1 TASK B1 OVERVIEW TASK B1 OVERVIEW By By YASAR ONEL The University of Iowa DOE SITE VISIT 2009 (fy10) I) I) CMS EXPERIMENT CMS EXPERIMENT HCAL (HF) CALORIMETER HCAL (HF) CALORIMETER II) II) CDF EXPERIMENT CDF EXPERIMENT III) SLHC and ILC R&D III) SLHC and ILC R&D http:// omega.physics.uiowa.edu /DOE http:// omega.physics.uiowa.edu /HEP

description

DOE SITE VISIT 2009 (fy10). TASK B1 OVERVIEW By YASAR ONEL The University of Iowa. CMS EXPERIMENT HCAL (HF) CALORIMETER CDF EXPERIMENT III) SLHC and ILC R&D. http://omega.physics.uiowa.edu/DOE http://omega.physics.uiowa.edu/HEP. TEAM MEMBERS. - PowerPoint PPT Presentation

Transcript of DOE SITE VISIT 2009 (fy10)

Page 1: DOE SITE VISIT 2009 (fy10)

1

TASK B1 OVERVIEWTASK B1 OVERVIEWByBy

YASAR ONELThe University of Iowa

DOE SITE VISIT 2009 (fy10)

I)I) CMS EXPERIMENTCMS EXPERIMENT• HCAL (HF) CALORIMETERHCAL (HF) CALORIMETER

II)II) CDF EXPERIMENTCDF EXPERIMENT

III) SLHC and ILC R&DIII) SLHC and ILC R&D

http://omega.physics.uiowa.edu/DOEhttp://omega.physics.uiowa.edu/HEP

Page 2: DOE SITE VISIT 2009 (fy10)

2

TEAM MEMBERS

E. MCCLIMENT*, E. NORBECK, Y. ONEL, J. NACHTMAN FACULTY

U. AKGUNADJUNCT FACULTY

J.P. MERLOPROJECT ASSOCIATE

A. MESTVIRISHVILI, K. CANKOCAK, T. YETKINPOST-DOCS

K. CHUNG**, K. YI,POST-DOCS (NACHTMAN STARTUP)

P. DEBBINS, M. MILLER, I. SCHMIDTENGINEERS

A. ALBAYRAK, B. BILKI, W.CLARIDA, F. OZOK, A. MOELLER, S. SEN, J. WETZELGRAD STUDENTS

P. BRUECKEN, C. LIKE, M. TRUESDELL QUARKNET TEACHERS

G. FUNK, J. NEUHAUS, M. POTTS, C. REEDSUNDERGRADUATE STUDENTS

GROUP WEB SITE: http://omega.physics.uiowa.edu/HEP* Professor Emeritus ** Research Scientist in Korea

Page 3: DOE SITE VISIT 2009 (fy10)

Iowa Task B1 Group

3

Page 4: DOE SITE VISIT 2009 (fy10)

4

HCAL ACTIVITIESHCAL ACTIVITIES

• HF I&C• HF CALIBRATION• HF OPERATIONS• LED/PID-PD SYSTEM DEVELOPMENT FOR HF/HB/HE• HO INTERFACE CARD PRODUCTION• SOURCE DRIVERS• RADIATION DAMAGE STUDIES ON QUARTZ FIBERS AT

LIL/CERN-PS/ARGONNE• DATA ANALYSIS:

• HF TEST BEAM DATA ANALYSIS• MTCC DATA ANALYSIS• GLOBAL RUN ANALYSIS

• CMS PHYSICS ANALYSIS• SM WW FUSION, – HZZleptonic – A. Mestvirishvili • MSSM, bbH tau tau leptonic – U. Akgun• SM, qqHtau tauleptonic – A. Moeller• Invisible Higgs with vector boson fusion with HF Jet Tagging– A.

Moeller• SM, qqHtau tausemi leptonic – W. Clarida• Majorana Neutrinos with di-muons + 0 MET – W. Clarida• SM, higgs pair production – F. Duru, (with M.H. Reno)• mSUGRA LM1-I, T. Yetkin, E. Albayrak

• CDF PHYSICS ANALYSIS-Jane Nachtman, Kai Yi

IOWA HAS MAJOR MANAGEMENT AND CONSTRUCTION RESPONSIBILITIES IN THE CMS IOWA HAS MAJOR MANAGEMENT AND CONSTRUCTION RESPONSIBILITIES IN THE CMS HADRONIC CALORIMETER, ESPECIALLY HF.HADRONIC CALORIMETER, ESPECIALLY HF.

