BOMC (Revised 28 Dec 2015)

10
Bintan Offshore Marine Centre

Transcript of BOMC (Revised 28 Dec 2015)

Page 1: BOMC (Revised 28 Dec 2015)

Bintan Offshore Marine Centre

Page 2: BOMC (Revised 28 Dec 2015)

IntroductionA common user facility for:

• Manufacturing / Fabrication

• Repairs / Modifications

• Project logistics for Oil & Energy, Mining, Dredging, and Marine industries

• Home port for our clients in the far east region

Page 3: BOMC (Revised 28 Dec 2015)

Location

Located within Bintan Industrial Estate, one hour away from Singapore

Page 4: BOMC (Revised 28 Dec 2015)

Layout of Bintan Industrial Estate

Page 5: BOMC (Revised 28 Dec 2015)

Why is Bintan Industrial Estate Chosen?

• Excellent location (close proximity to Singapore, Free Trade Zone, sheltered harbour, deep waters, international port license)

• Strong demand for a common-user deepwater facility of international standards in the region

• Increasing adverse conditions in Singapore for operating a business (lack of land availability, high cost of production, high cost of resources such as land and labour)

• Lack of alternative solutions to the region

Page 6: BOMC (Revised 28 Dec 2015)

Objective• To establish a strategic Joint Venture

between Singatac and reputable partner to build, own and operate the 24-hectare Bintan Offshore Marine Centre (BOMC)

• The land owner, Gallant Venture, an alliance partner, shall play an active role in supporting the operation to ensure the security and reliability, and offer its 4,000-hectare land bank to the users

• Active support of Singapore government agencies such as Economic Development Board (EDB), International Enterprise Singapore (IE Singapore), Spring Singapore, Jurong Town Corporation (JTC), etc.

• To development the supply chain

• Active management of the business environment

• Focus on high value products and services

Page 7: BOMC (Revised 28 Dec 2015)

Technical Details• Heavy duty wharves with 20 T/m2

general loading and 40 T/m2 to 60 T/m2 heavy loading at specific locations

• Linear wharf of up to 700 metres length with water depth of 10 metres at zero tide

• Large open staging ground of general load bearing 10 T/m2

• Access to nearby sheltered anchorage positions up to 40 metres depth at zero tide for cold-stack, warm-stack and repairs

• Heavy lifting/shifting equipment using large crawler cranes, SPMTs, and skid platforms/strand-jacks

• Large land bank from BIE for tenants to design and build factories specific to their needs

Page 8: BOMC (Revised 28 Dec 2015)

Services• Business resource centre for

advisory on regulations and local practices

• Logistics service between Singapore & BOMC with daily barging & RORO operation

• Common blasting chambers for coating & painting

• Supplies & disposal (shore power, potable water, sewage, waste oil, sludge, provisions) at wharf side & anchorage

• Sea transport (cargo boat, crew boat, harbour tugs, AHTs)

• Equipment hiring (generators, compressors, boom-lifts, forklifts, welding sets, fenders, winchers, spoolers, certified loads, etc.)

Page 9: BOMC (Revised 28 Dec 2015)

Built For…• Owners, Operators & Managers

of Offshore Rigs, Platforms, Drillships & Accommodation Units

• Offshore Equipment Manufacturers

• Offshore Service Companies

• Offshore Constructors & Heavylift Operators

• Shipyards & Engineering (EPC) Companies

• Offshore Logistics / Project Cargo Companies

• Oil Majors

Page 10: BOMC (Revised 28 Dec 2015)