THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11- 0512j Version: 1.0 Date: 07/07/2017 SCHNEIDER CE6 WITH SEPAM 1000+ RELAY TEST FORM Substation Name Substation Number Voltage Switchgear Switchboard Number Manufacturer Schneider Serial Number Type CE6 Protection CTs CT Ratio Relay Serial Number Protection Settings (specified by planner/designer) Overcurrent Settings Earth Fault Settings Setting Current Setting Current Curve Curve Time Multiplier Time Multiplier Highset Setting Current Highset Setting Current Highset Time Highset Time SEF Setting Current SEF Time Preliminary Checks () Visual inspection satisfactory (no visible signs of damage etc) Earthing satisfactory SF6 gas pressure satisfactory Functional/Interlock Checks () Open and close circuit-breaker

Transcript of ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop...

Page 1: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

THIS

IS A

N U

NC

ON

TRO

LLED

DO

CU

MEN

T, T

HE

REA

DER

MU

ST C

ON

FIR

M IT

S VA

LID

ITY

BEF

OR

E U

SE

Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

SCHNEIDER CE6 WITH SEPAM 1000+ RELAY TEST FORM

Substation Name

Substation Number

Voltage

Switchgear

Switchboard Number Manufacturer Schneider

Serial Number Type CE6

Protection CTs

CT Ratio

Relay

Serial Number

Protection Settings (specified by planner/designer)

Overcurrent Settings Earth Fault Settings

Setting Current Setting Current

Curve Curve

Time Multiplier Time Multiplier

Highset Setting Current Highset Setting Current

Highset Time Highset Time

SEF Setting Current

SEF Time

Preliminary Checks ()

Visual inspection satisfactory (no visible signs of damage etc)

Earthing satisfactory

SF6 gas pressure satisfactory

Functional/Interlock Checks ()

Open and close circuit-breaker

Earth switches cannot be operated when service selected

Circuit-breaker cannot be operated when earth selected

Open and close earth switches

Test access cannot be opened when circuit-breaker in On and Off position

Test access can be opened when earth switch closed

Circuit-breaker cannot be operated when test access open

Page 2: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Switchgear Continuity Test

Circuit-breaker Terminals Under Test Continuity Circuit-

breaker Terminals Under Test Continuity

Closed L1 - L1 Earthed L1 - E

L2 - L2 L2 - E

L3 - L3 L3 - E

HV Insulation Tests using Test Voltage from using Test Voltage from ECS 11-0006

Circuit-breaker Terminals Voltage (kV)

Duration (min)

IR (M)

Under Test Earthed

Closed L1 L2, L3

Closed L2 L1, L3

Closed L3 L1, L2

Open L1, L2, L3 L1, L2, L3

Protection CTs Insulation Resistance using 1kV Test Voltage

Remove CT wiring links C12, C32, C52, C71 ()

Remove CT wiring earth links C70, C90 ()

Ensure yellow physical shorting link is open ()

Measure the insulation resistance C70 - Earth M

Replace CT wiring earth links C70, C90 ()

Protection CTs Loop Continuity(from CT wiring terminal block)

Measure L1 CT continuity C11 - C70

Measure L3 CT continuity C31 - C70

Measure L3 CT continuity C51 - C70

Replace CT wiring links C12, C32, C52, C71 ()

© UK Power Networks 2017 All rights reserved 2 of 7

Page 3: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Figure 1: Protection CTs

Relay Case Resistance

Measure the resistance between the relay case and the switchgear earth ()

Dual Ratio Protection CTs

For switchgear with dual ratio protection CTs select the appropriate ratio to give the required protection settings and record CT ratio on the front of the form

()

CT Ratio Terminal Block Connections

400/1C210 - 5C230 - 6C250 - 7

()

800/1C110 - 1C130 - 2C150 - 3

()

© UK Power Networks 2017 All rights reserved 3 of 7

Page 4: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Test Protection Settings

Apply the following temporary settings to the relay (refer to Appendix A for guidance) ()

