PROFESSIONAL SUMMARY

I have over 25 years’ experience in the building, construction and design delivery, managing and working on a wide va-riety of project types from conceptual design through to final handover. I have been involved in the successful delivery of projects in the UK, Thailand, UAE and Iraq; In the last 6 years I have been working with Bim (building information modelling), implementing and managing the delivery and co-ordination of multidisciplinary design teams utilizing Au-todesk Revit and Navisworks. I have a broad architectural, construction knowledge and comprehensive understanding of both MEP and structural disciplines giving ability to understand the needs of all Stakeholder and their expectations in relation to Bim and project delivery.

Bim work experience in relation to RIBA work stages 2007 to 2013

• A,Appraisal

• B,DesignBrief

• UsingRevittobetterelaborateandinformdeveloperinrealizingthedesignbrief

• C,Concept

• 256CalgaryWoodsBagotArchitects

• AHighercollegeoftechnologyAbuDhabi

• TheVineyardPhaseIII,Thailand

• D,DesignDevelopment

• AlZeinaResidentialProject,AlRahaBeach,AbuDhabi• TigerWoodsHotelandGolfResort,Dubai• TheVineyardPhaseIII,Thailand

• E,TechnicalDesign

• AlZeinaResidentialProject,AlRahaBeach,AbuDhabi• TigerWoodsHotelandGolfResort,Dubai• TheVineyardPhaseIII,Thailand

• F,ProductionInformation

• AlZeinaResidentialProject,AlRahaBeach,AbuDhabi• TigerWoodsHotelandGolfResort,Dubai• TheVineyardPhaseIII,Thailand

• G,TenderDocumentation

• AlZeinaResidentialProject,AlRahaBeach,AbuDhabi• TigerWoodsHotelandGolfResort,Dubai• TheVineyardPhaseIII,Thailand

• H,TenderAction

• J,Mobilization

• AlZeinaResidentialProject,AlRahaBeach,AbuDhabi• TigerWoodsHotelandGolfResort,Dubai• TheVineyardPhaseIII,Thailand

Page 3: Bim Design Folio 06-04-2015

The L2-Pool Vila 260 SqmIs the sow house for a 24 villa development conceived to blur the boundaries between internal and external space comprised of three main volumes form the property the up-per has four double bedroom and over sales the outside kitchen , the lower has a living dinning , kitchen .shower room and utility room a separate guest suite with Balinese style outdoor bathroom completes the dwelling . The upper level facies the direction of the prevailing wind cooling the bedrooms in all but the hottest of months. The contemporary design incorporates a more traditional vernacular of Thai design having the living and cooking space under the dwelling and elevated sleeping plus a shaded terrace adjacent to the mater bedroom.

L2-Pool Villa

Page 4: Bim Design Folio 06-04-2015

A Higher college of technology The model was produced by applying a grid on a massing model introducing custom louvred system panels varying between 90 and 30 degrees of opening

Concept design 170Sqm SP2 Pool Villa Mount View Villas Thailand

Mount View Villas SP-2 VillaOne of the excepted concepts for the dwellings types on a hill side green field development.ThebriefwastokeepthevernacularoftheL2-Villabutkeptasasinglestory volume splitting the villa on by level to facilitate view over the sleep-ing area to the countryside beyond, a green roof was introduced along with operable timber shading. A battered slope to the landscape grounded the contemporary villa in its topical surroundings

Page 5: Bim Design Folio 06-04-2015

The Vineyard Phase II & III

Winner of the Thialand property awards40 villa development on a 12.2 acre green field site, introduce sustainable and lean design to the construction. Master plan, 6 different villa types, club house were de-veloped to detail design stage utilizing Autodesk Revit Architecture 2011, scheduling of materials for estimating, renderings, visualizations and daylight analysis were also produced.

