EGI Design [email protected] European Grid Initiative Design Study Proposal.

24
EGI Design Study [email protected] European Grid Initiative Design Study Proposal

Transcript of EGI Design [email protected] European Grid Initiative Design Study Proposal.

Page 1: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

European Grid Initiative

Design Study Proposal

Page 2: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Slide courtesy of Kyriakos Baxevanidis, EC

Broad scale test-beds

Production quality

facilities

Sustainable

e-Infrastructures

(utility model)

Sustainable grid/data-based e-Infrastructures

(utility model)

Towards sustainable grid-empowered e-Infrastructures

Page 3: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Broad scale test-beds

Production quality

facilities

Sustainable

e-Infrastructures

(utility model)

Sustainable grid/data-based e-Infrastructures

(utility model)

Towards sustainable grid-empowered e-Infrastructures“…for Grids we would like to see the

move towards long-term sustainable initiatives less dependent upon EU-funded project cycles”

Viviane Reding, Commissioner, European Commission, at the EGEE’06 Conference, September 25, 2006

Call Identifier: FP7-INFRASTRUCTURES-2007-1Call Topic: INFRA-2007-2.1.2: Design studies for e-InfrastructuresDeadline: 2 May 2007Indicative Budget: € 6 Mio.

Page 4: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

First e-Infrastructure Call in FP7INFRA-2007-2.1.2: Design studies for e-Infrastructures

• Support conceptual design studies for new research infrastructure (or major upgrades of existing ones) of clear European dimension and interest; such studies will help to assess technical and financial feasibility of proposed new research infrastructure

Action should also

• foster emergence of new organisational models to consolidate a sustainable approach to e-Infrastructures, in particular in the domain of grids and data repositories

• facilitate new service provisioning schemes to be more neutral and open to all user communities and resource providers

Page 5: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Challenge and Evolution of GridsGrids today:• Project-based funding cycles are a serious problem for

grid infrastructure planning and operations• Users of grid infrastructures require long-term

guarantees to protect their investments (for bringing applications to the grid)

Requirements for sustainability:• Consolidation of national grid infrastructures and

corresponding national funding are key to long-term sustainability

• Coordination on European level is needed and should be driven by NGIs

Page 6: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

European Grid Initiative• Coordination on European level is needed and

should be driven by NGIs

• The first goal of the European Grid Initiative is to set up a steering body of NGI representatives for European grid coordination

• The NGI representatives decide about the operation of the European grid infrastructure and provides feedback and advice for the national grid infrastructures

• The setup of the steering body needs to be carefully designed

Page 7: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

The EGI Design Study should …• … define the scope, functions, and procedures

of the European grid infrastructure body including the setup of the EGI Council (NGI representatives) and the transition from today’s grid infrastructures

• … support the advancement of each NGI to converge into a unique body managing its national grid infrastructure

• … feed-back and refine the EGI design with the NGI representatives

• ... support the establishment of the European grid infrastructure body and the EGI Council

Page 8: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

EGI Design Study Consortium• … is a group of experts with knowledge and

experience needed for advancing EGI to the next level

• … submits the proposal for the EGI Design Study to the European Commission

• … gathers input from all entities involved in grid infrastructure operations

• … distils information into documents

• … interacts with and seeks endorsement from the NGI representatives

• … dissolves after project end

Page 9: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

EGI Design Study Consortium

• CERN*, Switzerland (Wolfgang von Rüden)• CESNET, Czech Republic (Ludek Matyska)• CNRS, France (Guy Wormser)• CSC, Finland (Kimmo Koski)• DFN, Germany (Klaus Ullmann)• GRNET, Greece (Fotis Karayannis)• GUP Linz, Austria (Dieter Kranzlmüller)• INFN, Italy (Mirco Mazzucato)• STFC/CCLRC, UK (Michael Wilson)

* to be confirmed

Page 10: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Workpackage OverviewWP1: Project management

(Lead: GUP Linz, Austria)

WP2: EGI requirements consolidation (Lead: GRNET, Greece)

WP3: EGI functions definition and roadmap (Lead: INFN, Italy)

WP4: Design study of EGI legal and organisational options (Lead: CNRS, France)

WP5: Establishment of EGI (Lead: CERN, Switzerland)

WP6: EGI promotion and links with other initiatives (Lead: CSC, Finland)

Page 11: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP2: EGI requirements consolidation

Objective: • To ensure that the future EGI organisation takes the

requirements posed by the NGIs and other related stakeholders in a prioritised way into account

Tasks:• Update and consolidate existing preparatory work

(e.g. EGEE, e-IRG, …)• Consult with major stakeholders such as NGIs,

application communities, …• Build a knowledge base for NGIs and EGI• Collect use cases for EGI• Reflect on the results of the above tasks and incorporate

potential feedback

Page 12: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP2: EGI requirements consolidation

