Environmental Monitoring Report · 2020. 10. 27. · CURRENCY EQUIVALENTS (as of 26 October 2020)...
Transcript of Environmental Monitoring Report · 2020. 10. 27. · CURRENCY EQUIVALENTS (as of 26 October 2020)...
Environmental Monitoring Report
# Annual Report January - December 2019 October 2020
Indonesia: Neighborhood Upgrading and Shelter
Project - Phase 2
Prepared by the Directorate General of Human Settlements, Ministry of Public Works and Housing
for the Republic of Indonesia and the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 26 October 2020)
Currency unit – rupiah (Rp) Rp1.00 = $0.0000680874
$1.00 = Rp14,687
NOTE
(i) In this report, "$" refers to United States dollars unless otherwise stated This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Table of Contents
Table of Contents ...................................................................................................................................
List of Figures ........................................................................................................................................ i
List of Tables .......................................................................................................................................... i
List of Appendices ................................................................................................................................. i
Abbreviations ........................................................................................................................... ii
Chapter 1. Introduction ........................................................................................................... 1
Chapter 2. Key Project Activities and Progress ...................................................................... 2
Chapter 3. Environmental Mitigation and Monitoring Status ................................................... 4
3.1 Requirements of Environmental Safeguards ...................................................... 4
3.2 Key Roles and Responsibilities ........................................................................... 4
3.3 Community Contracts .......................................................................................... 7
3.4 Complex Civil Work Contract .............................................................................. 7
3.5 New Site Development Contracts ....................................................................... 8
Chapter 4. Public Consultation and Information Disclosure .................................................... 8
Chapter 5. Information Disclosure .......................................................................................... 8
Chapter 6. Grievance Redress Mechanism ............................................................................ 9
Chapter 7. Project Staffing and Capacity Building ................................................................ 10
Chapter 8. Key Issues and Corrective Actions ..................................................................... 10
Chapter 9. Conclusions and Recommendations ................................................................... 11
APPENDICES ....................................................................................................................... 13
i
List of Figures
Figure 1. NUSP-2 Project Location ................................................................................................... 1
Figure 2. Paving Road and Drainage Channel Contract, Tambak Rejo - Semarang ................ 3
Figure 3. Monthly Reports Prepared by the City Coordinators ..................................................... 7
Figure 4. Grievance Redress Mechanism ........................................................................................ 9
List of Tables
Table 1. Institutional Roles and Responsibilities ............................................................................. 4
Table 2. Key Issues and Corrective Actions .................................................................................. 11
List of Appendices
Appendix 1. Environmental Screeening and Assessment for Sawah Lebar Baru Community
Contract, Bengkulu ............................................................................................................................. 14
Appendix 2. Monitoring Progress of Construction Work in Tambak Rejo, Semarang ............. 17
Appendix 3. CAP Drafting Process for Kota Karang, Bandar Lampung .................................... 20
Appendix 4. Technical Coordination Meeting, January 2019 ...................................................... 25
ii
Abbreviations
ADB Asian Development Bank
AP
Bappenas
affected people
Badan Perencanaan Pembangunan Nasional (National Planning Bureau)
CA Community Advisor
CAP Community Action Plan
CC City Coordinator
CIO Community Implementing Organization (or BKM Badan Keswadayaan
Masyarakat)
CPMU Central Project Management Unit
DGHS Directorate General of Housing Settlements
