Brigada Eskwela 2013Advocacy Campaign

Page 3: Brigada eskwela 2013

Display of Tarpaulin in the stage two weeks before Brigada Eskwela2013

Page 4: Brigada eskwela 2013

Social Media Network Promotion

Page 5: Brigada eskwela 2013

KICK-OFFCEREMONY

Page 6: Brigada eskwela 2013

`

Page 7: Brigada eskwela 2013
Page 8: Brigada eskwela 2013

THE SCHOOL BEFORE BRIGADA ESKWELA 2013

Page 9: Brigada eskwela 2013
Page 10: Brigada eskwela 2013
Page 11: Brigada eskwela 2013
Page 12: Brigada eskwela 2013

It seems like it was just a month ago when the Annual BrigadaEskwela took place. And now again, before the start of the classes on June 3, 2013, as mandated by DepEd through Memorandum No. 70, s. 2007 known also as National Schools Maintenance Week, all schools have to prepare for the opening of the classes. So instead of enjoying the vacation, teachers along with the students and other stakeholders have come to school fuelled by the spirit of volunteerism and unity, fix whatever is there to fix, clean whatever is there to clean in the school for the beloved school clientele to be comfortable and inspired in another school year of learning.

The task was not simple, first the school officials, faculty, parents and students have to scout for other volunteer and donors of materials needed and labor support for the activity. The planning was a month ahead of the activity. Tasks were designated to faculty members; solicitation and invitation letters were printed and distributed to different stakeholders. The SSGO took part in inviting other students via social network. Some responded and gave material and cash support while others pledge for labor support. This year, there was a minimal repair jobs, but a great painting job lies ahead because, the school have to comply with the DepEd standard paint color for all public schools.

INTRODUCTION

Page 13: Brigada eskwela 2013

Brigada Eskwela was opened by a simple Kick-off ceremony: parade first and then a short program to welcome and inspire the participants. Despite the heat of the summer temperature, Tanza National High School was never disappointed, because volunteers came daily especially the 4P’s beneficiaries who spare their time to support this brigade. Every day, there were accomplishments and that was a great relief for all the school personnel to see the school getting ready for June 3.

After a week long and a few days more of preparation, the school was set ready for another school year. But surely, there’s something more, teachers have to get themselves ready to fire up and inspire another batch of students after Brigada Eskwela.

With this, the administrators, teachers, students and PTA Officers of TanzaNational High School would like to convey a heartfelt gratitude to all the volunteers on their share of sweat and effort to make the school ready for school year 2013-2014. God bless Tanza National High School. Hoping next year the spirit of volunteerism and unity will rise up again among teachers, students, parents and stakeholders for another Brigada Eskwela.

Page 14: Brigada eskwela 2013

Brigada Eskwela Form 1Physical Facilities Repair and Maintenance Needs Assessment Form

Page 15: Brigada eskwela 2013

BE Form 01 National Capital Region Division of Navotas City

TANZA NATIONAL HIGH SCHOOL School Year 2013- 2014

BRIGADA ESKWELA PHYSICAL FACILITIES REPAIR AND MAINTENANCE NEEDS ASSESSMENT FORM

(To be accomplished by the School Physical Facilities Coordinator)

Instruction: Conduct an ocular inspectionof the school physical facilities listed below, Then provide the needed information to facilitate the improvement to be done on these identified facilities. ( If needed, you may use separate forms for each classroom or school facilities)

FACILITIES CONDITION (Check One) Remarks Nature of Improvement Material Resources Manpower Needed

Satisfactory Unsatisfactory If Unsatisfactory Needed (e.g. repair, Needed ( Indicate kind and (Indicate quantity and nature of

Describe the problem repainting, replacement. etc .) quantity) labor and services needed)

• Roofs/gutters √

• Ceilings √

• Walls √ Unecessary marks/ tainted repainting 7 taro latex paint white

7liters latex paint yellow 10 painters

4 liters latex paint green 4 construction workers

6 liters latex paint red

10 pcs rollers 6"

cracked walls repair cement, sand

• Blackboards √ Lack of Blackboards (1 room) placement 2 pcs blackboard 4x8 2 Carpenters

• Chairs/ desks/tables √ some are damaged repair 1 kilo common nail 1"

1 kilo common nail 2"

1 kilo common nail 3"

and with unnecessary

repainting ( color coding )

Acrylic Color / latext Paint

marks 2 liters green 10 painters

4 liters blue 2 Volunteer carpenters

6 liters white

4 liters yellow

6 liters red

Prepared by:

Noted: Mr. William De Leon

May 1-3, 2013

Dr. Editha Gal Matias

School Physical Facilities Coordinator

Date of Inspection

Principal III

Page 16: Brigada eskwela 2013
Page 17: Brigada eskwela 2013

Nature of Improvement Manpower Needed

Needed (e.g. repair, (Indicate quantity and nature of

repainting, replacement. etc .) labor and services needed)

• Windows √ broken glass windows repair or replacement Window glass

damaged window 20 pcs 3/16" x 13 3/4" x 14 1/2" 10 construction workers

casing 40 pcs 3/16" X 13 3/4" x 21"

40 pcs 3/16" X 11 3/4" x 13 3/4"

100 pcs 1/4" x 4" x 27 1/2"

• Doors (Classrooms) √

• Comfort rooms √ untidy and with cleaning brooms, dust pans, cleaning agent 3 cleaners

vandals paint

• School grounds √ flooding when raining upgrading cement, sand 3 construction workers

• School canteen/ clinic √ broken tile flooring repair floor tiles, cement sand 3 construction workers

• School fence √

• Others, please specify

gate at the back √ unfinished fixing steel sheet, steel cutter, 4 welders

welding machine

Prepared by:

Mr. William De Leon Dr. Editha Gal Matias

School Phys ica l Faci l i ties Coordinator Date of Inspection Principal I I I

May 1-3, 2013

FACILITIESCONDITION (Check One) Remarks Material Resources

Satisfactory UnsatisfactoryIf Unsatisfactory Needed ( Indicate kind and

Describe the problem quantity)

Instruction: Conduct an ocular inspectionof the school physical facil ities l isted below, Then provide the needed information to facil itate the improvement to be done on

these identified facil ities. ( If needed, you may use separate forms for each classroom or school facil ities)

PHYSICAL FACILITIES REPAIR AND MAINTENANCE NEEDS ASSESSMENT FORM(To be accompl ished by the School Phys ica l Faci l i ties Coordinator)

National Capital Region

BRIGADA ESKWELA

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

School Year 2013 - 2014

BE Form 01 Department of Education

Republic of the Philippines

Page 18: Brigada eskwela 2013

Brigada EskwelaForm 2School Work Plan

Page 19: Brigada eskwela 2013

KRA

1. Advocacy and Marketing Meetings with parents and teachers BE Coordinator, School Head, Teachers

and student organization student organization

Inform and invite alumni through social Teachers, students computer /

network like facebook internet access

Hanging of tarpauline in significant places tarpaulin 300php

Invite parents during enrolment to join and participate Brigada Eskwela

2. Resource Mobilization Meeting with the teachers and parents

Identify and tap possible donors/ partners List of stakeholders

for materials and labor support needed

Distibute solicitation letters / letter of Letter of Invitation at least 100php

invitation BE Form 03 and 05

Prepared by: Noted:__________________________________ April 3, 2013 ___________________________Dr. Editha Gal Matias Date Prepared ASP Division Coordinator/ BE CoordinatorPrincipal III

April 2, 2013

April 2- May 17, 2013

BE Coordinator, School Head, Teachers

student organization

Enrollment Staff May 14-17, 2013

April 2, 2013

April 2- May 17, 2013

Apri 15- May 17, 2013

April 2- May 25, 2013

Instruction: List down all the specific activities that you will be undertaking in relation to the conduct Brigada Eskwela in your school and fi l l the required information.

Add another sheet if needed. Once completed submit a copy to the Adopt-A-School Program coordinator or Brigada Eskwela coordinator of your division on or before January 31.

Activities Timeline Person/s Responsible Materials Needed Budget

School Year 2013-2014

BRIGADA ESKWELASHOOL WORK PLAN

(To be accomplished by the School Head)

Republic of the Philippines

BE Form 02 Department of Education

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

Page 20: Brigada eskwela 2013

KRA3. Implementation Prepare kick off ceremony BE Coordinator Program, Tarpauline 300php

Organize working teams

Assign parents, teachers, and students as Principal, BE Coordinator, Teachers BE Task Schedule

team leaders students

Assign teachers and students stations to Principal, BE Coordinator, Teachers BE Assignments/

monitor e. g. attendance, materials etc students station

List task to be done and relay to different BE Coordinator BE Task Schedule

teams and volunteers

4. Monitoring and Evaluation Ensure that materials are available for the Material solicited

volunteers

If possible , snack drinks should be offered to Snacks/ water

volunteers

Prepare BE Form 04 BE Form 04

Conduct an inventory of all materials regularly BE Form 05

Express gratitudes and appreciation to

different working teams and volunteers

Conduct a final inspection BE Form 06

Prepared by: Noted:

__________________________________ April 3, 2013 ___________________________

Dr. Editha Gal Matias Date Prepared ASP Division Coordinator/ BE Coordinator

Principal III

May 20-25, 2013

May 13- 17,2013

May 13- 17,2013

May 20-25, 2013

May 20-25, 2013

May 13- 17,2013

Principal, BE Coordinator,

Steering committee

Team in charge of materials

Principal, BE Coordinator

Team assigned to take charge

of snacks and refreshment

School Physical Facilities Coordinator

BE Coordinator and

Person/s Responsible Materials Needed Budget May 13- 17,2013

500php daily

May 13- 17,2013

May 20-25, 2013

May 20-25, 2013

Instruction: List down all the specific activities that you will be undertaking in relation to the conduct Brigada Eskwela in your school and fi l l the required information.

TANZA NATIONAL HIGH SCHOOLSchool Year 2012-2013

BRIGADA ESKWELA

(To be accomplished by the School Head)

Add another sheet if needed. Once completed submit a copy to the Adopt-A-School Program coordinator or Brigada Eskwela coordinator of your division on or before January 31.

Activities Timeline

Division of Navotas City

SHOOL WORK PLAN

Republic of the Philippines

BE Form 02 Department of Education

National Capital Region

Page 21: Brigada eskwela 2013

KRA5. Reporting Conduct a meeting with the different committee

chairs.

Convene all the members of different committes

after the Brigada Eskwele

Colate, summarize or consolidate reports and Paper supplies, 200php

submit to the Brigada Eskwela computer, printer

Division Coordinator

Prepared by: Noted:

__________________________________ April 3, 2013 ___________________________

Dr. Editha Gal Matias Date Prepared ASP Division Coordinator/ BE Coordinator

and team leaders

BE Coordinator

Budget

SHOOL WORK PLAN

May 27- June 10, 2013

Instruction: List down all the specific activities that you will be undertaking in relation to the conduct Brigada Eskwela in your school and fi l l the required information.

Add another sheet if needed. Once completed submit a copy to the Adopt-A-School Program coordinator or Brigada Eskwela coordinator of your division on or before January 31.

Republic of the Philippines

BE Form 02 Department of Education

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

School Year 2012-2013

BRIGADA ESKWELA

May 27, 2013

May 27, 2013

(To be accomplished by the School Head)

Activities Timeline Person/s Responsible Materials NeededBE Coordinator, all chairs,

and team leaders

BE Coordinator, all chairs,

Page 22: Brigada eskwela 2013

Brigada Eskwela Form 3Request MobilizationForm

Page 23: Brigada eskwela 2013

latex paint white 7 taro

latex paint yellow 7 liters

latex paint green 4 liters

latex paint red 6 liters

enamel paint 1 gallon and other community

roller brush 15

plastic sheet 1

pvc pipes different sizes 30

plywoods 1/4 4

woods 2X2x12 5

nails 3 kilos

brooms 20

dustpans 20

window glass different sizes 190 pcs

electrical supplies assorted

blackboards 2 pcs

l iquid cleaning agent 1 liter

soap 1 kilo

GI sheet plain#14 1 pc

Prepared by: Noted:

___________________________

Mrs. Fe L. Villaluna Dr. Editha Gal Matias

Resource Mobilization Committee Chairperson Principal III

Plan of Action

Solicited

Not solicited

Solicited

Solicited provided

members

Corporartions:

Chesteel Corp

Seakid Food industries

and all other

possible donors

BE Coordinator

Send Letter

of invitation

Committee

(To be accomplished by Resource Mobilization Committee)

or partner to be tapped. Add additional sheet i f needed. The Status and Remarks columns should be updated regularly to determine progress in acquiring resources needed.

Key Person/ OrganizationMaterials Needed Quantity

Solicited

Solicited

Not solicited

Not solicited

provided

provided

provided

provided

Solicited

Solicited

Solicited

Solicited

Sangguniang Kabataan

Resource

School Year 2013-2014

Republic of the Philippines

BE Form 03 Department of Education

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

BRIGADA ESKWELARESOURCE MOBILIZATION FORM

Instruction: Us ing the completed BE Form 01: Physical facilities needs Assessment Form as bas is , summarize the resources (materia ls and manpower) needed and l i s t down the potentia l source

to be tappedStatus Remarks

Mobilization and

follow ups

Not solicited

solicited

and

Not solicited

Not solicited

and other stakeholders

Strategies/ Person

Responsible

like the city government

baranggay, NGO,

R & LT Corp,

Solicited

solicited

solicited

provided

provided

not provided

not provided

not provided

not provided

provided

provided

not provided

provided

provided

provided

provided

from R& LT Corp

Page 24: Brigada eskwela 2013

Labor Skills/ Volunteers

Needed

painters 20

construction workers/ Volunteers and parents

masons

electricians 3 Volunteers and parents

plumbers 3 Volunteers and parents

Prepared by: Noted:

___________________________

Mrs. Fe L. Villaluna Dr. Editha Gal Matias

Resource Mobilization Committee Chairperson Principal III

Strategies/

Plan of Action

Person

Responsible

Teachers, alumni and other

volunteers served as painters

letter of Invitation

and other volunteers

Provided by the Baranggay

Key Person/ OrganizationRemarks

to be tappedStatus

NGO's, govt agencies

and other stakeholders

willing to respond to the

BE Coordinator and

Resource

Brigada Eskwela

Letter of Invitation and follow ups

Mobilization

Committee

Send Brigada Eskwela

Republic of the Philippines

BE Form 03 Department of Education

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

School Year 2013-2014

BRIGADA ESKWELARESOURCE MOBILIZATION FORM

(To be accomplished by Resource Mobilization Committee)

Instruction: Us ing the completed BE Form 01: Physical facilities needs Assessment Form as bas is , summarize the resources (materia ls and manpower) needed and l i s t down the potentia l source

or partner to be tapped. Add additional sheet i f needed. The Status and Remarks columns should be updated regularly to determine progress in acquiring resources needed.

17

sweepers/ cleaners 20

Quantity

Page 25: Brigada eskwela 2013

Brigada Eskwela Form 4Daily Attendance ofVolunteers@Hard copy

Page 26: Brigada eskwela 2013
Page 27: Brigada eskwela 2013
Page 28: Brigada eskwela 2013

Brigada Eskwela Form 5Record of DonationsReceived

Page 29: Brigada eskwela 2013

DATE

RECEIVED PER UNIT

3 taro 2260

1pc 2045

Broom (native/ Baguio) 5 pcs. 17-May-13 150

5 18-May-13 15

5 19-May-13 65

1 taro 19-May-13 1830

2gallons 19-May-12 470

2gallons 20-May-12 470

5 pcs. 20-May-13 15

5pcs 200

5 pcs 50

3 taro 1830

10 50

Prepared by:

Mrs. Raquel Herrera

Committee on Documentation Chair/ Member

Noted:

DR. EDITHA GAL MATIAS

Principal III

PHP 5490.00

Paint brush big PHP 250.00

PHP 65.00

paint latex white Baranggay Tanza

Coun. R. Ginogino

Gemaree Malasan

Republic of the Philippines

BE Form 05 Department of Education

National Capital Region

Division of Navotas City

ASSUMED COST OF ITEMS

TANZA NATIONAL HIGH SCHOOL

School Year 2013-2014

PHP 6,780.00

NAME OF

DONOR

GI Sheet/ plate R&LT Corp. PHP 2,045.00

BRIGADA ESKWELARECORD OF DONATIONS RECEIVED

(To be accomplished by the Documentation Committee)

TOTAL

ITEM/S

OR MATERIALSQUANTITY

plastic Dustpan PHP 350.00

Coun. M Del Rosario PHP 750.00

Boysen paint white R&LT Corp.

PHP 75.00

1.8 mm x 4 x 8

broom stickCoun. Liz Lupisan

paint latex white Coun. C. Geronimo PHP 1,830.00

Broom( Native) Aqualife PHP1000.00

electrical socket Abelardo Cruz PHP 500.00

paint latex white PHP 940.00

PHP 940.00paint latex white

Broomstick

Coun. S. Naval

Baranggay Tanza

and cover

PHP 21015.00

Page 30: Brigada eskwela 2013

Date

Received

15-May-13 Php500.00

15-May-13 Php200.00

15-May-13 Php500.00

16-May-13 Php2,000.00

16-May-13 Php500.00

17-May-13 Php1,000.00

17-May-13 Php250.00

17-May-13 Php250.00

20-May-13 Php1,000.00

21-May-13 Php100.00

22-May-13 Php300.00

Php6,600.00

Prepared by:

Mrs. Raquel Herrera

Committee on Documentation Chair/ Member

Noted:

DR. EDITHA GAL MATIAS

Principal III

TANZA NATIONAL HIGH SCHOOL

School Year 2013-2014

BRIGADA ESKWELARECORDS OF CASH DONATION

(To be accomplished by the Documentation Committee)