Issues/challenges: • On collecting/prioritising the EGI requirements

and use cases: be inclusive, but rational!• Balance the diverse requirements posed by

– different NGIs– different communities– other stakeholders

• Keep the knowledge database up-to-date– Establish a good communication basis with NGIs

Page 13: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP3: EGI functions definition and roadmap

Objective: • Based on the requirements analysis performed in WP2,

define the functions to be carried out by EGI or delegated in total or partly to other bodies e.g. – e-Infrastructure operation, – Middleware development, standardization– Components integration, certification and deployment– Application support – Outreach and dissemination– Policy, and international cooperation

Page 14: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP3: EGI functions definition and roadmap

Tasks:

• Definition of the structural and working relations between EGI, NGIs and EU-Infrastructure related projects according to the functional responsibility attribution

• Definition of the evolution of the functions and scope for the EGI

• Present the functional definitions for EGI to the NGI communities, get the feedback for modifications and further revisions

Page 15: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP3: EGI functions definition and roadmap

Issues/challenges: • Workload sharing and synergies between EGI and NGIs• Guarantee sustainability of the e-Infrastructure

– stability and most effective ways of operations – expansion of the infrastructure in terms of sites, resources,

users, and communities– seamless integration in a world wide e-Infrastructure– coordination of the required middleware and operating tool

developments• Plan a smooth transition without loss in competitiveness

and support to user communities• Define a model for dealing with new European grid

projects to foster technical innovation required by different communities

Page 16: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP4: Design study of EGI legal and organisational options

Tasks:• Legal options for and design of EGI organisation• Governance model (based on WP3 output study issues

like Board of Directors, NGI Policy Committee, links with other bodies)

• Funding model (EC vs. NGI funding, other funding sources)

• Design of the operational model of EGI or convergence with existing model

Page 17: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP4: Design study of EGI legal and organisational options

Issues/challenges: • Identify the best legal framework for the EGI

organization by surveying large European infrastructure organisations and list pro and cons

• What are the legal requirements for NGIs?• Establish a lean and efficient governance: many

stakeholders, partners, funding bodies• Propose sustainable financial models• Clarify status of personnel associated with EGI

Page 18: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP5: Establishment of EGI

Tasks:• Support the creation of the new EGI organization• Prepare and initiate the seamless transition from existing

infrastructure projects (e.g. EGEE)• Seek funding from NGIs and the EU to ensure that the

essential fraction of skilled personnel operating today’s infrastructures can be taken over

Page 19: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP5: Establishment of EGI

Issues/challenges: • How to obtain long-term commitments from funding

agencies ?• How fast can the EGI organization start up?• What would be the earliest starting date?• Is an interim setup of an organization needed?• Is the EGI organization centralized or distributed?

Page 20: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP6: EGI Promotion and links with other initiatives

Tasks:• Identify potential collaboration partners and stake

holders for EGI• Establish a basis for liaisons between EGI and related

institutions and activities• Promote EGI to potential users and providers from

science and industry• Inform and interact with decision makers and funding

bodies on EGI related issues• Support the organization of EGI related events

Page 21: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

WP6: EGI Promotion and links with other initiatives

Issues/Challenges:• How to increase visibility and acknowledgement of grid

computing to increase national support for NGIs?• What is the optimal relation between EGI and European

grid projects? How can EGI contribute in building the European infrastructure in a sustained way?

• How to collaborate with other infrastructure communities?

• How to contribute in supporting the various infrastructures listed in ESFRI roadmap?

• How to increase the volume of European grid activities through growing input from industry and new user communities?

Page 22: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Workpackage OverviewWP1: Project management

(Lead: GUP Linz, Austria)

WP2: EGI requirements consolidation (Lead: GRNET, Greece)

WP3: EGI functions definition and roadmap (Lead: INFN, Italy)

WP4: Design study of EGI legal and organisational options (Lead: CNRS, France)

WP5: Establishment of EGI (Lead: CERN, Switzerland)

WP6: EGI promotion and links with other initiatives (Lead: CSC, Finland)

Page 23: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Schedule

• EGI Workshop, Munich, Germany February 26/27, 2006

• EGI Proposal Preparation until May 2, 2007 (Call INFRA-2007-2.1.2)

• Preparation of EGI Design Project until Nov 2007

• EGI Design Project (18 months) Dec 2007 – June 2009 3-4 Workshops for NGI Representatives

• EGI Operations (1 year overlap with EGEE-III) June 2009 -

Page 24: EGI Design Studycontact@eu-egi.org European Grid Initiative Design Study Proposal.

EGI Design Study [email protected]

Involvement in EGI Design Study

• EGI Council: NGI Representatives

Provide letters of support for EGI Design Study Proposal

• Deadline: 26 March 2007