Overcurrent Settings Earth Fault Settings

I> 80A400/1 0.2 In

Ie> 60A400/1 0.15 Ien

800/1 0.1 In 800/1 0.075 Ien

Delay Type DMT Delay Type DMT

IDMT IEC SI IDMT IEC SI

TMS 1.5 TMS 1.5

I>> 4.0 x In Ie>> 2.0 x Ien

I>>> No Ie>>> No

Relay Operation - Primary Injection Test

Increase the current until the LED starts to flash and record the current value. Reset the relay and, if necessary, close the circuit breaker before each test

Overcurrent Pickup Test

CB Conductors Under Test

Short Conductors

Is Setting Calculated Pickup Current (Is + 20%)

Actual Pickup Current

Closed L1 - L2 L1, L2, L3 80A 96A A

Closed L2 - L3 L1, L2, L3 80A 96A A

Earth Fault Pickup Test

CB Conductors Under Test Ios Setting Calculated Pickup Current (Ios + 20%)

Actual Pickup Current

Closed L1 - L1 60A 72A A

Closed L2 - L2 60A 72A A

Closed L3 - L3 60A 72A A

In-service Protection Settings

Apply the in-service protection settings as specified by the planner/designer to the relay and record them below (refer to A.4 for guidance) ()

Overcurrent Settings Earth Fault Settings

Is Ios

I> curve Io> curve

DT only DT only

t> Select from table on relay

to> Select from table on relayx10 / x1 x10 / x1

I>> (Highset Current ÷Is) Io>> (Highset Current ÷Is)

t>> to>>

© UK Power Networks 2017 All rights reserved 4 of 7

Page 5: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Table A - Calculate Injection Currents Overcurrent Setting Earth Fault Setting

CT Ratio

Primary Setting Current (Is) (Ios)

Secondary Setting Current (Primary Setting Current ÷ CT Ratio)

2 x Secondary Setting Current

5 x Secondary Setting Current

I>> or Io>> x Secondary Setting Current (highset)*

Table B - Calculate Operating Times Overcurrent Setting Earth Fault Setting

Curve (I>) (Io>)

Time Setting on relay(t>) (to>)

(t>>) (to>>)

Tripping time at 2 x secondary current

Curve SI (t> or to> x 3.4) +0.09s s s

Curve VI (t> or to> x 9) + 0.09s s s

Curve EI (t> or to> x 33) + 0.09s s s

Tripping time at 5 x secondary current

Curve SI (t> or to> x 1.44) + 0.09s s s

Curve VI (t> or to> x 2.25) + 0.09s s s

Curve EI (t> or to> x 4.1) + 0.09s s s

Tripping time at I>> or Io>> x Secondary Setting Current

Highset/Instantaneous* t>> or to>> + 0.09s s s

SEF* to> + 0.09s s

* Only calculate highset, instantaneous or SEF settings if used.

© UK Power Networks 2017 All rights reserved 5 of 7

Page 6: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Relay Operation - Secondary Injection Test

Connect timer circuit to auxiliary contacts 124 and 125 on rail A in marshalling box ()

Overcurrent Test

SettingCalculated Injection Current(from table A)

Calculated Operating Time (from table B)

Actual Operating Times

C110 – C130 C130 – C150 C150 - C110

2x A s s s s

5x A s s s s

Instantaneous A s s s s

Earth Fault Test

SettingCalculated Injection Current(from table A)

Calculated Operating Time (from table B)

Actual Operating Times

C110 - C70 C130 - C70 C150 - C70

2x A s s s s

5x A s s s s

Instantaneous A s s s s

SEF* A s s s s

Figure 2: Relay Timing Test Terminals

Shunt Trip and Emergency Trip (if fitted)

Check correct shunt trip coil voltage is selected ()

Test Coil Terminals Test Voltage CB Trips

Apply 70% (dc) or 85% (ac) of coil rated voltage

20-48V DC 53 – 55 V ()

110-240V AC/DC 53 – 54 V ()

Apply 110% Voltage of coil rated voltage

20-48V DC 53 – 55 V ()

110-240V AC/DC 53 – 54 V ()