DLH Dinas Lingkungan Hidup (Environmental Agency)
EA Executing Agency
EARF Environmental Review and Assessment Framework
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMS Environmental Management System
FY Fiscal Year
GRC Grievance Redress Committee
GRM Grievance Redress Mechanism
IEE Initial Environmental Examination
IPAL Instalasi Pengolahan Air Limbah (Communal Wastewater Treatment
Plant)
KPP Kelompok Pemanfaat dan Pemelihara (Operation and Maintenance
Group)
KSM Kelompok Swadaya Masyarakat (Community Self-Help Group)
LCO Local Coordinating Office
MDG Millennium Development Goals
MPWH Ministry of Public Work and Housing
Muskel Musyawarah Kelurahan (neighborhood assembly meeting)
NMC National Management Consultant
NSD New Site Development
NUSP-2 Neighborhood Upgrading and Shelter Project Phase 2
O&M Operation and Maintenance
PIU Project Implementing Unit (Satker or Satuan Kerja)
PMU
PPK
Project Management Unit
Pejabat Pembuat Komitmen (Commitment Officer)
Satker Satuan Kerja (Project Implementing Unit)
SPPL Surat Pernyataan Kesanggupan Pengelolaan dan Pemantauan
Lingkungan (Statement Letter for Environmental Management and
Monitoring)
UKL-UPL
UPTD
Upaya Pengelolaan Lingkungan dan Upaya Pemantauan Lingkungan
(Environmental Management Effort - Environmental Monitoring Effort)
document
Unit Pelaksana Teknis Daerah (Local Technical Implementing Unit)
Chapter 1. Introduction
1. Project Background. The Neighborhood Upgrading and Shelter Project – Phase 2
(NUSP-2) is aimed to upgrade basic public infrastructure in slum settlements, and contribute
to meeting the Millennium Development Goal (MDG) targets for achieving significant
improvement in the lives of slum dwellers (MDG target 7D) and halving the proportion of urban
households without sustainable access to safe drinking water and basic sanitation (MDG
target 7C).1 The NUSP-2 also contributes to the implementation of the Cities without Slums
Program launched by the Indonesian Government.2
2. The NUSP-2 is an ADB-funded project, particularly upgrading and/or developing basic
infrastructure and facilities for selected slum areas at 99 neighborhoods (kelurahan). These
neighborhoods are distributed in 20 districts (kabupaten) and municipalities (kota) located
across Sumatra, Java, Kalimantan, Sulawesi, Nusa Tenggara, and Maluku Islands as shown
in Figure 1. The executing agency of the NUSP-2 is the Directorate General of Human
Settlements (DGHS) of the Ministry of Public Works and Housing (MPWH).
Figure 1. NUSP-2 Project Location
3. The NUSP-2 assists the local governments in upgrading and/or developing basic
infrastructure and facilities at selected neighborhoods in order to achieve the following:
1 The 2015 MDG target for the proportion of the urban population living in slums is 6%; in 2011, 12.6% of the
urban population lived in slums. The 2015 MDG target for the proportion of households with sustainable access to an improved water source is 75.5%; in 2011, 40.5% of urban households had access to an improved water source, 72.5% had access to basic sanitation. The proportion of households with access to safe water and basic sanitation in slum areas is assumed to be much lower.
2 The Cities without Slums Program is incorporated in the National Long-Term Development Plan, 2005–2025. It aims to reduce slum areas in cities by 2025 by promoting concerted initiatives by the central and local governments, private sector, and civil society.
Tanjung
Balai
Bengkulu
Serang
Sukabumi
Semarang
Pasuruan
Bima
Tanjung
Jabung Barat
Kapuas
Bandar
Lampung
Makassar
Kendari
Ambon
Batam
Palembang
Banjarmasin
Pekalongan
Palangkaraya
Bone
Palopo
2
Output 1: Institutional capacities for managing pro-poor urban development strengthened;
Output 2: Infrastructure in slum neighborhoods upgraded; and
Output 3: New settlements for poor families established.
4. There are seven types of infrastructures and facilities built under the NUSP-2, among
others, construction of road, bridge, basic sanitation facilities, and communal wastewater
treatment plant; installation of clean water supply and street lighting; and provision of municipal
solid waste handling facility and transportation as well as basic fire-fighting equipment.
5. Objective and Scope of the Monitoring Report. This 2019 annual environmental
monitoring report (AEMR) summarizes the NUSP-2 activities and describes its environmental
safeguards implementation and compliance against the EARF requirements in 2019. This is
the final monitoring report submitted to ADB following the loan closing date for NUSP-2 in
December 2019. This monitoring report covers the following aspects:
• Chapter 2 Key project activities and progress
• Chapter 3 Implementation of environmental mitigation and monitoring status
• Chapter 4 Public consultation and disclosure
• Chapter 5 Information disclosure
• Chapter 6 Grievance redress mechanism
• Chapter 7 Capacity building
• Chapter 8 Key issues and corrective actions
• Chapter 9 Conclusions and recommendations.
