Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Ecobuild Design and Development Casestudy
-
Upload
emerson-galdino -
Category
Documents
-
view
216 -
download
0
Transcript of Ecobuild Design and Development Casestudy
-
7/21/2019 Ecobuild Design and Development Casestudy
1/32
St Silas School
Design & Development
Case Study
20 March 2012
-
7/21/2019 Ecobuild Design and Development Casestudy
2/32
2
The Project
St Silas Primary School, Blackburn
Delivered as part of the Blackburn with Darwen BSF
Completes early April 2012
Value 5.5m
Designers Capita Selected by the Local Authority and novated to
Balfour Beatty
Capita - a multi-disciplinary team
All team members working in BIM (Autodesk Revit Software)
First fully integrated BIM project involving designers, constructionand supply chain
-
7/21/2019 Ecobuild Design and Development Casestudy
3/32
3
Clients Drivers
Retain school in same location
Maximising use of a very tight site
Increasing amount of open space
Increasing sports facilities
Dynamic image
Increase community usage
High degree of public engagement
Use of BIM to ease decision making
-
7/21/2019 Ecobuild Design and Development Casestudy
4/32
4
Project Issues
Very constrained site
Steeply sloping site
Culvert running across centre
Surrounded by public realm
Narrow Roads on all 4 sides
In midst of Housing Estate
Poor ground conditions
-
7/21/2019 Ecobuild Design and Development Casestudy
5/32
5
Lower Ground Floor Plan
-
7/21/2019 Ecobuild Design and Development Casestudy
6/32
6
Ground Floor Plan
-
7/21/2019 Ecobuild Design and Development Casestudy
7/32
7
First Floor Plan
-
7/21/2019 Ecobuild Design and Development Casestudy
8/32
8
The Project
-
7/21/2019 Ecobuild Design and Development Casestudy
9/32
9
The Project
-
7/21/2019 Ecobuild Design and Development Casestudy
10/32
10
Interiors
-
7/21/2019 Ecobuild Design and Development Casestudy
11/32
11
Interiors
-
7/21/2019 Ecobuild Design and Development Casestudy
12/32
12
Exterior
-
7/21/2019 Ecobuild Design and Development Casestudy
13/32
13
Night shot
-
7/21/2019 Ecobuild Design and Development Casestudy
14/32
14
Integrated Schedule of Accommodation
-
7/21/2019 Ecobuild Design and Development Casestudy
15/32
15
BIM modelling
-
7/21/2019 Ecobuild Design and Development Casestudy
16/32
16
Structure and Services
-
7/21/2019 Ecobuild Design and Development Casestudy
17/32
17
Envelope
-
7/21/2019 Ecobuild Design and Development Casestudy
18/32
18
Environmental Analysis
-
7/21/2019 Ecobuild Design and Development Casestudy
19/32
19
FFE Integration
-
7/21/2019 Ecobuild Design and Development Casestudy
20/32
20
Installation Sequencing
-
7/21/2019 Ecobuild Design and Development Casestudy
21/32
21
Material Properties
-
7/21/2019 Ecobuild Design and Development Casestudy
22/32
22
Clash Detection Reports
-
7/21/2019 Ecobuild Design and Development Casestudy
23/32
23
Client Engagement
-
7/21/2019 Ecobuild Design and Development Casestudy
24/32
24
Client Testimonial
-
7/21/2019 Ecobuild Design and Development Casestudy
25/32
25
Client Testimonial
Because we have been able to see exactly what it lookslike we have been able to order the furniture now inadvance, which would never have been able to with the
use of flat plans.
A lot of consultation has gone on, Icertainly feel more
confidentbecause we can actually see what its going tolook like.
They have used the BIM model to help understand howto Keeping the school looking good, knowing how muchthats going to cost, sustainability, knowing how long
things will last, all of those have been within theconversations we have had and very much built into theplanning
-
7/21/2019 Ecobuild Design and Development Casestudy
26/32
26
Project Aims and Results
Design Integration
Shorter programme to planning
Reduced RFIs (23 to date)
Supply chain integration
Integration of FF&E, SoA schedules
Zero M&E Clashes on site
Visibility of Programming
Integration of Temporary Works
Increased safety-managing public interfaces on tight site
Aid to client decision making
-
7/21/2019 Ecobuild Design and Development Casestudy
27/32
27
Portable technology
-
7/21/2019 Ecobuild Design and Development Casestudy
28/32
28
Used by Client, design and site staff
-
7/21/2019 Ecobuild Design and Development Casestudy
29/32
29
Component Properties
Courtesy of Space0
-
7/21/2019 Ecobuild Design and Development Casestudy
30/32
30
Component Properties
Courtesy of Space0
-
7/21/2019 Ecobuild Design and Development Casestudy
31/32
31
Client Testimonial360 Gyroscopic Views
Courtesy of Space0
-
7/21/2019 Ecobuild Design and Development Casestudy
32/32
32
Thank you