Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior Advisor, Market Development & Analysis, CAISO

Transcript of Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow...

Page 1: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Briefing on CAISO / PacifiCorpEnergy Imbalance Market

Presentation to WECC Unscheduled Flow Administrative Subcommittee

January 8, 2014

Jim Price, Senior Advisor, Market Development & Analysis, CAISO

Page 2: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

What is the Energy Imbalance Market?

• Leverages existing CAISO market– Starting from BAs’ forecasted load and balanced generation,

15-minute security constrained unit commitment and 5-minute security constrained economic dispatch manage deviations:

• Automatically dispatch least cost resources to solve imbalances, • Avoid congestion.

• Enhances reliability with improved situational awareness

• Captures geographical diversity of load and resources

• Potentially reduces flexible reserve requirements

• Provides easy entry/exit for EIM participation– No critical mass – each participant enters when they are ready– New participants pay their way through a front end charge based

on size, and ongoing charges based on participation.

Page 2

Page 3: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM preserves participants’ autonomy and current practices

• Balancing authorities balance and provide their own ancillary services

• Balancing authorities can trade bilaterally

• Participants retain all physical scheduling rights

BAA 1

BAA 2

BAA 3

3

Page 4: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM concept has evolved in the West

• WECC studied benefits; active through 2011

• In late 2011, Western Governors’ Association formed PUC-EIM group.– NREL studies of benefits– SPP & CAISO submitted cost estimates (March 2012)

• PacifiCorp committed Feb. 2013 – implementation agreement approved by FERC June 2013

• NV Energy announced intent in Nov. 2013 to seek approval from PUCN to join EIM

• CAISO is working with other interested parties.

Page 4

Page 5: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Page 5

Scale of EIM in the West is growing

PacifiCorp1.7 million customers 9,500 MW peak demand10,600 MW generating capacity

NV Energy1.2 million customers8,148 MW peak demand5,815 MW generating capacity

CAISO11.4 million customers50,280 MW peak demand58,246 MW generating capacity

CAISO is working with other interested parties

Page 6: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM yields significant annual benefits for PacifiCorp and CAISO

Transfer capability

Low$14.1

$2.3

$4.0

$1.1

$21.4

High$11.0

$23.0

$20.8

$10.8

$65.6

Low$22.3

$2.3

$11.0

$1.1

$36.7

High$17.7

$23.0

$51.3

$10.8

$102.8

Low$22.4

$2.3

$13.4

$1.1

$39.2

High$17.8

$23.0

$77.1

$10.8

$128.7

Low(100 MW)

Medium(400 MW)

Interregional dispatch

Intraregional dispatch

Flexibility reserves

Renewable curtailment

Total benefits

$10.5 million to PacifiCorp customers

$10.9 million to CAISO customers

High(800 MW)

6

Page 7: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM implementation and stakeholder processes are in progress

Page 7

Implementation agreement

System testing market simulation

2013 2014

FERCreview

Implementation work

Filing

FERCreview

Go live 10/1/2014

tariff language

Process Merger

Board authorization

11/8/2013

FERC acceptance

Filing 4/30/2013

Board authorization

3/20/2013

FERC acceptance 6/28/2013

CAISO EIM stakeholder process

Stakeholder meetings:4/11/2013 – Folsom6/6/2013 – Folsom7/9/2013 – Phoenix

8/20/2013 – Portland9/30/2013 – Folsom

Page 8: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Energy Imbalance Market has key definitions

EIM Entity is a balancing authority, representing one or more EIM Transmission Service Providers that make transmission available to EIM, that enables the EIM to occur in its balancing authority area (BAA). By enabling the EIM, real-time load and generation imbalances within its BAA will be settled through the EIM.

• EIM Entity determines eligibility of resource types, and required transmission service, within its BAA. (15-minute economic bids on its interties? Dynamic transfers?)

EIM Participating Resource is a resource located within the EIM Entity BAA that is eligible and elects to participate in the EIM.

• In the 5-minute market, eligible resources may include generators, participating loads & demand response, non-generator resources, and dynamic transfers.

• In the 15-minute market, imports and exports may also be eligible.

Page 8

Page 9: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM builds on FERC Order 764 for financially binding 15-minute functions in real-time market

Page 9

CAISO EIM

Day Ahead Schedule

15-Minute Unit Commitment & Energy Schedule, and Incremental AS Awards

Real-Time Dispatch

15-Minute Unit Commitment & Energy Schedule

Real-Time Dispatch

Base Schedule(basis of financial

settlement)

Page 10: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM design includes functionality to submit base schedules and review/approve resource plans

Page 10

CReal-Time Market

Application

- CMRI -EIM Balance &

Feasibility Reports

Balance & Feasibility ResultsPowerflow(balance & feasibility)

Base Schedules

Base Schedule

- SIBR -EIM Base Schedules

Rules & workflowParticipating

resources

Non-participating

resources

Base Schedules Visibility & override

EIM Entity

supply/load MW mismatch, supply and load base schedules,

network flow MW overloads

Financially Binding Base Schedules

Financially Binding Base Schedules

Loads

Financially Binding Base Schedules

Base Schedules

EIM Entity Scheduling Coordinator has full visibility of all base schedules at all times.