Chapter 2. Key Project Activities and Progress
6. Community contract. In 2019, the NUSP-2 planned to commission 31 community
contract works in 6 cities/district (i.e., Tanjung Jabung Barat, Bengkulu, Bandar Lampung,
Semarang, Kapuas, and Makassar). However, these community contract works were
cancelled due to partial loan cancelation recommended by the National Planning Bureau
(Bappenas).
7. Complex civil work. Only 1 (one) complex civil work was continued and completed in
Tambak Rejo neighborhood, Semarang City. The types of infrastructure constructed under
this contract in are road paving and associated drainage channel. This construction work has
been completed in March 2019. The progress and the result of this construction works are
shown in Figure 1.
8. New site development (NSD). The activities of four NSDs in Kendari, Palopo, Bima
and Kapuas are reported separately under the obligation of the initial environmental
examination (IEE) report. In 2019, the construction of infrastructure and facilities at the two
NSD sites in Kendari and Palopo have been completed, whereas those of Bima and Kapuas
just commenced in late 2019. Nevertheless, the occupation of houses at these NSD has
commenced since 2019.
3
Construction Phase
After Construction
Figure 2. Paving Road and Drainage Channel Contract, Tambak Rejo - Semarang
4
Chapter 3. Environmental Mitigation and Monitoring Status
3.1 Requirements of Environmental Safeguards
9. According to the ADB’s Safeguard Policy Statement (2009), the NUSP-2 is classified
as Category B project, i.e., the project could have some adverse environmental impacts, but
of lesser degree or significance than those in category A project. The impacts are site specific
and can be readily addressed through common mitigation measures. The NUSP-2 creates
positive impacts on the environment and improves the wellbeing of the community through
alleviation of slum areas in emerging cities in Indonesia.
10. The Environmental Assessment and Review Framework (EARF) document for NUSP-
2 was prepared in 2014, providing screening procedure and checklist to review environmental
implications of the infrastructure and facility to be constructed. The EARF requires that:
• An initial environmental examination (IEE) report is prepared by DGHS as part of the new
site development (NSD) proposal and then cleared by ADB for disclosure; and
• Environmental Mitigation and Monitoring Effort (UKL-UPL) or Statement Letter to Conduct
Environmental Mitigation and Monitoring (SPPL) is prepared by DGHS according to the
Ministry of Environment Regulations No. 5/2012 on Types of Activities and/or Projects
Requiring Environmental Impact Assessment (AMDAL) and No. 16/2012 on the Guidance
for the Preparation of Environmental Documents; and Ministry of Public Work Regulation
No. 10/PRT/M/2008 on Types of Activities and/or Projects in the Public Work Sector
Subject to be Completed with UKL-UPL.
3.2 Key Roles and Responsibilities
11. The key roles and responsibilities of the executing and implementing agencies
involved in the implementation of NUSP-2 including their respective environmental
responsibilities, are summarized in Table 1.
Table 1 Institutional Roles and Responsibilities
Institutions and Responsibilities
Activities and Status Status
Directorate General of Housing Settlement (Executing Agency)
• Overall coordination,
supervision,
monitoring.
The coordination, supervision and monitoring by the
PMU/EA were mostly done through coordinating and
review meetings, in which safeguard issues were
discussed, including collecting evidences. Some
supervision meetings were conducted on ad hoc basis and
on the sites.
Compliant
• Preparation and
submission of quarterly
progress and
evaluation reports.
In 2019 the PMU submitted four quarterly progress and
evaluation reports to ADB (QPR 1 January – March; QPR
2 April – June; QPR 3 July - September; QPR 4 October –
December).
Compliant
• Prepare guidelines for
the environmental due
diligence and
monitoring of
environmental
management plan.
The DGHS had published a Technical Guideline on Social
and Environmental Management in September 2016, that
has been used along the implementation of NUSP-2
project. This guideline was a sort of manual and reference
to implement and monitor the environmental and social
safeguard components using screening checklist forms
and templates provided.
Compliant
5
Institutions and Responsibilities
Activities and Status Status
Public Works (Local Coordinating Officer) at City or District Level
• Provide overall
coordination,
supervision, monitoring
and approval of
neighborhood
proposals including
environmental
checklists.
