    St Silas School

    Design & Development

    Case Study

    20 March 2012

  • 7/21/2019 Ecobuild Design and Development Casestudy

    2/32

    2

    The Project

    St Silas Primary School, Blackburn

    Delivered as part of the Blackburn with Darwen BSF

    Completes early April 2012

    Value 5.5m

    Designers Capita Selected by the Local Authority and novated to

    Balfour Beatty

    Capita - a multi-disciplinary team

    All team members working in BIM (Autodesk Revit Software)

    First fully integrated BIM project involving designers, constructionand supply chain

  • 7/21/2019 Ecobuild Design and Development Casestudy

    3/32

    3

    Clients Drivers

    Retain school in same location

    Maximising use of a very tight site

    Increasing amount of open space

    Increasing sports facilities

    Dynamic image

    Increase community usage

    High degree of public engagement

    Use of BIM to ease decision making

  • 7/21/2019 Ecobuild Design and Development Casestudy

    4/32

    4

    Project Issues

    Very constrained site

    Steeply sloping site

    Culvert running across centre

    Surrounded by public realm

    Narrow Roads on all 4 sides

    In midst of Housing Estate

    Poor ground conditions

  • 7/21/2019 Ecobuild Design and Development Casestudy

    5/32

    5

    Lower Ground Floor Plan

  • 7/21/2019 Ecobuild Design and Development Casestudy

    6/32

    6

    Ground Floor Plan

  • 7/21/2019 Ecobuild Design and Development Casestudy

    7/32

    7

    First Floor Plan

  • 7/21/2019 Ecobuild Design and Development Casestudy

    8/32

    8

    The Project

  • 7/21/2019 Ecobuild Design and Development Casestudy

    9/32

    9

    The Project

  • 7/21/2019 Ecobuild Design and Development Casestudy

    10/32

    10

    Interiors

  • 7/21/2019 Ecobuild Design and Development Casestudy

    11/32

    11

    Interiors

  • 7/21/2019 Ecobuild Design and Development Casestudy

    12/32

    12

    Exterior

  • 7/21/2019 Ecobuild Design and Development Casestudy

    13/32

    13

    Night shot

  • 7/21/2019 Ecobuild Design and Development Casestudy

    14/32

    14

    Integrated Schedule of Accommodation

  • 7/21/2019 Ecobuild Design and Development Casestudy

    15/32

    15

    BIM modelling

  • 7/21/2019 Ecobuild Design and Development Casestudy

    16/32

    16

    Structure and Services

  • 7/21/2019 Ecobuild Design and Development Casestudy

    17/32

    17

    Envelope

  • 7/21/2019 Ecobuild Design and Development Casestudy

    18/32

    18

    Environmental Analysis

  • 7/21/2019 Ecobuild Design and Development Casestudy

    19/32

    19

    FFE Integration

  • 7/21/2019 Ecobuild Design and Development Casestudy

    20/32

    20

    Installation Sequencing

  • 7/21/2019 Ecobuild Design and Development Casestudy

    21/32

    21

    Material Properties

  • 7/21/2019 Ecobuild Design and Development Casestudy

    22/32

    22

    Clash Detection Reports

  • 7/21/2019 Ecobuild Design and Development Casestudy

    23/32

    23

    Client Engagement

  • 7/21/2019 Ecobuild Design and Development Casestudy

    24/32

    24

    Client Testimonial

  • 7/21/2019 Ecobuild Design and Development Casestudy

    25/32

    25

    Client Testimonial

    Because we have been able to see exactly what it lookslike we have been able to order the furniture now inadvance, which would never have been able to with the

    use of flat plans.

    A lot of consultation has gone on, Icertainly feel more

    confidentbecause we can actually see what its going tolook like.

    They have used the BIM model to help understand howto Keeping the school looking good, knowing how muchthats going to cost, sustainability, knowing how long

    things will last, all of those have been within theconversations we have had and very much built into theplanning

  • 7/21/2019 Ecobuild Design and Development Casestudy

    26/32

    26

    Project Aims and Results

    Design Integration

    Shorter programme to planning

    Reduced RFIs (23 to date)

    Supply chain integration

    Integration of FF&E, SoA schedules

    Zero M&E Clashes on site

    Visibility of Programming

    Integration of Temporary Works

    Increased safety-managing public interfaces on tight site

    Aid to client decision making

  • 7/21/2019 Ecobuild Design and Development Casestudy

    27/32

    27

    Portable technology

  • 7/21/2019 Ecobuild Design and Development Casestudy

    28/32

    28

    Used by Client, design and site staff

  • 7/21/2019 Ecobuild Design and Development Casestudy

    29/32

    29

    Component Properties

    Courtesy of Space0

  • 7/21/2019 Ecobuild Design and Development Casestudy

    30/32

    30

    Component Properties

    Courtesy of Space0

  • 7/21/2019 Ecobuild Design and Development Casestudy

    31/32

    31

    Client Testimonial360 Gyroscopic Views

    Courtesy of Space0

  • 7/21/2019 Ecobuild Design and Development Casestudy

    32/32

    32

    Thank you