    N ORTH C AROLINA D EPARTMENT OF T RANSPORTATION

    C ONCRETE P AVEMENT S URVEY M ANUAL

    2004

  • 8/14/2019 Con Pave Man July 04

    2/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    1

    This manual has been developed to assist North Carolina Division of Highways personnel inconducting a condition survey of the concrete pavements in North Carolina. The survey is a 20% samplesurvey. The first .20 mile (CRC) or first 41 slabs (JCP) are rated. The manual is divided into four

    sections as follows:

    A) GENERAL

    1) Shoulder Type Page 22) Shoulder Condition Page 23) Shoulder-Lane Drop-off Page 64) Shoulder-Lane Joint Seal Page 75) Surface Wear Page 96) Pumping Page 107) Ride Quality Page 11

    B) JOINTED CONCRETE PAVEMENTS

    1) Concrete Patches Page 122) Asphalt Patches Page 123) Longitudinal Cracking Page 134) Transverse Cracking Page 145) Corner Breaks Page 156) Spalling Page 167) Joint Seal Damage Page 178) Faulting Page 18

    C) CONTINUOUS REINFORCED CONCRETE PAVEMENTS

    1) Concrete Patches Page 192) Asphalt Patches Page 193) Longitudinal Cracking Page 214) Transverse Cracking Page 225) Punch Outs Page 236) Narrow Cracks Page 247) Y Cracks Page 24

    D) RATING FORMS

    1) Jointed Concrete Pavement Page 252) Continuous Reinforced Concrete Pavement Page 26

  • 8/14/2019 Con Pave Man July 04

    3/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    2

    A) GENERAL

    1) Shoulder Type 1 st line paved, 2 nd line unpaved

    P Plant Mix, S Slurry, C Concrete, U Unpaved

    2) Shoulder Condition

    Paved Shoulder plant mix, slurry or BST

    L: Overall good condition, edge intact with no crackingM: Acceptable condition; some cracking present up to wide, less than

    rutting, outside edge stable although may begin to break away in spots.S: Unacceptable condition; cracking greater than , edge breaking away over a

    large part of section; rutting greater than .

    Low Severity Asphalt Shoulder

  • 8/14/2019 Con Pave Man July 04

    4/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    3

    Moderate Severity Asphalt Shoulder

    High Severity Asphalt Shoulder

  • 8/14/2019 Con Pave Man July 04

    5/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    4

    Paved shoulder concrete

    L: Shoulder condition basically in good shape with little or no problems; nocracking or faulting.

    M: Cracks 1/8 wide or less light to moderate spalling, material is stable.

    S: Cracks over 1/8 wide, unstable material, faulting greater than .

    Low Severity Concrete Shoulder

    Moderate Severity Concrete Shoulder High Severity Concrete Shoulder

  • 8/14/2019 Con Pave Man July 04

    6/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    5

    Unpaved shoulder

    L: Little or no erosion evident; thick vegetation cover.M: Thin vegetation with some bare spots; shallow erosion channel may be

    present.

    S: Sparse vegetation; deep erosion channels, ruts greater than 1 inch.

    Low Severity Unpaved Shoulder Moderate Severity Unpaved Shoulder

    High Severity Unpaved Shoulder

  • 8/14/2019 Con Pave Man July 04

    7/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    6

    3) Shoulder Lane Drop-off

    Description : difference in elevation between edge of slab and outside shoulder.

    L: Shoulder drop-off less than inch.

    M: Shoulder drop-off to inch.S: Shoulder drop-off greater than inch.

    Low Severity Shoulder Lane Drop Off Moderate Severity Shoulder Lane Drop Off

    High Severity Shoulder Lane Drop Off

  • 8/14/2019 Con Pave Man July 04

    8/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    7

    4) Shoulder Lane Joint Seal Description: widening of the joint between the edge of slab and outside shoulder.

    Asphalt shoulder

    L: Joint seal failure, less than opening between lane and shoulder.M: Joint seal failure, to opening between lane and shoulder.S: Joint seal failure, over opening between lane and shoulder.

    Concrete shoulder

    L: Joint seal failed at isolated locations.M: Joint seal failed 25% to 50% of the joint.S: Joint seal failed over 50% of the joint.

    Low Severity Shoulder Lane Joint Seal High Severity Shoulder Lane Joint SealAsphalt Shoulder Asphalt Shoulder

  • 8/14/2019 Con Pave Man July 04

    9/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    8

    Low Severity Shoulder Lane Joint Seal High Severity Shoulder Lane Joint SealConcrete Shoulder Concrete Shoulder

  • 8/14/2019 Con Pave Man July 04

    10/27

  • 8/14/2019 Con Pave Man July 04

    11/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    10

    6) Pumping Number of joints or areas Description: Seeping or ejection of water from beneath the pavement through cracks or joints. Finematerial may be present near joints or cracks staining the surface and there may also be depressions.

  • 8/14/2019 Con Pave Man July 04

    12/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    11

    7) Ride Quality Percent of area

    Description : Ride quality is what the general public perceives as an indicator of howwell a road is performing. The average operating speed is the speed at which mostdrivers would travel a section of road.

    L: Operating speed easy to maintain. A few bumps and dips (up to 25% of section). Joints are fairly smooth.

    M: Slightly difficult to maintain safe operating speed. Some joints appear to be faulted. Joints or cracks cause bumps and unevenness.

    S: Difficult to maintain safe operating speed. Most joints severely faulted.Cracks cause unevenness and surface may be broken, cracked or worn away.