In 2019, the LCO at the Local Planning Agencies of the
selected 6 cities oversaw the overall implementation of
NUSP-2 intervention, including approval of the
neighborhood proposals to continue the community
contract construction works. The supervision and
monitoring by the LCO and City Satker conducted through
the finalization process of the Community Action Plan
(CAP).
For the 4 NSDs, the LCO also coordinated and supervised
the proposal and the implementation of environmental
safeguard mitigations and monitoring through various
meetings.
Complied
• Prepare quarterly
progress reports
including
environmental.
The LCO provided inputs to the PMU on the quarterly
progress reports of the NUSP-2 intervention. Some reports
included monitoring on infrastructure progress on 50% and
on 100%, which were also uploaded in Management
Information System or MIS (www.nusp2.id).
Complied
• Provide technical
support to community
advisors and
BKMs/CIOs.
The technical support provided by LCO through
consultation and coordination when the Badan
Keswadayaan Masyarakat (BKM) presents their CAP.
Along the process of construction works, the Local Public
Work Agency provide technical support, coaching and
empowerment.
Complied
• Carry out
environmental due
diligence.
• For the community contract, the environmental due
diligence was carried out using the environmental
screening checklist. Subsequently, this information is
utilized to develop the SPPL for submission to the Local
Environmental Agency.
• For the complex civil work contract, the SPPL is
prepared by City Satker and the contractor firm assisted
by the CCs (City Coordinators).
• For the NSD, the IEE and UKL-UPL documents are
prepared for ADB/DGHS endorsement and local
government respectively. Subsequently, in 2019, all
mitigation and monitoring measures have been reported
in the Semi-Annual Environmental Monitoring Report of
each NSD.
• Complied
• Complied
• Complied
• Monitor the
implementation of the
environmental
management plan.
The LCO has been monitoring the implementation of
environmental management plan in ad-hoc basis through
visiting the site for visual inspection. There was no
documentation on this activity recorded as this is a
common practice.
Complied
Environmental Agency at City or District Level (Dinas Lingkungan Hidup/DLH)
• Provide guidance on
environmental
checklists.
The Environmental Agencies used the checklists provided
in the Technical Guidelines mentioned above as the
reference for issuing the approval for SPPL document for
each CAP.
Complied
• Coordinate with
community advisors to
conduct site visits to
validate the screening
results.
The Environmental Agencies conducted site visits to
validate the environmental screening results on 0% point
of infrastructure during the community meeting, and
validate monitoring results on 50% and 100% of
infrastructure progress to verify the requirement of budget
disbursement. There was no documentation on this activity
recorded as this is a common practice.
Complied
6
Institutions and Responsibilities
Activities and Status Status
• Review the engineering
design and
environmental
checklists and provide
permit for construction
of a deep well.
There is no deep well constructed as part of the NUSP-2 in
2019.
Not applicable
• Conduct random
checking during
construction and after
completion to inspect
environmental
procedures and
impacts.
Random checking was done by the Environmental
Agencies during construction and after completion to also
make sure of infrastructure quality and gave technical
inputs for improvement where needed. There was no
documentation on this activity recorded as this is a common
practice.
Complied
Health Agency at City or District Level
• Test collected water
quality samples to
determine if collected
water sources meet the
drinking water
standards.
This water testing was not conducted, as most of the clean
water source for the NSD sites were supplied from treated
water from the municipal water company (known as
Perusahaan Daerah Air Minum or PDAM).
Not applicable
Community Implementation Organization (CIO)
• Responsible for
establishing project
implementation units.
The CIO established the project implementing units in the
form of community self-help group (Kelompok Swadaya
Masyarakat or KSM) to implement the NUSP-2 activities.
Complied
• Responsible for
conducting
environmental
checklists assisted by
community advisors/
safeguard specialist.
The CIO, assisted by the CA and CC, conducted
environmental screening by visual inspection and review
of the CAP using the checklist forms included in the
Technical Guideline for Social and Environmental
Management (2016).
Complied
• Formulate the
Operation and
Maintenance (O & M)
mechanisms.
