BUILDING

CONSTRUCTION-1 SUB CODE- ARC 1523

ASSIGNMENT 1 - EXPERIENCING CONSTRUCTION

(EXPERIENCING, DOCUMENTING AND ANALYSING THE CONSTRUCTION PROCESS)

TUTOR – Ar. ALICE LIM LI YUEN

Page 2: Building Construction 1: project 1
Page 3: Building Construction 1: project 1

Content

1.0 Introduction and Group members detail. (SI*)

1.1 Introduction to site

2.0 Site and Safety (MM*)

2.1 Plants and Machinery

3.0 External Work (SV*)

4.0 Foundation (MNA*)

4.1 Foundation type and construction process (from site visit)

5.0 Superstructure (from site visit and reference)

5.1 Beam and Column (SI*)

5.2 Slab (MNA*)

5.3 Wall (PZ*)

5.4 Staircase (JE*)

6.0 Doors and Windows (PZ*)

7.0 Roof (LZH*)

7.1 Roof type and construction process (from site visit)

8.0 Summary

8.1 References

(SI*) Saurabha Iyer

(MM*) Muhammad Mubarak

(SV*) Saravanan Vytelingum

(MNA*) Muhammad Nabeel Ali Joomun

(PZ*) Prisha Zenia

(JE*) Jonathan Edwards

(LZH*) Lim Zhi Hong

Page

1

2-6

7-8

9-16

17-24

25

26-30

31

32-34

35-40

41

42-46

47

48

Page 4: Building Construction 1: project 1

Introduction to site

• Location – Megan Salak park, Jalan 1/125E , Desa Pedaling ,57100 Kuala Lumpur

• date of approval- 11 July 2013

• Date of completion – January 2016

• Developer- Chico Development Sdn Bhd

• Architect- Akitek Akiprima SDN BHD

• Landscape architect- Primeclass Landscaping SDN BDH

• Contractor- Suncity Trading and Construction SDN BHD

• House type- 3story semi d

• Land tenure – freehold

• 115 units

Introduction to the group members

Saravanan Vytelingum 0320563

Muhammad Nabeel Ali Joomun 0320583

Muhammad Mubarak 0319984

Saurabha Iyer 0320569

Prisha Zenia 0320762

Jonathan Edwards Woe 0320458

Lim Zhi Hong 0304547

4

Page 5: Building Construction 1: project 1

Site and Safety

5

Page 6: Building Construction 1: project 1

Importance of following safety site rules

Accident rates are higher in construction sites because people doesn’t pay much attention to the surrounding and the warning signboards that is placed outside of the construction site.

Personal Protective Equipment (PPE)

• All refers to protective clothing, helmet, goggles or other garments or equipment designed to protect the wearer’s body from injury.

• Staffs and workers must wear and use PPE as appropriate.

• Sub-con and their workers must not wear short pants/slipper to work.

6

Page 7: Building Construction 1: project 1

Site safety rules:

• To prevent any injuries on the head as it is the most dangerous part.

• To prevent dust particalsfrom the construction site to draw on the head.

• To prevent from any ear damage due to drilling and construction work

Foot protection should be worn in this area

Safety helmets must be worn:

Hearing protection must be worn

• To prevent danger of foot injuries due to falling or rolling objects or objects piercing the sole and where such employee’s feet are exposed to electrical hazards

No person who is under the influence of alcohol or drugs are allowed in the site

• as a drunk person may not be conscious , it may be dangerous as they could walk to buildings which are not complete which are full of metal bars therefore it will be dangerous

• To reduce electrical shock hazard when near exposed electrical conductors which could contact the head.

No unauthorized entry

• All visitors must report to the office

• Management or workers may not be responsible for any accidents.

7

Page 8: Building Construction 1: project 1

High visibility clothing must be worn in this area

• So that when to construction work is going on’ it will be easier to be noticed by the bright color of the clothing to prevent any accidents from happening

Safety googles must be worn.• The dust particles at the site

may be harmful to the eye therefore by wearing a safety google it can prevent the dust from entering the eye. Eg flying particles, molten metals, liquid chemicals or acids.

