Building Construction Project 2

1
OPEN HOUSE tan shing yeou 0314850 building construction 1 1. TOILET FLOORING ( TILES ) STEP- BY- STEP 1. SCRUB THE FLOOR WITH STRIPPER 2. DRIVE 2-1/2-IN SCREWS INTO THE FLOOR JOISTS 3. FILL LOW SPOTS WITH THIN-SET 4. INSTALL BACKER BOARD OVER THE FLOOR 5. SCORE AND SNAP THE BACKER BOARD 6. TROWEL ON THE THIN-SET 7. COVER THE JOINTS 8. ATTACH GUIDE BOARDS TO GUIDE THE LAYOUT 9. SET THE FULL TILES 10. SET THE PERIMETER TILES 11. INSTALL AN EXTENSION RING OVER THE TOILET FLANGE 12. STUFF BACKER ROD ALONG THE WALL 13. GROUT THE JOINS 14. CLEAN THE TILES PROPERTIES OF TILES - DURABLE & SAFE - SLIP RESISTANCE SURFACE WHICH IS SUITABLE FOR BATHROOM FLOORING - IMPERVIOUS TO WATER ABSORPTION 2. WINDOW window sill rough sill nailing fin STEP- BY- STEP 1. LAY A BEA OF CAULK ALONG THE INSIDE OF THE OUTSIDE STOPS ON THE JAMBS, MARK THE SILL FOR THE SILL ANGLE, CAULK AND INSTALL THE SILL ANGLE. 2. CENTER THE TOP AND BOTTOM SASHES VERTICALLY 3. PLACE THE HEADER OF TOP OF THE WINDOW AND CULTK ITS TOPS 4. INSTALL THE MOUNTING SCREWS AT THE TOP AND BOTTOM OF EACH SIDE JAMB. 5. SLIDE THE HEADER UP SO THAT IT SEALS ANY GAP BETWEEN THE WINDOW AND FRAME. 6. SLIDE THE TOP AND BOTTOM SASHES UP AND DONW TO CHECK FOR GAPS AND SMOOTH OPERA- TION. 7. USE BUILT-IN ADJUSTMENT IN THE SIDE JAMBS TO ADJUST THE WINDOW FRAME 8. CAULK THE INSIDE OF THE WINDOW AND INSTALL THE INSIDE STOPS VINYL TRIM AND CAULK SEAL THE GAP AT THE BOTTOM OF THE WINDOW. IT MAKE SURE THE WINDOWS FITS AGAINST THE STOOL ON THE INSIDE THE INSIDE STOP MOLDING HELPS HOLD THE WINDOW IN PLACE STEP- BY- STEP 1. MEASURE AND CUT THE STAIRCASE TREAD INTO STANDARD SIZE. 2. INSTALL THE SKIRT BOARD TOGETHER WITH THE STRUCTURE BONE OF THE STAIRCASE 3. ATTACH TO THE HANGER BOARD AND SKREW WITH 70MM DESK SCREW 4. INSTALL THE TREAD AND SCREW IT INTO THE HOLES WROD-FACE TRIMMER STEPPED REBATED NOSING 3. INDOOR STAIRCASE

Transcript of Building Construction Project 2

OPEN HOUSEtan shing yeou 0314850building construction 1 1. TOILET FLOORING

( TILES )

STEP- BY- STEP1. SCRUB THE FLOOR WITH STRIPPER2. DRIVE 2-1/2-IN SCREWS INTO THE FLOOR JOISTS3. FILL LOW SPOTS WITH THIN-SET4. INSTALL BACKER BOARD OVER THE FLOOR5. SCORE AND SNAP THE BACKER BOARD6. TROWEL ON THE THIN-SET7. COVER THE JOINTS8. ATTACH GUIDE BOARDS TO GUIDE THE LAYOUT9. SET THE FULL TILES10. SET THE PERIMETER TILES11. INSTALL AN EXTENSION RING OVER THE TOILET FLANGE12. STUFF BACKER ROD ALONG THE WALL13. GROUT THE JOINS14. CLEAN THE TILES

PROPERTIES OF TILES- DURABLE & SAFE- SLIP RESISTANCE SURFACE WHICH IS SUITABLE FOR BATHROOM FLOORING - IMPERVIOUS TO WATER ABSORPTION

2. WINDOW

window sill

rough sill

nailing fin

STEP- BY- STEP

1. LAY A BEA OF CAULK ALONG THE INSIDE OF THE OUTSIDE STOPS ON THE JAMBS, MARK THE SILL FOR THE SILL ANGLE, CAULK AND INSTALL THE SILL ANGLE.2. CENTER THE TOP AND BOTTOM SASHES VERTICALLY3. PLACE THE HEADER OF TOP OF THE WINDOW AND CULTK ITS TOPS4. INSTALL THE MOUNTING SCREWS AT THE TOP AND BOTTOM OF EACH SIDE JAMB.5. SLIDE THE HEADER UP SO THAT IT SEALS ANY GAP BETWEEN THE WINDOW AND FRAME.6. SLIDE THE TOP AND BOTTOM SASHES UP AND DONW TO CHECK FOR GAPS AND SMOOTH OPERA-TION.7. USE BUILT-IN ADJUSTMENT IN THE SIDE JAMBS TO ADJUST THE WINDOW FRAME8. CAULK THE INSIDE OF THE WINDOW AND INSTALL THE INSIDE STOPS

VINYL TRIM AND CAULK SEAL THE GAP AT THE BOTTOM OF THE WINDOW. IT MAKE SURE THE WINDOWS FITS AGAINST THE STOOL ON THE INSIDE

THE INSIDE STOP MOLDING HELPS HOLD THE WINDOW IN PLACE

STEP- BY- STEP

1. MEASURE AND CUT THE STAIRCASE TREAD INTO STANDARD SIZE.2. INSTALL THE SKIRT BOARD TOGETHER WITH THE STRUCTURE BONE OF THE STAIRCASE3. ATTACH TO THE HANGER BOARD AND SKREW WITH 70MM DESK SCREW4. INSTALL THE TREAD AND SCREW IT INTO THE HOLES

WROD-FACETRIMMER

STEPPED REBATED NOSING

3. INDOOR STAIRCASE