Page 6: Bim Design Folio 06-04-2015

RL 150,150Level 25

RL 154,150Level 26

RL 158,150Level 27

RL 162,150Level 28

R S T

4,000

4,000

4,000

A500102

______________________________________________________

6,7009,000

3,0501,5001,5001,5001,5001,5001,5001,5001,5001,500

1,250

2,750

1,250

2,750

1,250

2,750

1,250

8

7

R S T

A50010 1

A500102

______________________________________________________

9,000 6,700

6,700

1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500

1,500

1,500

1,500

400

400

241

209

350 350

3,050

3,050

______________________________________________________

5A50010

A500113

______________________________________________________

RL 150,150Level 25

RL 154,150Level 26

RL 158,150Level 27

RL 162,150Level 28

7

850

4,000

4,000

4,000

______________________________________________________

2A50011

1,250

2,750

1,250

2,750

1,250

2,750

1,250

NOTE: LINE DENOTESTRANSITION IN GLASSTRANSITION FROM FLAT TOCONICAL GLASS

7

S

STEEL COLUMN - SIZE VARIES

EXTERNAL FACE OF FACADE

850

209

325

325

325 325

102

38

LEVELS 45, 46 & 47 ONLY19MM THICK SPRAY APPLIEDFIRE-RESISTIVE MATERIAL

316

16MM GYPSUM BOARD ON64MM METAL CHANNELS

16MM THICK INTUMESCENTSPRAY APPLIEDFIRE-RESISTIVE MATERIAL

7

S

STEEL COLUMN - SIZE VARIES

EXTERNAL FACE OF FACADE

850

350

350

350 350

209

51 51

3817

1

291

16MM GYPSUM BOARD ON64MM METAL CHANNELS

16MM THICK INTUMESCENTSPRAY APPLIEDFIRE-RESISTIVE MATERIAL

7

S

16MM GYPSUM BOARD ON64MM METAL CHANNELS

STEEL COLUMN - SIZE VARIES

16MM THICK INTUMESCENTSPRAY APPLIEDFIRE-RESISTIVE MATERIAL

850

209

241

400

400

400 400

51 51

3817

1

Rev

CopyrightWOODS BAGOT

Description Date App'd

NotesCONTRACTOR MUST VERIFY ALL DIMENSIONSON SITE BEFORE COMMENCING WORK ORPREPARING WORKSHOP DRAWINGS. DO NOTSCALE DRAWING.

Project number Drawing number

Date generated

Checked Approved

50mm on original

Drawing title

Project Revision

Status

Scale

Client

@ A0 sheet size

A collaboration between Woods Bagot & Dialog

key Plan

200 University Avenue, 7th FloorToronto, Ontario,M5H 3C6, Canada Tel: (416) -477-5832

Consultants

285 Yorkland Blvd. Toronto, Ontario M2J 1S5Tel (416) -499-8000

44 Mobile Drive, Toronto ON M4A 2P2Tel (416) -751-2520

1As indicated

C:\My Documents\440080-WB-A-1-Façade-V13-Central_lhryxi.rvt17-05-13 9:58:27 PM

TYPICAL BUILDINGMAIN FACADE

225 SIXTH

225 Sixth, Calgary, Alberta, Canada

44-00-80 A50010RD NNA

SCALE 1 : 50TYPICAL FACADE ELEVATION1

SCALE 1 : 50TYPICAL FACADE PLAN3

SCALE 1 : 50TYPICAL FACADE SECTION2

SCALETYPICAL CORNER AXO4

SCALE 1 : 10COLUMN CASING (650mm) - LEVELS 45 - 567

SCALE 1 : 10COLUMN CASING (700mm) - LEVELS 27 - 446

SCALE 1 : 10COLUMN CASING (800mm) - LEVELS 4 - 265

1 SD DRAFT ISSUE 17/05/13

225SIXTHProjectindowntownCalgary,this2.8millionsquarefeetdevelopmentbyBrookfield,includesthetalleststructureindowntownCalgaryat58storeysand247meterstalltobelocatedatthenortheastcornerofacityblock.Asecondtower of 42 storeys will be located on the northwest corner. Situated between the towers is a spectacular three-storey, 50,000-square-foot transparent glass pavilion, connecting the grade-level open space to the +15 pedestrian skywalks.

Page 7: Bim Design Folio 06-04-2015

3000 CLEAR

2250

3800 CAB HEIGHT

11350

ASSUME

150

8350 MINIMUM

8200 CLEAR

LEVEL 57

RL 276,400Plant Level 01 (Bld 1)

RL 282,400Plant Level 01(Bld 1)

RL 287,200Level 58

RL 271,050Level 55

RL 290,100LMR LEVEL 60

RL 270,150LMR LEVEL 61

RL 293,750Plant Roof (Bld 1)

L M N O P Q R S T UO P Q R S T U

RL 271,050Level 55

RL 276,150Level 56

RL 282,150Level 57

RL 294,150Parapet Level (Bld1)

RL 288,150Roof Level (Bld1)

A411012

______________________________________________________

RL 295,250Parapet Level 60

8,600

37.22 m²

HIGHRISESHAFT

37.00 m²

MACHINEROOM

37.21 m²

MACHINEROOM

49.61 m²UNALOCATED

49.61 m²

LIFTLOBBYHIGHRISE

19.34 m²

LIFTOVERRUN

130.79 m²Unallocated

3,797

1426.86 m²

PLANTROOM 1426.86 m²

PLANTROOM

CHILLER CHILLER

AIR INTAKE AIR INTAKE

STAIR ESCAPE TOCORE

37.20 m²

LIFTOVERRUN

38.07 m²

LIFTOVERRUN

2,900

4,800

6,000

5,350

ACCESSES HATCHABOVE

54.35 m²Unallocated

RL 294,450

O P Q R S T U

RL 271,050Level 55

RL 276,150Level 56

RL 282,150Level 57

RL 294,150Parapet Level (Bld1)

RL 288,150Roof Level (Bld1)

1,500

3,650

RL 279,400Level 56 landing

Rev

CopyrightWOODS BAGOT

Description Date App'd

NotesCONTRACTOR MUST VERIFY ALL DIMENSIONSON SITE BEFORE COMMENCING WORK ORPREPARING WORKSHOP DRAWINGS. DO NOTSCALE DRAWING.

