A B C D E Tee & Dead Ends 250 250 250 250 250 250 250 615 1385 2465 3850 5545 7545 9855 250 250 250 250 250 250 250 DIMENSION TABLE Soil Type Muck, peat, etc. Soft Clay Sand Sand and gravel Sand and gravel cemented with clay Hard shale CONCRETE BLOCKING FOR CONVEX VERTICAL BENDS CONCRETE THRUST BLOCKING (HORIZONTAL) DETERMINATION OF THRUST BLOCK BEARING AREA ( ) WYE TEE CROSS BEND TEE CROSS THRUST BLOCKING ( ) CONVEX VERTICAL BEND Table Pressure PSI Table Pressure PSI Soil Bearing Capacity (B) in PSI ( ) ( ) Stirrup (Typ.) STRADDLE 4" 6" 8" 10" 12" 14" 16" 4" 6" 8" 10" 12" 14" 16" PIPE DIA. 90 deg Bend 45 deg Bend 22.5 deg Bend 11.25 deg Bend Bend Angle (deg) 11.25 22.5 45 11.25 22.5 45 11.25 22.5 45 11.25 22.5 45 11.25 22.5 45 11.25 22.5 45 11.25 22.5 45 PIPE DIA. in. 0.21 0.43 0.77 0.48 0.95 1.79 0.86 1.65 3.22 1.39 2.62 4.97 1.94 3.91 6.89 2.62 5.26 9.70 3.44 6.89 12.63 1.8 2.3 2.8 2.4 3.0 3.6 2.9 3.5 4.4 3.3 4.1 4.1 3.7 4.7 5.7 4.1 5.2 6.4 4.5 5.7 7.0 17 17 17 17 17 24 17 20 27 17 24 30 Stirrup Embmt. (in) Concrete Volume (cy) Cube Size (ft) Stirrup Dia. (in) 4440 9995 17770 27770 39985 54425 71085 2405 5410 9620 15030 21640 29455 38470 Thrust (T) at fittings in Pounds 3140 7070 12565 19635 28275 38485 50265 1225 2760 4905 7660 11030 15015 19615 0 1000 2000 3000 4000 10,000 11.55 sq ft THRUST BLOCKING 2008 RD250 rd250.dgn 31-DEC-2008 NOTE: WHEN THRUST BLOCK BEARING AREA IS NOT SPECIFIED ON THE PLANS OR DETERMINED BY THE ENGINEER, USE THE FOLLOWING PROCEDURE TO DETERMINE REQUIRED BEARING AREA. 1. Determine thrust (T) for type of fitting or joint and size of pipe from Table. 2. Determine Design (Test) Pressure from Standard Specifications or Special Provisions. 3. Determine Table Pressure from Table. 4. Determine Soil Bearing Capacity (B) of soil from Table. 5. Determine required bearing area (A) in sq. ft. as follows: A = Example: Design (Test) Pressure = 150 PSI From Table, T = 272.3 PSI Pipe = 14" From Table, B = 14 PSI Fitting = Tee Soil = Sand A = Design (Test) Pressure Table Pressure T B 38485 2000 150 250 RD250 5 5 5 5 5 7 5 6 8 5 7 9 Stirrup Bar # 5/8 5/8 5/8 5/8 5/8 7/8 5/8 3/4 1 5/8 7/8 1 1/8 GENERAL NOTES FOR ALL DETAILS: 1. Contractor to provide blocking adequate to withstand full test pressure. 2. Divide thrust by safe bearing load to determine required bearing area (A in sq ft) of concrete to distribute load. 3. Adjust bearing areas (A) for other pressure conditions. (See "Determination of Thrust Block Bearing Area" equation. 4. Pour concrete blocking against undisturbed earth. 5. All concrete shall be commercial grade concrete. 6. Wrap pipe and/or fittings with 2 layers of polyethylene film where in contact with concrete 7. Keep concrete clear of all joints and accessories. 8. Stirrups shall be deformed galvanized cold rolled steel AASHTO M31 (ASTM A615), Grade 60. Coat with coal tar epoxy after installation. NOTE: All material and workmanship shall be in accordance with the current Oregon Standard Specifications OREGON STANDARD DRAWINGS DATE REVISION DESCRIPTION BASELINE REPORT DATE CALC. BOOK NO. Effective Date: December 1, 2009 - May 31, 2010 Effective Date: December 1, 2009 - May 31, 2010