First aid box

• First aid equipment is kept in the site managers office as it is easier and faster access in case of emergency

Children must not play in the site

• When the construction activity is going on, it will be dangerous for the children as any accidents might happen such as getting hit by vehicles or falling object

Hand glove must be worn • to protect the

employee hand from bruise

• To protect hands from hazardous substance

Scaffolding platform

• Helps to minimize the risk of fall when a worker is doing the construction work high up the building

8

Page 9: Building Construction 1: project 1

Reasons for using construction plant.

• High output - Complete work volume in time.

• Quality work - Accuracy and consistency.

• Economy - Cost effectiveness.

• Nature of work - Dangerous if do the task manually.

TYPES OF PLANT AND EQUIPMENT

1. Excavating and earth- moving

equipment:

• Backhoe-loaders

• Excavators

• Loaders

• Trucks and hauling equipment

• Vacuum excavators

2. Lifting and vertical transportation

equipment

• Mobile cranes

• Tower cranes

• Goods hoists

• Passengers hoists

3) Bulldozers

4) Scrapers

5) Concrete plant and equipment

• Concrete trucks

• Concrete mixing plant

• Concrete pumps

Plants and Machinery

9

Page 10: Building Construction 1: project 1

Backhoe-loaderBackhoe loader is engineering vehicle, which consist of a tractor, fitted with a shovel or bucket on the front and a small backhoe on the back.

Uses:

• Digging shallow excavations

• Digging trenches

• General grading

• Lifting loads

• Loading and carrying materials

ExcavatorsUses of excavators:• Excavating below or above natural surface of ground

on which machine rests.• Digging bigger trenches.• Digging pits for basements,• General grading work.• Loading onto haul units (dumper trucks)• Lifting

Other uses:Excavator bucket can be replaced with a breaker or hammer turning the unit into a demolition machine.

Construction equipment found on site

10

Page 11: Building Construction 1: project 1

Mobile crane• A full revolving superstructure mounted on a truck with multi section-

telescoping boom.• These cranes can travel on public roads between projects under own

power with minimum or no dismantling and reassembling.• Therefore very suitable if a job requires crane utilization for a few hours

to a couple of days.

Uses:To hoist materials and machineries.

Vibrating smooth wheel rollerVibratory road roller can be equipped with single drum or double drum.

Uses:

• Rolling aggregates

• Compaction of clay and sand

• Proof rolling of subgrades and in

compacting asphalt pavements.

11

Page 12: Building Construction 1: project 1

3.0 External work

12

Page 13: Building Construction 1: project 1

• External works on our construction site are mainly:

• Setting out

• Signage

• Site boundary

• Temporary shelters

• Earthworks

• Drainage

• Sloping

13

Page 14: Building Construction 1: project 1

Setting Out

Starting period : Semptember 2013

Construction start :

March 2014

Handing Over : January 2016

Site Area : 18 Hectares

Functional external features may take the form of access requirements where security may be an issue. To enhance security on any project fencing could be used to separate the site from adjacent properties and land. Any from of fencing, whether it be full permimeter fencing or partial fencing installed at key areas of the site, can stop or cut down any unwanted pedestrian or vehicular access.

The primary form of fencing present on our site is mainly metal hoardings placed moslty around the whole site boundary except around the hillside.Another form of protection at our site boundary would be the retaining wall (R.E Wall) or Retaining Concrete Wall (R.C Wall).

Site boundary

Retaining wall R.C wall

Metal hoarding 14

Page 15: Building Construction 1: project 1

Storage of material and temporary shelters

They are actually small housing shelters for storing site equipments and for construction workers to rest.

15

Page 16: Building Construction 1: project 1

EarthworksEarthworks are engineering works created through the moving or processing of parts of the earth's surface involving quantities of soil or unformed rock. The earth may be moved to another location and formed into a desired shape for a purpose. Much of earthworks involves machine excavation and fill or backfill.