Project number Drawing number

Date generated

Checked Approved

50mm on original

Drawing title

Project Revision

Status

Scale

Client

@ A0 sheet size

A collaboration between Woods Bagot & Dialog

key Plan

200 University Avenue, 7th FloorToronto, Ontario,M5H 3C6, Canada Tel: (416) -477-5832

Consultants

285 Yorkland Blvd. Toronto, Ontario M2J 1S5Tel (416) -499-8000

44 Mobile Drive, Toronto ON M4A 2P2Tel (416) -751-2520

1 : 100

C:\My Documents\Autodesk\Revit\RAC2013\440080-WB-A-1-Core-V13-Central_lhrdxt.rvt17-05-13 22:42:26

BUIGDING 1 SECTION LEVEL 55-60

225 SIXTH

225 Sixth, Calgary, Alberta, Canada

44-00-80 A44115GI Approver

A B C D E F G H J

K L M N O P Q R S T U

RL 47,150Level 01 - GROUND(B1)

RL 53,240Level 02 +15

RL 53,240Level 02 +15

RL 59,250Level 03 - Plant

RL 59,250Level 03 - Plant

RL 65,250Level 04

RL 65,250Level 04

RL 70,150Level 05

RL 70,150Level 05

RL 90,150Leve 10

RL 90,150Leve 10

RL 110,150Level 15

RL 110,150Level 15

RL 130,150Level 20

RL 130,150Level 20

RL 150,150Level 25

RL 150,150Level 25

RL 170,150Level 30

RL 170,150Level 30

RL 190,150Level 35

RL 190,150Level 35

RL 230,150Level 45

RL 250,150Level 50

RL 271,050Level 55

RL 282,150Level 57

RL 294,150Parapet Level (B1)

RL 210,150Level 40

RL 210,150Level 40

RL 47,850Level 01 - Ground (B2)

RL 288,150Level 58

RL 226,650Parapet Level (B2)RL 220,150Level 42 (B2)

6,000

6,000

6,000

5,100

4,900

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,200

3,800

4,000

4,000

4,000

4,900

6,000

6,010

6,090

6,500

6,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,200

3,800

4,000

4,000

4,000

4,900

6,000

6,010

5,390

4,000

4,000

RL 26,150Level P6

RL 26,150Level P6

3,175

2,825

3,000

3,000

3,000

3,000

3,000

A B C D E F G H J

K L M N O P Q R S T U

RL 47,150Level 01 - GROUND(B1)

RL 53,240Level 02 +15

RL 53,240Level 02 +15

RL 59,250Level 03 - Plant

RL 59,250Level 03 - Plant

RL 65,250Level 04

RL 65,250Level 04

RL 70,150Level 05

RL 70,150Level 05

RL 90,150Leve 10

RL 90,150Leve 10

RL 110,150Level 15

RL 110,150Level 15

RL 130,150Level 20

RL 130,150Level 20

RL 150,150Level 25

RL 150,150Level 25

RL 170,150Level 30

RL 170,150Level 30

RL 190,150Level 35

RL 190,150Level 35

RL 230,150Level 45

RL 250,150Level 50

RL 271,050Level 55

RL 282,150Level 57

RL 294,150Parapet Level (B1)

RL 210,150Level 40

RL 210,150Level 40

RL 47,850Level 01 - Ground (B2)

______________________________________________________

1A31011

RL 288,150Level 58

RL 226,650Parapet Level (B2)RL 220,150Level 42 (B2)

6,000

6,000

6,000

5,100

4,900

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,200

3,800

4,000

4,000

4,000

4,900

6,000

6,010

6,090

6,500

6,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,000

4,200

3,800

4,000

4,000

4,000

4,900

6,000

6,010

5,390

4,000

4,000

RL 43,975Level P1 MEZZ

RL 26,150Level P6

RL 26,150Level P6

3,175

2,825

3,000

3,000

3,000

3,000

3,000

3,875

2,825

3,000

3,000

3,000

3,000

3,000

Rev

CopyrightWOODS BAGOT

Description Date App'd

NotesCONTRACTOR MUST VERIFY ALL DIMENSIONSON SITE BEFORE COMMENCING WORK ORPREPARING WORKSHOP DRAWINGS. DO NOTSCALE DRAWING.

Project number Drawing number

Date generated

Checked Approved

50mm on original

Drawing title

Project Revision

Status

Scale

Client

@ A0 sheet size

A collaboration between Woods Bagot & Dialog

key Plan

200 University Avenue, 7th FloorToronto, Ontario,M5H 3C6, Canada Tel: (416) -477-5832

Consultants

285 Yorkland Blvd. Toronto, Ontario M2J 1S5Tel (416) -499-8000

44 Mobile Drive, Toronto ON M4A 2P2Tel (416) -751-2520

1 1 : 500

C:\My Documents\Autodesk\Revit\RAC2013\440080-WB-A-0-Master-V13-Central_lhrsos.rvt17-05-13 11:23:56 PM

SECTIONSA-A & B-B

225 SIXTH

225 Sixth, Calgary, Alberta, Canada

44-00-80 A31001DT NAA

PRELIMINARY

SCALE 1 : 500SECTION B-B2

1 SD DRAFT ISSUE 17/05/13 PV

SCALE 1 : 500SECTION A-A1

Page 8: Bim Design Folio 06-04-2015

150 COLDWATER

XX VSTACK

XX SSTACK

FUEL PIPING

(4)10FOR OIL S

2000EXHADUCTPARK12

11

10

9

8

7

6

5

4

3

2

1

24

23

22

21

20

19

18

17

16

15

14

13

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

7

6

5

4

3

13

12

11

10

9

8

RL 59,250Level 3 Plant

RL 70,150Level 5

RL 230,150Level 45

RL 234,150Level 46

RL 238,150Level 47

RL 242,150Level 48

RL 246,150Level 49

RL 250,150Level 50

RL 254,150Level 51

RL 266,150Level 54

RL 282,400Plant Level 01(Bld 1)