description

drws

Transcript of Drg

A B C D E

Tee &

Dead

Ends

250

250

250

250

250

250

250

615

1385

2465

3850

5545

7545

9855

250

250

250

250

250

250

250

DIMENSION TABLE

Soil Type

Muck, peat, etc.

Soft Clay

Sand

Sand and gravel

Sand and gravel cemented with clay

Hard shale

CONCRETE BLOCKING FORCONVEX VERTICAL BENDS

CONCRETE THRUSTBLOCKING (HORIZONTAL)

DETERMINATION OF THRUST BLOCK BEARING AREA

( )

WYE

TEECROSSBEND

TEE CROSS

THRUST BLOCKING

( )

CONVEX

VERTICAL BEND

Table

Pressure

PSI

Table

Pressure

PSI

Soil Bearing Capacity

(B) in PSI

()

( )

Stirrup (Typ.)

STRADDLE

4"

6"

8"

10"

12"

14"

16"

4"

6"

8"

10"

12"

14"

16"

PIPE

DIA.

90 deg

Bend

45 deg

Bend

22.5

deg

Bend

11.25

deg

Bend

Bend

Angle

(deg)

11.25

22.5

45

11.25

22.5

45

11.25

22.5

45

11.25

22.5

45

11.25

22.5

45

11.25

22.5

45

11.25

22.5

45

PIPE

DIA.

in.

0.21

0.43

0.77

0.48

0.95

1.79

0.86

1.65

3.22

1.39

2.62

4.97

1.94

3.91

6.89

2.62

5.26

9.70

3.44

6.89

12.63

1.8

2.3

2.8

2.4

3.0

3.6

2.9

3.5

4.4

3.3

4.1

4.1

3.7

4.7

5.7

4.1

5.2

6.4

4.5

5.7

7.0

17

17

17

17

17

24

17

20

27

17

24

30

Stirrup

Embmt.

(in)

Concrete

Volume

(cy)

Cube

Size

(ft)

Stirrup

Dia.

(in)

4440

9995

17770

27770

39985

54425

71085

2405

5410

9620

15030

21640

29455

38470

Thrust (T) at fittings in Pounds

3140

7070

12565

19635

28275

38485

50265

1225

2760

4905

7660

11030

15015

19615

0

1000

2000

3000

4000

10,000

11.55 sq ft

THRUST BLOCKING

2008

RD

25

0

rd250.d

gn 3

1-D

EC

-2008

NOTE: WHEN THRUST BLOCK BEARING AREA IS NOT SPECIFIED ON THE PLANS OR DETERMINED BY THE ENGINEER, USE THE FOLLOWING PROCEDURE TO DETERMINE REQUIRED BEARING AREA.

1. Determine thrust (T) for type of fitting or joint and size of pipe from Table. 2. Determine Design (Test) Pressure from Standard Specifications or Special Provisions. 3. Determine Table Pressure from Table. 4. Determine Soil Bearing Capacity (B) of soil from Table. 5. Determine required bearing area (A) in sq. ft. as follows: A = Example: Design (Test) Pressure = 150 PSI From Table, T = 272.3 PSI Pipe = 14" From Table, B = 14 PSI Fitting = Tee Soil = Sand A =

Design (Test) Pressure

Table Pressure

T

B

38485

2000

150

250

RD250

5

5

5

5

5

7

5

6

8

5

7

9

Stirrup

Bar

#

5/8

5/8

5/8

5/8

5/8

7/8

5/8

3/4

1

5/8

7/8

1 1/8

GENERAL NOTES FOR ALL DETAILS:

1. Contractor to provide blocking adequate to withstand full test pressure.

2. Divide thrust by safe bearing load to determine required bearing area (A in sq ft) of concrete to distribute load.

3. Adjust bearing areas (A) for other pressure conditions. (See "Determination of Thrust Block Bearing Area" equation.

4. Pour concrete blocking against undisturbed earth.

5. All concrete shall be commercial grade concrete.

6. Wrap pipe and/or fittings with 2 layers of polyethylene film where in contact with concrete

7. Keep concrete clear of all joints and accessories.

8. Stirrups shall be deformed galvanized cold rolled steel AASHTO M31 (ASTM A615), Grade 60. Coat with coal tar epoxy after installation.

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

25

4

HYDRANT INSTALLATION

Sidewalk

Breakaway flange

Depth

of

bury

as

reqd.

6" ductile iron pipe

HYDRANT ASSEMBLY

2008

rd254.d

gn 3

1-D

EC

-2008

Valve box (Install valve box extension& operator extension, as reqd.)

6" auxiliarygate valve mechanicaljoint to flange

36" x 36" x 6"concrete pad(optional)

6"min.

Wrap hydrant barrel with 2layers of polyethylene filmwhere in contact with concrete

2"-8" aboveconcrete pad orsurrounding datum

Concretethrust block

Concrete thrust block

Mechanical joint x flange hydrant teeor tapping sleeve

Mechanical jointretainer gland Min. cubic yard drain

rock to 6" above drain hole.Optional: wrap drain rock ingeotextile fabric

13

GENERAL NOTES FOR ALL DETAILS:

1. When pipe is shorter than 18’, no joints allowed. Use mechanical joint retainer glands. Two 3/4 " galvanized tie rods may be used in lieu of thrust blocks for installations less than 18’ long. Coat tie rods with two coats of coal tar epoxy. 2. When pipe is longer that 18’ retainer glands not required. 3. There shall be a minimum of 18" horizontal clearance around hydrant. 4. When placed adjacent to curb, hydrant port shall be 24" from face of curb. 5. Concrete thrust blocks shall be constructed as per thrust blocking Std. Drg. RD250. Do not block drain holes 6. Extensions required for hydrant systems shall be installed to the manufacturer’s specifications. 7. Hydrants shall be placed to provide a minimum of 5’ clearance from driveways, poles, and other obstructions. 8. Hydrant pumper port shall face direction of access. 9. Set hydrant plumb in all directions.

RD254

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

258

RD258

WA

TE

R

VALVE BOX EXTENSION SECTION

COVER PLAN

6"

36

" m

ax

.

2008

VALVE BOX AND OPERATOR

EXTENSION ASSEMBLY

rd258.d

gn 3

1-D

EC

-2008

Operator extension1 1/2 " Schedule 80pipe shaft

Rock guard, 1/8 " steel plate:welded to pipe shaftdiameter = valve box extensioninside diameter minus 1/2 "

Flat bar2 1/2 x 2 1/2 x 3/8 "

3/8 x 3/4 " square headcupped capscrews

3 x 3 x 3/8 x 2"long steel squaretube welded allaround to flat bar

Gravel bedding

3/4 "-0 compactedaggregate baseor conc. block,see general note 4

VALVE BOX

ASSEMBLY DETAIL

GENERAL NOTES FOR ALL DETAILS:

1. Valve box not to rest on operating assembly.

2. Operator extension required when valve nut is deeper than 4’ from finish grade.

3. Center valve box on axis of operator nut.

4. Valves 12" and smaller shall be provided with compacted aggr. base on undisturbed ground. Valves greater than 12" shall be installed on precast concrete block.

5. Welds shall be minimum 1/4 " all around.

6. Hot dip galvanize operator extension after fabrication.

Cast iron cover Raised lettering

Cast iron valve box(6" dia. min.)

PVC valve box extension(ASTM D3034, SDR 35)

2" square operator nutwelded to pipe shaft

Ad

just

ab

le

Fro

m 1

2" m

ax

. t

o 6

" m

in.