NAME OF

DONOR

Rosy Palacio

Solicited by Amount

Republic of the Philippines

BE Form 05-A Department of Education

National Capital Region

Division of Navotas City

Abelardo Cruz

Romeo Hidalgo

Mayor John Rey Tiangco

Germie Sabisaje

Cong. Toby Tiangco

Cory's Store

Eddie Pineda

Greta Manuel

Estrella Laquindanum

Vangie De Roxaz

Page 31: Brigada eskwela 2013

200 May 18, 2013 Gerry Abriam

500 May 20, 2013 PTA Vpres. -Mr J. Sabisaje

2904 May 20, 2013 Gerry Abriam

50 May 20, 2013 SSGO Pres. Grace Vicente

1500 May 21, 2013 Mr. Will iam De Leon

285 May 21, 2013 Mr. Will iam De Leon

533 May 21, 2013 Mr. Will iam De Leon

50 May 21, 2013 SSGO Pres. Grace Vicente

180 May 22,2013 Gerry Abriam

700 May 22,2013 Mrs Gepanayao

150 May 22,2013 SSGO Pres. Grace Vicente

500 May 22,2013 Mang Erning

800 May 23,2012 Mrs Gepanayao

900 May 24,2012 Mrs Gepanayao

100 May 24,2012 SSGO Pres. Grace Vicente

1000 May 25,2012 Mrs Gepanayao

168 May 25,2012 SSGO Pres. Grace Vicente

500 May 25,2012 Gerry Abriam

3387 May 25,2012 PTA Vpres. -Mr J. Sabisaje

1500 May 25,2012 PTA Vpres. -Mr J. Sabisaje

15907.00

Prepared by: Noted:

MRS. THELMA L. SINGSON

Brigada Eskwela Coordinator DR. EDITHA GAL MATIAS

Labor (welding)

for steel cases (fr MOOE)

Food

Snack PM

Steel Matting/ angle bars for

computers (fr MOOE)

Snack PM

Paint Materials + transpo

School Year 2013-2014

BRIGADA ESKWELA

RECORDS OF EXPENSES

(To be accomplished by the Documentation Committee)

Nature Amount

Received by:of Expenses

Republic of the Philippines

BE Form 05 Department of Education

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

Date

Snack (AM)

Assorted Paint (Tinting Colors)

Additional Snack (POSO)

Merienda and Lunch

Merienda and Lunch

1 liter Yellow Paint

Labor for Painter

Food (POSO/PIO)

Water Facilities Repair materials

Wood

Snack (PM)

Transportation Brigada

Eskwela materials

Labor for Painter

Steel Bar

Page 32: Brigada eskwela 2013

Donations

Page 33: Brigada eskwela 2013

Donations

Page 34: Brigada eskwela 2013

Brigada Eskwela Form 6Daily Accomplishment Report

Page 35: Brigada eskwela 2013

Day 1Moving out of chairs/ clearing of bulletin board display

Page 36: Brigada eskwela 2013
Page 37: Brigada eskwela 2013

Day 1Vacating of rooms, dusting, sweeping of vacated rooms, sorting of papers

Page 38: Brigada eskwela 2013
Page 39: Brigada eskwela 2013

Day 1Sorting of chairs, removing of clutters, sweeping, clearingand cleaning of back of Teresa Bldg, by Sitio Pulo Volunteers

Page 40: Brigada eskwela 2013
Page 41: Brigada eskwela 2013

DAY 1 2 3 4 5 6 DATE:

Instructions: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day, please mark the appropriate column

Pantawid Pamilyang Pilipino Program (4P's)

Clearing ang cleaning of back of TERESA BLDG. Done by SAMASAISIP an organization of Sitio

Pulo residents

Prepared by:

Mrs, Josefina Brigino

Program Implementation Committee

Noted: Date Prepared:

__________________________________

Dr. Editha Gal Matias

Principal III

School Year 2013-2014

Republic of the Philippines

BE Form 06 Department of Education

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

(To be accomplished by the Program Implementation Committee)

Completed Started but not completed Not DoneREMARKS/ RECOMMENDATIONS

STATUSACTIVITIES

BRIGADA ESKWELADAILY ACCOMPLISHMENT REPORT

that corresponds to the status of each activity. Cite reason for non completion.

20-May-13

Ready for cleaning and dusting

Ready for repair and color coding

Cleaning of rooms, removing of cobwebs, clutters Four rooms at the second floor are partially

Sorting of chairs for repairs and color coding √

Clearing of rooms--- rooms were vacated √

to be continued the next day

by students teachers and parents of

Clearing and cleaning of walls and bulletin boards At least 4 rooms at the Teresa Bldg are cleared

and old decors

20-May-13

Page 42: Brigada eskwela 2013

Day 2Sorting, Cleaning of rooms, removing of clutters/ repair of chairs / Weeding of grounds

Page 43: Brigada eskwela 2013
Page 44: Brigada eskwela 2013
Page 45: Brigada eskwela 2013
Page 46: Brigada eskwela 2013

BE Form 06 Department of Education

DAY 1 2 3 4 5 6 DATE:

Instructions: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day, please mark the appropriate column

that corresponds to the status of each activity. Cite reason for non completion.

