CHINA GO TEAM VISIT 2014

29
CHINA GO TEAM VISIT 2014 Erwin Lassooij/Joel Morin 30 June 2014

description

CHINA GO TEAM VISIT 2014. Erwin Lassooij/Joel Morin 30 June 2014. Purpose. Increase the implementation of PBN through: Improved capability in the use of the PBN concept in planning / designing airspace Improved understanding of Stakeholder involvement in PBN implementation planning. - PowerPoint PPT Presentation

Transcript of CHINA GO TEAM VISIT 2014

Page 1: CHINA GO TEAM VISIT 2014

CHINA GO TEAM VISIT 2014

Erwin Lassooij/Joel Morin

30 June 2014

Page 2: CHINA GO TEAM VISIT 2014

Purpose

• Increase the implementation of PBN through:

– Improved capability in the use of the PBN concept in planning / designing airspace

– Improved understanding of Stakeholder involvement in PBN implementation planning

2

Page 3: CHINA GO TEAM VISIT 2014

Expected Visit Outcome

3

• Understand application of PBN airspace design concepts

• Apply Airspace designs from the workshop as basis for implementation

• Increased civil/military

cooperation

Page 4: CHINA GO TEAM VISIT 2014

So where are we today?

April 21, 2023 4

Page 5: CHINA GO TEAM VISIT 2014

Slide 5

Commitment from Stakeholders– ICAO– IATA– CANSO– IFATCA– IFALPA– IBAC– ICCAIA– ACI– FHA– FSF

Page 6: CHINA GO TEAM VISIT 2014

Global PBN Instrument Approach Growth

April 21, 2023 6

Page 7: CHINA GO TEAM VISIT 2014

Global PBN SID & STAR Growth

April 21, 2023 7

Page 8: CHINA GO TEAM VISIT 2014

8

Page 9: CHINA GO TEAM VISIT 2014

9

Page 10: CHINA GO TEAM VISIT 2014

PBN Versus Conventional Routes

April 21, 2023 10

Page 11: CHINA GO TEAM VISIT 2014

…But still not implemented worldwide!

Page 12: CHINA GO TEAM VISIT 2014

A37-11 PBN Global Targets• States complete a PBN Implementation Plan

to achieve:

– Approach procedures with vertical guidance (APV (Baro-VNAV) including LNAV-only minima for all instrument runway ends by 2016:

• 30% by 2010, 70% by 2014

– Straight-in LNAV only procedures as an exception to the above where there is:

• no local altimeter setting; and • no aircraft equipped for APV with max certified mass

of 5700kg or more

April 21, 2023 12

Page 13: CHINA GO TEAM VISIT 2014

Only 102 States (or 53%)

have a PBN Implementation

Plan

Global Implementation Status

Page 14: CHINA GO TEAM VISIT 2014

PBN PlanAustraliaBangladeshCambodiaChinaDemocratic Peoples Republic of KoreaFijiIndiaIndonesiaJapanLao People’s Democratic RepublicMalaysiaMaldivesMongoliaMyanmarNepalNew ZealandPakistanPapua New GuineaPhilippinesRepublic of KoreaSingaporeSri LankaThailandTongaVietnam

NO PBN PlanAfghanistanBhutanBrunei DarussalamCook IslandsKiribatiMarshall IslandsiMicronesia (Federated States of)NauruPalauSamoaSolomon IslandsTimor-Leste Vanuatu

66% of the APAC States have a PBN

Implementation Plan

Page 15: CHINA GO TEAM VISIT 2014

Global Implementation Status (2)

15

69%69%

53%53%2010201053%53%

2010201030%30%

2014201430%30%

2014201419%19%

2016201619%19%

20162016

Although 69% of all instrument runways have at least 1 PBN approach. . .

. . . only 30% of ICAO Member States are on track to meet the

2014 targets of Assembly Resolution A37-11

6 June 2014

Page 16: CHINA GO TEAM VISIT 2014

China’s PBN progress

Implementation PlanRegulationSID STAR implementation startedAPV approach startedRNP AR approach

Page 17: CHINA GO TEAM VISIT 2014
Page 18: CHINA GO TEAM VISIT 2014
Page 19: CHINA GO TEAM VISIT 2014

What has ICAO done to help States with implementation? . . .