Page 11: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Resource sufficiency evaluation addresses real-time leaning prior to start of EIM for the trade hour • Under-scheduling incentivizes balanced base schedules

and compensates other LAPs for leaning

• BAA real-time congestion balancing account isolates the cost of infeasible base schedules to the BAA

• Flexibility requirement ensures EIM Entity can meet their requirements, based on diversity benefit, independently before start of market optimization across EIM footprint

• Benefits of reduced flexibility requirements realized

• Information provided to facilitate opportunity for EIM entity to resolve infeasible base schedules

11

Page 12: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Timeline: Submission of hourly base schedules and resource plans is interactive

Page 12

Market 1 Market 2 Market 3 Market 4

T-75: Base schedules and energy bids due (Resources)

T- 55: Updated base schedules are submitted if necessary (Resources)

T-20: E-tagging deadline (Entity SC)

T

(T = start of the hour)

T-60: Results of sufficiency test published (Balanced? Feasible transmission? Sufficient flexible ramping?)

T-45: Results of sufficiency test published

T-40: Updated base schedules are submitted if necessary (Entity SC)

T-37.5: Start of Market 1 optimization

X:00 X:30 Y:00X:15 X:45

T- 22.5: 15-minute scheduled awards published

Market Operator

EIM Market Participants

Page 13: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Timeline: Dispatch for 5-minute interval and beyond works together with 15-minute market

Page 13

5 minutes5 minutes 5 minutes

Optimize for Interval 1 and beyond (T-7.5)

Dispatch for Interval 1 (T-2.5) Optimize for Interval 2 and beyond

5 minutes 5 minutes

Interval 1 Interval 2 Interval 3

Dispatch for Interval 2Optimize for Interval 3 and beyond

Dispatch for Interval 3

X:00 T

X:05 X:10 X:15

Look-ahead horizons:•15-minute market optimization looks ahead up to 4.5 hours•5-minute market optimization looks ahead up to 65 minutes

Page 14: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Transmission service follows simple principles

• Transmission capacity is made available through EIM Entities, and communicated through dynamic e-Tag and transmission registry:– EIM Participating Resources can offer their contracted capacity– Network service within EIM Entities allows redispatch up to available

network capacity– TSPs make uncommitted capacity available

• Reciprocity: Since transfer capability will be limited, as made available through EIM Entities, initial design proposes no charge for transmission for EIM transfers between EIM Entities

• EIM stakeholder process will continue discussion of transmission rate design for EIM transfers

Page 14

Page 15: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM’s congestion management is a parallel process to the Unscheduled Flow Mitigation Plan

• EIM will manage congestion on transmission made available through EIM Entities, and notify them if available bids cannot resolve congestion.– EIM Entities then determine further steps, as done now (also

applies to CAISO management of COI).– EIM Entities may act before EIM exhausts bids.– EIM will adjust its schedules for UFMP or other manual dispatch.

• EIM will not manage constraints outside its market area (e.g., Path 36 - TOT3, from Wyoming to Colorado).– Existing processes remain available to path operators.

• Provisions are in EIM tariff (29.7(i)), and agreements with EIM participants’ transmission providers as needed.

Page 15

Page 16: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Design considers California greenhouse gas regulations

• Optimization process efficiently schedules resources at least cost, recognizing Calif. Air Resources Board obligations for energy transferred to California.

• Market dispatch enables compliance, compensates resources, and does not assign costs to non-CA load.

• EIM Participating Resources may submit a separate bid for the GHG compliance obligation costs.

• Energy generated outside California that is not imported is not subject to GHG obligation.

• GHG costs for transfers into California incorporated into price paid by CA demand.

16

Page 17: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Guiding objectives for governance drive toward a long-term independent EIM

Independent EIM structure

Page 17

Stakeholder Transition Committee• Roles: advise on EIM matters, propose independent EIM

structure• Sectors: investor owned utilities, publicly owned utilities,

generators and marketers, alternative energy providers, EIM participants, government agencies, public interest entities

• Open meetings, CAISO staff support, no compensation

Prompt & direct input

Adaptable structure

Promote successful implementation

STEP 1 STEP 2

Page 18: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

EIM Administrative Fee is cost-based(with illustrative example)

Net Annual Energy for

Load MWh

One time sign up fee

@ $.03/MWh

Assume 10% total deviation (5% load

and 5% gen) MWh

Estimated annual cost @

$.20/MWh

25,000,000 $750,000 2,500,000 $500,000

Note: Estimate does not include bid segment fee @ $0.005/bid segment or monthly SCID fee of $1,000/Month

EIM Fees

Sign-up Fee $0.03 * Net Energy for Load

Volumetric Charge $0.20/MWh

18

EIM volumetric charge is based on CAISO Grid Management Charge (GMC), for services used by EIM

Page 19: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

CAISO remains committed to a stable GMC revenue requirement

19

Page 20: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

Summary

• EIM provides reliability and financial benefits to California, EIM participants, and the West

• CAISO implementation is based on its existing platform to provide a flexible and scalable approach, at low cost, to other balancing authorities

• EIM implementation helps facilitate renewable integration

20

Page 21: Briefing on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Unscheduled Flow Administrative Subcommittee January 8, 2014 Jim Price, Senior.

More information is available

• Computer based training:“Introduction to the Energy Imbalance Market”

– http://www.caiso.com/Documents/Markets%20training/Energy%20imbalance%20market

• CAISO EIM stakeholder process– http://www.caiso.com/informed/Pages/StakeholderProcesses/EnergyImbalanceMarket.aspx

–Includes proposals, benefit assessments, tariff development, etc.

• PacifiCorp EIM information– http://www.pacificorp.com/about/eim.html

–Includes fact sheets, memorandum of understanding, link to OASIS for stakeholder process, etc.

Page 21