Excavation may be classified by type of material:

• Topsoil excavation

• Earth excavation

• Rock excavation

• Muck excavation - this usually contains excess water and unsuitable soil

• Unclassified excavation - this is any combination of material types

Excavation may be classified by the purpose:

Stripping

• Roadway excavation

• Drainage or structure excavation

• Bridge excavation

• Channel excavation

• Footing excavation

• Borrow excavation

• Dredge excavation

• Underground Excavation

Typical earthworks include roads, railway beds, causeways, dams, levees, canals, and berms. Other common earthworks are land grading to reconfigure the topography of a site, or to stabilize slopes.

Earth-moving machines such as the loader, production trucks, the grader, the bulldozer, the backhoe, and the dragline excavator.

16

Page 17: Building Construction 1: project 1

Sloping

One unique and very ingenios way of using waste concrete to prevent soil erosion and provide slope protection is by graniting.This method is implemeted by fitting pipes into the slopes to carry accumulated water from the top away while the face of the slope is sprayed with waste concrete from construction also helping to save on material cost.

This method of sloping is aesthetically pleasing, economical and prevents materials wastage.

17

Page 18: Building Construction 1: project 1

DrainageDrainage is the natural or artificial removal of surface and sub-surface water from an area. The drainage system on the site is essential as it carries away waste water from the site to its respective destination.

Civil engineers and construction managers work alongside architects and supervisors, planners, quantity surveyors, the general workforce, as well as subcontractors.

Drainage options for the construction industry include:

• Point drainage

It intercepts water at gullies (points). Gullies connect to drainage pipes beneath the ground surface and deep excavation is required to facilitate this system. Support for deep trenches is required in the shape of planking, strutting or shoring.

• Channel drainage

It intercepts water along the entire run of the channel. Channel drainage is typically manufactured from concrete, steel, polymer or composites. The interception rate of channel drainage is greater than point drainage and the excavation required is usually much less deep.

The surface opening of channel drainage usually comes in the form of gratings (polymer, plastic, steel or iron) or a single slot (slot drain) that runs along the ground surface (typically manufactured from steel or iron).

18

Page 19: Building Construction 1: project 1

Street FurnitureStreet furniture represents a large and diverse subcategory of external works. It can be used to create subtle themes within city centres, whether it be a traditional or contemporary theme. Elements of street furniture may comprise seating, lighting, signage and litter management. The layout of street furniture can be used to create strong visual effects within a city environment.

Examples:

• Benches and seats

• Cast iron seating

PavingThey can be obtained in a wide variety of colours and finishes.

Types:

• Concrete paving stones

They are seen as a cost effective alternative to traditional clay block pavers, especially if large numbers are required for driveway and access road construction. In industrial environments reinforced concrete is favoured for access roads and loading bays to take the strain of heavy goods vehicles.

• Tarmac

It can also be used to cover large areas, such as car parks, as it has the ability to accommodate small settlements without cracking. Specialist road surfacing contractors will be able to advise on specifications to withstand intended usage.

Hardstanding areas within residential garden areas may need to be more aesthetically pleasing.

To fulfil this requirement products such as timber decking have been developed to provide eye catching functional features within gardens. Wooden decking can be constructed to suit most situations with anti slip surfaces available, along with accompanying handrails and balustrades.

Patios, also suited to garden locations, may typically be constructed from concrete or concrete paving slabs.

Landscaping

19

Page 20: Building Construction 1: project 1

4.0 Foundation

20

Page 21: Building Construction 1: project 1

The foundation is the substructure constructed below or partly below the surface of the ground. It anchors the superstructure by distributing the load safely into the ground.

Settlement is the downward compression of the soil due to the load of the building on the foundation. Therefore the foundation is designed so as to limit the settlement and make it uniform.

4.0 Introduction to Foundation

Uniform settlement Tipping settlement Differential settlement

Foundation system

GroundFoundation

Building

Factors considered when choosing foundation types:1. Load of building2. Ground conditions3. Types of soil4. Types of structure in neighbourhood

21

Page 22: Building Construction 1: project 1

4.0 Types of Foundation

Pile foundation

This one takes the load of the building through made-up ground or weak soil to load bearing strata. Building loads is transferred to the beam through ground beams.