Prepared by:

Mrs, Josefina Brigino

Program Implementation Committee

Noted: Date Prepared:

__________________________________

Dr. Editha Gal Matias

Principal III

To be continued the next day

21-May-13

Repainting of Teresa Bldg.

Color Coding of chairs 3 sets are completed (55x 3)

Cleaning and clearing of Library √

Outside walls ground floor was started

√ √ Clutters are segregated

and old decors

Clearing and cleaning of clinic

Cleaning of rooms, removing of cobwebs, clutters √ Continuation of yesterday's task

Repairs of chairs √ Time constraint

21-May-13

ACTIVITIESSTATUS

REMARKS/ RECOMMENDATIONSCompleted Started but not completed Not Done

Weeding of grounds √ Very hot temperature, to be continued

(To be accomplished by the Program Implementation Committee)

TANZA NATIONAL HIGH SCHOOL

School Year 2013-2014

BRIGADA ESKWELA

DAILY ACCOMPLISHMENT REPORT

Republic of the Philippines

National Capital Region

Division of Navotas City

Page 47: Brigada eskwela 2013

Day 3 Continuation Repair of Chairs / weeding and of grounds/ cleaning and clearing of 2 two rooms Teresa bldg. (down)/ trimming of trees

Page 48: Brigada eskwela 2013
Page 49: Brigada eskwela 2013

Day 3 Trimming of trees/ repainting of Sandoval Bldgdown/ cleaning of library

Page 50: Brigada eskwela 2013
Page 51: Brigada eskwela 2013

Day 3 Cleaning of canteen, repainting of Sandoval Bldg./ color coding of chairs

Page 52: Brigada eskwela 2013
Page 53: Brigada eskwela 2013

BE Form 06 Department of Education

DAY 1 2 3 4 5 6 DATE:

Instructions: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day, please mark the appropriate column

that corresponds to the status of each activity. Cite reason for non completion.

Color coding of chairs

Prepared by:

Mrs, Josefina Brigino

Program Implementation Committee

Noted: Date Prepared:

__________________________________

Dr. Editha Gal Matias

Principal III

22-May-13

Cleaning of Library √ Done

Repainting of Sandoval Bldg. √ Started down stairs

√ Additional 2 Sets are completed ( 55 per set)

Clearing and cleaning of canteen √ Time constraint, to be continued

Cut down branches are ready for pick up

down

√ not yet finish because of very hot temperature

Cleaning and clearing of two rooms Teresa Bldg. √ Finished

Weeding and clearing of grounds

Trimming of trees, front of Teresa Bldg. √

School Year 2013-2014

BRIGADA ESKWELA

DAILY ACCOMPLISHMENT REPORT

(To be accomplished by the Program Implementation Committee)

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

Repairs of chairs √ Time constraint… to be continued the next day

22-May-13

ACTIVITIESSTATUS

REMARKS/ RECOMMENDATIONSCompleted Started but not completed Not Done

Republic of the Philippines

Page 54: Brigada eskwela 2013

Day 4-- color coding of

chairs (last 2 sets)/ electrical outlet repair/ replacement of fluorescent bulb/ painting of Sandoval building wall and classroom

Page 55: Brigada eskwela 2013
Page 56: Brigada eskwela 2013

Day 4—Trimming of

trees, cleaning of canteen, cleaning and repainting of window grills, stenciling of blackboards (for attendance), cleaning of coordinators’ office

Page 57: Brigada eskwela 2013
Page 58: Brigada eskwela 2013

Day4 –Clearing of grounds

Page 59: Brigada eskwela 2013
Page 60: Brigada eskwela 2013

BE Form 06 Department of Education

DAY 1 2 3 4 5 6 DATE:

Instructions: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day, please mark the appropriate column

that corresponds to the status of each activity. Cite reason for non completion.

Electrical oulet repair-- at stairway

Cleaning of coordinators room

Cleaning back of Sandoval Bldg.

