Energy Development and Transmission Committee
Transcript of Energy Development and Transmission Committee
![Page 1: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/1.jpg)
Energy Development and Transmission Committee North Dakota Pipeline Authority
Justin J. Kringstad July 8, 2014 - Bismarck, ND
![Page 2: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/2.jpg)
Forecasting Williston Basin Oil Production, BOPD
Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.
2 2 JJ Kringstad - North Dakota Pipeline Authority
![Page 3: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/3.jpg)
Challenges* 1) Moving oil out of the
Williston Basin 2) Moving oil within the
Williston Basin
*Modified from Bridger and Belle Fourche Pipelines
2
1
3
North Dakota Crude Oil Pipelines
3 JJ Kringstad - North Dakota Pipeline Authority
![Page 4: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/4.jpg)
210,000 BOPD
68,000 BOPD
160,000 BOPD
145,000 BOPD
4
North Dakota Crude Oil Pipelines
4 JJ Kringstad - North Dakota Pipeline Authority
40,000 BOPD
![Page 5: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/5.jpg)
April 2014
Estimated Williston Basin Oil Transportation
5
5 JJ Kringstad - North Dakota Pipeline Authority 5
![Page 6: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/6.jpg)
Estimated Williston Basin Oil Transportation
6
6 JJ Kringstad - North Dakota Pipeline Authority 6
![Page 7: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/7.jpg)
Estimated ND Rail Export Volumes
7 JJ Kringstad - North Dakota Pipeline Authority 7
![Page 8: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/8.jpg)
Estimated Williston Basin Oil Transportation
8
8 JJ Kringstad - North Dakota Pipeline Authority 8
![Page 9: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/9.jpg)
Williston Basin Oil Production & Export Capacity, BOPD
Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.
9 9 JJ Kringstad - North Dakota Pipeline Authority
![Page 10: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/10.jpg)
Confirmed Pipeline Projects
10
10 JJ Kringstad - North Dakota Pipeline Authority 10
Butte Loop • In-service Date: Q3 2014 • 110,000 BOPD • Service to Guernsey, WY
Hiland Double H • In-service Date: Q4 2014 • 50,000 BOPD (Expandable up to 100,000 BOPD) • Service to Guernsey, WY
Plains Bakken North • In-service Date: May 2014 • 40,000 BOPD (Expandable up to 70,000 BOPD) • Movement North to Canadian Interconnect
![Page 11: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/11.jpg)
Pipeline Projects In Business Development or Regulatory
11
11 JJ Kringstad - North Dakota Pipeline Authority 11
North Dakota Pipeline Company Sandpiper • 225,000 BOPD • Route: ND to Clearbrook, MN, 24” Clearbrook to Superior, WI, 30” • In-service Date: Q1 2016
Enterprise Pipeline • 200,000-250,000 BOPD (Estimated ND Portion) • Route: Stanley, ND to Cushing, OK 1,200 miles, 30” • In-service Date: Q4 2016
TransCanada Keystone XL • Up to 100,000 BOPD • Timeline Uncertain
Energy Transfer Partners • 320,000 BOPD • Route: ND to Patoka, IL, 1,100 miles, 30” • In-service Date: Q4 2016
![Page 12: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/12.jpg)
Challenges* 1) Moving oil out of the
Williston Basin 2) Moving oil within the
Williston Basin
*Modified from Bridger and Belle Fourche Pipelines
2
1
12
North Dakota Crude Oil Pipelines
12 JJ Kringstad - North Dakota Pipeline Authority
![Page 13: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/13.jpg)
Red – Trucked Blue – Pipeline
Sep 2013 Estimates Some data incomplete or unavailable
All ND Production
ND Oil Gathering
13 13 JJ Kringstad - North Dakota Pipeline Authority
41% 59% 20%
80%
31% 69%
48% 52%
54% 46%
42% 58%
9%
91%
41% 59%
22%
78%
100%
100%
36% 64%
100%
14%
86%
3%
97%
![Page 14: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/14.jpg)
~250 Additional Truckloads Per Day
14 JJ Kringstad - North Dakota Pipeline Authority
Year-Over-Year Oil Gathering Changes*
*Best available estimate. Some data incomplete or missing
![Page 15: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/15.jpg)
15 JJ Kringstad - North Dakota Pipeline Authority
Estimated YOY Oil Gathering Change
Sep 2012 to Sep 2013
![Page 16: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/16.jpg)
16 JJ Kringstad - North Dakota Pipeline Authority
Estimated YOY Daily Truckload Change
Sep 2012 to Sep 2013 Assumes - 225 bbls/truck
![Page 17: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/17.jpg)
US Refining Markets
17 JJ Kringstad - North Dakota Pipeline Authority
$106.08
$100.74
$94.42
$89.83
$104.28
EIA April 2014 Refiner Acquisition Cost
![Page 18: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/18.jpg)
North Dakota Natural Gas Production
18 JJ Kringstad - North Dakota Pipeline Authority
Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.
![Page 19: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/19.jpg)
Solving the Flaring Challenge
19 JJ Kringstad - North Dakota Pipeline Authority
![Page 20: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/20.jpg)
Simple Terms Blue – Lack of pipelines Orange – Challenges on existing infrastructure
GREEN – % of gas captured and sold Blue – % flared from zero sales wells Orange – % flared from wells with at least one mcf sold.
April 2014 Data – Non-Confidential Wells Statewide
Solving the Flaring Challenge
20 JJ Kringstad - North Dakota Pipeline Authority
![Page 21: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/21.jpg)
Capturing the 10% Faster Well Connections
21 21 JJ Kringstad - North Dakota Pipeline Authority
![Page 22: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/22.jpg)
• 400 MMCFD
• 55 Miles, 20”
• Proposed In-service: Late 2016
22
Major Gas Projects in Development
WBI Energy – Dakota Pipeline
• 400-500 MMCFD
• 375 Miles, 24”
• Proposed In-service: 2017
Northern Border – Bakken Header
22 JJ Kringstad - North Dakota Pipeline Authority
![Page 23: Energy Development and Transmission Committee](https://reader036.fdocuments.us/reader036/viewer/2022071012/62c92f1e9e2e1d259a0f9243/html5/thumbnails/23.jpg)
Justin J. Kringstad, Director North Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840
Phone: (701)220-6227
Fax: (701)328-2820 E-mail: [email protected]
Websites:
www.pipeline.nd.gov www.northdakotapipelines.com
23 JJ Kringstad - North Dakota Pipeline Authority
Contact Information
23