jalur SUTT sebelum melaksanakan inspeksi.

    6.2 Petugas Ground Patrol yang bertanggung jawab mengawasi beberapa buah tower

    melaksanakan tugas memantau secara visual komponen dan lingkungan pada area

    transmisi dengan menelusuri jalur transmisi dengan berjalan kaki dan hanya

    dilakukan pemantauan dari bawah dan maksimal memanjat sampai dengan leg 1

    bagian tower apabila diperlukan untuk melihat kondisi ROW yang tertutupi oleh

    pohon.

    6.3 Petugas Ground Patrol menggunakan aplikasi Srintami yang sudah terinstal pada

    smartphone yang merupakan salah satu perangkat kerja untuk memasukan laporan

    inspeksi.

    6.4 Koordinator Petugas Ground Patrol melaporkan hasil inspeksi kepada koordinator

    Gardu Induk dengan mengunggah hasil data inspeksi dari aplikasi Mobile Srintami

    ke Server Srintami.

    No. Dokumen SMK3/UP3B/IK/22.001 Edisi / Revisi 00 / 00 Berlaku Efektif 3 Maret 2020 Halaman 6 dari 7

    pusmankonHighlight

  • 2.b Increased Access

    No permanent access roads to RoW in T.171 Bengkayang District.

  • 2.c Health and Safety

    Anti-Climbing Devices (ACD) in T.10 Tiga Berkat Village, Bengkayang District.

    The tower has been equipped with lock nut in T.10 Tiga Berkat Village, Bengkayang Dsitict.

  • 2.d Avian Collisions

    Avian Collisions Report

  • APPENDIX 3

    IMPLEMENTATION OF MITIGATION MEASURES

    AT 275 kV BENGKAYANG SUBSTATIONS (OPERATION PHASE)

  • 3.a Noise

    Noise Monitoring Result

  • PT PLN (Persero) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT

    FORMULIR PEMANTAUAN LINGKUNGAN No. Dokumen SMK3/UP3B/F/05.001 Edisi / Revisi 00 / 00 Berlaku Efektif 1 Juli 2019 Halaman 1 dari 1

    Lokasi : GITET DAN GI BENGKAYANG Waktu : 3 NOVEMBER 2020 Cuaca : Cerah Berawan

    No. Lokasi / Peralatan

    Kebisingan Keterangan Hasil Ukur

    (dB) Max (dB)

    1 TRAFO 2 150 KV 62,7 85 BAY 150 KV

    2 TRAFO 1 150 KV 62,3 85 BAY 150 KV

    3 ANTARA TRAFO 1&2 66,2 85 BAY 150 KV

    4 TENGAH SWITCHYARD 51,3 85 BAY 150 KV

    5 REAKTOR 275 KV 13,4 85 TIDAK OPERASI (275 KV)

    6 IBT 1 PHASA R 68,3 85 BAY 275 KV

    7 IBT 1 PHASA S 69,4 85 BAY 275 KV

    8 IBT 1 PHASA T 65,1 85 BAY 275 KV

    9 IBT 2 PHASA R 67,3 85 BAY 275 KV

    10 IBT 2 PHASA S 66,3 85 BAY 275 KV

    11 IBT 2 PHASA T 66,5 85 BAY 275 KV

    12

    13

    14

    Pelaksana Pengukur

    (ROSSY YUWANA BASTIAN)

  • 3.b Health and Safety

    The availability of security post in 275 kV Bengkayang Substation (3 November 2020)

    Fire Extinguisher in 275 kV Bengkayang Substation (3 November 2020)

    Switchyard area 275 kV Bengkayang Substation (3 November 2020)

    PPE in 275 kV Bengkayang Substation (3 November 2020)

  • 4.b Health and Safety

    Warning signs in tower T.35 Bengkayang – Ngabang 150kV TL (16 November 2020)

    Tower has been equipped with anti-climbing devices in tower T.18 Bengkayang – Ngabang 150kV TL

    (16 November 2020)