Raft foundation

This reinforced foundation distributes the load over the whole building area reducing the load per unit area. Raft foundations are used where building loads are high or when ground conditions are poor

Reasons for using this foundation.- The ground is quite weak and

in poor condition- The buildings are 3 storey high

which makes it heavy, therefore requiring a raft foundation to distribute the load uniformly on the weak ground.

Reasons for using this foundation.- This is used in sloppy areas of the site- Best foundation to hold the load of the

whole building on the slope having a ground which is also weak.

22

Page 23: Building Construction 1: project 1

Pile foundation

4.1 Pile Foundation (from site visit)

Pile foundation is used at the slopes of the hill. It is more suitable for this terrain because the soil here is quite soft and weak. The load is also well distributed and thus keeping the building stable and well balanced.

65 cm 65 cm

160 cm

160 cm

130 cm

111 cm

130 cm

Pile cap

Column

Pile

23

Page 24: Building Construction 1: project 1

4.1 Pile Foundation construction process (from site visit)

1. The area where the foundation will be is excavated.

2. Borehole is drilled using an auger

3. The reinforcement cage is placed inside the borehole and then filled with concrete

4. The reinforcement of the pile cap is then placed inside. There is also the reinforcement for the column attached to it

5. Formworks are placed around, and it is then filled with concrete

6. The column is also finished using the same way and then the pile cap is covered with soil

Auger

Borehole

24

Page 25: Building Construction 1: project 1

4.1 Solid Slab Raft Foundation (from site visit) Raft foundation

Raft foundation is used on the flat surface.

Upper reinforcement

Upper reinforcement

Hairpin bar

Plastic spacer

25

Page 26: Building Construction 1: project 1

4.1 Raft Foundation construction process (from site visit)

The ground is excavated 40 cm deep and then levelled

Wood is used as the formwork to hold the concrete in shape

Concrete is then poured into the formwork, levelled and then left to dry.

15 cm

40 cm

A compacted hardcore layer (Used as solid working base) and a blinding layer (Used to prevent wet concrete from running down the hardcore) is added inside

Reinforcements are added. This will give more strength to the foundation

Compacted hardcore15 cm thick

Sand blinding

Steel mesh

Steel bar

Concrete

Brace

Vertical

Wood formwork

Reinforcement

Then the soil is added to fil the gap between the foundation and the soil

40 cmLevelled ground

Ground beam

Wood formwork

26

Page 27: Building Construction 1: project 1

Original slope

4.1 Stepped Raft Foundation construction process (from site visit)

Hard core layer

Levelled groundThe slope is excavated into steps which are then levelled. This is done so as to get flat surfaces instead of a slope

The surface is then covered with compacted hardcore and a blinding layer

The reinforcements which consists of steel meshes and steel bars are added.

The wood formworks are placed and concrete is poured inside.

Blinding layer

Steel mesh

Steel bar

Wood formwork

Concrete

50 cm

27

Page 28: Building Construction 1: project 1

5.0 Superstructure

28

Page 29: Building Construction 1: project 1

SUPERSTRUCTURE

• Superstructure of a building is the portion of the structure above the foundation. It provides the necessary utility of the building with comfort, structural safety, ventilation, etc.

SUPERSTRUCTURES IN OUR SITE

• Beam

1. Simply supported beam

2. Fixed beam

3. Cantilever beam

4. Continuous beam

• Columns

• Slab

• walls

• staircase

29

Page 30: Building Construction 1: project 1

BEAM

• Beam is the horizontal member of a structure, carrying transverse loads. Beam is rectangular in cross-section. Beam carry the floor slab or the roof slab. Beam transfer all the loads including its self-weight to the columns or walls.

1. Fix the reinforcement bar of the beam

2.Fix the wooden framework for the concrete beam and pour the concrete

3.Let it dry up and remove the formwork and you have your rcc beam

CONSTRUCTION OF A RCC BEAM• The beam in the basement of

our building is attached to the foundation slab.

• For the ground floor, 1ST and 2nd floor they cast the beam with the slab since it was not possible to cast the slab later.

• The ground, 1st and 2nd floor beam rest on the various collumns on the basement, ground and 1st floor respectively.

• The 2nd floor beam is cast with the roof slab at our site.