    Low Severity Ride Quality

    High Severity Ride Quality

  • 8/14/2019 Con Pave Man July 04

    13/27

  • 8/14/2019 Con Pave Man July 04

    14/27

  • 8/14/2019 Con Pave Man July 04

    15/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    14

    4 ) Transverse Cracking Number of slabs with transverse cracks

    Description : Cracks that are predominantly perpendicular to the pavement centerline.

    L: Crack widths less than 1/8 inch, no spalling, no faulting

    M: Crack widths from 1/8 to 1/2 inch, or with spalling less than 3 inches, or faulting up to 1/4 inch, may be sealed.

    S: Crack widths greater than 1/2 inch, or with spalling greater than 3 inches, or faulting greater than 1/4 inch.

    Low Severity Transverse Cracking Moderate Severity Transverse Cracking

    High Severity Transverse Cracking

  • 8/14/2019 Con Pave Man July 04

    16/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    15

    5) Corner Breaks Number of slabs with corner breaks Description : A portion of the slab separated by a crack which intersects theadjacent transverse and longitudinal joints, approximately at a 45 degree angle. Thelength of the sides is from 1 ft. to 1/2 the width of the slab, on each side of the corner.

    L: Crack well sealed or hairline, no faulting or spalling, no break-up.M: Crack spalled at low to moderate severity, faulting less than 1/2 inch, no pieces

    broken.S: Crack spalled at moderate to severe severity, faulting greater than 1/2 inch,

    broken into two or more pieces.

    Low Severity Corner Break

    Moderate Severity Corner Break

    High Severity Corner Break

  • 8/14/2019 Con Pave Man July 04

    17/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    16

    6) Spalling Number of slabs with spalls

    Description : Cracking, breaking, or chipping of slab edges within 2 feet of joint.

    L: Spalls less than 3 inches wide with loss of material, or spalls with no loss of material and no patching.

    M: Spalls from 3 to 6 inches wide with loss of material.S: Spalls greater than 6 inches wide with loss of material.

    Low Severity Spalling Moderate Severity Spalling

    High Severity Spalling

  • 8/14/2019 Con Pave Man July 04

    18/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    17

    7) Joint Seal Damage Number of joints with joint seal damage

    Description : Condition which enables materials or water to infiltrate the joint. Also,includes extrusion, hardening, adhesive failure, cohesive failure or complete loss of sealant.

    L: Joint seal damage exists in less than 10% of the joint.M: Joint seal damage exists in 10% to 50% of the joint.S: Joint seal damage exists in more than 50% of the joint.

    Low Severity Joint Seal Damage Moderate Severity Joint Seal Damage

    High Severity Joint Seal Damage

  • 8/14/2019 Con Pave Man July 04

    19/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    18

    8) Faulting of Transverse Joints Average of faulting (inches) in section

    Description : Difference in elevation across the transverse joint.

  • 8/14/2019 Con Pave Man July 04

    20/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    19

    C) CONTINUOUS REINFORCED CONCRETE PAVEMENTS

    1) Concrete Patches Number of concrete patches in section

    Good: Patch with no cracks, spalls or movement.

    Fair: Patch starting to spall, crack and shows movement.Poor: Patch broken and may have loss of material. .

    1) Asphalt Patches - Number of asphalt patches in section

    Good Concrete Patch

    Fair Concrete Patch

  • 8/14/2019 Con Pave Man July 04

    21/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    20

    Poor Concrete Patch

    Asphalt Patch

  • 8/14/2019 Con Pave Man July 04

    22/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    21

    2) Longitudinal Cracking Length of longitudinal cracks in section

    L: Crack not open, less than 1/8 inch wide, no spalling or faulting.M: Crack widths from 1/8 to 1/2 inch, or with spalling less than 3 inches, or

    faulting up to 1/2 inch, may be sealed.

    S: Crack widths more than 1/2 inch, or with spalling greater than 3 inches, or faulting greater than 1/2 inch.

    Low Severity Longitudinal Cracking

    Moderate Severity Longitudinal Cracking

    High Severity Longitudinal Cracking

  • 8/14/2019 Con Pave Man July 04

    23/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    22

    3) Transverse Cracking Number of transverse cracks in section

    L: Crack width less than 1/8 inch wide, or spalled less than 10% of length.(Do not rate the light cracks)

    M: Crack width from 1/8 to 1/2 inch wide, or spalled from 10 to 50% of length,

    may be sealed.S: Crack width more than 1/2 inch, or spalled more than 50% of length.

    Low Severity Transverse Cracking Moderate Severity Transverse Cracking

    High Severity Transverse Cracking

  • 8/14/2019 Con Pave Man July 04

    24/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    23

    5 ) Punchouts Number of punchouts in section

    Description : The area enclosed by two closely spaced transverse cracks, a shortlongitudinal crack and the edge of pavement or a longitudinal joint. Also includes Ycracks that are spalled, breaking up and faulted.

    L: Boundary of punchout is well defined but still has good aggregate interlock,cracks are tight and no spalling around boundary.

    M: Boundary of punchout is spalled, has faulting and shows signs of movement.S: Loss of material and developing secondary cracks.

    Low Severity Punchout Moderate Severity Punchout

    High Severity Punchout

  • 8/14/2019 Con Pave Man July 04

    25/27

  • 8/14/2019 Con Pave Man July 04

    26/27

    NORTH CAROLINA DIVISION OF HIGHWAYSCONCRETE PAVEMENT CONDITION SURVEY

    25