RL 273,500Level 55 landing

A411012

______________________________________________________

6.19 m²

FIRESTAIRNORTH

A411011

______________________________________________________ 2,950

300

10 1010

A411012

______________________________________________________

1010

280

280

280

280

280

280

280

280

280

1,255

A411011

______________________________________________________

6.19 m²

FIRESTAIRNORTH

10

A411012

______________________________________________________

280

280

280

280

280

280

280

280

280

280

280

280

280

280

280

280

2,014

190

1,414

1,412 1,537

A411011

______________________________________________________

190

1,908

6.19 m²

FIRESTAIRNORTH

10

A411012

______________________________________________________

R 1,400

280

280

280

280

280

280

280

280

280

1,700

280

280

1,230

A411011

______________________________________________________

6.19 m²

FIRESTAIRNORTH

6,010

190

10

A411012

______________________________________________________

2,140

280

280

280

280

280

2,432

RL 47,24001-Ground Level

RL 52,520Level 2 +15

RL 59,250Level 3 Plant

RL 65,250Level 4

RL 70,150Level 5

RL 74,150Level 6

RL 78,150Level 7

RL 82,150Level 8

RL 126,150Level 19

RL 130,150Level 20

RL 134,150Level 21

RL 138,150Level 22

RL 142,150Level 23 TRANSFER

RL 146,150Level 24 OVERRUN

RL 150,150Level 25 MACHINE

RL 206,150Level 39

RL 210,150Level 40 TRANSFER

RL 214,150Level 41 OVERRUN

RL 218,150Level 42 MACHINE

RL 222,150Level 43

RL 226,150Level 44

RL 258,150Level 52

RL 262,150Level 53

RL 266,150Level 54

RL 276,400Plant Level 01 (Bld 1)

RL 282,400Plant Level 01(Bld 1)

RL 271,050Level 55

RL 268,600Level 54 landing

RL 67,700Level 4 landing

A411011

______________________________________________________

RL 62,150LEVEL 3 LANDING

RL 273,500Level 55 landing

RL 55,885LEVEL 2 landing

109

RL 47,240Level 01(Bld1) -

Ground

RL 59,250Level 03 - Plant

RL 65,250Level 04

RL 70,150Level 05

RL 53,240Level 02 +15

RL 47,790Level 01(Bld2) -

Ground

RL 51,670Mechanical Plenum

910

RL 74,150Level 06

RL 82,150Level 08

RL 86,150Level 09

RL 90,150Level 10

RL 94,150Level 11

RL 98,150Level 12

RL 102,150Level 13

RL 106,150Level 14

RL 110,150Level 15

RL 114,150Level 16

RL 118,150Level 17

RL 122,150Level 18

RL 126,150Level 19

RL 130,150Level 20

RL 134,150Level 21

RL 138,150Level 22

RL 142,150Level 23

RL 146,150Level 24

RL 150,150Level 25

RL 154,150Level 26

RL 158,150Level 27

RL 162,150Level 28

RL 166,150Level 29

RL 170,150Level 30

RL 174,150Level 31

RL 178,150Level 32

RL 182,150Level 33

RL 186,150Level 34

RL 190,150Level 35

RL 194,150Level 36

RL 198,150Level 37

RL 202,150Level 38

RL 206,150Level 39

RL 210,150Level 40

RL 214,150Level 41

RL 218,150Level 42

RL 222,150Level 43

RL 226,150Level 44

RL 230,150Level 45

RL 234,150Level 46

RL 238,150Level 47

RL 242,150Level 48

RL 246,150Level 49

RL 250,150Level 50

RL 254,150Level 51

RL 258,150Level 52

RL 262,150Level 53

RL 266,150Level 54

RL 271,050Level 55

RL 276,150Level 56

RL 282,150Level 57

RL 220,150Level 42 - Plant (Bld2)

RL 226,150Roof Level(Bld2)

RL 226,650Parapet Level (Bld2)

RL 214,150Level 41 - Plant (Bld2)

RL 47,240BS 01

RL 46,840BS 02

RL 72,150LEVEL 5 landing

4,0004,0004,0002,4502,450

260

6,000

2,700

2,450 2,450 2,900 6,000

14,309

4,0004,0004,0004,0004,0004,000

4,0004,0004,0004,0003,3653,3655,280 4,0004,0004,000

Fire stair level 54 to 54 landing going 280, rise 14 risers @ 166.7Fire stair PLANTLEVELS 1 to 2going 280, rise 17risers @ 161.8