Wroughtiron rod

Sliding type cast ironvalve box and cover

Pavement or ground

Valve box extension

Operator extension,see detail this sheet

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

262

RD262

Gravel bedding

(typical)

Brass piping and fittings

between tapped plug and

gate valve (typical)

Thrust block

Vari

es

Water main

2" coupling with

plug. assemble with

anti-seize compound.

(hand tight)

2" galvanized

steel riser

2" galvanized

steel pipe

Plug or cap with 2"

I.P.T. tap. for eccentric

tapped plugs, locate tap

at lowest point of pipe.

2" iron body screwed

gate valve with 2"

standard operating nut

24

"

24"

8"

2" malleable 90 deg.

elbow with two 1/4 "

dia. drain holes and

1 cubic ft. of

drain rock

2008

TYPICAL MAIN DEAD-END

BLOWOFF ASSEMBLY

GENERAL NOTES FOR ALL DETAILS:

1. Wrap main and fittings in thrust block zone with two layers of polyethylene film

to facilitate future removal.

2. In lieu of concrete thrust block, restrain pipe or pour concrete straddle block.

Gravel

bedding

(Typical)

Notch PVC

riser

Valve box

(Typical)

rd262.d

gn 3

1-D

EC

-2008

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

26

6

RD266

~

Slope

Pipe saddle

Water main

Varies

6"

min

.

MANUAL AIR-RELEASE

ASSEMBLY ( 3/4 ")

2008

rd266.d

gn 3

1-D

EC

-2008

3/4 " corporationstop

GENERAL NOTES FOR ALL DETAILS:

1. Locate at high point of main.

2. Tap top of main.

3. Provide insulation and additional depth when specified for freeze protection.

Brass nippleand cap

Brass pipeand fittings

3/4 "curb stop

3/4 " Type Kcopper pipe

Gravel bedding(6" min. depth)

Meter boxand cover

Match existinggrade

Sp

ecif

ied

min

imu

m d

ep

th

of

wate

r m

ain

6" min.diameter PVC pipe

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

270

RD270

~

Meter box and cover

Match existing grade

Slope

Corporation stop

Pipe saddle

Water main

Specif

ied m

inim

um

depth

of

wate

r m

ain

Slope

Brass pipe and fittings

Varies

Metal strap

Union

3’

min

.

6"

min

.

18

" m

in.

2008

COMBINATION AIR RELEASE

AIR VACUUM VALVE ASSEMBLY

(2" AND SMALLER)

rd270.d

gn 3

1-D

EC

-2008

GENERAL NOTES FOR ALL DETAILS:

1. Air release/air vacuum valve shall be size specified in Contract. Piping and valves to be same size as combination air release/air vacuum valve.

2. Locate at high point of main.

3. Tap top of main.

4. Provide insulation and additional depth when specified for freeze protection.

PVC valve boxextension(6" dia. min.)

Galvanized outlet and pipe to besame size as inlet pipe withbeehive strainer and outlet

Gravel bedding(6" min. depth)

Curb stop or gate valvewith operating nut

Type Kcopper pipe

4" x 4" x 80" pressuretreated wood post

Air release/air vacuum valve

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

27

4

RD274

Service Main

4" min.

45^

Isolation joint

PLAN

3" to 6"

SECTION

2008

Use felt strip or 10 mil.poly. isolation joint if meterbox is set in concrete

Concrete meter boxwith reader lid

Customerservice line

Customerservice valve

Angle metervalve

Seamless, softannealed copperservice line,size as required

6" of 3/4 " to 0crushed rock

Water main

Corporationstop

GENERAL NOTES FOR ALL DETAILS:

1. Meter to be centered and set plumb inside meter box. 2. Manufactured meter setter may be used for 3/4 " to 2" services. 3. Set meter box 4" minimum behind curb or sidewalk. 4. Meter boxes set in driveways shall have traffic lids.

rd274.d

gn 3

1-D

EC

-2008

3/4 " TO 2"

WATER SERVICE CONNECTION

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

278

RD278

10

8

13

6

5

11

9

12

14

7

4

3

2

1

3

7

9

10

6

21

6

9

712 13 8

9

7

6

143

4

11 115

M

M

15

15

12" clear from allfittings and valves

12" clear from allfittings and valves

REFERENCE DRAWING ONLY

(NOT FOR CONSTRUCTION)

SEE SPECIAL PROVISIONS FOR

SPECIFIC PROJECT REQUIREMENTS.

