Case story: New storage facility at Case story: New storage facility at ASTRA Museum, Sibiu, Romania Workshop on low energy climate control i d hi in museum and archives Copenhagen, 7 October 2010 Morten RyhlSvendsen

Transcript of Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat...

Page 1: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Case story: New storage facility atCase story: New storage facility at ASTRA Museum, Sibiu, Romania

Workshop on low energy climate controli d hiin museum and archives

Copenhagen, 7 October 2010

Morten Ryhl‐Svendsen

Page 2: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Sibiu RomaniaSibiu, Romania

Page 3: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

ASTRA National Museum ComplexASTRA National Museum Complex

Page 4: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

The new storage buildingThe new storage building

Page 5: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Ground floorLayer 1: Concrete reinforced v/c 0.4 C420, 0.20m thickL 2 St fill 0 15 thi kLayer 2: Stone, fill, 0.15m thickTotal thickness: 0.35m, Total R-value 0.310m2K/W.

CeilingLayer 1: Concrete reinforced v/c 0.4 C420, 0.15m thickLayer 2: Styrodyr 25, 0.05m thickLayer 3: Concrete reinforced v/c 0.4 C420, 0.06m thickLayer 4: Rubber, 0.01m thickTotal thickness: 0.27m, Total R-value 1.39m2K/W.

Exterior walls section 1 and 3 Layer 1: Ytong Cellular concrete, 0.30m thickLayer 2: Isover 35, 0.20m thickLayer 3: Ventilated air gap, 0.02m thickLayer 4: Wood fiber board 0 03m thickLayer 4: Wood fiber board, 0.03m thickTotal thickness: 0.55m, Total R-value 8.44m2K/W.

Page 6: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Local climateLocal climate

Page 7: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

What if we raise the temperature 5C?What if we raise the temperature 5C?

Page 8: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Simulation, empty buildingAER 0.05 h‐1

The temperature inertia is satisfying, however, the relative humidity is highly influenced by changes in weather 

Page 9: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Simulation, with collectionAER 0.05 h‐1

Adding humidity buffer: wood boards, 3 m2 / m3

Page 10: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Simulation, with collectionAER 0.05 and 0.1 h‐1

The simulated climate in the fully loaded permanent storage room 301 at the air exchange rate 0.05 per hour (dark  color) and 0.1 per hour (light color).

Page 11: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

Construction began September 2009Construction began September 2009

Page 12: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 13: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 14: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 15: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 16: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 17: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 18: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 19: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives
Page 20: Case story: New storage facilityat ASTRA Museum, Sibiu ... · Case story: New storage facilityat ASTRA Museum, Sibiu, Romania Workshop onlowenergy climate control in museum and archives

http://www conservareapatrimoniului ro/noutati si foto en phphttp://www.conservareapatrimoniului.ro/noutati_si_foto_en.php