Check emergency trip button operates circuit-breaker ()

© UK Power Networks 2017 All rights reserved 6 of 7

Page 7: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Final Checks ()

Check correct CT and interposing CT ratios selected

Check correct ratio labels have been fitted

Check correct protection settings applied

Check relay reset

Ensure FPI CT shorting-link(s) are replaced if CTs are not used or not connected to FPI or RTU

Reconnect umbilical cable to RTU (if fitted)

Asset data form completed

Test Equipment

Make/Type Serial Number Calibration Date

Certification ()

All tests have been completed satisfactorily

Comments

Commissioning Engineer Signature Date

The completed test form shall be left on-site in a plastic wallet and in secure location. A copy of the completed test shall be sent to the relevant ART mailbox.

© UK Power Networks 2017 All rights reserved 7 of 7

Page 8: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Appendix A MICOM P116

A.1 Introduction

The MiCOM P116 is a three-phase overcurrent and earth fault relay which has been designed to control, protect and monitor industrial and distribution installations. The relay can be self-powered powered from the CTs or an auxiliary voltage supply. The relay includes a built-in USB port which provides access to disturbance records, fault records, events and relay settings. Settings for the protection elements can be entered using the front panel keyboard and local display or using the MiCOM S1 or S1 Studio setting software.

A.2 Front Panel

1 – Green ‘Healthy’ LED – Watchdog

2 – Red ‘Trip’ LED - Protection Trip

3 – Yellow ‘Alarm’ LED

4 – Five red programmable LEDs

5 – 16 character by 2-lin3 alphanumeric LCD

6 – Clear key

7 – Read key (jump to RECORDS column)

8 – Arrow keys and enter key

9 – Electromechanical flag indicators

10 – Circuit-breaker Close

11 – Circuit-breaker Open

12 – USB port for local connection

A.3 Relay Front Panel Navigation

An overview of the relay front panel is shown in Section A.2. The arrow buttons can be used to move left, right, up, down respectively to navigate from one menu to the another in turn to access information such as protection settings, fault records, etc. The OK button is used as an enter key.

The main menu structures are shown Section A.5 and should be self-explanatory when used in conjunction with the arrow buttons. When the P116 relay is energised the screen display will show the three-phase and neutral current values on the LCD display screen, which is the starting point for navigating to the various sub menus within the relay.

© UK Power Networks 2017 All rights reserved 1

Page 9: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

A.4 Programming

The keypad has seven keys divided into two groups:

The and keys situated immediately under the screen are dedicated to reading and acknowledging alarms.

The other five keys situated below these are used for programming the relay and navigating the menu system (a map of the menu system is shown in section A.5). The

directional keys either move through the various levels of the menu or are

used to change settings. The key validates a choice or applied value. The general

menu navigation is left and right to scroll through the main menu headings. Pressing down will enter the menu selected and allow you to scroll through the various options.

For example, applying the following typical settings to a MiCOM P116 relay used with 400/1 CTs:

Test Protection Settings

Apply the following temporary settings to the relay (refer to A.4 for guidance) ()

Overcurrent Settings Earth Fault Settings

I> 80A400/1 0.2

In Ie> 60A400/1 0.15 Ien

800/1 0.1 In 800/1 0.075

IenDelay Type DMT Delay Type DMTIDMT IEC SI IDMT IEC SITMS 1.5 TMS 1.5I>> 4.0 x In Ie>> 2.0 x IenI>>> No Ie>>> No

Note: Various settings, such as the selection of the various thresholds, time delays, trip settings etc are password protected and when accessing these menus a password entry is required. By default this is set to OOOO and will already be entered when the password

prompt appears on the LCD. To proceed past this screen press the key.