April 21, 2023 19

Page 20: CHINA GO TEAM VISIT 2014

20

PBN Documentation Framework• PANS Ops Volume II• PBN Manual (Doc 9613) 4th Edition• RNP AR Procedure Design Manual

(Doc 9905)• PBN Ops Approval Manual (Doc

9997)*• Manual on PBN Use in Airspace

Design (Doc 9992)*• CDO Manual (Doc 9931)• CCO Manual (Doc 9993)*• GNSS Manual (Doc 9849)• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New

4 th Edition

Page 21: CHINA GO TEAM VISIT 2014

PBN Productsto assist with implementation

• PBN related Publications and Annexes– Bundled specifically for Stakeholders– Hard and soft copies

• eLibrary Solutions

• PBN ikit

• CBT Training (iLearn)

21

Available through ICAO e-store: www.store1.icao.int

Page 22: CHINA GO TEAM VISIT 2014

PBN Products and Services• PBN Start

• PBN Training

• PBN Publication and Bundles

• PBN Workshops

• PBN Implementation Assistance

• PBN Financial Aid

April 21, 2023 22

Provided through ICAO HQ, Regional Offices, FPPs, ICAO Authorized

Training Centers, On-line ICAO Store

Page 23: CHINA GO TEAM VISIT 2014

23

• Endorsement of Instrument procedure design organizations

• Consistent with other endorsements (training)

• To assist States with PBN Implementation

• Organizations listed on ICAO PBN Web-site:

– Airways New Zealand– ASAP s.r.o. (Slovakia)– CAAC Central-Southern Airport Design &

Research Institute (China)– GE Aviation (USA)– Hughes Aerospace (USA)– Ingegneria Dei Sistemi S.p.A (Italy)

PBN Endorsement – IFP Organizations

Name of Organization

Page 24: CHINA GO TEAM VISIT 2014

Flight Procedures Programme (FPP)

• Beijing, China– Now in Regional

Sub-Office

• Dakar, Senegal– FPP Office

established June 2014

24

Page 25: CHINA GO TEAM VISIT 2014

ICAO/IATA PBN GO Teams• Expert Teams Visits to address specific implementation issues

– Phase I (PBN Requirements Assessment) completed – Phase II (Airspace Design and Operations Approvals) will be completed in early

July (Last visit to China)

• Future GO Team Visits will be specific to Region and State requirements for PBN Implementation– On request basis

• Focus/Services provided will be:– PBN Assessments / Gap Analysis– PBN Plan Development– Training– Implementation Assistance

Completed Global Visits Phase (I and II)

Thailand (2) UAE (2)Mexico KenyaGermany IndiaEcuador RussiaSouth Africa USA (CAR/SAM)

Page 26: CHINA GO TEAM VISIT 2014

26Slide 26

China Statement of Work

• participants' knowledge of PBN and updates based on upcoming changes.

• design best practices for terminal and en route airspace• collaborative design skills in the application of those best

practice elements• civil-military collaboration in airspace management• next steps to put the Airspace design best practices into

application to reduce delays, increase safety and improve efficiency of ATM within China.

Provide Assessments and Recommendations on:

Page 27: CHINA GO TEAM VISIT 2014

27

Visit Format (overview)

- Lecture- Case study exercises- Civil/military aspects- Conclusions/Next steps

Page 28: CHINA GO TEAM VISIT 2014

Visit Format (detailed)

28

Classroom Instruction•Continuous Climb Operations•Continuous Descent Operations•Procedure Design Considerations•Designing Volumes and Sectors•Safety and Criteria Assumptions •Best Practices•Designing Routes and Holds•Civil-Military Cooperation•Traffic Management and FUA integration•Validation and Implementation•Performance Evaluation

Practical Exercises•TMA Exercise

• Assumptions, Enablers & Constraints• Operational Requirements & Scope• Generic Airspace• Routes and Holds• Volumes/Sectors• Case Study• Timelines• Group presentations • Implementation support

•En route Design Exercise• En route structure and NAVSPECs• Group presentations• Implementation support

Page 29: CHINA GO TEAM VISIT 2014

Thank YouThank You