Page 5: DOE SITE VISIT 2009 (fy10)

5

• HF was 1st CMS detector in the CMS Cavern.• HF+ Commissioned• Air Source Drivers for HB & HE completed and shipped• HF- Commissioned• HF Source Drivers completed and delivered.• HF participated in CRAFT, CRUZET and beam splash.• HF Phase I upgrade R&D and related test beams at FNAL

and CERN.• HE Phase II upgrade R&D and related test beams at FNAL

and CERN.

HCAL ACTIVITIESHCAL ACTIVITIES

Iowa achieved several major milestones in CMS

Page 6: DOE SITE VISIT 2009 (fy10)

New HCAL Organization

6

New Additional Leadership Roles:T.Yetkin HCAL Ops CoordinatorI.Schmidt Forward Region TCW.Clarida HCAL ROC Coordinator

Page 7: DOE SITE VISIT 2009 (fy10)

7

Iowa Team At UX5

Page 8: DOE SITE VISIT 2009 (fy10)

8

On November 6, 450 GeV protons are injected to LHC and are dumped 150 m. before CMS

First splash events from the beam tests 06-Nov-2009

Page 9: DOE SITE VISIT 2009 (fy10)

9

Beam Splash events were used to calibrate our detector.

HF- first HF+ 100 ns later

Page 10: DOE SITE VISIT 2009 (fy10)

Iowa Leadership

• Y. Onel: L3 manager for HCAL Photodetectors and SLHC Quartz Plate Calorimeter Phase II Upgrade coordinator, HFPMT and HF Front End Upgrade Coordinator for Phase I.

• J. Nachtman: LPC di-jet co-coordinator and the CMS calorimeter trigger upgrade co-coordinator, Performance and Simulation Coordinator for HCAL Phase I Upgrades.

• K. Cankocak: (was DPG Data Validation co-coordinator) HCAL Operation Expert, HCAL Coordinator for Calibration Systems.

• T. Yetkin: (was DPG Prompt Analysis co-coordinator as well as HCAL ROC co-coordinator) HCAL Operation Expert.

• A. Mestvirishvili: HCAL System Operations Support.• I. Schmidt: HF Integration Engineer.• W. Clarida: HCAL ROC coordinator at FNAL.

10

Page 11: DOE SITE VISIT 2009 (fy10)

11

Conclusions

• Installation and commissioning at CERN FY08-09K. Cankocak, J.P. Merlo, A. Mestvirishvili, I. Schmidt [HF CommissioningTask Leaders]

• Several Major CMS Milestones Achieved.• Iowa Postdocs and students will maintain and operate remaining Iowa delivered

equipment/parts for [2000 PMTs & μ-metals (HF), 260 PCB Base Boards (HF), Radioactive source system components (HF), 1728 light-guides (HF), 220 LED boards (HB, HE, HO and HF) and 200 (HO) interface boards, HCAL Source Drivers (Air & Electric) and the ZDC detector.

• New projects [ZDC Lifting Crane, Online monitoring for HF]• R&D for SLHC [Quartz plates, PPAC, Raddam (Argonne,CERN)]• R&D for ILC, Quartz Detector for Compton Polarimeter and Digital Hadron RPC

Calorimeter.• HCAL Trigger, Monitoring and Upgrades.• HCAL DPG and DQM Activities. • Large US and Iowa investment in LHC and discovery physics potential next 10-

20 years.• CMS Built it/Maintain it.• Leadership roles of K. Cankocak, J. Nachtman, Y. Onel, I. Schmidt,T. Yetkin• Physics Simulations Standard model, MSSM higgs discovery and study on

properties, SUSY Searches. Support USCMS, LPC @ Fermilab Physics efforts.• LPC Dijet Topology group activities -- Search for New Physics in Multi-jet Events• Jet-MET/Hcal DPG/Tau POG Group• Educate/train students-postdocs, Do Physics.• WE NEED OUR BASE ENHANCEMENT NOW!