17.72 m²Unallocated

55.51 m²

LIFTLOBBYPARKADE

57.36 m²

FireEgressSouth

33.33 m²

FireEgressNorthStair

1501,750

2,700

2,4502,4500

RL 47,240Level 01(Bld1) -

Ground

RL 59,250Level 03 - Plant

RL 65,250Level 04

RL 70,150Level 05

RL 53,240Level 02 +15

RL 47,790Level 01(Bld2) -

Ground

RL 51,670Mechanical Plenum

910

RL 74,150Level 06

RL 82,150Level 08

RL 86,150Level 09

RL 90,150Level 10

RL 94,150Level 11

RL 98,150Level 12

RL 102,150Level 13

RL 106,150Level 14

RL 110,150Level 15

RL 114,150Level 16

RL 118,150Level 17

RL 122,150Level 18

RL 126,150Level 19

RL 130,150Level 20

RL 134,150Level 21

RL 138,150Level 22

RL 142,150Level 23

RL 146,150Level 24

RL 150,150Level 25

RL 154,150Level 26

RL 158,150Level 27

RL 162,150Level 28

RL 166,150Level 29

RL 170,150Level 30

RL 174,150Level 31

RL 178,150Level 32

RL 182,150Level 33

RL 186,150Level 34

RL 190,150Level 35

RL 194,150Level 36

RL 198,150Level 37

RL 202,150Level 38

RL 206,150Level 39

RL 210,150Level 40

RL 214,150Level 41

RL 218,150Level 42

RL 222,150Level 43

RL 226,150Level 44

RL 230,150Level 45

RL 234,150Level 46

RL 238,150Level 47

RL 242,150Level 48

RL 246,150Level 49

RL 250,150Level 50

RL 254,150Level 51

RL 258,150Level 52

RL 262,150Level 53

RL 266,150Level 54

RL 271,050Level 55

RL 276,150Level 56

RL 282,150Level 57

RL 220,150Level 42 - Plant (Bld2)

RL 226,150Roof Level(Bld2)

RL 226,650Parapet Level (Bld2)

RL 214,150Level 41 - Plant (Bld2)

RL 47,240BS 01

RL 46,840BS 02

Fire stair level 54to 55 Landinggoing 280, rise 17risers @ 171.9

RL 279,400Level 56 landing

600

Rev

CopyrightWOODS BAGOT

Description Date App'd

NotesCONTRACTOR MUST VERIFY ALL DIMENSIONSON SITE BEFORE COMMENCING WORK ORPREPARING WORKSHOP DRAWINGS. DO NOTSCALE DRAWING.

Project number Drawing number

Date generated

Checked Approved

50mm on original

Drawing title

Project Revision

Status

Scale

Client

@ A0 sheet size

A collaboration between Woods Bagot & Dialog

key Plan

200 University Avenue, 7th FloorToronto, Ontario,M5H 3C6, Canada Tel: (416) -477-5832

Consultants

285 Yorkland Blvd. Toronto, Ontario M2J 1S5Tel (416) -499-8000

44 Mobile Drive, Toronto ON M4A 2P2Tel (416) -751-2520

1As indicated

C:\My Documents\Autodesk\Revit\RAC2013\440080-WB-A-1-Core-V13-Central_lhrjoo.rvt17-05-13 10:12:01 PM

BUILDING 1- 2TYPICAL FIRE STAIR

225 SIXTH

225 Sixth, Calgary, Alberta, Canada

44-00-80 A41101GV NAA

SCALE 1 : 100

FIRE EGRESS STAIR SECTION CC1

SCALE 1 : 50Callout Level 53

SCALE 1 : 50Callout of Level 3 Plant7

SCALE 1 : 50Callout of Level 548

SCALE 1 : 50Callout of Level 56 PLANT5

SCALE 1 : 100

Copy of Section 222

1 SD DRAFT ISSUE 17/05/13 JO

Al Zeina Residential Project, Al Raha Beach, Abu DhabiProjectValue:US1.09billionAED4Billion2007-September2011

Page 9: Bim Design Folio 06-04-2015

Al Zeina Al Raha Beach, Abu Dhabi Aerial View

TheAlZeinaprojectlocatedAlRahaBeach,AbuDhabi,UAE,consists of a 334,000sqm gated community with a gross built up areaof747,583sqm.Thisincludes1,221luxuryvillas,townhous-es and apartments ranging from studios to 6 bedroom duplexes. In addition 7,313sqm of street front retail units and parking for 2,748vehiclesisprovided.Thedevelopmentisdividedinto7precincts,AtoGincorporating18buildings,rangingfromBasement+5andBasement+15,utilisinganRCstructurewith post tensioned slabs together with 27 slip form cores all ris-ing simultaneously.AstheArchitectsofrecord,PFConsecoundertookthedetaildesign together with all necessary statutory submissions and approvals. The majority of the design documentation was pro-ducedutilizingAutoCAD.Asamulti-disciplinarydesigncon-sultancy, over10.000 drawings were required and the need for co-ordination from the outset was imperative. There were no project standards, templates or system in place, therefore every-thing was set up from scratch including; naming conventions, files,storage,emailstructure,folderstructure,CADstandardsand protocols. These were all initiated at the outset to give all disciplines the same project information in a central depository. Supporting documentation, updated from information sent in from other drawings, offices and ourselves with the latest itera-tion of the design, was Xreferenced into sheet drawings. This overall structure now forms the project standards for PF in the Middle East.