First enter the CT ratio (400/1A) into the relay:

Global Settings LOC CT Ratio Line CT primaryOK Setting Mode OK Change setting to 400A (using up/down & left/right buttons)OK OK

Moves to ‘E/Gnd CT Primary’ change setting to 400AChange setting to 400A (using up/down & left/right buttons)

© UK Power Networks 2017 All rights reserved 2

Page 10: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Next apply the relay settings:

Overcurrent: Global Settings Setting Group 1

Protection G1Phase O/C G1 [50/51]

I>OK Change setting to 1: Trip OK

Use up or down arrows to change settingI> Threshold

OK Change setting to 0.2In OK

Use left or right buttons to move to required positionUse up or down buttons to change settingDelay Type I>

OK OK Change setting to 1: IEC SI (using up or down buttons) I> TMSOK OK Change setting to 1.5 (using up/down & left/right buttons) I>>OK OK Change setting to 1: Trip (using up/down buttons) I>> ThresholdOK OK Change setting to 4.0In (using up/down & left/right buttons) Delay Type I>>OK OK Change setting to 0: DMT (using up/down buttons) tI>>OK OKOK OK

Change setting to 3s (using up/down & left/right buttons)I>>> set to 0:disabled (using up/down buttons)set to 0:disabled (using up/down buttons)

Earth Fault:Return to Phase O/C G1 [50/51] (press 13 times) E/GND FAULT G1 [50N/51N/67N] IN_1 stageOK OK Change setting to 1: IN> Trip (using up/down buttons) IN_1 ThresholdOK OK Change setting to 0.15 Ien (using up/down & left/right buttons) Delay Type IN_1OK OK Change setting to 1: IEC SI (using up/down buttons) IN_1 TMSOK OK Change setting to 1.5 (using up/down & left/right buttons) IN_2 stageOK OK Change setting to 1: IN>> Trip (using up/down buttons) IN_2 ThresholdOK OK Change setting to 2.0 Ien (using up/down & left/right buttons) tIN_2OK OK Change setting to 3s (using up/down & left/right buttons)

© UK Power Networks 2017 All rights reserved 3

Page 11: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

Output Relays:Return to PROTECTION G1(press 10 times) OUTPUT RELAYS configuration G1 Protect TF654321OK Change setting to configure output relays required for tripping

TF65432110000011 (using up/down & left/right buttons) to change each

digit position to a 1 or 0, press once complete.

Press button three times to go back to main screen.

If further earth fault settings are required they should be implemented using the IN_3 menu. If not required, ensure this is not enabled by setting them to 0:Disabled. From main screen press right button () 3 times, down button () 2 times, right button () 2

times, press down button () 10 times, press use up/down buttons to change to

0:Disabled, press once complete. Press button four times to go back to main screen.

Main Screen

© UK Power Networks 2017 All rights reserved 4

Page 12: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

A.5 P116 Menu Structure Diagrams

For ease of reference the following menu structures go from the main LCD display through to the setting group 1 menu where the protection settings are stored. All other menu structures are detailed in the P116 relay manual (available from Alfresco > Reference Library > Schneider).

© UK Power Networks 2017 All rights reserved 5

Start here

Page 13: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

© UK Power Networks 2017 All rights reserved 6

Page 14: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

This page is left intentionally blank.

© UK Power Networks 2017 All rights reserved 7

Page 15: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

THIS

IS A

N U

NC

ON

TRO

LLED

DO

CU

MEN

T, T

HE

REA

DER

MU

ST C

ON

FIR

M IT

S VA

LID

ITY

BEF

OR

E U

SE

Document Number: ECP 11-0512jj

Version: 1.0

Date: 07/07/2017

Appendix B – Schematic Diagrams

Page 16: ECP 11-0512j Schneider CE6 with Sepam 1000+ Relay … · Web viewProtection CTs Loop Continuity(from CT wiring terminal block) Measure L1 CT continuity C11 - C70 Measure L3 CT continuity

THIS

IS A

N U

NC

ON

TRO

LLED

DO

CU

MEN

T, T

HE

REA

DER

MU

ST C

ON

FIR

M IT

S VA

LID

ITY

BEF

OR

E U

SE

Schneider CE6 with Sepam 1000+ Relay Test Form Document Number: ECP 11-0512j

Version: 1.0

Date: 07/07/2017

© UK Power Networks 2017 All rights reserved 2