    Capacity Plan

    `

    U.S. Department of Housing and Urban Development

  • 8/12/2019 Cap Plan Temp

    2/9

    Capacity Plan

    Version 1.1 5/26/2011 Page i

    Solution InformationInformation

    Solution Name

    Solution Acronym

    Project Cost Accounting System

    (PCAS) Identifier

    Document Owner

    Project Sponsor

    Version/Release Number

    Document History

    Release No. Date Author Revision Description

    Note to the Author

    The control gate criteria for each of the seven phases of the Department of Housing and UrbanDevelopments (HUD) Project Planning Management (PPM) Life Cycle require the completion of various

    artifacts. Each IT project, working in conjunction with the Office of the Chief Information Officer (OCIO),

    will capture decisions around PPM tailoring in the Project Process Agreement(PPA), which documents

    the reasons for using, combining or skipping specific artifacts applicable to the project.

    This document is a template for a Capacity Planthat is to be completed during the Definition Phase, the

    second phase of the PPM Life Cycle.

    The template includes instructions to the author, boilerplate text, and fields that should be replaced

    with the values specific to the project:

    Blue italicized text enclosed in angle brackets () provides instructions to the documentauthor or indicates a field that should be replaced with information specific to a particularproject.

    Text and tables in blackare provided as boilerplate examples of wording and formats that maybe used or modified as appropriate to a specific project. These are offered only as suggestions to

    assist in developing project documents; they are not mandatory formats.

  • 8/12/2019 Cap Plan Temp

    3/9

    Capacity Plan

    Version 1.1 5/26/2011 Page ii

    Capacity Plan Authorization

    Memorandum

    I have carefully assessed the Capacity Planfor . This document has been completed in

    accordance with the requirements of the HUD Project Planning and Management (PPM) Life Cycle.

    MANAGEMENT CERTIFICATION - Please check the appropriate statement.

    ______ The document is accepted.

    ______ The document is accepted pending the changes noted.

    ______ The document is not accepted.

    We fully accept the content within this project artifact and associated tasks.

    ______________________________ _____________________

    NAME DATE

    Business Project Manager

    ______________________________ _____________________NAME DATE

    Project Sponsor

    _______________________________ _____________________

    NAME DATE

    Technical Review Sub-Committee

    _______________________________ _____________________

    NAME DATE

    Investment Review Sub-Committee (if applicable)

    _______________________________ _____________________NAME DATE

    Customer Care Committee (if applicable)

    _______________________________ _____________________

    NAME DATE

    Executive Investment Board (if applicable)

  • 8/12/2019 Cap Plan Temp

    4/9

    Capacity Plan

    Version 1.1 5/26/2011 Page iii

    Contents

    1. Purpose ................................................................................................................................................ 1

    2. Analysis of Capacity .............................................................................................................................. 2

    3. Findings Summary ................................................................................................................................ 3

    Appendix A: References ................................................................................................................................ 4

    Appendix B: Key Terms ................................................................................................................................. 5

  • 8/12/2019 Cap Plan Temp

    5/9

    Capacity Plan

    Version 1.1 5/26/2011 Page 1

    1. PurposeThe Capacity Planis an important part of infrastructure and deployment planning. A Capacity Plan

    supports the goal of optimum and cost effective provisioning of organizational resources and services by

    matching them to business demands. It helps identify and reduce inefficiencies associated with either

    under-utilized resources or unmet customer demand and to provide satisfactory service levels in a cost-

    efficient manner. The plan helps ensure that all infrastructure components are capable of performing all

    required functions, that components will perform as efficiently as possible and accommodate

    reasonable growth without being overly wasteful.

    Capacity requirements can vary greatly from times of peak demand to times of limited demand. As a

    result there may be drastic differences in the resources required to maintain normal operations during

    periods of peak demand. When planning for what levels of capacity will be supported, it is important to

    understand and weigh the costs, benefits, and risks of delivering, or not delivering, a certain level of

    capacity.

    The intended audience of the Capacity Planis all project stakeholders including theProject Sponsor, Integrated Project Team (IPT), and the project team.

  • 8/12/2019 Cap Plan Temp

    6/9

    Capacity Plan

    Version 1.1 5/26/2011 Page 2

    2.Analysis of Capacity

    Capacity Type Current Capacity Analysis Planned/Expected Growth and

    Recommendations

    Table 1 - Analysis of Capacity

  • 8/12/2019 Cap Plan Temp

    7/9

    Capacity Plan

    Version 1.1 5/26/2011 Page 3

    3. Findings Summary

    Area/Item

    Monitored

    Capacity

    Requirements

    % Increase

    Needed

    Per

    Capacity

    Threshold(s)

    Threshold Response Strategy

    (Action to Be Take Upon Reaching

    Threshold)

    Table 2 - Findings Summary

  • 8/12/2019 Cap Plan Temp

    8/9

    Capacity Plan

    Version 1.1 5/26/2011 Page 4

    Appendix A: References

    Table 3 below summarizes the documents referenced in this document.

    Document Name Description Location

    Table 3 - Appendix A: References

  • 8/12/2019 Cap Plan Temp

    9/9

    Capacity Plan

    Version 1.1 5/26/2011 Page 5

    Appendix B: Key Terms

    Table 4 below provides definitions and explanations for terms and acronyms relevant to the content

    presented within this document.

    Term Definition

    Table 4 - Appendix B: Key Terms