12
Colin McNaught Market update – Two years of the UK’s Feed-in Tariff

description

AEA Renewable Energy Knowledge Leader, Colin McNaught, provides an insight into the UK Solar PV Market - presented at Ecobuild, London, 23 March, 2012.

Transcript of AEA Solar PV market update at Ecobuild 2012

Page 1: AEA Solar PV market update at Ecobuild 2012

Colin McNaught

Market update – Two years of the UK’s Feed-in Tariff

Page 2: AEA Solar PV market update at Ecobuild 2012

A brief history…

Feed-in Tariff

DTI Domestic Field Trial2002 installs:• 262 kWp• 12 sites• Avg £7,200 per kWp

Low Carbon BuildingsLCBP Solar PV:• 11,490 kWp• 5,586 sites• Avg 5,924 per kWp• £45.5 million grant

Clear Skies“The gap led to "a famine". "a lot of damage to a rapidly-growing industry"

Page 3: AEA Solar PV market update at Ecobuild 2012

The Feed-in Tariff

Page 4: AEA Solar PV market update at Ecobuild 2012

The Feed-in Tariff

Page 5: AEA Solar PV market update at Ecobuild 2012

Feed-in Tariff surges

Page 6: AEA Solar PV market update at Ecobuild 2012

Mapping the market

End Dec 2011End Sept 2011

Page 7: AEA Solar PV market update at Ecobuild 2012

Local market data

District NR14 – Loddon, nr Norwich

Page 8: AEA Solar PV market update at Ecobuild 2012

Which districts have the best market?

Page 9: AEA Solar PV market update at Ecobuild 2012

System price trends

Page 10: AEA Solar PV market update at Ecobuild 2012

Buying behaviours

Average size of system in up to 4 kWp band

Page 11: AEA Solar PV market update at Ecobuild 2012

…and the future

Quantity uncertain Timing clearer

Page 12: AEA Solar PV market update at Ecobuild 2012

Market update – Two years of the UK’s Feed-in Tariff

www.aeat.com [email protected]

0870 190 1900