The O&M mechanism was formulated during finalization of
the CAP. In 2019, since there was a loan cancelation, the
CIOs only underwent the process up till formulating the
CAP.
Complied
• Responsible for
monitoring construction
activities and
conducting inspection
for completed
interventions.
This activity of responsibility was not performed since the
project did not proceed to the construction works for the
community contract due to loan cancelation.
Not applicable
• Disclose, on the
neighborhood board,
neighborhood
proposals and
contracts including
environmental
checklists.
The discussion to develop and finalize the neighborhood
proposals was conducted through series of discussion at
the neighborhood assembly meetings (musyawarah
kelurahan/Muskel II - III). However, the proposals,
contracts, and checklists were not disclosed on the
neighborhood board due to uncertainty of the funds to
continue of project.
Partially complied
• Responsible for taking
any negative feedback
related to site,
construction, and
operation from other
neighborhood
members and
This activity was not performed since the project did not
proceed to the construction works due to partial loan
cancelation in 2019.
Not applicable
7
Institutions and Responsibilities
Activities and Status Status
organizing meetings to
solve problems.
• Responsible for
reporting environmental
monitoring to LCOs
This activity of responsibility was not performed since the
project did not proceed to the construction works for the
community contract due to partial loan cancelation.
Not applicable
3.3 Community Contracts
12. Environmental Mitigation and Monitoring. The community contracts for 31
neighborhoods in 6 cities (i.e., Bengkulu, Tanjung Jabung Barat, Bandar Lampung,
Semarang, Kapuas, and Makassar) were cancelled for 2019 following the partial loan
cancellation. However, prior to this, the CIO of each neighborhood has prepared the CAP,
starting with the environmental and social screening process based on the NUSP-2 Technical
Guidelines on Social and Environmental Management. A sample of this screening process
using the checklist forms is provided in Appendix 1.
13. Assisted by the CA, the CIO conducted a neighborhood meeting (Musyawarah
Kelurahan or Muskel III) to disseminate the screening result and discuss the CAP. However,
due to the partial loan cancellation in 2019, the process beyond the CAP is discontinued.
Nevertheless, the City Coordinators kept preparing the monthly project reports for these 31
community contracts until March 2019 (as shown in Figure 3).
Figure 3. Monthly Reports Prepared by the City Coordinators
3.4 Complex Civil Work Contract
14. Environmental Mitigation. In 2019, one remaining package of multi-year contract in
Tambak Rejo neighborhood, Semarang City was progressed and completed in March 2019.
The SPPL for this civil work contract was submitted to the Integrated Permitting Office (Dinas
Penanaman Modal Pelayanan Terpadu Satu Pintu) of Semarang City in early January 2019.
15. Environmental Monitoring. For the complex civil work contract, the CCs in
coordination with LCO are responsible for the day-to-day environmental monitoring during the
8
construction activities. The SG-5 form was used to conduct the monitoring for both social and
environmental safeguard of the construction works conducted at Tambak Rejo neighborhood
(see Appendix 2).
3.5 New Site Development Contracts
16. As of end 2019, the semi-annual monitoring reports (SAEMR) of Bima and Palopo
NSDs have been completely submitted and cleared by ADB for disclosure. However, Kapuas
and Kendari NSDs have only submitted the SAEMR of January to June 2019 to ADB, and
therefore the July to December 2019 reports are still pending. In any case, the environmental
mitigation and monitoring measures for each NSD were implemented by the respective
contractors and monitored by each City/District Satker.
Chapter 4. Public Consultation and Information Disclosure
17. The NUSP-2 project conducted public consultation as an integral part of the
identification, selection and implementation of neighborhood infrastructure interventions. For
the community contract packages, neighborhood meetings (known as musyawarah
kelurahan) were conducted to discuss the environmental and social safeguard, formulate the
Community Action Plan (CAP), and select the kelompok swadaya masyarakat (KSM, or
Community Implementing Organization or CIO) as the implementing unit. Through these
meetings, all community members and concerned stakeholders would have such forum to
raise their concerns on the project and subsequently seek resolution. So far, there is no report
of any concerns or complaints addressed to the KSM.
