Wealth Unearthed Delivering liquid energy, cost effectively “on tap” to the working face

description

Blasting Masterclass 30 September 2014

Transcript of Delivering liquid energy cost effectively on tap to the working face - Mark

Page 1: Delivering liquid energy cost effectively on tap to the working face - Mark

WealthUnearthed

Delivering liquid energy, cost

effectively “on tap” to the working

face

Page 2: Delivering liquid energy cost effectively on tap to the working face - Mark

Conventional emulsion delivery

Page 3: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop

Page 4: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop delivery

Page 5: Delivering liquid energy cost effectively on tap to the working face - Mark

Components of a vertical drop installation

Page 6: Delivering liquid energy cost effectively on tap to the working face - Mark

Tanker arrives at mine

Page 7: Delivering liquid energy cost effectively on tap to the working face - Mark

Surface infrastructure

Page 8: Delivering liquid energy cost effectively on tap to the working face - Mark

Surface delivery point detail

Page 9: Delivering liquid energy cost effectively on tap to the working face - Mark

Underground delivery point

Page 10: Delivering liquid energy cost effectively on tap to the working face - Mark

Underground delivery point to isotainers and tanks

Page 11: Delivering liquid energy cost effectively on tap to the working face - Mark

Isotainers outlet piping

Page 12: Delivering liquid energy cost effectively on tap to the working face - Mark

Charging of MCU’s

Page 13: Delivering liquid energy cost effectively on tap to the working face - Mark

Guideline costing for a vertical drop installation

Estimated total cost: USD 400K (~200m drop)

Page 14: Delivering liquid energy cost effectively on tap to the working face - Mark

Case Study 1 – Vertical drop

Page 15: Delivering liquid energy cost effectively on tap to the working face - Mark

Base case

Base case

• 180 000 tons production• ~220 tons emulsion

Page 16: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop

Option 1

Page 17: Delivering liquid energy cost effectively on tap to the working face - Mark

Vertical drop

Option 2

Page 18: Delivering liquid energy cost effectively on tap to the working face - Mark

Tangible Benefits

Option 1 Option 2

CAPEX 400 000 400 000

NPV 260 169 401 473

IRR 48% 62%

Payback ~1.7 years ~1.5 years

Page 19: Delivering liquid energy cost effectively on tap to the working face - Mark

Non-tangible Benefits

Page 20: Delivering liquid energy cost effectively on tap to the working face - Mark

Case Study 2: Liquid energy on “tap”

Page 21: Delivering liquid energy cost effectively on tap to the working face - Mark

Mining issues

Poor hangingwall conditions

Overbreak

Page 22: Delivering liquid energy cost effectively on tap to the working face - Mark

Poor fragmentation

Mining issues cont…

Page 23: Delivering liquid energy cost effectively on tap to the working face - Mark

Large bouldersrequiring secondary blasting

Mining issues cont…

Page 24: Delivering liquid energy cost effectively on tap to the working face - Mark

Mining issues cont…

Poor inventory control and wastage

Page 25: Delivering liquid energy cost effectively on tap to the working face - Mark

AEL MS Actions

• Blast redesign to address:

• Perimeter control

• Reduction of large boulders and minimise secondary blasting

• Improved fragmentation profile

• Manage explosive use

• Achieve design face advance of >=92%

Page 26: Delivering liquid energy cost effectively on tap to the working face - Mark

Blast design:

• Reduced drilled holes

• Reduced powder factor

• Perimeter control

Page 27: Delivering liquid energy cost effectively on tap to the working face - Mark

Blasting results

Page 28: Delivering liquid energy cost effectively on tap to the working face - Mark

Barrels on the side walls

Half-casts in sidewall

35% on every face!!!

Page 29: Delivering liquid energy cost effectively on tap to the working face - Mark

Barrels

Barrels on the hanging wall

Half-casts in hangingwall

Page 30: Delivering liquid energy cost effectively on tap to the working face - Mark

Fragmentation profile

Page 31: Delivering liquid energy cost effectively on tap to the working face - Mark

0

25

50

75

100

0 200 400 600 800 1000 1200 1400

% passing

Size - mm

Fragmentation analysis

96% Passing at 300mm

Page 32: Delivering liquid energy cost effectively on tap to the working face - Mark

Face advance

88%

89%

90%

91%

92%

93%

94%

95%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

advance/drilled length average advance/drilled length

Page 33: Delivering liquid energy cost effectively on tap to the working face - Mark

Inventory control

Page 34: Delivering liquid energy cost effectively on tap to the working face - Mark

Further benefits

Page 35: Delivering liquid energy cost effectively on tap to the working face - Mark

Conclusions

AEL MS have formulations and equipment that allow for

perimeter blasting to reduce rockwall damage

deliver on customer specifications

AEL MS Use blast designs in conjunction with in-situ results to deliver on customer specifications

By means of vertical drop By means of vertical drop

AEL MS Innovate to create solutions for their

customers problems

Page 36: Delivering liquid energy cost effectively on tap to the working face - Mark

YES

Page 37: Delivering liquid energy cost effectively on tap to the working face - Mark

Thank You