30

Page 31: Building Construction 1: project 1

DIFFERENT KINDS OF BEAMS AT OUR SITE

SIMPLY SUPPORTED BEAM

FIXED BEAM

CONTINUOUS BEAM

CANTILIVER BEAM31

Page 32: Building Construction 1: project 1

COLUMNS• Columns is a vertical structural member. It transmits the load from ceiling/roof slab and beam, including its self-weight to

the foundation.

• Columns may be subjected to a pure compressive load. R.C.C columns are the most widely used now days.

Fix the reinforcement bars for the columns

Built the wooden form work around the reinforcement and pour concrete and leave it to dry

Remove the wooden form work after the mixture dries and there we get our column

CONSTRUCTION OF A RCC COLUMN

Section of a RCC column

32

Page 33: Building Construction 1: project 1

The columns of the basement has its reinforcements coming from the foundation

The reinforcements of the columns of the ground floor run from the columns of the basement they are smaller in dimensions compared to the columns in the basement yet have the same center.

The reinforcements of the columns of the first floor run from the columns of the ground floor, they are smaller in dimensions compared to the ground floor yet have the same center

The reinforcements of the columns of the second floor run from the columns of the first floor, they are smaller in dimensions compared to the first floor with the same center.We even see that in this floor the numbers of columns also reduce since it is the last floor and has no load of further floors

33

Page 34: Building Construction 1: project 1

5.2 Slab

Type of slab used in our site:

Two way slab (with beam)

This type of slab is supported on four sides by beams and columns. This is because the ratio of length to width is less than two. The load is carried in two directions. The reinforcement is arranged to support the slab in two directions.

Advantage:• Framing of beams with column• Versatile

Disadvantage:• Beams dropping from ceiling are visible

The formwork is assembled over the columns and is supported by scaffoldings.

More wood is added to the formwork so as to look like this. Then the reinforcement cage for the beam is placed inside the gaps

Steel meshes are inserted, this will give strength to the slab.

Concrete is then poured inside and left to dry.

Section cut

45 cm

15 cm

Construction process:

34

Page 35: Building Construction 1: project 1

5.3 WallsWall is the vertical plane of a building, it defines an enclosed space or acts as a division. Walls are made to provide shelter from weathering, safety and privacy. It can be either load bearing or non-load bearing. The types of structural walls found on the building are: building wall, partition wall, party wall, and retaining wall.Types of building materials used : Masonry bricks and Reinforced concrete.

Clay brick sand brick

R.C wall Concrete retaining wallR.C wall

Clay brick

35

Page 36: Building Construction 1: project 1

36

Page 37: Building Construction 1: project 1

Reinforced concrete wood formwork

37

Page 38: Building Construction 1: project 1

5.4 Staircase

38

Page 39: Building Construction 1: project 1

5.4 Staircase

39

Page 40: Building Construction 1: project 1

Staircase

A staircase is a construction designed to link a large vertical distance by dividing it into smaller vertical distances which is called steps. It allows easy movement between the different levels of design.

Aspect that should be considered when designing a staircase is the placement of stairs, ease to travel and most importantly the safety. Also, the design of a staircase should take proper consideration of the width, landings, handrail, guardrails, treads, rises, and nosing which are the requirements of a staircase.

Concrete staircaseConcrete staircase are often specified for their strength, durability, the protection, food resistance and sound reduction properties

Concrete Quarter landing staircaseQuarter Landing Stairs represent a variety of straight stairs, which also include a landing. But here the landing is needed to change a direction of the flight by 90 degrees and at the same time it serves as a place for rest when moving. The landing may change its position in the flight from its beginning and up to its end. Staircases of this type are more convenient and safe than straight staircases

37

Page 41: Building Construction 1: project 1

Advantages of quarter landing stairs shaped Stairs:

1. Quarter landing stairs can be more visually interesting.2. They provide a visual barrier between floors so they can add some privacy.3. Also quarter landing stairs can help somewhat with sound transmission between floors if the stairs are contained within

walls.4. Some believe they are safer than straight stairs as the central landing reduces the number of treads one could fall in a

given flight.5. The landing can provide a place to stop and rest while ascending.6. They can be located in a corner of a room if this works better for your design.