  • 4.c Avian Collisions

    Avian Collisions Report

  • 5.a Noise

    Noise Monitoring Result

  • PT PLN (Persero) UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT

    FORMULIR PEMANTAUAN LINGKUNGAN No. Dokumen SMK3/UP3B/F/05.001 Edisi / Revisi 00 / 00 Berlaku Efektif 1 Juli 2019 Halaman 1 dari 1

    Lokasi : GI NGABANG Waktu : 3 NOVEMBER 2020 Cuaca : Mendung

    No. Lokasi / Peralatan

    Kebisingan Keterangan Hasil Ukur

    (dB) Max (dB)

    1 Depan Lobby GI 38,4 85 BAY 150 KV

    2 TRAFO 1 150 KV 59,7 85 BAY 150 KV

    3 TRAFO 2 150 KV 50,4 85 Tidak Operasi

    4 TENGAH SWITCYARD 46,9 85 BAY 150 KV

    5 ARAH JALAN RAYA 73,4 85 Kondisi Jalanan Sedang

    6

    7

    8

    9

    10

    11

    12

    13

    14

    Pelaksana Pengukur

    (ROSSY YUWANA BASTIAN)

  • 5.b Health and Safety

    Warning sign in the switchyard of 150 kV TayanSubstation (12 November 2020)

    Security office at the 150 kV Ngabang Substation(3 November 2020)

    PPE for the visitors in 150 kV NgabangSubstation (3 November 2020)

    Fire extinguishers in the switchyard area of 150 kVTayan Substation (12 November 2020)

  • APPENDIX 6

    THE MITIGATION IMPLEMENTATIONS OF

    150 kV TAYAN EXTENSION, SANGGAU AND SEKADAUSUBSTATIONS (CONSTRUCTION PHASE)

  • 6.a Vegetation Clearing

  • Attendance List of Toolbox Meeting for socializing the prohibition of herbicides use and burningvegetation and waste

  • 6.b Soil Erosion

  • The Checklist Related to Soil Erosion Control in Quarterly Report

  • The switchyard area with gravelling in Sanggau Substations (28 October 2020)

    The switchyard area with gravelling in Sekadau Substations (14 November 2020)

  • 6.c Drainage

    Drainage construction in the Sanggau Substation (20 September 2020)

    Drainage construction in the Sekadau Substation

  • 6.d Water Quality Impacts

    Temporary oil and fuel storage at Sanggau SS (30 July 2020)

  • 6.e Air Quality Impacts

    The water spraying was conducted at the Sanggau SS construction site, since dust level is consideredhigh (24 July 2020)

  • 6.f Construction Waste Management

    Organic and non-organic waste has already separated in Sanggau SS (16 September 2020)

    Sekadau Final disposal facilities, in Sekadau-Sanggau street Km. 6, Sekadau Hilir Sub-district (20September 2020)

  • 6.g Encroachment into Protected Forests, Hunting, Wood Collection

  • Attendance List of Toolbox Meeting for socializing the prohibition of hunting and wood collectionand cultural heritage

  • Prohibition of hunting in Sekadau Substation (16 September 2020)

  • 6.h Occupational Health and Safety

  • PPE usage for the workers in Sekadau SS (17 July2020)

    First aid kit inspection (13 September 2020)

    Emergency Respons Procedures EHS statistic board

  • Socialization regarding to Covid-19 and wash hand awareness

  • 6.l Community Health and Safety

  • Emergency vehicle services by Contractor in Sanggau Substation

    Provide Fire Extinguisher in Sanggau Substation(17 July 2020)

    Fire Extingusher Inspection in Sekadau Substation(17 November 2020)

  • Safety sign around construction site in Sanggau substation (20 September 2020)

    Safety sign around construction site in Sekadau substation

    1-Semiannual Environmental S2 2020 Final.pdf2-APPENDIX.pdfAPP 1.pdfAPP 2.pdfimage_001.pdf (p.8)

    APP 3.pdfAPP 4.pdfAPP 5.pdfAPP 6.pdfAPP 7.pdfSAFETY TALK (3).pdf (p.2)

    APP 8.pdfAPP 9.pdf