2008

WATER METER ASSEMBLY

(LARGER THAN 2")

GENERAL NOTES FOR ALL DETAILS:

1. Vaults shall be sized per specifications and minimum clearances. When required, vaults shall be designed for site specific conditions by a resistered professonal engineer.

2. All vaults shall be supported with adequate concrete floor and shall be designed to prevent bouyancy from groundwater if groundwater exists at any time during the year. Vaults shall be water-tight.

3. Precast concrete utility vaults may be used in lieu of cast-in-place when sizes are available.

4. Backflow devices to be installed on service and irrigation lines as required.

5. Standard bypass size is 2".

6. Service and irrigation line sizes will vary according to need.

7. Tees and valves shall be supported with conc. blocks, jacks or adjustable pipe supports.

8. Vault depth shall be such that there is a minimum clearance to the vault lid of 6" when the valves are fully open.

9. Provide flexible connections on piping within 18" of vault wall.

10. Provide opening and ladder locations, vault drainage and pipe penetrations in accordance with special provisions and contract drawings.

rd278.d

gn 3

1-D

EC

-2008

Mechanical joint x flange adapter

All-flange cross

Flange gate valve

Meter (Domestic)

Meter (Irrigation)

Companion flange

Brass nipples

Mechanical coupling

I.P. x I.P. brass elbow

I.P. x I.P. gate valve (Optional)

I.P. x meter flange gate valve

I.P. x I.P. gate valve

Brass pipe

All-flange tee

Concrete valult

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

RD

282

RD282

WATER SAMPLING STATION

45^

12"

..

..

.

.

.. ...

...

....

. .....

.

Hinge (2)

Elbow

Gravel Bedding

4"

min

.

2’-

0"

To 3

’-0"

2008

rd282.d

gn 3

1-D

EC

-2008

With optional 1/4 " ballvalve in place of 1/4 "petcock on vent pipe

Use 2 layers of polyethylene filmbetween station and concrete pad

Sampling station

Padlockprovision

Standard valve box

Curbstop

Concretepad

GENERAL NOTES FOR ALL DETAILS:

1. Provide insulation and additional depth when specified for freeze protection.

3/4 " service line

3/4 " Corporation stop

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010Effective Date: December 1, 2009 - May 31, 2010

TREE

10

’ o

r le

ssCurb

10’ or less

Curb

PLAN

SECTION

5’ 5’

1’

1’

ROOT BARRIER

2008

RD

286

RD286

Water pipe

Water pipe

Root Barrier10’ long x 4’ high x 10 GA,galv. steel or HDPE

Root Barrier10’ long x 4’ high x 10 GA,galv. steel or HDPE

GENERAL NOTES FOR ALL DETAILS:

1. Where existing parkway trees have been root pruned, install continuous, lineal root barrier adjacent to the pipe.

2. Root sealer shall be applied to all cut root areas which are larger that 2" in diameter. The sealer shall be applied as soon as practical after the cuts have been made. Root sealer shall be approved by the engineer at least 48 hours in advance of the pruning operation.

3. Root barriers shall be fabricated from a high density, high impact plastic or hot dipped galvanized steel.

rd286.d

gn 3

1-D

EC

-2008

NOTE: All material and workmanship shall be in accordance with

the current Oregon Standard Specifications

OREGON STANDARD DRAWINGS

DATE REVISION DESCRIPTION

BASELINE REPORT DATECALC. BOOK NO.

Effective Date: December 1, 2009 - May 31, 2010