Disadvantages of quarter landing stairs shaped Stairs:1. Quarter landing stairs are a bit more difficult to build.2. A support is typically required for the landing in a quarter landing stairs. Often this is built into the surrounding wallsso it goes unnoticed. In modern dwellings however it is usually desirable to open up the space leaving the stair structure visible. In these cases the supporting structure can be visually minimized by taking advantage of the strength of steel to create slim supporting members. Through careful engineering,it is possible to eliminate the landing support all together.3. Handrails for these types of stairs require more skill and planning to construct.4. In climates where basements are used, stairs are typically stacked over each other for efficient use of space. Since basements are often used for storage, large items can be difficult to move in and out of the basement.

38

Page 42: Building Construction 1: project 1

procedure of constructing concrete staircase

step 1 : calculate the stairs dimensionmeasure the height of one floor to the other. Divide the height with 7 inches (standard measurement of rise) to get the number of steps. measure the horizontal distance the staircase will span and me sure the width of staircase from left to right.

step 2 : determine the foundation dimensionthe dimension of the staircase’s foundation are the total length of run and total width of staircase as measured in step 1

step 3 : build the formwork around the reinforcement using either plywood or framing lumber to build the form. Cut the side forms according to the tread and riser calculations.

step 4 : prepare the concreteproduce sufficient and well-mixed mortar with a portable cement mixer.

step 5 : pour the mortarstart at the bottom and pour one step at a time. make sure the mortars are spread evenly. use a spade to remove the trapped air bubbles.

step 6 : add finishing touchesuse a simple wood float to clean and smooth the surface of the mortars.

step 7 : leave and waitspray the stairs with cur in compound and cover it with burlap. after a week, remove from the lumber.

39

Page 43: Building Construction 1: project 1

Rectangle stainless steel handrails

50 x 25mm and 50 x 10mm rectangle stainless steel tube and fittings can be used to create a modern stainless steel rail which is suitable for both internal and external use.

Advantages of stainless steel handrail1. Easy to clean2. The finishing (satin or mirror) look valuable3. Not easy rusty4. Not easy contaminated5. Very strong in structure6. Stainless steel look simple but luxury7 .Stainless steel easy match to some other material such as glass and wood8. Stainless steel have more accessories to fit with9. Stainless steel is majority part fabricating onsite, instead of fabricating offsite at the factories

then go onsite to install. Therefore, the job done is more precisely.10. handrail using stainless steel material to fabricate always look better than other materials asno requirement of painting or powder coating as steel or aluminium. Fabricator can polish onsitewhen install the job. Even some balustrades need to fit or re-fabricated, then the fabricator caneasily re-polish the finishing.

1. higher cost compare to other material.2. require higher skill to weld and must have proper skill of polishing the stainless steel.3. need properly maintain when it install at outside.4. it is not easy to distinguish the material of stainless steel.

Disadvantages of stainless steel handrail

40

Page 44: Building Construction 1: project 1

6.0 Windows and doors

Hinged: side hung

Types of windows

Fixed window

Installation of windows:

The above picture shows the frame fixed onto the walls after being plastered and skim coated.

Then the aluminium window frames are fixed onto it.

Installation of doors:

The frame of the door is fitted The opening made into thewall. Then the door is fixed on This frame using a hinge.

Type of door on site

Side hung timber flush door

44

Page 45: Building Construction 1: project 1

7.0 Roofs

45

Page 46: Building Construction 1: project 1

RoofRoofing Introduction

Flat roof has a pitch of less than 5’. However, flat roof structures are suitable for shallow pitched roof (up to 25’), although the building materials must be adequately protected against slippage. The top section of the flat roof is the roof covering, known as the roof weatherproofing or waterproofing.

Layers of structural elementsFlat roofs can have various functional layers, which must be matched to each other. It is essential that the layers sequence provide adequate insulation against heat and noise. Building materials must be compatible with each other.

-under course-bonding course -leveling course -separating course -vapor barrier -thermal insulation-vapor pressure compensation course-roof waterproofing-filter course -surface protection-accessible coverings

Structural element courses according to the guidelines laid down by the Zentrolverband des Deutshen Dachdeckerhandwerks: Flat roof guidelines.