Al Zeina Residential Project, Al Raha Beach, Abu DhabiModularizationOver 5000 modularized bathroom pods wereusedonAlZeinaprojectbutwithnumerous iterations of the same type. By simply stacking the apartment types, one on top of the other, would have reduced the number of types considerably. This simple rational is incorporated in this study.

Modulated pods are constructed from a light steel gauge stud supported on a 100mmRCbase.Amaximumtrans-portable size has set the parameters from which to start creating a simple ‘fam-ily type’. Utilising these set parameters, denoting the types and usage the draw-ings of one apartment type was popu-lated, providing a precise layout for the interiorwalltoabut.Co-ordinatingtheservice risers to create the plumbing lay-outs for the pods together with linking inserted Revit MEP drawings gave the necessary penetrations. Integrating slab depressionsintothePTslabkeptthescreed depth to the normal minimum thickness.Creatingamassingzonetorepresentthepod installation path facilitated clash de-tection with the proposed paths. Then by populating the model floor by floor has provided quantifiable information for scheduling. Further consideration has been given to the use of MEP cassette serving both vertical and horizontal ser-vices.

Page 10: Bim Design Folio 06-04-2015

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

20/1

1/20

12 2

1:55

:22

Unnamed

PA-610-PF-A-

Al Zenia

Issue Date

Author

Checker

D-06

No. Description Date

1 Iso Typical Aparment

Standard Apartment type Visualized and co-ordinated

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

UP

UP UP

DN

-

-

A1261

- -

-

-

C G H J

3

4

5

6

7

8

LBA KD F

1

2

2800 7800 2800

1A122

186 3970

3238

E-

204

304

6000

9000

9000

9000

9000

9000

9000

9000 9000 2300 6700 6700 2300 9000 9075 2725 3200

309

1552

-

---

2

D-07

340

91

94

95

96

97

98

99

100

101

124

125

126

127

128

129

130

131

132

133

134

135

184188 189

201 202

203

205 206

207

208 209

210

211

213

214217218

219

220

229230

231

232

233234

235

236

237238

239

240

241242

243

244

250251

252

253

269

270

271

272

273

274

275

329341

2

A128

4

A128

3

A128

4D-02

4850 4850

346

348

349

4850

4850

-

---

351

352

2A-130

4D-07

WT-P1

WT-B1

WT-E1

WT-E2

WT-P1

WT-B1

WT-B1

WT-E1

WT-B1

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 150

25/1

1/20

12 1

5:36

:58

Buiding A Podum Level

PA-610-PF-A-

Al Zenia

25-10-2012

JO

JO

A1051 : 1501 Podium

No. Description Date1 Revision 1 Date 1

Al ZeinaPodium Floor Plan

Page 11: Bim Design Folio 06-04-2015

Room Legend

Balcony

Core A Lift Lobby

Garbage Shoot

Hall

Kitchen PT

Lift Lobby Core B

Living /Dinning

Maids

MEP

MEP ElectricalRiser

MEP Room

Room

TV Room

Utility

W/C

W/C-PT

Living /Dinning

1Utility

2

Maids

3

TV Room

4

Maids

5

Utility

6

TV Room

7

TV Room

8

Maids

9

Utility

10

Living /Dinning

11

Living /Dinning

12

Living /Dinning

13

Living /Dinning

14

TV Room

15

Maids

16

Utility

17

TV Room

18

Kitchen PT

19

Kitchen PT

20

Kitchen PT

21

Kitchen PT

22

W/C

23

W/C

24

Kitchen PT

25

W/C-PT

26

W/C-PT

27

W/C-PT

28

Utility

29

Maids

30

Hall

31

Hall

32

Hall

33

Room

34

Hall

35

Utility

36

Maids

37

TV Room

38

TV Room

39

Utility

40

Maids

41

TV Room

42

Living /Dinning

45

Living /Dinning

46

Living /Dinning

47

Utility

48

Maids

49

W/C

51

W/C

52

W/C

55

W/C

56

W/C

58

Utility

60

Maids

61

TV Room

62

TV Room

63

Hall

64

Utility

65

Maids

66

Lift Lobby Core B

81

MEP

82

Balcony

84

Living /Dinning

96

Balcony

97

Balcony

98

Balcony

99

Balcony

100

Maids

101

TV Room

102

Utility

103

Hall

104

Living /Dinning

105

Living /Dinning

106Hall

107Kitchen PT

108

Kitchen PT

109 Hall

110

Hall

111

Garbage Shoot

112

MEP Electrical Riser

113MEP Room

114

Core A Lift Lobby

115

Kitchen PT

116

Kitchen PT

117

Kitchen PT

118

Kitchen PT

119 Hall

120

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 150

21/1

1/20

12 0

3:12