18. In 2019, public consultation concerning the community-contract typed projects were
conducted. An example of this public consultation in Kota Karang neighborhood of Bandar
Lampung City is presented in Appendix 3. At this consultation, the community members
discussed the activity plan formulated into the CAP and disseminated safeguard requirements
for the project.
19. Other public consultations were conducted at Kendari, Palopo, Bima, and Kapuas with
potential beneficiaries whether they are interested in occupying the houses in the he NSD
including associated rules and responsibilities. The local communities were consulted for job
and business opportunities to be recruited as construction workers or suppliers. The more
detailed description with evidences and documentations of these consultation and discussion
are reported separately and provided in each Semi-Annual Environmental Monitoring Reports
of each NSD.
Chapter 5. Information Disclosure
20. The information on the implementation, the progress, as well as on related public
consultation, discussion, and neighborhood meetings of community contract and complex civil
work packages are documented and uploaded into the NUSP-2’s website (www.nusp2.id).
9
Along the project, NUSP-2 had also published about six posters explaining the NUSP-2 project
and one special poster on NSD. These posters dissemination is another strategy to reach out
the potential beneficiaries. These posters have been distributed gradually in 2016 till 2018 and
mentioning the email addresses and mobile contact numbers to redress grievance or
complains from communities. Most of these posters had been presented in previous AEMR of
2017 and 2018.
Chapter 6. Grievance Redress Mechanism
21. The NUSP-2 has established its Grievance Redress Mechanism (GRM), which
consists of three levels, i.e. at the neighborhood, at the city/district, and at the national levels
as shown in Figure 4. This leveling system of the GRM is expected to timely address any
complaints during project implementation. Affected people will have the right to file complaints
and/or queries related to disturbance or environmental impacts due to the project activities.
Figure 4. Grievance Redress Mechanism
22. There was no major complaint about the NUSP-2 project reported in 2019. Some minor
complaints concerning the maintenance of the NSD housing were recorded and resolved by
respective Management Board and reported in related Semi-Annual Environmental Monitoring
Report of the respective NSD.
10
Chapter 7. Project Staffing and Capacity Building
23. The consulting services are provided at the national, city/district and kelurahan level.
At the national level, a team of consultants assist the Central Project Management Unit
(CPMU) of the NUSP-2, namely the National Management Consultant (NMC) based in
Jakarta. Part of this NMC, a safeguard specialist and the two safeguard assistants were
recruited to prepare social and environmental management guidelines, checking supporting
data and documents from the field in the project’s NUSP-2 website, incorporating
environmental monitoring in the quarterly progress reports and environmental survey results
in the monitoring and evaluation framework. The NMC’s safeguard team also prepared the
reports on annual environmental monitoring, semi-annual social monitoring, and semi-annual
environmental monitoring report of NSD.
24. In addition to each NSD, there are four sub-specialists responsible to assist in day-to-
day monitoring and evaluation for the implementation of the NSD. This also includes assisting
the city/district Satker and the LCO and collecting data for monitoring the implementation of
mitigation measures set forth in the EMP of the IEE. They are based in the NSD sites of
Kendari, Palopo, Bima, and Kapuas
25. At the city/district level there were City Coordinators (CCs) based in 6 cities/districts of
the NUSP-2 project, responsible in assisting the city/district Satker, the Local Coordinating
Offices (LCOs), and the Community Advisors (CAs). The CCs also responsible for conducting
review and screening of the environmental and social safeguard checklists. Further, they
reviewed the completion of necessary safeguard documents, and reviewed the quality of
documentations uploaded by the CAs or the Community Implementing Organizations (CIOs)
in the NUSP-2 website.
26. At the kelurahan level, there were CAs who may in-charge for 1 - 2 kelurahans, and
responsible for assisting each CIO for day-to-day management of the community contract
works, among others, facilitating the establishment of CIO and user groups; facilitating the
preparation of Community Action Plans (CAPs); and providing the community with technical
guidance in book-keeping, documentation and report preparation.
27. In January 2019, the Safeguard Team joined the Technical Coordination Meeting in
Grand Tropic Hotel, Jakarta, for the CCs, CAs and Sub-Specialists NSD. The Safeguard
Specialist joined the class of Sub-Specialist NSD to brief them the Environmental
Management Plan (EMP) on each NSD site. Invitation letter and pictures of these events is
shown in Appendix 4. In addition, the capacity building was also done by the Satker staff
members and safeguard consultant team during the site visit to the NSDs in Kapuas (March
2019), Palopo (April 2019), Kendari (May 2019), and Bima (September 2019).