46

Page 47: Building Construction 1: project 1

Roof edging

Flat roof can be finished as projecting flat roofs at the point they meet the façade, or with an upstand. Current practice is to finish the roof with a parapet or an edge trim but we are focusing on roof edge with parapet as we can see in our site

Roof Structure: roof waterproofing, single course, vapor pressure, compensation course, thermal insulation, vapor barrier, leveling course preliminary coating, reinforced concrete slabWall structure: façade slabs, air space, thermal insulation calcium silicate mansonary

47

Page 48: Building Construction 1: project 1

Components for roof edge with parapet

48

Page 49: Building Construction 1: project 1

Flat roof is not perfectly flat , the rafters are laid at slight angle to allow the rain water to flow. Sheathing and roofing are applied to the top of the rafters

The hip roof slopes at all sides,results in an even overhang allaround the building. This roof is popular due to its low maintenance

Curved roof is known for their aesthetic appeal. A curved roof also may help to reduce resistance to wind

Most of the roofs in Malaysia are flat roof and it is slowly becoming popular compared to hip roof

Famous for its low maintenance but users think that it is too old fashioned

This kind of roof is not suitable or housing or commercial

Flat roofs are quicker to apply thus saves time and money

Hip roof takes more time to apply thus cost more money but the maintenance is low

Even more time consuming to build curved panel roof

Comparison between flat roofs and other types of roof

49

Page 50: Building Construction 1: project 1

Summary

To conclude throughout all these site visit we have definitely learnt a lot from this experience. From basic structure theories to being able to indentify construction flaws. We visited one site in Kuala Lumpur (Desa Petaling , Desa hill villa ) it had 165 unit at different construction levels we saw houses at extraction level, foundation level, basic framework level, super structures level, completion level and with the final touches. Through this project we understood how one should go about contracting a three storey house.

We learnt that to start any project we first need to do external works that is setting out boundaries surveying the land setting out earth works. The next stage is site safety and security. After all this on the basis of land survey we excavate the land for the foundation. We learnt about two different kinds of foundation at our site i.e. pile foundation and raft foundation.

After setting out the foundation we studied the placing and construction of the various superstructures i.e. the columns, beams, slabs, staircase and wall. Later followed by the construction of the roof. After this the building is checked for water proofing .

After that we set up the services and the electrical work and fill up the walls .

The stage after this is the placing and installation of the doors and windows. We studied the different kinds of windows and doors at our site. After all this we see a final wall finishing that consists of plastering followed by smoothing and leveling which is followed by painting.

After this we need to add up the final touches to the house that is the final paint coat the doors and window knobs furniture and that is how we construct or house.

507

Page 51: Building Construction 1: project 1

Reference

• Engineering intro. Rollers. http://www.engineeringintro.com/all-about-construction-equipments/rollers-types-of-roller-characteristics/

• BuildingHow. Raft foundation. http://www.buildinghow.com/en-us/Products/Books/Volume-A/The-reinforcement-II/Foundation/Raft-foundation

• King Saud University. Two way slabs.http://faculty.ksu.edu.sa/charif/Documents/Two%20way%20slabs.pdf

• External wall construction. http://www.bca.gov.sg/professionals/iquas/..%5CIquas%5Cgpgs%5CWEWall%5CWEWChpt5.pdf

• http://www.buildingscience.com/documents/digests/bsd-102-understanding-attic-ventilation

• http://constructionstudiesq1.weebly.com/uploads/1/6/4/9/16490624/1364418771.jpg

• http://www.greenspec.co.uk/images/web/refurb/timflatroof/warmtimbflatroof.png

• Tanja Brotruck, 2007 Birkhauser, Roof Construction, Publishers for Architecture, P.O. Box133,CH-4010 Basel, Switzerland.

• Barry’s introduction to building construction. Stephen Emmitt, Christopher A. Gorse. Jan 2010

• Different types of beams. http://www.slideshare.net/mbrsalman/civil-engineering-beamscolumns

• Construction of columns and beams from site

Everything else from site information

48