Energy Generation and Transmission
-
Upload
ascommme -
Category
Government & Nonprofit
-
view
216 -
download
1
Transcript of Energy Generation and Transmission
![Page 1: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/1.jpg)
Expansion Energy Generation and Transmission
Minister Eduardo Braga
October 2015
Investment Opportunities
![Page 2: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/2.jpg)
Summary1. Institutional Environment
2. Electricity Sector in Brazil
3. Generation and Transmission Expansion
4. Investment Opportunities
2
![Page 3: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/3.jpg)
Operation
CNPE MME
Research and Public Polícies Trade
Regulation and Enforcement
CMSE
Monitoring
Institutional Environment3
![Page 4: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/4.jpg)
Institutional Environment Market
Generation Trade Transmission Distribution
Natural MonopolyCompetition
Free MarketRegulated
Market
Separation of Market Sections
4
![Page 5: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/5.jpg)
Institutional Environment
Free Contractual Environment
Prices Freely Negociated
Regulated Contractual Environment
Prices are Results of Auctions
Lower Tariff
Auctions of Electricity Generation
5
![Page 6: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/6.jpg)
Fonte: ANEEL
Adjusting AuctionsContracts: up to 2 years
A-5 A-3 A-1
A
Beginning of Supply
Auctions of Electricity Generation6
New Plants Contracts: 15 to 30 years
Buyers: distributors of electricity
Potencial Sellers: technically approved power plants
Existing EnterprisesContracts: 3 to 15 years
![Page 7: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/7.jpg)
Object: Operation of public service of transmission of electric energy by building, operating, and maintaining transmission utilities.
Duration: 30 years
Source of Revenues: consumers of the system, regardless the actual energy provided.
Rev
enue
s
Construction0%
30 years
Operation100%
Auctions of Electricity Transmission7
![Page 8: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/8.jpg)
Energy Sector
In Brazil
8
![Page 9: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/9.jpg)
TRANSMISSION LINES126 thousand km
ELECTRIC ENERGY PRODUCTION550 thousand GWh (projected for 2015)
(58% of South America)
INSTALLED CAPACITY138 GW
Key FeaturesElectric Energy Sector in Brazil 9
![Page 10: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/10.jpg)
Percentage of
Renewable Souces
Not Renewable
Renewable
Percentage of Renewable Souces (%)
2014 2013 2014 2013Source: IEA and MME
Supply of Electric Energy
Brazil USA OCDE World
Electric Energy Sector in Brazil
10
![Page 11: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/11.jpg)
32%
31%
23%
9%5%
Natural GasBiomassOilCoalNuclear
65,1%
4,9%
30,0%
<0,1%Hydro
Thermal
SolarWindInstalled Capacity Generation
SOURCE INSTALLED CAPACITY(MW) NºOF PLANTS
HYDRO 90,388 1,189THERMAL 41,682 2,808
WIND 6,629 273SOLAR 25 25
TOTAL 138,724 4,209
Source: Aneel – Big – 30-09-2015
Electric Energy Sector in Brazil 11
13,338 MW12,921 MW9,682MW
3,751 MW1,990 MW
![Page 12: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/12.jpg)
126 thousand km
102Transmission companies
Tension (kV)
Extension(km) % Capacity
MVA %
230 53.024 41,8 79.390 26,0345 10.303 8,1 49.795 16,3440 6.741 5,3 23.916 7,8500 41.197 32,5 129.842 42,5
600 (CC) 12.816 10,1 - -750 2.683 2,1 22.500 7,4
TOTAL 126.764 100,0 305.443 100,0
2015Transmission System
September
Source: Boletim Mensal DMSE/MME
Electric Energy Sector in Brazil 12
![Page 13: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/13.jpg)
Continental Dimension
BRAZIL
4,000 km EUROPE
Transmission SystemElectric Energy Sector in Brazil 13
![Page 14: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/14.jpg)
System Operation
-N
C -
-
-
-
COSRN - CO
COSRNE
COSRSE
COSRS
CNOS
Centralized Operation290 power plants126 thousand km lines560 substations
EnergyOptimization
Center for Operation of the System in the Region
COSR
Electric Energy Sector in Brazil 14
![Page 15: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/15.jpg)
Expansion
Generation and Transmission of Electricity
of
15
![Page 16: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/16.jpg)
HYDRO
BIOMASSNUCLEAR
NATURAL GAS
WIND
Potencial and Diversity
SOLARCOAL
GENERATION16Expansion of Electricity Generation and Transmission
![Page 17: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/17.jpg)
Competitiveness between the Main Sources