Chapter 8. Key Issues and Corrective Actions
28. Some corrective actions for pending issues were completed, some are still partially
achieved and some not achieved. The corrective actions on the gaps of EMP implementation
identified in the 2018 AEMR have been followed up in 2019, and reported in Table 2 .
11
Table 2 Key Issues and Corrective Actions
No Key Issues / Gaps Corrective Actions PIC & Schedule Status/Progress
up to Oct 2019
1 The Local
Environmental
Agencies (DLH) have
not yet conducted
random checking
during construction
and after completion to
inspect environmental
procedures and
impacts.
The Local
Environmental Agencies
needs to conduct
random checking during
and after completion of
the construction works
in 2019.
PIC: DLHs
Schedule: During site
visits and ad-hoc
events in Q4 of 2018
and Q1 of 2019.
Completed – The DLH
officer checked the
completion of complex
civil works in Tambak
Rejo, Semarang.
2 The formulation and
establishment of the
O&M mechanism.
Monitoring the formulation of O&M mechanism for Kendari, Bima and Kapuas NSD in the Q1 2019.
PIC: LCO at respective local Public Work offices.
Schedule: Q1 2019
Partially achieved –
Palopo, Bima and
Kapuas NSDs already
have the O&M
mechanism for NSD
Management Board,
while for Kendari NSD,
the local government is
now preparing the
Mayor’s Decree for NSD Management Board
3 Environmental
safeguard monitoring
at Tambak Rejo
neighborhood,
Semarang City
Monitoring the continuation of multi-years contract in Tambak Rejo neighborhood, Semarang City (to be reported in the next report).
PIC: CA/CC
Schedule:
During site visits
Completed – the work
completed on March
2019.
Chapter 9. Conclusions
29. Conclusions. In 2019, there were only few NUSP-2 subprojects conducted: NSD
construction activities in Bima City and Kapuas District; and a multi-year, complex civil work
contract in Tambak Rejo, Semarang City. Thirty-one community-typed contracts were
cancelled due to Bappenas’ recommendation to partially cancel the NUSP-2 loan.
30. The monitoring of environmental mitigation was conducted in a participatory and
consultative manner, involving the related stakeholders particularly the community. Monitoring
of environmental mitigation on the projects/sub-projects implemented has generally improved
over the previous year with regards to the capacity building conducted, completeness and
quality of supporting documents provided for this 2019 monitoring report.
31. As for the responsibility of the agencies and community organizations, only partially
complied status is about the proposals, contracts, and checklists which were not disclosed on
the neighborhood boards. The disclosure was not conducted due to uncertainty of the funds
to continue of project. However, the process of preparing these checklists, proposals and
contracts were conducted in a participatory and transparent manner through series of
neighborhood meetings.
12
32. Corrective actions identified in the 2018 monitoring reports in relation to conducting
safeguards monitoring have been completed in 2019. One corrective action remains partially
achieved is related to the absence of major decree on the establishment of Kendari NSD
board.
13
APPENDICES
14
Appendix 1. Environmental Screeening and Assessment for Sawah Lebar Baru Community Contract, Bengkulu
1.a. Form SFG-1 to Screen Out Negative Investment List Activities for Community Contract Work Packages in Sawah Lebar Baru, Bengkulu City
15
16
1.b. Form SFG-2 to Identify Social and Environment Impacts
17
Appendix 2. Monitoring Progress of Construction Work in Tambak Rejo, Semarang
18
19
20
Appendix 3. CAP Drafting Process for Kota Karang, Bandar Lampung
3.a. Minutes of Meeting MUSKEL III
21
22
23
3.a. List Attendances of Meeting MUSKEL III
24
3.c. Notes of Meeting MUSKEL III
3.d. Photos of Meeting MUSKEL III
25
Appendix 4. Technical Coordination Meeting, January 2019
4a. The Invitation Letter to the Meeting
26
4b. Picture of Technical Coordination Meeting, January 2019