:32

Unnamed

PA-610-PF-A-

Al Zenia

Issue Date

Author

Checker

D-08

No. Description Date

Al Zeina Room Legend

UP

DN

G H J

4

5

LK

F

184

188 189 -

-

- -

-

----

2300 9000 9075 2725 3200

9000

4900 2338 1954 8052

830

2197

1062

1260

3264

192

192

3156

1470

WT-H1

Kitchen PT

21TV Room

7

Maids

5

Utility

6

W/C-PT

26

Hall

33

5000

186

5

4

WT-H2

R @22 181.8 mm

600x600mm Tile65mm

600x600mm Tile65mm

600x600mm Tile65mm

600x600mm Tile65mm

----

MEP

82

42 m²

Balcony

84

-

---

1

A128

2

D-07

2

A128

04050

18

374

-

---

384

Living / Dining

122

WT-P1

WT-P1

WT-E1

WT-E1

WT-H1

G H J

4

5

LK

197 198

1100

199200

193

15

14

195 194

339

----

----

----

Bedroom 1

85

Master Bedroom

86

Bedroom 2Room

87

Utillty Room

88

Landing

89

Walkin Wardrobe

90

En Suit MasterBedroom Pod Type

91

Famerly Room

92

4277 450 3311 2000 3311 4727

1611

1936

2717

1225

1225

4654

WT-H2

WT-H2

600x600mm Tile65mm

600x600mm Tile65mm

600x600mm Tile65mm

R @22 181.8 mm

En Suit Pod Type

93

En Suit Pod Type

94

1

A128

2

D-07

2

A128

AluminiumBalustade

WT-E1

WT-E2

WT-H1

WD-01

WD-01

WD-02 WD-02 WT-H1

-

---

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 50

25/1

1/20

12 1

7:19

:01

Aparment Type A Floor plan

PA-610-PF-A-

Al Zenia

25-10-2012

Author

Checker

A122

1 : 501 0011-Typical lower Floor Duplex Plan

1 : 502 0013-Typical upper floor duplex Plan

No. Description Date

Al Zeina Apartment Type Drawings

Page 12: Bim Design Folio 06-04-2015

Ground

0

Podium

5000

G

Basment

-5000

Level 1

9000

Level 2

13000

Level 3

17000

Level 4

21000

Level 5

25000

Level 6

29000

Level 8

32500

7D-001

8D-001

1D-001

4000

4000

4000

4000

4000

4000

5000

5000

3500

Ground

0

Podium

5000

J

Basment

-5000

Level 1

9000

Level 2

13000

Level 3

17000

Level 4

21000

Level 5

25000

K

Level 6

29000

Level 1

0

Level 2

3122

3D-001

6D-001

----

----

5D-001

4000

4000

4000

4000

4000

4000

5000

Ground

0

Podium

5000

Basment

-5000

Level 1

9000

Level 2

13000

Level 3

17000

Level 4

21000

Level 5

25000

Level 6

29000

1

Level 8

32500

4D-001

9D-001

3500

4000

4000

4000

4000

4000

4000

4885

5115

Ground

0

Podium

5000

J

Basment

-5000

Level 1

9000

Level 2

13000

Level 3

17000

Level 4

21000

Level 5

25000

Level 6

29000

Level 8

32500

----

----

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 100

25/1

1/20

12 1

7:26

:29

Lader Section's Facard

PA-610-PF-A-

Al Zenia

25-10-2012

Author

Checker

A128 1 : 1001 lader section Grid-G 1 : 1002 WS-EE

1 : 1003 FF 1 : 1004 Section 19

No. Description Date

Al Zeina Ladder Sections

Ground

0

Ground

0

Podium

5000

45

Level 1

9000

Level 2

13000

Level 3

17000

Level 4

21000

Level 5

25000

Level 6

29000

2

D-07

WT-E1

AluminiumBalustade

WT-E2

WT-E1

WT-P1

WT-B1

Brisesoleil

WT-E2

Ground

0

Podium

5000

J

Level 1

9000

Level 2

13000

Level 3

17000

Level 4

21000

L

Level 5

25000

K

Level 6

29000

4685

1235

0

2100

1150

Brisesoleil

WT-P1

WT-E1

450 x 800mm

450 x 800mm

450 x 800mm

WT-E1

450 x 800mm

450 x 800mm

450 x 800mm

WT-E1

WT-B1

JL

K

2

D-07

27253200

1058425

38

450 860 1829 860 1001

3550 4503550 ----

----

----

4 5

WT-E1

WT-H

1

WT-E2

WT-E1

WT-P1

WT-P1

JK

2

D-07

----

2725

3550 3550

1514WT-E1

WT-E1

WT-E2

WT-H

1

WT-H

2

JL

K

2

D-07

9000

1410 1386 1386 1386 1386 1386

8340

--

----

----

172

J

45

K

725

--

275

379

450

500

450375

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 75

23/1

1/20

12 0

2:05

:50

Typical Bay on grid

PA-610-PF-A-

Al Zenia

Issue Date

Author

Checker

D-07

No. Description Date

1 : 751 Callout of East1 : 752 GA-Section-BB

Al Zeina Typical Bay Details

Page 13: Bim Design Folio 06-04-2015

Al Zeina Sketch Drawings

Kitchen Pod Shower Pod W/C Pod Master Barthroom Pod

Pod Key

1 : 3003 0007-Typical upper level GA1 : 3004 0006-Typical lower level GA

Generic Model Material Takeoff

Count Family and Type Description LevelManufactu

rerMaterial:

URL

Master Bathrrom Pod: Master Bathrrom Pod154 Master Bathrrom Pod: Master Bathrrom Pod Master bathrrom Pod Level 5 Modular168 Master Bathrrom Pod: Master Bathrrom Pod Master bathrrom Pod Level 3 Modular42 Master Bathrrom Pod: Master Bathrrom Pod Master bathrrom Pod Level 1 ModularPath of Travel: 01 Start2 Path of Travel: 01 StartPath of Travel: 02 Middle5 Path of Travel: 02 MiddlePath of Travel: 03 End2 Path of Travel: 03 EndPod-Type- Kitchen: standerd pod Kitchen144 Pod-Type- Kitchen: standerd pod Kitchen kitchen Pod Sanderd Level 4240 Pod-Type- Kitchen: standerd pod Kitchen kitchen Pod Sanderd Level 2112 Pod-Type- Kitchen: standerd pod Kitchen kitchen Pod Sanderd PodiumPod-Type-Master Bathrrom: Master Bathrrom Pod17 Pod-Type-Master Bathrrom: Master Bathrrom Pod Master Bathrrom Pod Level 5 ModularPod-Type-Shower: Standerd Pod Shower294 Pod-Type-Shower: Standerd Pod Shower Level 5406 Pod-Type-Shower: Standerd Pod Shower Level 3210 Pod-Type-Shower: Standerd Pod Shower Level 1Pod-Type-W/C: standerd pod Toilet143 Pod-Type-W/C: standerd pod Toilet Level 4187 Pod-Type-W/C: standerd pod Toilet Level 222 Pod-Type-W/C: standerd pod Toilet Podium2148

1 : 3002 Callout (2) of Section 3

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 300

14/1

1/20

12 1

2:41

:06

Pod Extent Drawing

PA-610-PF-A-

Al zenia

Aldar

Issue Date

Author

Checker

A125

No. Description Date

Al Zeina Pod Extent

Page 14: Bim Design Folio 06-04-2015

-

---

-

---

3502

3175

1382738 1382

97 372813 659 1281

-

-

-

-

-

1085 1210 1085

-

-

-

776

4 7

-

--

-

-

-

---

-

---

-

-

-

-

-

-

-

-

-

--

-

-

1 : 20Level 1

1 1 : 1Framing-View-01

2

1 : 20Level 1

3 1 : 13D View Internail_7

4

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

As indicated

14/1

1/20

12 1

4:43

:41

Pod-Type Master Bathroom

PA610

Al Zeina

Aladar

Issue Date

JO

Checker

A101

No. Description Date

Al Zeina Master Bathroom Pod Type

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

UP

UP UP

DN

UP

DN

STAIR

STAI

R

66 m²

Living / Dining

46

Lift Lobby Core B

81

Hall

64

340

66 m²

Living / Dining

96

Living / Dining

45

Living / Dining

47

Utility

48

Maids

49

TV Room

63

Living / Dining

1

Living / Dining

11

Living / Dining

14

Maids

30

Utility

29

TV Room

15

TV Room

4

Maids

3

Utility

2

Maids

5

TV Room

7

W/C-PT

26

Utility

6

Hall

33Kitchen PT

21

Balcony

84

Balcony

97

Balcony

98

Balcony

100

Maids

101

TV Room

102

Utility

103

Hall

104

Living / Dining

105

Living / Dining

106Hall

107Kitchen PT

108

Kitchen PT

109

Hall

110

Hall

111

Kitchen PT

25

Living / Dining

13

TV Room

8

Maids

9

Living / Dining

96

Kitchen PT

116

Kitchen PT

117

Kitchen PT

118

Kitchen PT

119Hall

120

Kitchen PT

22

TV Room

18

Maids

16

Utility

17

Utility

10

W/C

23

W/C

24

Kitchen PT

20

Kitchen PT

19

W/C-PT

28

TV Room

62

Maids

61

Utility

60

Maids

66

Utility

65

TV Room

39

TV Room

38

Maids

37

Utility

36

Utility

40

Maids

41

Balcony

84

Maids

5

Utility

6W/C-PT

26

Kitchen PT

21

TV Room

7

Hall

33

Living / Dining

122

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

PA610

1 : 150

25/1

1/20

12 1

8:55

:31

Fire Egress Podium Level

PA-610-PF-A-

Al Zenia

25-10-2012

John Olroy

Jo

A-1301 : 1501 0049-Fire fire ratings review Podiom

EGRESS DATAFAMILY EXIT ROUTE DISTANCE

Path of Travel: 01 Start Route A 4387Path of Travel: 02 Middle Route A 11535Path of Travel: 02 Middle Route A 10461Path of Travel: 02 Middle Route A 2356Path of Travel: 02 Middle Route A 1293Path of Travel: 02 Middle Route A 7132Path of Travel: 02 Middle Route A 1408Path of Travel: 02 Middle Route A 725Path of Travel: 02 Middle Route A 5000Path of Travel: 02 Middle Route A 4126Path of Travel: 02 Middle Route A 4114Path of Travel: 02 Middle Route A 479Path of Travel: 03 End Route A 5880Route A: 13 58895Grand total: 13 58895

No. Description Date

1 : 1502 Fire Review Typical lower Floor Duplex Plan

1 : 1503 Fire Review Typical upper floor duplex Plan