Prepared by:

Mrs, Josefina Brigino

Program Implementation Committee

Noted: Date Prepared:

__________________________________

Dr. Editha Gal Matias

Principal III

23-May-13

√ to be continuedClearing of grounds

√ Done by volleyball players

Clearing and cleaning of canteen

√ to be continued

√ Windows are dusted and washed

Cleaning and repainting of window grills √ Time constraint

Trimming of trees front of sandoval Bldg. √

Repainting of Sandoval Bldg. Up and down √ Not yet finish

√ Done

Replacement of flourescent bulb √ Done

Painting of chairs ( color coding) √ Done with the last 2 sets (55/ set)

23-May-13

ACTIVITIESSTATUS

REMARKS/ RECOMMENDATIONSCompleted Started but not completed Not Done

Republic of the Philippines

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

School Year 2013-2014

BRIGADA ESKWELA

DAILY ACCOMPLISHMENT REPORT

(To be accomplished by the Program Implementation Committee)

Page 61: Brigada eskwela 2013

Day 5 Gardening/ painting of bulletinboards/ painting of window grills (with mayor john rey and councilors) / continuation of unpainted areas/ Painting in different areas

Page 62: Brigada eskwela 2013
Page 63: Brigada eskwela 2013

Day 5 Marathon Painting

Page 64: Brigada eskwela 2013
Page 65: Brigada eskwela 2013

Day 5--- Fixing of water

installation/ upgrading of pathway—entrance Sampaguita st. Side.. (cementing and repair of gate)

Page 66: Brigada eskwela 2013
Page 67: Brigada eskwela 2013

Day 5Clearing up

Page 68: Brigada eskwela 2013
Page 69: Brigada eskwela 2013

BE Form 06 Department of Education

DAY 1 2 3 4 5 6 DATE:

Instructions: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day, please mark the appropriate column

that corresponds to the status of each activity. Cite reason for non completion.

Arrangement of chairs to diff rooms

Repainting of Sandoval Bldg. Up and down

Clearing of Grounds

Cleaning of Comfort rooms

Assembling of computer steel casing`

Prepared by:

Mrs, Josefina Brigino

Program Implementation Committee

Noted: Date Prepared:

__________________________________

Dr. Editha Gal Matias

Principal III

24-May-13

√ to be continued on the other day

24-May-24

ACTIVITIESSTATUS

REMARKS/ RECOMMENDATIONSCompleted Started but not completed Not Done

√ to be continued

√ Done

√ to be continued

Painting of bulletin boards

Republic of the Philippines

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

School Year 2013-2014

BRIGADA ESKWELA

DAILY ACCOMPLISHMENT REPORT

(To be accomplished by the Program Implementation Committee)

√ Done

Repainting of window grills √

Done

Done

Weeding of grounds √ Done

Page 70: Brigada eskwela 2013

Day 6---General Clean-up Boodle Fight Lunch Time together

Page 71: Brigada eskwela 2013
Page 72: Brigada eskwela 2013
Page 73: Brigada eskwela 2013

BE Form 06 Department of Education

DAY 1 2 3 4 5 6 DATE:

Instructions: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day, please mark the appropriate column

that corresponds to the status of each activity. Cite reason for non completion.

General clean up

Prepared by:

Mr. Bartolome C. Alvez

Program Implementation Committee

Noted: Date Prepared:

__________________________________

Dr. Editha Gal Matias

Principal III

25-May-13

Lunchtime together

√ maintain cleanliness

Cleaning and clearing of School sorroundings √ maintain cleanliness

Clearing of grounds √ maintain cleanliness

25-May-13

ACTIVITIESSTATUS

REMARKS/ RECOMMENDATIONSCompleted Started but not completed Not Done

School Year 2013-2014

BRIGADA ESKWELA

DAILY ACCOMPLISHMENT REPORT

(To be accomplished by the Program Implementation Committee)

Republic of the Philippines

National Capital Region

Division of Navotas City

TANZA NATIONAL HIGH SCHOOL

Page 74: Brigada eskwela 2013

THE SCHOOL AFTER BRIGADA

ESKWELA 2013

Page 75: Brigada eskwela 2013

The classrooms

Page 76: Brigada eskwela 2013

the façade/ landing bulletin board (Sandoval bldg. side) stairway/ hallway/Blackboard attendance

Page 77: Brigada eskwela 2013

Hall way/ bulletin boards/ landing/ canteen

Page 78: Brigada eskwela 2013

The comfort room area

Page 79: Brigada eskwela 2013

Brigada EskwelaForm 7School Accomplishment Report

Page 80: Brigada eskwela 2013

DIVISION: Navotas City REGION: National Capital RegionSCHOOL: Tanza National High School School ID:

SCHOOL ADDRESS: Sampaguita cor. Amapola St., Merville Subd., Tanza, Navotas City (Please appropriate box)

Level: Type of School: Elementary Central School

High School Non-Central School (complete)