Hydroelectricity
Wind
Biomass
Coal
Nuclear
Solar
Natural Gas
Oil
Diesel
117
135
150
160
170
216
223
393
749
Values in R$/MWh
GENERATION17
Source: SPE/MME – Average values
Generation and Transmission Expansion
![Page 18: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/18.jpg)
SourceSeptember 2015 December 2024
Installed Power(GW)
Participation (%)
Installed Power(GW)
Increase (GW)
Participation (%)
Hydro 90,3 65,1 125,0 34,7 60,4Thermal 41,7 30,0 51,0 9,3 24,6
Wind 6,6 4,9 24,0 17,4 11,6Solar < 0,03 < 0,1 7,0 7,0 3,4
TOTAL 138,6 100,0 207,0 68,4 100,0
Sour
ce:
MM
E / S
PE -
PDE
202
4
Ten-Year Plan - Electric Energy (PDE) 2024
18
GenerationGeneration and Transmission Expansion
![Page 19: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/19.jpg)
140 billion in investments
Contracted Projects Period: 2015 - 2018
Source: CMSE/MME – september 2015
GENERATION
504 power plants
39 thousand MW of installed capacity
19
R$
![Page 20: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/20.jpg)
National integration
Regional connections
Strengthening of main grid
Energy optimization
20Generation and Transmission Expansion
Transmission LinesExpansion Policies
![Page 21: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/21.jpg)
Tension (kV)
September 2015 December 2024Extension
(km)Capacity
(MVA)Extension
(km)Capacity
(MVA)
230 53.024 79.390 73.517 126.471345 10.303 49.795 11.969 70.942440 6.741 23.916 7.081 34.947500 41.197 129.842 83.439 234.520
600 (CC) 12.816 - 12.816 -750 2.683 22.500 2.683 26.897
800 (CC) - - 10.055 -TOTAL 126.764 305.443 201.560 493.777
Transmission
Extension (km): increase of59% Capacity (MVA): increase of62%
Sour
ce: P
DE 2
024
- MM
E
Ten-Year Plan - Electric Energy (PDE) 2024
21Generation and Transmission Expansion
![Page 22: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/22.jpg)
232 transmission lines32,5 thousand km
45 billion in investments
Registered Projects Period: 2015 - 2018
192 substations
42,5 thousand MVASource: CMSE/MME – september 2015
TRANSMISSION22
R$
![Page 23: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/23.jpg)
InvestmentOpportunities
23
![Page 24: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/24.jpg)
Auctions of partially financed hydro plants
Investment Opportunities
Date: November 6th, 2015
Source: Hydro
Projects: 29 plants (1,5 ~ 3.444
MW)
Registered Power: 6.062 MW
24
New Auctions Electricity Generation
![Page 25: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/25.jpg)
Partially Financed UHEs Auctions
Investment Opportunities
UHE Três Marias396 MW
UHE Jupiá1.551 MW
UHE Ilha Solteira3.444 MW
Some projects
25
New Auctions Electricity Generation
![Page 26: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/26.jpg)
2nd Auction of Energy Reserve
Investment Opportunities
Date: 13 de novembro de 2015Sources: Solar Fotovoltaica e EólicaRegistered Projects: 1.379Registered Power: 39.917 MWContracts: 20 years Ceiling -Prices: Solar – R$ 381,00 / MWh Eolic – R$ 213,00 / MWh
26
New Auctions Electricity Generation
![Page 27: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/27.jpg)
Date: February 5th, 2016
Sources: Hydro, Coal, Biomass, Natural Gas and
Wind
Contracts: 20 - 30 years
Registration Deadline: to be confirmed
Auction A-5 /2016
Investment Opportunities 27
New Auctions Electricity Generation
![Page 28: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/28.jpg)
28
Date: November 6th, 2015
4.267 km of transmission lines
9.767 MVA of processing capacityBeggining of operations : july/ 2019 – january/ 2021
Investments: R$ 7,1 billion
Investment Opportunities
Auction nº 5/2015New Auctions Transmission
Source: Aneel – september 2015
![Page 29: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/29.jpg)
Source: Aneel – september 2015
29Investment Opportunities
Date: January 29th, 2016
7.806 km of transmission lines
3.300 MVA of processing capacityBeggining of operations: april/2019 – april/2021
Investments: R$ 12,6 billion
Auction nº 13/2015New Auctions Transmission
![Page 30: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/30.jpg)
Transmision Lines Expansion - 2016over 3 Auctions
Midwest RegionReinforcements
South Reinforcements
Investments of R$ 12,4 billion
30
Interconnection Expansion
North - Southeast and Northeast - Southeast
![Page 31: Energy Generation and Transmission](https://reader035.fdocuments.us/reader035/viewer/2022070314/587b16fa1a28abb15c8b7a37/html5/thumbnails/31.jpg)
Thank you!