Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.
-
Upload
gabriella-hall -
Category
Documents
-
view
212 -
download
0
Transcript of Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.
![Page 1: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/1.jpg)
Connect. Communicate. Collaborate
GÉANT2 (and 3)
CCIRN Xi’An
26 August 2007
David West DANTE
![Page 2: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/2.jpg)
Connect. Communicate. CollaborateGÉANT2
• 7th generation of pan-European research network infrastructure
• Project partners: 30 NRENs and over 3500 research and education establishments
• Funded jointly by NRENs and European Commission• Project timescale September 2004 - August 2008
– Extension to Q2 2009– Four year project, GEANT3 planned from Q3 2009 to
Q2 2013
![Page 3: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/3.jpg)
Connect. Communicate. Collaborate
Current topology 2006/2007
![Page 4: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/4.jpg)
Connect. Communicate. CollaborateGÉANT2 Connect. Communicate. Collaborate
• 25 POPs • 11600 km of fibre + 140 ILA sites• 50+ x (own) 10G lambdas• Additional leased 10 and 2.5 Gbps
circuits • Router tender underway• NREN accesses at up to 10Gbps
(+ backup) + P2P• connections to other R&E
networks: Abilene, ESnet, CA*net4, SINET, TENET, RedCLARA, EUMEDCONNECT, TEIN2
![Page 5: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/5.jpg)
Connect. Communicate. Collaborate
Wavelength growth across GEANT2 since July 06
0
2
4
6
8
10
12
14
network spans
num
bers
of
10 G
b w
avel
engt
hs p
er s
pan
Jul-06
Apr-07
Overall increase of ~50%From 59 to 88 10 Gb wavelength spans
![Page 6: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/6.jpg)
Connect. Communicate. CollaborateGEANT2 operational services
• Basic IP access via the GEANT2 router
• ‘GEANT+’ service: a point to point (P2P) service typically of GE paths within a 10 GE access
• Managed wavelength service: P2P service of full rate 10 Gb wavelength
![Page 7: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/7.jpg)
Connect. Communicate. CollaborateP2P Circuits
0
24
68
10
12
Number of Orders
19-21
22-24
25-27
28-30
31-33
Project Month
GÉANT+
10Gbps Lambda
![Page 8: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/8.jpg)
Connect. Communicate. Collaborate
GÉANT2 P2P Circuit Orders –by Project
• LHC: – 3 x GE– 9 x 10Gbps
• DEISA– 5 x 10Gbps
• Phosphorus– 4 x GE
• EXPReS (eVLBI)– 4 x GE
LHC
DEISA
EXPReS
Phosphorus
Other
![Page 9: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/9.jpg)
Connect. Communicate. Collaborate
GÉANT2 P2P User Group 1: Large Hadron Collider
• Providing 10Gbps circuits on the primary Tier 0 to Tier 1 routes: 9 delivered so far
• Additional 1Gbps circuits provided on some Tier1-Tier1 routes
• IP backbone supports further international data transfers
![Page 10: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/10.jpg)
Connect. Communicate. Collaborate
GÉANT2 P2P User Group 2: eVLBI
• Aim to connect all European telescopes using dedicated 1Gbps wavelengths– Already connected at 1Gbps via GÉANT2
• Medicina (Italy)• Cambridge (UK)• Jodrell Bank (UK)• Torun (Poland)
![Page 11: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/11.jpg)
Connect. Communicate. Collaborate
Example of new service developments
• Provision of ‘PerfSONAR’ Monitoring services – In an Environment that is:
• Multi-domain• Using multiple transmission technologies
![Page 12: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/12.jpg)
Connect. Communicate. CollaborateProblem space
Point A
PointB
Domain A
Domain B
Domain C
Goal: (near) real-time monitoring (link status) of constituent DomainLinks
(and links between domains) and whole end-to-end Link A-B.
E2ELink A-B
![Page 13: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/13.jpg)
Connect. Communicate. CollaborateApproach
Point A
PointB
Domain A
Domain B
Domain C
E2ELink A-B
perfSONARMP or MA
perfSONARMP or MA
E2Emoncorrelator
perfSONARMeasurement Point (MP)
or Measurement Archive (MA)
DomainLink and(partial) ID_Link info
“Weathermap”view for users
E2ECUoperators
![Page 14: Connect. Communicate. Collaborate GÉANT2 (and 3) CCIRN XiAn 26 August 2007 David West DANTE.](https://reader036.fdocuments.us/reader036/viewer/2022070305/55148564550346f06e8b4be2/html5/thumbnails/14.jpg)
Connect. Communicate. CollaborateGÉANT3 (from 2009)
• Planning has started!• Building on conclusions of EARNEST foresight study• Exploit and extend dark fibre investment• Focus on improving performance for users:
– further service development– Inter-regional co-operation