Xypex Crystalline Products
The Xypex product range has been specifically developed over the past 33 years to satisfy varying project
requirements.
•Australia•Bangladesh•Belgium•Argentina•Brazil•Brunei•Bulgaria•Canada•Chile•China•Colombia•Croatia•Cyprus•Czech Republic•Denmark•Ecuador•Egypt•Ethiopia•Fiji•France•Germany•Ghana
•Greece•India•Indonesia•Iran•Japan•Jordan•Kenya•Korea•Latvia•Lithuania•Malaysia•Mexico•Monaco•Myanmar•Nepal•Netherlands•New Zealand•Norway•Panama•Peru•Philippines•Poland
•Portugal•Puerto Rico•Republic of Georgia•Romania•Russia•Saudi Arabia•Singapore•Slovak Republic•Spain•Sri Lanka•Switzerland•Taiwan•Tanzania•Thailand•Turkey•Ukraine•United States •of America•United Arab Emirates•United Kingdom•Venezuela•Vietnam
XYPEX Throughout the World Today.
Essentials of Waterproofing
Concrete
4. Some Case Studies
XYPEX Concentrate ‘Mud Slurry’ Application at KLCC CC.
XYPEX Crystallization Technology, Spray-Applied To Basement Slab
At ZAQ-Nam Fatt JV Project Parcel E Putrajaya (June 2001)
Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)
12/12/2008
2
KLCC Convention Centre
Located alongside the Mandarin Oriental Hotel in central Kuala Lumpur with the Petronas Twin Towers in the background, the lower basement covers almost 35,000 square meters
XYPEX Concentrate spray applications commenced April 2003
XYPEX Crystallization Technology, Spray-Applied To Basement Slab
At ZAQ-Nam Fatt JV Project Parcel E Putrajaya (June 2001)
The West Wing of KLCC Convention CentreThe West Wing of KLCC Convention Centrewith 1with 1stst, 2, 2ndnd and 3rd casting sites at left hand end.and 3rd casting sites at left hand end.
The lake in the background is around Suria KLCC, the The lake in the background is around Suria KLCC, the shopping complex at the base of the Petronas Twin Towersshopping complex at the base of the Petronas Twin Towers
Details of Kuala Lumpur Convention Centre
Project
Client: KLCC Projects Bhd
Architect: Arkitek Jururancang (M) Sdn Bhd
Structural Engineers: Sepakat Setia Perunding Sdn Bhd (SSP)
M&E Engineers: KTA Tenaga Sdn Bhd
Contractor: Sunway Constructions Berhad
Commencing April 2003, initial contract calls for application of approx. 35,000 sq. meters of XYPEX Concentrate Mud Slurry at base of basement slab as primary waterproofing. Also included in this contract is application of XYPEX Concentrate and Modified Two Coat system to external face of retaining walls.
Other Malaysian Projects
with
XYPEX Concentrate ‘Mud Slurry’ Application to Basement Slabs
Parcel 2G4, Precinct 2,
Putrajaya
(Home of Domestic Industry & Consumer Affairs Departments)
Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)
12/12/2008
3
Parcel 2G3, Precinct 2, Putrajaya(Home of Primary Industry & Immigration Departments)
Details ofLots 2G3 and 2G4
Precinct 2 at Putrajaya
Client: Putrajaya Holdings Sdn Bhd
Architect: ARC Partnership Lot 2G3 Arkitek Kitas Sdn Bhd Lot 2G4
Structural Engineers: LPH Consultant
M&E Engineers: Enmac Sekutu Sdn Bhd
Contractor: WCT Engineering Bhd
At completion of waterproofing contract, approx. 60,000 sq. meters of coatings will have been applied throughout these two structures, including Concentrate Mud Slurry to basement slab; Two-Coat systems to retaining walls, water tanks, water features and exposed decks. A single slurry coat application will be applied under topping and levelling screeds on reinforced concrete roofdecks
The XYPEX Concentrate Mud Slurry is sprayed down through and over the top level of steel, onto the bottom layer of steel and the ‘lean concrete’ casting site base.
Parcel 2G5, Precinct 2, Putrajaya
Parcel 2G6, Precinct 2, Putrajaya
Details of Lots 2G5 and 2G6,
Precinct 2 at Putrajaya
Client: Putrajaya Holdings Sdn Bhd
Architect: Gerak Reka Akitek Sdn Bhd Lot 2G5 Khalid Johari Arkitek Sdn Bhd Lot 2G6
Structural Engineers: Sepakat Setia Perunding Sdn Bhd (SSP)
M&E Engineers: Petareka Perunding (M) Sdn Bhd Lot 2G5KTA Tenaga Sdn Bhd Lot 2G6
Contractor: Sunway Constructions Berhad
At completion of waterproofing contract, (sub-structure only) approx. 25,600 sq. meters of XYPEX Concentrate Mud Slurry had been applied to basement slabs, while approx. 9300 sq meters of XYPEX Two-Coat systems were applied to retaining walls.
Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)
12/12/2008
4
Parcel 3G1, Precinct 3, Putrajaya Details of
Lot 3G1,Precinct 3 at Putrajaya
Client: Putrajaya Holdings Sdn Bhd
Architect: MBA Akitek Sdn Bhd
Structural Engineers: Yakin Konsult &Zaidun Leeng Sdn Bhd
M&E Engineers: Jurutera Perunding Kuasanaga
Contractor: Road Builder (M) Sdn Bhd
At completion of waterproofing contract, (sub-structure only) approx. 8800 sq. meters of XYPEX Concentrate Mud Slurry had been applied to basement slabs, while approx. 7300 sq meters of XYPEX Two-Coat systems were applied to retaining walls.
Warisan Project, Putrajaya (Photo taken during second casting-April 2003. the concentrate Mud Slurry has been applied 1-2 hours in advance of the concrete placement)
Details ofAlam Warisan Project,Precinct 5 at Putrajaya
Client: KLCC Projects Bhd
Architect: Senibahri Akitek &Zaini Dubus Richez Sdn Bhd
Consulting Engineers: Zaidun-Leeng Sdn Bhd
Contractor: IJM Construction Sdn Bhd
The sub-structure waterproofing contract (now current – May 2003) calls for application of approx. 35,000 sq. meters of XYPEX Concentrate Mud Slurry to basement slabs. Further contracts for superstructure works, plus significant marine works now being negotiated.
Block E1, Precinct 1, Parcel E, Putrajaya(Putra Perdana Constructions)
Blocks E2, E3 & EA, Precinct 1, Parcel E, Putrajaya
Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)
12/12/2008
5
Blocks E2, E3 & EA, Precinct 1, Parcel E, PutrajayaBlocks E2, E3 & EAParcel E at Precinct 1, PutrajayaNote: This was the first major Concentrate Mud Slurry project in Malaysia, with XYPEX works completed in May, 2002
Client: Putrajaya Holdings Sdn Bhd
Architect: RSP Akitek &SNO Architect Sdn Bhd
Structural Engineers: Wan Husin & Associates Sdn Bhd &KL Prima Consult Sdn Bhd
M&E Engineers: Norman Disney & Young Sdn Bhd &SSP (E&M) Sdn Bhd
Contractor: ZAQ Num Fatt JV
Substantially completed by May 2002, the waterproofing contract (sub-structure only) saw application of approx. 13,660sq. meters of XYPEX Concentrate Mud Slurry applied to basement slabs, while approx. 4750 sq. meters of XYPEX Two-Coat systems were applied to retaining walls.
Block E5,Precinct 1, Parcel E, Putrajaya
(Putra Perdana Constructions)
The Curve Mutiara Damansara Project, Damansara, Selangor
The Curve,Damansara, Selangor
Client: Mutiara Rini Sdn Bhd
Architect: Arkitek MAA Sdn Bhd
Structural Engineers: Sepakat Setia Perunding Sdn Bhd (SSP)
M & E Engineers: Arup Jururunding Sdn Bhd
Contractor: WCT Construction Sdn Bhd
Project includes a five star hotel plus retail and commercial development. The sub-structure waterproofing contract (now current – May 2003) calls for application of approx. 30,000 sq. meters of XYPEX Concentrate Mud Slurry to basement slabs, plus XYPEX Tow-Coat system to retaining walls. Further contracts for superstructure works now being negotiated.
Proton City
A total of four new underpasses have been
built to facilitate one -way traffic low through busy intersections along the
outer ring road servicing this huge new motor vehicle production facility, located
approx 90 km north of Kuala Lumpur.
The 4 meter width structures are designed for small vehicles and motor
cycles.
The pavement slabs have been constructed with
XYPEX Concentrate Mud Slurry applied during
casting, whilst the retaining walls and roof slabs were treated externally with a XYPEX Concentrate &
Modified Two-Coat application.
Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)
12/12/2008
6
Mutiara Damansara Project, Damansara, Selangor
Note 1. Tesco Damansara
‘Slightly’ visible in background is the Tesco Damansara Project, in which XYPEX Concentrate and
Modified were applied as the XYPEX Two-Coat System to waterproof all water storage tanks. This is the third
and latest Tesco site to be similarly treated.
Create PDF files without this message by purchasing novaPDF printer (http://www.novapdf.com)