Multigrade

Primary School/ Incomplete

Integrated School

Dr. Editha Gal Matias

Abelardo Cruz

A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)

Prepared by:

_____________________________________

Committee on Documentation Chair/ Member

Noted:

DR. EDITHA GAL MATIAS

Principal III

TOTAL PHP 27,615.00

Type of Donations Source Estimated Cost

In Kinds BE Form 5 Diff. Stakeholders PHP 21,015.00

B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)

10. Others (specify)

Cash Donations BE Form 5-A Diff. Stakeholders PHP 6,600.00

8. School Grounds/ Landscaping

9. School Signs

6. Comfort Rooms

7. Leaking Rooms

5. Chair/Desks, Tables and Blackboards

4. Windows and Doors

3. Walls

2. Ceilings Repaired before

1. Roofs

Repaired Repainted Replaced

not accomplished

Others

(Brief Description)

SCHOOL HEAD: CONTACT NUMBER: 02- 2824282

What was done?

PTCA PRESIDENT: CONTACT NUMBER:

BE Form 07 BRIGADA ESKWELADEPARTMENT OF EDUCATION SCHOOL ACCOMPLISHMENT REPORT

(To be accomplished by the School Head)

Page 81: Brigada eskwela 2013

BE Form 07

DEPARTMENT OF EDUCATION

C. VOLUNTEER SERVICESName of Individuals/

Type of Volunteer Organization Day Day Day Day Day Day(Use separate sheets,

needed)1. PTCA Members

3 3 2 2 10

2. Barangay Officials

3. Municipal/ City

Government Officials 5 5

4. Provincial

Government Officials

5. NGOs/Civic

Organizations OSCA 13 13

6. Private Citizens

7 8 7 22

7. Private Companies/

Corporation

8. Other government

offices CTPMO 15 15

9. Parents

4P's 35 24 28 28 46 30 191

10. Teachers

17 15 26 15 22 8 103

11. Pupils/ Students

30 38 30 26 18 8 150

12. Others (specify)

Volleyball players 5 5

13. Prominent

Volunteers

514TOTAL

1 2 3 4 5 6

Number of Volunteers

Total

Page 82: Brigada eskwela 2013

BE Form 07

DEPARTMENT OF EDUCATION

D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED. Refer to Guide for Computing Labor Cost (Use separate sheets, if needed)

What is/ are its important

contribution to the operation

of the school or to the existing

needs of the school?

F. ISSUES AND CONCERNS (Describe briefly problems encounterd and how resolved)

Materials were insufficient. The school head used part of MOOE

G. LESSONS LEARNED/ BEST PRACTICES

Be happy while doing voluntary works. It really works

Brigada Eskwela

no significant event

happened during

514 26837.50

What happened?Who were

When?Involved

2 8 @ 50/hr 400.00

Electrical/ Electronic 2

32 245@ 37.5/ hr

8@ 50/hr 400.00

E. SIGNIFICANT EVENTS/ EXPERIENCE ( Use separate sheets, if needed)

Ordinary Labor 471

TOTAL

Others

1264 @ 12.5/ hr 15800.00

Type of Service

Masonry

Landscaping/ Gardening

Plumbing

Total Number of Total Number of

9187.50 Painting

Carpentry 7 21 @ 50/hr 1050.00

Total EstimatedVolunteers Hours Rendered Costs

Page 83: Brigada eskwela 2013

BE Form 07

DEPARTMENT OF EDUCATION

H. SUGGESTIONS TO STRENGHTEN BRIGADA ESKWELA PROJECT (include support needed from

Central, Region, and Division Office that can increase the impact of the Brigada Eskwela

Project in your school)Additional campaign tarpaulin to be posted in strategic areas should be

provided by the Division Office

I. EVIDENCES/ ATTACHMENTS

a. Photos (Photos, during and after)

b. Photocopy of all completed BE Forms (check if attached)

√ Form 01 √ Form 05

√ Form 02 √ Form 06

√ Form 03

√ Form 04

Prepared by: Date:

Mrs. Thelma L. SingsonSchool Brigada Eskwela Coordinator

Name and Designation

Submit copy of this completed form to ADOPT-A-SCHOOL PROGRAM DISTRICT COORDINATOR

or District Supervisor on or before June 15.

14-Jun-13

Page 84: Brigada eskwela 2013

Brigada Eskwela….

All is ready for another school year… inspired…motivated… united… that’s how we are in Tanza National High School….

ss

And now… after …

Page 85: Brigada eskwela 2013

Whatsoever you do … do it heartily unto the LORD

and not unto men!!!

God Bless and Thank you!!!